October 2000 to Present
Phillips Petroleum Offshore Company
Site Structural Engineer
Responsible to site manager for all aspects of structural/ civil engineering during fabrication of Bayu Undan DPP and CUQ integrated decks (15,000 tonnes & 11,500 tonnes resp). Principal achievements include:-
- Completed reviews of floatover and load out designs at critical stages, liaison with all contributing parties to ensure consensus agreement and commonality of design detail.
- Developed load out procedures with HHI engineers. Obtained Marine Warranty Surveyor approval. Specified analysis requirements for inclusion in procedures. Platforms were floatover installations and a critical consideration was reliability of deck support and leg mating unit tolerances.
- Key involvement in the successful completion of the decks by application of sound structural engineering principles to site queries and clash resolution. Working with designers operating PDS model to produce solutions to clashes, fit up and other problems.
- Rationalized engineering problems to produce timely and cost effective solutions, enabling area mechanical completions to proceed on schedule.
- Proactively assisted HHI with craneage and erection procedures during fabrication of decks which were built in 'blocks'. Utilizing 3D PDS model for clear understanding of erection sequences and clearance problems.
- Supervised HHI production of fabrication Weight Report, advised and assisted HHI to develop weighing procedures for the two decks.
- Participated in craneage and yard handling procedures at Samsung Heavy Industries during fabrication Bayu Undan FSO during visits to their Koje fabrication yard.
April 2000 to November 2000
Brown and Root Energy services.
Principal Engineer
- Developed procedures for installation of replacement riser on Liverpool Bay wellhead platform. Performed structural analysis of jacket with revised modelling in order to obtain Lloyd's approval.
- Lead structural engineer Shah Deniz topsides pre FEED. Collaborated with drilling consultants to produce conceptual topsides structure layout preliminary weight report and weight estimates for installation on jacket in the Caspian Sea. Concept was that the topsides would be fabricated remotely and trans-shipped via Volga- Don canal to Caspian Sea.
Between March 1999 and April 2000, took one year sabbatical.
April 1997 to March 1999
Brown and Root Energy services.
Principal Engineer
Initially in Central Projects Group responsible for performing detailed structural design assignments on Sangu Field topsides in Bangladesh and re-certification work on Amoco Northern North Sea fields. Key achievements were:
- Development of procedures for caisson replacements after corrosion failures at NW Hutton.
- Represented Halliburton Energy Services as company technical structural adviser during due diligence evaluations for proposed operation of NW Hutton platform.
- Preparation of design calculations for topsides of Sangu platform, liaison with PDMS/ Triton draftsmen for issuing of AFC drawings to fabricator.
December 1994 to April 1997
Intershore Durban South Africa (AMEC)
Lead Structural Engineer (Topsides)
Responsible for production of detail design of topsides for Chevron Cabinda Phase 2 an EPC contract Supervision and preparation of detailed engineering calculation packages for primary, secondary and tertiary structural steelwork also responsible for design of fabrication supports, temporary build structures, roll ups and response to site queries. Coordination of the interface between EPC contract (Intershore/Amec) and Transportation and Installation contractor (Saipem) as well as the load out contractor (Econofreight). Project engineering for development of green field construction yard including load out quay, foundations for jackets and topsides and main facilities for fabrication and load out of Cabinda project modules.
FEBRUARY 1989 TO SEPTEMBER 1994 - GOODWYN A PLATFORM - WESTERN AUSTRALIA.
December 1992 to September 1994
WOODSIDE OFFSHORE PETROLEUM
Lead Structural Engineer - Goodwyn A Project
Lead Structural Engineer during the final phase of the project responsible for all aspects of Jackets and Topsides Structural Engineering, including completion work, change control, structural integrity, report production, as built drawings, preparation of safety case, offshore job card production and hook up support. Topsides design representative during offshore installation.
During the pile remedial program which lasted 15 months responsible for project engineering for completions work on Modules, project engineer for combining drilling "mini modules" into two lifted modules of 1200 and 2000 tonnes.
Installation engineering on new 200 tonnes "Amenities Module" for Goodwyn.
February 1989 to December 1992:
DAVY MCKEE MCDERMOTT
Lead Structural Engineer - Goodwyn A Project
Supervision of all design aspects relating to installation of Goodwyn 'A' Platform Topsides for Woodside Petroleum including: Analysis for Load-Out, Transportation, Lifting and Skidding of the modules. Development of installation procedures and details for six modules of up to 3500 tonnes weight and the vertical flare tower 115 metres in length.
Liaison with the Client (Woodside), Marine Warranty Surveyor, Substructure Designers, Fabricators and Installation Contractors on all matters relating to installation through the conceptual, detailed design, construction and offshore installation phases.
Performed a quality audit on Hyundai's load out proposals and engineering and produced a report recommending extensive changes and improvements, seconded to Woodside's site team to resolve these issues.
January 1992 to November 1992:
Seconded to Woodside's Korean site team as Site Structural Engineer. During this period the 115m vertical flare tower was fabricated and trial fitted to its host module using a procedure developed and agreed with HHI on site. The 2500 Tonnes of load out grillages were designed, built and installed on the two transportation barges.
Responsible for scrutiny and acceptance of all HHI's construction proposals from the point of view of safety, quality and cost.
Site structural engineer until sailaway attended all load outs and supervised construction and inspection of module seafastenings with internal repair of the barges where appropriate. Seconded to Woodside from January 1992.
April 1988 to January 1989:
BUREAU VERITAS - PARIS
Project Engineer
Following on from previous position with Stena in N Africa (see below), certification of various platforms including: finalisation of Ashtart topsides, Elf Petroland L7D wellhead jacket and topside. Warranty Survey for Kakap field in Indonesia, checking of installation procedures for jacket load-out, towing, launch and upending including conducting full analysis together detailed review of topsides load out, towing and lifting proposals.
July 1987 to April 1988:
STENA OFFSHORE
Project Engineer
Re-certification for ELF AQUITAINE of 5 platforms and 3 bridges in Tunisia in 66 metres water depth. Responsible for detailed analysis of the 12 leg drilling jacket, two 4 pile utilities jackets and two flare tripods.
Production of detailed reports which were used to develop planned inspection and maintenance program for the client. Analyses were performed using the SESAM 80 suite of programs. Successfully negotiated re-certification with Bureau Veritas for four of the five platforms the fifth was completed with BV continuing on from completion of STENA's involvement.
September 1986 to May 1987:
MICOPERI
Senior Structural Engineer
Performed feasibility study for SAGA Petroleum (SNORRE) on installation of proposed 2000 tonnes sub-sea manifold and drilling template, TLP template and anchor sub-base. Concepts developed for steel or concrete TLP mating and installation. Preliminary installation engineering for the TLP sub base and drilling template.
The result was the successful development of the field using the procedures developed during this study.
June 1985 to August 1986:
KROESE OFFSHORE SERVICES LTD
Project Engineer
Responsible for management of engineering in a specialized offshore installation consultancy, providing advice to operators on installation matters. Clients and projects included:
Marathon East Brae - very large module (6,000 - 10,000 tonnes) installation and fabrication feasibility study.
British Petroleum - heavy lift vessel evaluation and large topside (integrated deck) development feasibility study.
British Gas Corporation - Morecambe Bay - installation management for a riser protection structure on CPP1
Shell UK - Lifted jacket installation and load out feasibility study (NW Dunlin).
October 1983 to June 1985:
HEEREMA ENGINEERING SERVICES (UK) LTD
Project Engineer
Senior Structural Engineer ARCO Thames development, responsible for engineering of two 160ft water depth jackets design from initial concept through detailed design, including in-place, load-out, transportation, lifting, damage and fatigue analyses. Construction engineering at Lewis Offshore, load outs and seafastening.
March 1979 to September 1983:
BRUNEI SHELL PETROLEUM
Senior Structural Engineer
Responsible for structural integrity of BSP's 200 jackets e.g. preparation of Inspection Philosophy, NDT Inspection Procedures using divers and ROV's and other data gathering exercises. Preparation of design reports and analyses of topsides and jackets.
Design checking of jackets prior to workovers and after discovery of damage. Subsequently, formulating programs of remedial works, including fabrication and installation supervision.
Developing Scopes of Work for design verifications, design of repairs and development of procedures for various repairs from simple weld repairs to complex grouted and clamped solutions.
Arising from the above programs, development of Scope of Work and conceptual design of replacement drilling platform to be installed around 19 existing oil wells (AMDP-1). Supervision of detailed design by Earl and Wright, including a period of 8 months as Resident Engineer in their offices in San Francisco.
April 1975 to February 1979:
HEEREMA ENGINEERING SERVICE - HOLLAND
Structural Engineer
Responsible for jackets, decks and foundations design for a number of structures in the North Sea including:
Two 4 pile and one 6 pile platform, 100ft. water depth (Pennzoil, Holland).
12 pile, 24 conductor drilling platform in 280ft. water depth (Elf, Tunisia).
Also, generally responsible for the structural design of facilities for jacket launching, deck lifting, module lifting, loadout and seafastening. Projects included: Phillips Ekofisk, Shell Brent B, Oxy Claymore and Beryl Alpha.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 6601 to 6650 of 15497)
Go to Search Parameters...
Brief Description
Experienced Maintenance Mechanic/Welder with twenty-five years in the maintenance field. Skilled in all types of mechanical work- hydraulic, pneumatic, conveying systems
25 years of experience in the mining industry - heavy equipment operator and driller.
Mathematics BS.C English Arabic bilingual Experience in large civil and oil-gas projects. Logistic, accounting, environmental and general supervision.
More than 26 years experience directly involved in the offshore oil and gas industry. Experienced in detailed structural engineering, fabrication and installation of offshore platform topsides including floatover installations and Floating Production Platforms.
Award winning Project Manager / Facilities Engineer.
SCADA Specialist
Over 30 years of Construction and Project management work on large scale projects all over the world. Computer literate and fluent in Castilian Spanish and English
Extensive experience in the construction of industrial buildings, Multi-story buildings, Steel Structures, Water Structures, Infrastructures Writing Progress Reports, Maintaining and Coordinating Construction work schedules Computer skills: Office 2000, Primavera 5.1, Auto CAD
Extensive background in the planning and profitable management of large scale projects/ programs in support of multi-million dollar business operations.
25 years in Oil& Gas, Power and Petro-Chemical Industries. I am a multi disciplined QA/QC professional. Safety oriented, team oriented, quality oriented, and production oriented. I have organizational and managerial capabilities. I would look forward to an opportunity to serve your interests.
BACKGROUND SUMMARY · Twenty years experience in all aspects of organizing, managing and producing domestic and foreign conferences, trades shows and special events. · Fifteen years experience in the travel industry associated with the airline, corporate travel and agency environments
ELECT. ENGGR WITH 21YRS+ CONSTRUCTION SUPERVISION EXP.PG DIP IN CONST MANGMT AND MSPROJECT PI PPM. INVOLVED IN PROJ MANAGMT CONSULTACY FOR ELECTRICL/PLNNG COORD/QUALITY ASSURANCE COORD AND HSE MANAGEMENT.
Eleven years of experience in design, development, testing and implementation of Application Software.
Functional summary Twelve years of experience in emergency medicine and international projects. Five years experience as a health and safety advisor on major oil and gas projects. Computer literate, excellent supervisory skills, creative thinker. Russian language ability.
22 years in oil field industry. Drilling and completion supervisor
I am looking for a full time work, anywhere
Twenty-five years experience in the construction/consulting sector.
BS in civil engineering and MS in structural engineering. Have worked as a civil/structural design engineer for 14 years in petrochemical plants design and construction. Skilled with MS office, Staad-Pro & Risa3d. Familiar with AutoCAD. Contract only.
Senior Networking Engineer
My previous experience has been working offshore for Dubai Natural Gas Company for over 20 years. During this time I was promoted to Platform Chief after working as a Process Technician and Shift Supervisor.
My strength is in rig management and in particular jack-up rigs in the international market. In excess of twenty years diversified experience in execution and management of drilling and workover operations worldwide onshore and offshore operations.
Experienced project logistics consultant available to assist with decommissioning and movement of all equipment / project cargoes
I have a total of 20 years in heavy construction Safety
MBA with comprehensive experience in oil and gas industry; strong skills in project management and business development; good communicator and outstanding interpersonal and leadership skills; Canadian citizenship
I am a Commissioning \ Construction \ Hook Up Manager with 27 years experience in the Oil, Gas and Power Industries.
I'm a USN Veteran Electrician with a solid background of electronics. I'm a self starter, and I have been working for myself on/off during the last year as a contract labor electrician. At this time I'm working for myself doing electrical jobs for Coastal Drilling in Corpus Christi, Texas.
OIL AND GAS SUPER/CONST 30 EXP US AND INTERNATIONAL
A Technical personnel willing to relocate and learn and be involved in a new working environment. Can perform PC and LAN troubleshooting, installation, maintenance and configuration.
Mature Canadian seeking work on major civil projects. Available Immediately.
Operation rig manager for drilling rigs onshore and offshore.
Construction Management: Site; Project; and Senior. 30 years experience broad managerial, technical, administrative, and commercial experience. Extensive experience in fabrication of Structural, Plate, Tanks & Pressure Vessels. Sales/Marketing U.S. and Internationally
Senior directional driller
Experienced electrician looking for full time employment.
Working in siemes power generation having 11 year exp.
A Professional Engineer with more than 27 years oil & gas experience. P. Eng Status current
Broad experience in mid-stream and upstream oil and gas production and facilities. B.S. double major Petroleum and Chemical Engineering. M.S. Environmental Engineering
Piping Design using CadWorx, Smart plant Review. Construction General Foreman
Offers Design and Engineering expertise accrued in Designing Mineral Beneficiation Plants and systems during Basic and Detailed Process Engineering in Bateman and hands on experience in operation, maintenance & monitoring of Iron ore beneficiation process and equipments in SAIL.
Talented and accomplished Management professional with strong background in logistics, materials management, and business development. International expertise in coordinating materials and logistics operations, including shipping, imports/exports, duty/customs functions, procurement.
I have worked in the Oil and Gas / Petrochemical industry for the past twelve years. I have extensive knowledge of both offshore and onshore risk reduction methods in upstream and downstream processes
a geologist with experience in gold deposits and can work as either an exploration geologist or production mine geologist
More than 7 years seismic acquisition, processing, Interpretation and reservoir Geophysics experiences with several major seismic companies and seismic processing contractor company.
Skilled administratrator managing very large teams of engineers, blue collars, and white collars
Possess Degree in Engineering and more than 10 years of Professional Experience in Project Planning and Controls through various project phases such as Front End Design, Detail Design, Procurement, Manufacturing and Construction for various Oil & Gas, Petrochemicals & Chemical projects.
I am a Petrophycisist with 8 years of experience
Nebosh certified HSE professonal,with ability toimplement occupational health and safey management system,effective verbal and written communication ability and site HSEplan implementaion.
Education Qualification
Petroleum Engineer with 2+ years of field experience in drilling & workover
Site Leader, Supervisor DCS (Distributed Control Systems), GE Gas turbine and Compressor, Vibration Monitoring System, Metering, Process Control Systems, Control Valves.
BE MECHANICAL ENGINEERING,ME THERMAL ENGINEERING.
First
Prev
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
[ 133 ]
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com