CONTACT INFORMATION:
View contact information...
CURRICULAM VITAE
Date of Birth: 01-06-1973
Marital Status: Married
Nationality: Indian
Qualification:
Educational: B.E. Mechanical Engineering
(Bharathidhasan University, Trichirapalli, India)
Professional: * Senior Welding Inspector (CSWIP 3.2)
* BGAS Grade-2 Painting Inspector
* IRCA approved Lead Auditor (ISO 9000:2000)
* LEEA Lifting Inspection (Part.1 Group.1)
* Lifting Inspector (AIB Vincotte-Belgium)
* European Welding Inspector Level 4
* ASNT Level-II in RT, PT, MT and Film Interpretation
Driving License: Valid Oman light vehicle driving license
Indian International Light Motor Vehicle License
Professional Training Attended:
* Management Development Course (SPIC - Mumbai)
* Welding Refresher Course (IIW - Mumbai)
* Insitu - Metallography Course (ISNT - Mumbai)
* Confined space entry Course -Qatar
* Permit Applicant, ESSW & H2S Course-Muscat
* Environmental Awareness & Defensive Driving Course - Muscat
Summary of Experience: Eight Years in total on the following activities.
* Welding Inspection of cross country pipeline, Hot tapping, onshore & Offshore Piping for DSS, CU-NI, Al, NACE- CS, SS & LTCS materials.
* Corrosion monitoring of on-plot piping, flow lines and static equipment.
* Inspection for Ammonia Storage Tanks, Pressure vessels, Offshore Rig legs, Hull structures, Pipelines, and Reformer Tubes for residual life assessment.
* Preparation and review of QAP, ITP, WPS and witnessing PQR &WPQ for various projects.
* Inspection of Lifting Equipment like Overhead Crane, Mobile Crane, Runway beam, Fork lift, Bucket truck, winches, Lever hoist, shackles, slings, eye bolts etc.
* Inspection of Pipe, Fittings, Valves, Plate & Tube materials as per relevant code.
* Painting, coating and blasting Inspection of Pipeline, Piping & Structural work.
* PVC-C, PVC-U, PP/GRP & HDPE Piping Inspection for various projects.
* Witnessing Relief valve setting, testing and maintaining records.
* Preparation and review of Test Packs and as built Drawings for various projects.
* Liaison with NDT team at site, review of NDT reports and interpretation of RT films.
* NDT and Dynamic balancing for Turbine, Pump & Compressor rotors for various clients
* Working Knowledge of ISO 9000: 2000 Quality System.
* Preparation, implementation and review of Contract Quality Plan, Contract Specific procedures, Quality Control Plans & work instructions etc.
* Familiar with international codes &standards like API, ASME, ANSI, AWS, BS/EN, BGAS, BP etc.
Employment History
August 2001 to till Date: AIB-VINCOTTE International & Partners. LLC, Oman
Client: PDO (Petroleum Development of Oman)
Position: Multi Discipline Inspector
Activities:
„X Review of Quality assurance Procedure & plan, witnessing hot tapping, welding procedure, PQR & WQT.
„X Preparation of welder performance record, monitoring PE pipe, consumables, raw material storage and control.
„X Surveillance Inspection of Flow line welding, PE fusion, painting & Hydro test activity for Flow line, on plot, Hook up connection, Shop fabrication and shutdown jobs.
„X Review of daily welding, PE fusion & painting reports, Interpretation of RT films and review of NDT reports.
„X Review of Final Test packs and as-built drawings. Preparation of weekly and monthly Inspection reports.
Position: Lifting Equipment Inspector
Activities:
„X Thorough knowledge & preparation of technical specifications, lifting operational procedures & training requirements in accordance with PDO lifting equipment regulations & relevant British Standards.
„X Inspection, proof load testing & Certification of lifting equipment & tackles at PDO Oil & Gas Operational facilities which includes Mobile Work Platforms, EOT Cranes, Gantry Cranes, Runway Beams, Mobile Cranes, Pedestal Cranes, Winches, Electric Hoists, Pull Lifts, fork lift, Chain Blocks, Baskets, Wire Rope Slings, Webbing Slings, Chain Slings, Shackles, Eye bolts etc.
„X Auditing and spot check of Lifting Equipment used in PDO and Contractors. Responsible for station visit to check the integrity of Static Equipment /lifting Equipment fitted in the Oil & Gas plant Facilities.
April 2000 to July 2001: Qatar Inspection Services (ISO 9002), Qatar
Client: LG Eng. & Construction
Position: QA/QC Engineer
Project handled: NODCO Refinery Expansion Project, Qatar
Job Involved:
„X Line Verification, Punch list Preparation, Inspection of Special Supports & Orifice flanges
„X Conducting internal audit, preparation and review of Data Dossier.
„X Holiday Test for Below Ground pipeline, blasting & Painting Inspection.
„X Witnessing Hydro/Pneumatic Test for flare/Condensate, fire water line, Nitrogen & Process Piping.
Client: Velosi TUV Bayern LLC, Qatar
Position: Surveyor
Project handled:
„« Fabrication of Aluminum Silos- 16 Nos. for Q-Chem Projects, Qatar
„« Painting Inspection of New Halul Power generation project, Qatar.
„« Welding of Thermo-Couple for Oil Heater Pipes at Khatiah Station (QGPC)
Job Involved:
„X Approval of various Procedures & Quality Assurance plan.
„X Assembly Inspection, fit up & welding inspection for cell roof & cone section of silos.
„X Witnessing internal flush grinding, Overall dimensional inspection of silos.
„X Hydro test & Internal Cleaning. Review of data dossier & prepare inspection release notes.
„X Blasting and painting Inspection of various Pipes, Valves & fittings.
Client: BP Arco, Qatar
Location: RIG AMMINA - Offshore
Position: Rig Survey and NDT In charge.
Job Involved:
„X Performed visual inspection and thickness survey for preload load tank, storage tank, UT and MPI check for rig legs, life boat structures etc.., witnessing and monitoring repair marking and repair welding. Preparation of preliminary and final inspection reports.
Client: Maersk Oil Offshore
Location: BA & CA Platform, Offshore
Position: Welding / Lifting Inspector
Job Involved:
„X Inspection for Cu-Ni, Stainless Steel, CS piping & condenser tube expansion & replacement.
„X Inspection of lifting Equipment like, Chain slings, Wire Rope, Hook, Shackles, Mobile crane etc.
„X Co-ordination with Third party for proof load testing of Lifting equipment. Welding & painting inspection for offshore containers and lifting Baskets.
Client: CCIC, Qatar vinyl Project (QVC), Qatar
Position: QA / QC Inspector
Project involved:: Inspection of GRP/PVC-C, PVC-U,PP piping for Chlorine plant.
Job involved:
„X Raw material inspection, welder & operator qualification for GRP pipes.
„X Hot gas & Heating Plate welding Inspection and maintaining performance record.
„X Spark test, Visual Inspection, resin, Lamination & Hardness Check.
„X Punch list preparation, Test pack review and witnessing Hydro test.
June'99 to March '00: M/s. Desert Line Projects LLC. (ISO 9002), Oman
Client: Petroleum Development of Oman
Position: Welding Inspector
Project involved:
„« DSS Pipe Line for LNG upstream Project, Saih Rawl.
„« Amin to Karim West to NRPS 34" API 5l X52 Oil Export Pipeline Project, Nimr
„« Fahud-Yibal 16" Coated API 5L X52 Water Export Pipeline Project, Fahud
Jobs carried out:
„X Preparation of Daily welding report, test pack and as-built drawings.
„X Conducting PQR and WQT using portable Arc monitoring unit.
„X Fit-up check for using Internal & external clamps.
„X Co-ordination with NDT team at site, Interpretation of RT films.
„X Trench Inspection, lowering of pipe spool, Hydro test and back filling.
„X Blasting & shrink sleeve wrapping inspection.
Sept '95 to May '99: Southeren Petrochemical Industries Corporation Ltd.,
(IS0 9000) Mumbai.
Position: QA/QC Engineer
Project involved:
„« 10,000 MT Double walled Ammonia Storage tank at M/s. GNFC Bharuch.
„« Ammonia Plant Pressure Vessels at M/s.Coromandel Fertilizer ltd., Vishakapattanam.
„« Reformer Tubes at M/s. Deepak Fertilizer LTD, Taloja.
„« Dynamic Balancing of Turbine, compressor and Pump rotors for various clients at workshop.
„« DSS Pipeline for flow-arm Up-gradation Project at BA Platform ONGC Offshore
„« NACE-CS, SS & Cu-Ni Piping for cooling water segregation system of BPA Platform, ONGC Offshore.
„« 18" API 5L X 60 Pipeline, API 5L Gr. B & LTCS Piping of Hook Up connection Project at ONGC, Uran.
Jobs carried out:
„X Raw materials identification, Preparation of WPS, conducting PQR and WQT, welding inspection, maintaining consumable storage and control record, preparation of welding report.
„X Co-ordination with design department for detail engineering, preparation of MTO, Inspection and expediting for procurement of raw material, Equipment and weld consumables.
„X NDT, Hardness check, Creep measurement, Ferrite measurement and in-situ metallography for various Pressure vessels like reactor regenerator, stripper, steam drum, Knockout drum, heating coils, rotors and pipelines etc.
„X Dynamic balancing & NDT check for single and multistage pump, compressor and Turbine rotors.
„X Co-ordination with NDT team and Interpretation of RT films, painting inspection, witnessing hydro-test, review of test packs and co-ordination with commissioning team.
View contact information... |