CONTACT INFORMATION:
View contact information...
ACADAMIC QUALIFICATION
Higher Secondary School Certificate
Welding Course Certificate from GOV'T ITI, India
Technical Qualification Apprentice Course Certificate from BHEL, India
CAWI Certificate from AWS, USA
CSWIP 3.1
ASNT-Level II (PT,MT,UT and RTFI)
EXPERENCE 25 years
Project Qualhat LNG Project, Sultanate of Oman.
Company Chiyoda Foster Wheeler and Company LLC
Muscat, Sultanate of Oman.
Period Since DEC-2003
Position QC-Inspector-(Welding)
Responsebilities To check the material certificate chemical composition and the physical properties.
Confirm the material against the material certificate.
To check the material surface condition, thickness, diameter and length.
To monitor the welding activities as per Project spec and Procedure.
Review the subcontractor Daily Weld Report.
Advise the Sub contractor fullfil the NDE reqerment
Review the subcontractor Weld data prior to test.
Project Karaghajanak International Oil. B.V. Kazakhisthan.
Company CCC- Saipem Consortium, Kazakhisthan.
Position QC-Inspector (Piping & Welding)
Period June10/2001 to August 31,2003.
Responsebilities To check the documents related to the work as follows
Drawing, welding Procedure, Welder Qualification and Project Specification.
To check the Pipe size, thickness and Surface condition prior to fit/up.
To check the fit/up as per the project specification
Monitor the welding activities as per Project Specification
Visual Inspection of weldments
To follow up the NDT & related heat treatmentas per the
Project Specification.
When the line complete and ready for test,The line is walkdown for punchlist
Secrecate the punchlist in two categary a) Rectification is mandatary prior to hydrotest b)Rectification requerd after hydro test
Prepare the line control sheet.Include all details in the line control sheet
Any change in the drawing make as built
Submit the line control sheet to the clientfor review and got the approval prior to hydrotest
Post test requerment to be checked and signed the requered form
Project Onshore Gas Development phase-2, Habshan
Company CCC- Abu dhabi
Position QC-Inspector (Welding & Piping)
Period September 1999 to December 2000
Project Yanpet Expansion
Company Austrian Energy Arabia Ltd, Jubail, K.S.A
Position Welding Supervisor
Period August 1998 to April 1999
Company Thai Rotary Engineering Limited, Thailand
Project Map-Tha-Put Oil storage, Thailand
Position Welding Inspector
Period April 1996 to June 1996
Projects Yanpet Petrochemical
Yanbu Desalination
Quatar Desalination
Dubai Desalination
Safaniya GOSP-4
IBN sina MTBE Plant
Ar Rasi Gas Project
Singapore Aramatics
Company Belleli Saudi Heavy Industries, Jubail, K.S.A
Position Welding Supervisor
Period September 1991 to September 1995
Company Bharath Heavy Electricals Limited, India
Projects 500MW and Below Power Plants all over India & Malaysiya
Position WELDER
Period January 1979 to September 1991
I have experence in various welding process and various codes like ASMEB31.1,ASMEB31.3, ASMEB31.8,ASMESec-IX,
ASMESecVIII, API-1104, API-650, API 1107 and BS5500.
Materials Carbonsteel, Low temperature carbon steel, stainless steel, Duplex stainless steel, Inconel, Incoalloy and copper nickel.
View contact information... |
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer".
Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
|