Academic and Professional Attainment
B.Sc - Second Class Honours degree (1979) in Electrical and Electronic Engineering,
- The Polytechnic of the South Bank, Borough Road, London.
MIET - Member of the Institution of Engineering and Technology (formerly the IEE).
Professional Experience
TURBINE TECHNOLOGY SERVICE, Orlando, Florida, USA SEP 2008 to DATE
I & C ENGINEER
Sabiya Gas Turbine Power Plant, Kuwait
4 GE Frame 7EA gas turbines were dismantled from the USA, shipped to and installed in Kuwait. The challenging part was assessing which 60Hz equipment needed replacing or modification. This plant is the first of it's kind, ie a 60Hz machine operating in a 50Hz environment.
My responsibilities included:
* Generating BOP cable list and termination sheets. for the electrical contractor.
* Ordering cable requirement and instrument (new and replacement).
* Verifying all aspect of the Gas Compressor system and Water Treatment Plant systems.
* Assist with testing and commissioning.
PARSON BRINCKERHOFF, Newcastle upon Tyne, UK SEP 2007 to AUG 2008
TECHNICAL ADVISOR
Duara Power Plant, Baghdad, Iraq
Operational & Maintenance contract for 4 oil-fired Units 3, 4, 5 & 6. Provide technical advice and evaluation for efficient and reliable operation to sustain power generation. Lead a team of local Iraqi engineers to develop modules to provide the Ministry of Electricity personnel with On-the-job training. All DCS related issues to Unit 5 & 6 configuration changes are directly my responsibility. Preparation of Daily Report.
GULF REGION DIVISION - PCO APR 2007 to AUG 2007
LEAD DCS ENGINEER
Duara Power Plant, Baghdad, Iraq
Transferred over to GRD/PCO (Worley Parsons and Parsons Brinckerhoof Joint Venture) to complete the commissioning of Unit 6. Also responsible for control room startup operations and training of local national operation personnel. All DCS related issues, configuration changes are directly my responsibility.
WASHINGTON GROUP INTERNATIONAL AUG 2006 to APR 2007
DCS ENGINEER
Duara Power Plant, Baghdad, Iraq
This is a continuation of my services with the Daura Power Plant. As part of the O&M team I am now involved with the Unit 3, 4 and 5, provide technical advice and support. All DCS related issues, configuration changes are directly my responsibility.
BECHTEL CORPORATION MAY 2006 to JULY 2006
LEAD DCS STARTUP ENGINEER
Ratnagiri I & II Power Plant, Ratnagiri, India
Formerly know as Dabhol Power Plant. Foxboro DCS. Provide technical and commissioning support for the restart program for Block I and Block II. Involved a complete verification of the of configuration logic to the original specification, As-left condition against the last revised hard copy. The plant has been in shutdown mode since 2001 when Enron, Bechtel and GE pull off site.
BECHTEL CORPORATION MAY 2005 to APR 2006
LEAD DCS STARTUP ENGINEER
Duara Power Plant, Baghdad, Iraq
USAID Iraq Infrastructure Rehabilitation Program (IIRP). Unit 5 and Unit 6 are over 15years old each comprising of a Siemens steam turbine and a Babcock multi-fuel oil-fired boiler. The Emersion Ovation DCS is a complete new system on a single control highway network with 10 workstations and a single historian. As the Lead DCS Engineer, I am responsible for all the loop checks queries/rectifications, logic configuration and graphics modifications, functional testing, provide operational support and on-the-job training to the local nationals. Above all I am responsible for the system integrity in view of the geographical and political situation in the country.
GENERAL ELECTRIC INTERNATIONAL INC. JUL 2004 to JAN 2005
DCS/CONTROLS STARTUP TA
Arcos de la Frontera I, & II, Arcos, Spain
Foxboro IA Series DCS. 2 blocks of single shalf 209FA CCGT. To provide technical assistance and support to GE power island supplied equipment. Commissioning of the one-button auto startup and shutdown sequencer.
SHANAHAN ENGINEERING LIMITED AUG 2003 to DEC 2003
DCS STARTUP ENGINEER
Tarragona CCGT, Tarragona, Spain
ABB Bailey INFI-90 DCS. To provide additional support during the final stages of the project and clean up punchlist items on the DCS.
BECHTEL CORPORATION JUN 2003 to JUL 2003
DCS STARTUP ENGINEER
Redbud Energy Project, Oklahoma, USA.
The Redbud Energy Project is identical to the Cottonwood Energy Project listed below. To provide additional support with the knowledge and experience acquired at Cottonwood.
BECHTEL CORPORATION JUN 2002 to MAY 2003
DCS STARTUP ENGINEER
Cottonwood Energy Project, Texas, USA.
This is a 4 block of 1x1x1 units combined cycle power station. The DCS is a ABB Bailey INFI-90, four individual loop communication interconnected via three 'bridges'. The Operator Interface Stations comprises of four RTDS (real time data station) servers with four historians servers running the all new OPERATE IT ver B1.2. I was responsible for the overall commissioning for the DCS control system with interfaces to the GE Mark VI, Alstom P320, the Gas Compound, 500kV substation RTU and Allen Bradley PLC 5 and SLC500 systems to Final Completion.
BECHTEL CORPORATION JAN 2002 to APR 2002
DCS STARTUP ENGINEER
Turkey Boo Energy Project, Gebze, Adapazari, Izmir, Turkey.
This is a 5 block of 2x2x1 units, 3 sites combined cycle power station. Originally was with ABB Automation (USA) as a field service representative to troubleshoot problems with the OIS Conductor VMS consoles 'freeze' problems after upgrade of the operating system. Later transferred to Bechtel to rechecked the DCS (Bailey INFI-90) loop communication to minimise errors, set up the Sequence of Events (SOE), and commissioned all foreign device interfaces (FDI) from the DCS to GE Mark V, Alstom Advant and Allen-Bradley plc systems.
BECHTEL CORPORATION MAY 2000 to JAN 2002
LEAD DCS SUPERVISOR
Coryton Energy Project, Essex.
850MW Combined cycle power station. Responsible for the overall functionality of the DCS (Bailey INFI-90) control system and foreign device interfaces from installation, setting of the hardware, testing and commissioning of instruments, software configuration, OIS graphics and database, system description function testing, and training of client's C & I personnel.
SHANAHAN ENGINEERING LIMITED JUL 1999 to APR 2000
DCS TECHNICAL ADVISOR
(POSCO) Kwangyang Combined Cycle Power Project, South Korea.
500MW Combined cycle power station. Seconded to GE International Inc. in the capacity of DCS Technical Advisor responsible for the overall functionality of the DCS (Bailey INFI-90) control system.
STONE & WEBSTER ENGINEERING LIMITED (POWER GROUP) AUG 1997 to JUL 1999
LEAD INSTRUMENT & DCS ENGINEER
Sutton Bridge Power Station, Sutton Bridge, Lincolnshire.
790MW Combined cycle power station. Special responsibilities for coordinating engineering design at Head Office for the Balance of Plant DCS (Bailey INFI-90) with GE and Bailey Controls of the USA. Transferred to site May 1998 with responsibilities for the installation, testing and commissioning for all instrumentation and DCS control systems.
SIEMENS PLC, POWER GENERATION GROUP FEB 1996 to JUL 1997
SENIOR C & I COMMISSIONING ENGINEER
Didcot B CCGT Power Station, Didcot, Oxfordshire.
1360MW Combined cycle power station. As a member of the Siemens Site Management C & I Team I was the responsible engineer for the testing and commissioning of the water/steam cycle functional areas and it's associate Siemens TelePerm XP 680 distributed control system.
CEGELEC POWER INSTRUMENTATION and CONTROL LIMITED MAY 1995 to DEC 1995
DCS COMMISSIONING ENGINEER
Barking Reach Power Station, Barking, London.
1000MW Combined cycle power station. Part of the DCS commissioning team responsible for clearing outstanding work and additional software requirements for the station's overall control system - Bailey INFI-90 distributed control system (DCS).
HAWKER SIDDELEY POWER ENGINEERING LIMITED MAY 1994 to APR 1995
DCS COMMISSIONING ENGINEER
Peterborough Power Station, Peterborough.
350MW Combined cycle power station. Responsible for clearing all outstanding work, and to ensure correct interpretation and implementation of defects and additional software requirements for the station's overall Bailey INFI-90 distributed control system (DCS) by Bailey ICS personnel. Since September 1994 sole representative for HSPE carrying out all software configurations, graphics and database changes; and other control and instrumentation systems.
ROLLS ROYCE & ASSOCIATES, NUCLEAR MD NOV 1992 to APR 1994
CONSULTANT ELECTRICAL, C & I ENGINEER
Chemical Recovery Plant, Rolls Royce Nuclear Division, Derby.
M.O.D project. To assist RR & A in the operational, maintenance, controls and calibration of instrumentation loops; and additional design requirements, installation, testing and commissioning to the Chemical Recovery Plant mentioned below.
GEC ALSTHOM ENGINEERING SYSTEMS LTD JUL 1991 to NOV 1992
SENIOR ELECTRICAL, C & I COMMISSIONING ENGINEER
Chemical Recovery Plant, Rolls Royce Nuclear Division, Derby.
M.O.D. project. Overall responsible for testing, commissioning and functional testing of all aspect of electrical and mechanical equipment. Also to provide assistance in the electrical installation of the plant.
GEC ALSTHOM ENGINEERING SYSTEMS LTD JAN 1991 to JUN 1991
ELECTRICAL, C & I COMMISSIONING ENGINEER
Hinkley Point `B' Nuclear Power Station, Somerset.
Testing and commissioning of the liquid nitrogen plant to inject vaporised nitrogen into the reactor in an emergency shutdown. The plant has three vaporisers, four liquid nitrogen tanks connected to three nitrogen pumps. The control system consists of six GEM80 programmable logic controllers (plc) together with a mimic layout instrumentation and alarm system. The plant can either be fully manual or automatically controlled.
GEC ELECTRICAL PROJECTS LIMITED JUL 1990 to DEC 1990
ELECTRICAL, C & I COMMISSIONING ENGINEER
British Steel Limited, Lackenby, Cleveland.
Testing and commissioning of a hot strip steel beam mill comprising of d.c drives controlled with GEM Drive Micros controllers through closed loops systems using position measuring devices and MULTI GEM programmable logic controllers.
GEC ALSTHOM ENGINEERING SYSTEMS LTD JAN 1990 to JUN 1990
ELECTRICAL, C & I COMMISSIONING ENGINEER
Hinkley Point `B' Nuclear Power Station, Somerset.
In charge of testing, setting to work and commissioning the Plug Unit Handling Machines (PUHM) controlled by two GEM80 programmable logic controllers; and to provide a 24 hour maintenance coverage during reactor operations. The PUHM is used for upper half plug unit standpipes exchanges to prevent damage to the heat shields.
GEC ENERGY SYSTEMS LIMITED APR 1986 to JUL 1989
ELECTRICAL, C & I COMMISSIONING ENGINEER Jan 1989 to Jul 1989
Hinkley Point `B' Nuclear Power Station, Somerset.
*** Same as above ***
RESIDENT ENGINEER Jun 1988 to Dec 1988
Kiambere Hydro Electric Power Station, Kenya.
Responsible for the day to day technical management and supervision of sub contractors to rectify over 500 items of defects on ten (10) sections of Taking Over Certificates, to obtain client's signatures for defects agreed as cleared, and to complete additional requirements and modifications as requested by the clients.
ELECTRICAL, C & I COMMISSIONING ENGINEER Aug 1987 to May 1988
Kiambere Hydro Electric Power Station, Kenya.
Responsible for on site testing, setting to work and commissioning on the previously above mentioned project.
SENIOR ELECTRICAL, C & I ENGINEER Jun 1987 to Jul 1987
Heysham II Nuclear Power Station.
Responsible for on site testing, setting to work and commissioning of trace heating system for Reactor Instrumentation Pipework to current CEGB requirements and safety standards.
MAIN GRADE ENGINEER Apr 1986 to May 1987
Responsible for designing control and instrumentation systems for Hartlepool / Heysham I Nuclear Power Stations fuel routes to current CEGB requirements and safety standards.
MK ELECTRIC LIMITED SEP 1979 to APR 1986
MEASUREMENT and CONTROL SYSTEMS MANAGER
Responsible for specifications, designing, supervising installation, testing and commissioning of a purpose built Product Test Centre for testing all MK Electric products to the latest British and International Standards. The Test Centre combined the latest in computer control and measurement systems, ventilation and air conditioning systems incorporating energy saving management system. One of my responsibilities was to liaise with the computer consultant to achieve the required dedicated software program.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 301 to 350 of 15477)
Go to Search Parameters...
Brief Description
+30 Years experiance as Mining Engineer, and Metallurgist
Highly skilled and experienced Sr. Drilling Engineer, experience with land/offshore (including deepwater), having worked as Drlg Engineer through Drilling Engineering Supervisor for a large scale GoM deepwater developement project.
Accomplished presence in providing EHS decision support to Top Management through strategic planning for more than 16 years.
My techanical abilities in the use of Primavera and my leadership skills may be of significant interest to you. Upon review of my qualifications I think you will find that I would be a very valuable member to your company.
Around 2 decades of functional experience in Maintenance, Repair & Overhauling of Heavy Mining & Construction Equipments such as Bulldozers, Graders, Excavators, Loaders, Rig/Drill Machines, Cranes, Tower cranes, Compacters, Crushers, Batching plants, Water Pumps, Generators, Concrete Pumps/mixer
A highly experienced & qualified, possessing extensive experience in handling any size of organization in various aspects of Finance & Administration seeking a managerial position.
Total of 20 years offshore , for just over the past 4 years I have been working as night drilling supervisor in the UK North Sea. I started my career in mud logging and moved on to being a wellsite geologist,
20 years experience in the mining maintenance field. Experience covering fitter to mechanical superintendent roles.
20 years experience in design, installation, commissioning, performance testing, client personnel training to final handover of the DCS control system for epc power station projects. Excellent working relation with design, process, control, instrument, operation and vendor system personnel.
High educated Creative leader with 18 years of experience in business and human development and multi languages speaker seeking new challenges, quality experiences and more traces
I hold Master degree in palynology and currently Phd student doing research on ordovician silurian palynology
Bachelor Degree in Electrical Engineering,Masters in Management,Having Good technical knowledge about Engg.standards such as IEC, SEC-standards, IEEE, BIS.
looking for a new experience abroad
Chartered Civil Engineer with 30 plus years' experience in project control, construction, & design of major infrastructures, including reclamation, highways, water, drainage, sewage treatment works, underground and above-ground railways. Specialised in Geotechnical Engineering.
20 years experience in drilling/work
Engineering design, offshore and onshore pipelines and facilities, Report writing DBM, FEED, PEP
I graduated from university studies, firstly Drilling and Production then MASTER (Horizontal Drilling Wells). For 2 years I worked as Engineer in Cementing Department for SC Petros SA (Romania), then for 18 years I worked as Engineer and Data Analyst in Drill Stem Testing Department.
Production chemist involved in oil & gas flow assurance, development and validation analytical operating procedures, reliability plant engineering
Working as Dy. Manager (Forestry) and associated with raw material storage management, procurement and Tissue Culture.
Hands on Metallurgist with diversified experience in copper/cobalt refining as well as Sulphuric Acid Plants. I hold a B Min Sc(Met and Min processing) with over 26 yrs experience, 16 yrs at senior level
I am a diligent person and very articulate in presentation. I have a huge experience in Business Development with PETRONAS and its PSC Contractors like Exxon Mobile, Shell, Talisman and Murphy during my stint in promoting VDP status products and services. Cheers
Working in oil and gas project for more that 15 years as a QC- Piping Inspector.
Mining manager 25 yrs of experience
B.E.(Mechanical); 22 Years total Industry Experience; Served with SABIC, Reliance, SPIC & Shell;
HSEQ Manager
Supplier management, vendor development, startegic sourcing, procurement support, procurement management
More than twenty (20) years experience in the field of Engineering Construction in
Manager of milling department woodworking division, wood lamination, sawmill manager, lumber quality checker, logs scaler.
A professional, well-qualified MECHANICAL ENGINEER with extensive project management experience in the oil refining, gas, LNG/LPG, petrochemical and associated industries.
Senior Plant Inspection Engineer. Mechanical engineering graduate with 29 years of experience in Oil/ Petrochemical industries loking after Process Plant Inspection, Materials Inspection, NDT, Corrosion, Failure Analysis, Fabrication/ Welding inspection in running plants + new grass root projects.
Cost, management, financial accountant
Geologist, Heavy Oil and Oilsands. Experienced consultant, prospect generator, horizontal well planner for thermal and CHOPS applications.
dcs operator or panel operator
Process Industries, Oil & GasOffshore & Onshore Construction, Completion, Fabrication & Installation.
I have 22 Years of experience in the Detailed Design and Engineering in the areas of Plant Design & Piping for Oil & Gas, Petrochemical, Chemical and Power Projects. I am presently working as a Head Piping.
Accomplished senior manager with over 23 years experience in Financial Accounting, business development, Auditing and system designs. Special skills in Enterprise Resource Planning ( ERP) system implementation and SAP support and Training,
Extensive experience in multidisciplinary projects for the Canadian, Mexican and Venezuelan Petroleum Industry.
With 20years O&G experience, my main experience has been on major projects during design. I have experience within Operations, Construction and Commissioning and also worked on site; offshore, pipeline construction and FPSO shipyard construction. I have Australian and British Citizenship.
35+ years as Drilling Engineer, Drilling Supervisor, and Drilling Superintendent
Diploma in Polymer Tech.:Plastic And Rubber Institute London (UK), B.Sc. (Chemistry. & Physics.) Mumbai University.
Dedicated professional in Exploration and Production with 27 years experience working for the two largest major Oil Services Companies. Strong engineering background in Drilling and Completion Fluids as well as Drilling Waste Management through years of focused operational management.. Strong engi
Drafter & Designer experience in estimation and designing of transmission lines and poles. Facilitated department meetings for administration of projects. Have worked the industry for twenty-five years and have obtained a Bachelors of Science degree in, Business Administration. Ability to prioritize
Profile: A Specialist Seismic Interpreter with over 15 years experience in Oil & Gas exploration, in seismic interpretation and prospect generation. Having the ability to supervise seismic processing and acquisition activities and take on role as a Project Manager. Confident in ability to cont
Project Manager and Senior Staff Landman and Senior Right of Way Agent
Experienc in the development and management of new mines and existing operations.
Technical English instructor in oil and gas industry, rotational and residential; ESP, ESL and General English in a variety of countries; administrative/management experience as well as technical writing/translation and course writing; BA, MA and TESL cerified
Purchasing/Contract Administration career includes experience in oil & gas, subsea, petrochemicals and drilling. It also includes large and small projects and many years in chemical/refinery enviroment. My Motto: Whatever it takes to get the job done.
Over 31 years of extensive professional experience in various Highway/Road Construction projects in Bangladesh, Ethiopia, U.A.E., Yemen and Laos. Experienced in Geometric and Structural Design of road pavements. Experienced in Execution, Supervision Consultancy and Design of roads including bridges,
Working with Transocean as a Drilling Manager in Integrated services Project started for 5 Jack up rig for Bombay High field with client -ONGC. Operation commence in Jan 2007.
Drilling Engineer offshore tender rigs jackups onshore land rigs
First
1
2
3
4
5
6
[ 7 ]
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com