* Aker Kvaerner: Senior / Lead Process Engineer - June 2006 to March 2008 (Brisbane, QLD, Australia)

a) BP Bulwer Refinery – Hydrogen Compression Project (Aug 2007 – Present)
Worked as a Senior Process Engineer supervising a team of 3 other engineers in charge of the Relief System / Relief Valves and major Control valves related to the installation of a new Hydrogen Compressor package at the BP Bulwer Refinery. Reviewed relief scenarios, compiled and checked calculations, sized relief valves and control valves and prepared datasheets.

b) BP Kwinana Refinery – G10 Diesel Capability Project (June 2007 – Aug 2007)
As a Senior Process Engineer conducted study work for the BP Kwinana Refinery to evaluate options for upgrading the existing Hydrofiner Units to meet the new G10 Diesel Sulphur specification. Used HYSYS along with TASC, ACOL, and HTRI for equipment rating to assist in evaluating design options.

c) BP Bulwer Refinery – Relief Study – Capacity Verification of Overpressure Protection Devices (July 2006 – May 2007)
Senior Process Engineer for the relief study work related to the Residue Cracking Unit / Vapor Recovery Unit / Merox Sulfur Removal Unit and Lead Process Engineer for the relief study work related to the Amine Treating Units and Sulphur Recovery Units for the

* WorleyParsons: Senior / Lead Process Engineer – January 2006 to June 2006 (Melbourne, VIC, Australia)

a) Midwest BD - Biodiesel Production Facility / Select Phase (February 2006 to April 2006)
Positioned as the Lead Process Engineer I assisted the engineering team in developing the site layout, sizing equipment (tanks, pumps, utility packages), and completing the Basis of Design Document related to a proposed Biodiesel production facility.

b) Origin Energy – Bas Gas LPG Recovery Facility / Low Temperature Review (January 2006 – February 2006)
Positioned as a Senior Process Engineer I performed steady state and dynamic evaluations using HYSYS to evaluate low temperature concerns within an LPG Recovery Facility. Compiled calculations & reviewed calculations compiled by others.

* WorleyParsons MEG: Lead Process Engineer – August 2005 to December 2005 (Calgary, AB, Canada)

MEG Energy – Worked as an Area Lead in charge of the BFW and Steam Generation systems for the FEED and partial Detailed Engineering phases of a 30,000 bpd SAGD (Steam Assisted Gravity Drainage) Oil Sands facility. Prepared Process Flow Diagrams (PFDs) and Piping and Instrumentation Diagrams (P&IDs), performed equipment sizing calculations (pumps, tanks, heat exchangers, control valves, PSVs), compiled calculation documentation, and assembled equipment data sheets.

* Acres Parsons E&C: Intermediate Process Engineer - February 2004 to July 2005

a) Petro Canada Mackay River – Extended Study Work (April 2005 - Present)
Involved in study efforts to evaluate the impact of design options on the overall Capital and Operating cost estimates for the proposed Commercial Facility. Assumed a lead role for the work involving steam co-injection with various solvents (diluent / butane) and assisted in the work related to the following: evaluating varying plant capacities; the impact of modifying the SOR (steam to oil ratio); utilizing a fractionator for enhanced diluent recovery; using eductors for steam re-injection at the wellpads.

b) Petro Canada Mackay River / Meadow Creek - SAGD Conceptual Engineering Study (Oct 2004 – March 2005)
Utilized HYSYS to simulate the complete 40,000 bpd SAGD (Steam Assisted Gravity Drainage) Oil Sands facility. Compiled the related Heat and Material Balances and assisted in the development of the PFDs and the Design Basis Memorandum (DBM) document. Sized vessels, pumps, and tanks and used ACX and STX to size Air Coolers and Shell and Tube Heat Exchangers. Completed equipment data sheets and wrote technical memorandum documents.

c) ConocoPhilips Surmont SAGD Phase 1 - SAGD Detailed Engineering Work (Feb 2004 - Sept 2004)
Carried out equipment sizing, package specification, line sizing, PSV sizing, and design calculations related to the production treating train for a commercial Oil Sands facility focusing on the Vapor Recovery Unit (VRU) and Slop Oil Treating systems. Created PFDs and P&IDs. Participated in HAZOP review meetings with the client, operations personnel and vendors.

* Bantrel: Intermediate Process Engineer - Sept 2003 to Feb 2004

EnCana Foster Creek SAGD Phase 2 - Performed Value Engineering Studies related to the Conceptual Engineering work in an attempt to optimize the design and lower the capital costs prior to proceeding with the Detailed Engineering work.

* Japan Canada Oil Sands (JACOS): Intermediate Process Engineer - June 2002 to Sept 2003

SAGD Commercial Facility - Oil Sands Thermal Recovery
Involved in the conceptual design of a SAGD Commercial Facility for Japan Canada Oil Sand. Simulated the complete process using HYSYS, conducted process studies, optimized heat recovery / heat integration within the plant, prepared PFDs and P&IDs, compiled heat and material balances, sized related equipment (exchangers, tanks, pumps, vessels, compressors, etc), evaluated capital and operating costs, assisted with the compilation of the commercial cost estimate, and participated in HAZOP reviews. I also carried out tasks related to upgrading the existing Pilot Facility.

* Alberta Energy Company (AEC): Intermediate Process Engineer - February 2001 to May 2002

a) SAGD Commercial Facility - Oil Sands Thermal Recovery (August 2001 - May 2002)
Process Engineer in charge of the preliminary Design and Optimization of the second phase of a large scale commercial SAGD project (FEED). Extensively utilized HYSYS to perform process optimization and feasibility studies and evaluate heat recovery and heat integration options. Conducted Front End Engineering Design (FEED) work; prepared PFDs, P&IDs, and heat and material balances; completed equipment cost estimates and economic evaluations; assisted in the compilation of the Design Basis Memorandum (DBM), Basic Engineering Data and the Equipment Specifications. Evaluated surplus equipment (pumps, vessels, tanks) and performed hydraulics calculations.

b) VAPEX Pilot Facility Design - Enhanced Heavy Oil Recovery (Feb 2001 - August 2001)
For this project I worked along side the Reservoir Specialist in the development of a Pilot Facility that would pioneer the VAPEX (VAPor EXtraction) heavy oil recovery process. This process employed the injection of a chemical solvent into the reservoir to interact with / dilute the Bitumen and result in a free flowing product which could be extracted. I modeled the complete process on HYSYS and was involved in interviewing potential engineering companies to oversee the detailed engineering and construction work. Performed site visits and coordinated the pilot work with field operations.

* Alberta Energy Company: Intermediate Process Engineer - May 2000 to February 2001

Heavy Oil Battery Upgrades / Zero Emissions
Involved in the expansion of a heavy oil battery which included the implementation of the new Zero Emissions environmental policy (collection of all produced vapors) and involved the addition of sour gas treating and gas compression equipment. Simulated the process using HYSYS, evaluated capital and operated costs, sized equipment (exchangers, tanks, pumps, vessels, compressors, etc), performed hydraulics evaluations, prepared PFDs and P&IDs, and participated in HAZOP reviews.

* Macdonald Engineering Group: Process / Mechanical / Project Engineer - Nov 1995 to March 2000

a) Suncor Energy Incorporated - SAGD Commercial Facility - Oil Sands Thermal Recovery (June 1998 – Mar 2000)
Functioned as an Intermediate Process Engineer for the Front End Design of the Firebag Phase I Commercial SAGD facility. Simulated the complete process and performed design and feasibility studies using HYSYS, STX, and ACX. Optimized heat recovery and heat integration. Prepared PFDs, P&IDs, and heat and material balances. Studied the option of steam generation with power co-generation. Specified equipment and assisted in the compilation of the project cost estimate. Compiled all related design notes, process calculations and study reports.

b) Gulf Canada Heavy Oil - Satellite & Battery Design (Oct 1997 - June 1998)
Employed as a Mechanical / Process Engineer to configure the piping gathering system for a multi-well / multi-satellite system and aid in the design of the Battery (storage) facility. Configured the layout for the well flowlines and group satellite lines. Analyzed the flowline and gathering system hydraulics (single / multiphase) using Pipeflo. Performed process analysis and optimization relating to condensate recovery using Hysim. Specified and evaluated pumps, tanks, heat exchangers, utility systems, and flare systems. Prepared and issued RFQ's (requests for quotation) and PO's (purchase orders).

c) Unocal Canada - Water Injection Facility / Gas Well Gathering System (Aug 1996 - Oct 1997)
Husky Oil - LACT Metering Skid Addition / Gas Well Tie-ins (Nov 1995 - Aug 1996)
For these two projects I was the designated Project Engineer. I outlined the project schedule, specified and purchased all equipment, monitored all related project costs, prepared the required permit applications, developed PFDs and P&IDs, performed hydraulics analysis, system optimization and production forecasting.

EDUCATION
1993 M. Sc., Mechanical Engineering - Heat Transfer and Fluid Dynamics - Numerical / Experimental - University of Saskatchewan, Saskatoon, Saskatchewan, Canada

1990 B. Eng., Mechanical Engineering - Graduated with Great Distinction (Highest Honors Possible) - University of Saskatchewan, Saskatoon, Saskatchewan, Canada

Additional Courses
1999 ISO 9000 - Internal Quality System Auditor Training Course
1998 Natural Gas Processing Technology (Graduate Level - Dept. of Chemical Engineering - University of Calgary)

TECHNICAL SKILLS
Computer Skills: MS Project; Word; Excel; Outlook; Access; PowerPoint, AutoCAD, Programming in VisualBasic

Process Analysis / Hydraulics: Extensive Knowledge of HYSYS Steady State, HYSYS Dynamics, STX, ACX, Pipeflo, Wellflo, Heat Integration & Optimization

ADDITIONAL EXPERIENCE (details available upon request)
1. Graduate Student – Heat Transfer and Fluid Dynamics in Porous Media (Numerical / Experimental) - University of Saskatchewan, Saskatoon, SK, Canada (Sept 1990 - Nov 1993)

2. Heat Transfer Engineer - Heat Transfer and Fluid Dynamics associated with Multiphase Flow - Canadian Space Agency, Saskatoon, SK, Canada (Sept 1990 - Nov 1991 part-time)

3. Microgravity Research Engineer – Microgravity Platform / Experimental Design & Testing - Canadian Space Agency, Saskatoon, SK, Canada (Sept 1989 - May 1991 part-time)

4. Aerodynamics Research Assistant - Wind Tunnel Vehicle Aerodynamic Research - Vehicle Research Division, University of Saskatchewan, Saskatoon, SK, Canada (May 1989 - Sept 1989)

SCHOLARSHIPS AND AWARDS
1990-92 NSERC Graduate Student Research Award ($30,000 Can)
1989 NSERC Undergraduate Student Research Award ($1500 Can)
1989,88,87 University of Saskatchewan Undergraduate Scholarships ($1200 Can Each)

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1851 to 1900 of 15507)Go to Search Parameters...
Brief Description
Experienced Project Manager and proficient with AutoCAD, MS Word, MS Project, MS Excel, MS Powerpoint. Familiar and follow industry standards of the FDA, USDA, PHARMACEUTICAL and OSHA requirements. Experienced with real-time PMP methods.
Heavy equipment operator
Mechanical Fitter (Foreman) Maintenance Department. - 25 years experience
TURRET PRESS AMADA EXPERT,ARIES,COMA,VELLA,PEGA,VIPROS,2510
39 years experience running both surface & mineral titles & preparing reports
Assistant Driller - Main activities and responsibilities on the rig DRILLMEC HH - 220
Material Handling Operation (Coal Handling System; Ash Handling System; Limestone System; Gypsum Area; Waste Handling Area; Fuel Oil System and Heavy Equipment), hard worker with 14 years hand on experiences in Power Plan Operation, commissioning, trouble shooting and root cause analysis.
I have been responsible for all aspects of mineral and royalty acquisitions that there are. I am also an experienced permit agent and familiar with most aspects of two and three-d seismic permitting. Negotiated damage settlements.
Construction management/estimating/field supervision
I am a motivated individual with a high degree of HSE knowledge and operations integrity & commitment, I have operations & maintenance experience working in the oil, gas & chemical industry (without an OSHA recordable incident)
I am currently employed within local goverment as a Roads Inspector. I have been employed in this position for nearly 5 years. I worked my way up from a maintenance road worker and have many years of skills and expertise in this field.
Versed in plant operations and turnaround codination. Seeking short term contract assignment.
Project Engineer & System engineer along with detail design experience and product development expertise gained from 20+ years working for NASA.
skilled tradesman. Mobile/Tower crane operator, Heavy duty equipment mechanic, Rigger, Inspector, Apprentice Millwright
An extensive career having an experienced blend of commercial and construction credentials in the engineering/infrastructure field including civil and mechanical engineering works involving co-ordination of consultants, contractors & public utilities, managing deadlines and optimising costs
A professional with 24 years of multi-functional & multi-ethnic/culture experience in Technical and Project Management areas. Experienced in handling multi projects, excellent communication skills & man management capabilities, team building, business road mapping, problem solving abilities
I am a Mechanical Engineer with work experience basically in Oil & Gas and Refining Project Management, Gas Compression Plant Maintenance, and Process Safety Management. Currently I live in Venezuela and planning to relocate to the United States. I have dual citizenship and fluent in both languages.
25 years of professional experience in the Front-end and Detailed Design and Engineering, Projects Engineering, PMC, Factory & Site Acceptance Testing, Supervision of Installation, Testing and Commissioning of state-of-art DCS, SCADA, Safety Shutdown and F&G Systems and field instrumentation
TQM facilitator & instructor /Lead teams to resolve to improve process/ 4 yrs offshore Maintenance Supervisor /2yrs manager offshores field/ 4yrs CMSM coordinator/6 yrs contol management stocks
Masters degree management. 20+ years commercial/ heavy industrial construction. Carpenter based w/15 years management
Field Acquisition QC. Over 20 Years experience in Land Seismic. 3D Design by OMNI and MESA. Field processing of 2D/3D land seismic data (MicroMax,ProMax, VISTA, APEX) . Creating and verification of SPS files. Static correction.
Environmental Compliance Manager Results-driven, Certified Professional Geologist with extensive leadership, knowledge and experience in ensuring environmental compliance.
Working as In charge OIL/GAS LABORATORY TESTING OF LPG/C2C3/NAPHTHA/OIL ETC. PROCUREMENT/CALIBRATION/MAINTENANCE OF EQUIPMENTS
Worldwide experience in planning, managing, designing and implementing a wide range of water resources and water supply projects.
French Engineer with international and overseas experience Contract Management, General Management In the field of Water Treatment.
OBJECTIVE: Add value by leading people and projects, solving problems, bringing order from chaos, turning dysfunction into productivity, in a petroleum exploration or development geology management position.
Management consultant/ environmental scientist specializing in NEPA, RCRA, CWA, CAA, environmental assessments and fraud investigations.
Contracts Experience in Construction, Management and Administration (EPC), Materials Manager (PMC), Materials Control, Procurement & Expeditor; Fluent in English, conversational in French, Russian. Seeking to continue professional career effectively utilizing my skills and gained experience
More than(18) years in piping design & construction. Specialize in stress analysis of piping system using Caesar 11. Worked in oil refineries, onshore & offshore, gas plant & petrochemicals e.g. Saudi Aramco & Saudi Basic Petrochemicals ,Petromin Shell & Jeddah Oil Refinery.
Registered Mechanical engineer with heavy industrial, mining and USACE construction experience.
Specializaion in environmental management in an iron ore industry backerup by the experience in a regulatory body dealing with environment conservation.
-University – Master Science in Geology evaluated by York University. -Environmental adviser course – 1000 hours;
Senior Mechanical Engineer (M.Sc.) having experience as plant manager and project manager, specialist in mining, safety glass, manufacturing plant and brewery investments.
Detailed Structural designs of Civil Structures(RCC structure i,e, Buildings(Multi-storied office and residential), Roads, Bridges, Culverts, earth retaining structures(Retaining wall), Dams, rig & machinery foundations for Gas exploration
More than 10 years’ experience of coordinating structural projects and technology development acquired during the Master and Doctor Courses in Civil Engineering and working as engineer in construction, aerospace, offshore and onshore industries.
Working as a Rotating Machinery Specialist with specialist skills in machinery Componenant condition monitoring by Vibration analysis (CSI RBMware), Bentley Nevada DM2000 online monitoring system, Adre data collection, Flexware performance analysis, Ultrasonic check by CSI sonic scan and etc.
Strengths: detail oriented, flexible, analytical, self-motivated, adaptable, effective communicator and articulate. Experience in field drilling operation management with extensive hands-on technical, administrative and managerial functions; drilling technology assessment & implementation, contract
Presently working as Site Supt. Civil here in the construction of Khursaniyah Gas Plant (KGP) at NGL Trains 1 & 2, Saudi Arabia with Saudi ARAMCO. Representing the client in all civil works aspect of the work, I supervise two (2) major contractors-Bechtel/Technip Joint Venture.
Mining Engineer from with 24 years experience in underground as well as opencast mines. I have exposure in Lead-Zinc, Chromate Mines, Bauxite Mines and Limestone Mines. Presently, working as functional head of Limestone Mines captive to Cement plant.
I am confident and Expert; I am having 14 years experience with FIDIC contracts Worked on projects of Infrastructure Projects, Highway Roads, Bridges, Underpasses, Mechanical, Electrical, Water Work, Strom Water, Sub base Drainage, and Irrigation system, Construction of soft and hard Landscaping
Over 9+ years of experience in Portfolio management, Start stream TLM, Accounts, Operations & system automation.
Structural design of Post Tensioned Concrete Bridge, RCC High Rise Building, Tunnel, Highway Interchange Structure. Familiar with AASHTO LRFD, BS, ACI. Skilled in finite element softwares (MidasCIVIL, SAP, STAADPro, SAM-LEAP5 and AutoCAD). Specification, Report, AIP writing.
An accomplished and result-driven Management Executive with multi-faceted marketing experience. Exceptional communicator with demonstrated success interacting with people at all levels.
Free! Dear Sir untill now I have more than 9 years experience in construction, conversion & repair of the Supply Vessels, ULCC tankers, Tug Boats & Jack Up Drilling Rigs. 6 years experience as Project Engineer. Currently I work at the position of the Project Coordinator in ship repair.
Lead Process Engineer for Oil& gas Offshore/Onshore projects for Conceptual, Basic /FEED and Detail Engineering, Optimization and De-bottlenecking
I have a total of 13 years of experience working as an Engineer in the Petroleum Industry. For the last 10 years I have been working as a Process Engineer handling all aspects from Conceptual Engineering through to the Detailed Engineering Phase. I am seeking work as a Senior Process Engineer.
Involved in commissioning and pre-commissioning activities.
To secure a long/short-term contract, or permanent position. In Construction, Maintenance, Commissioning etc. My current position is as an Electrical/Instrument Engineer (as to the above position I am negotiable).
Fourteen years of combined experience in petroleum engineering and G&G (U.S. & international.) Experience includes integrated 3D reservoir modeling, numerical simulation, reserves assessment, field development, and reservoir studies.
Three years diploma in Civil Engineering (Technical Education Board of Punjab Pakistan)
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   [ 38 ]   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com