CONTACT INFORMATION:
View contact information...
Dear Sir
I hereby would like to submit my curriculum vitae for your kind consideration and will be pleasure to supply any additional information you may require on later stage.
CV
EDUCATIONAL QUALIFICATION:
Bachelor of Science in Mechanical Engineering Khaje Nasir al Din Toosi
University of Technology, Tehran, Iran 1996
CAREER DEVELOPMENT AND WORK EXPERIENCE:
1. Sep,2002 – Up to present: Flowmaster Sole Representative in Iran and UAE
Responsibility for sales, support and training of Flowmaster software, having more than 4 years successful activity in this field. Flowmaster is fluid flow simulation tool which helps engineers to predict parameters same as pressure, temperature, flow rate, … in critical points of a system true steady state and transient (pure dynamic) analysis. It is widely used in aerospace, automotive, oil and gas, power generation, water and waster water industries. For more information please visit www.flowmaster.com
2. Des., 2005 – Up to Present: EEC Representative in Iran
EEC (Environmental Engineering Company) is a British company, manufacturer of waste water treatment package which applied a very unique process to treat waste water of factories, hospitals, residential and commercial complexes, the method of treatment is based on biodegradation and Sedimentation technology which is unique due to its compactness and performance in respect of volumetric efficiency.
2. Sep, 2003 – Up to Present: MAHAB GHODS
Surge Analysis Expert
Analysis of the Water and Waste Water Treatment Project to
Investigate probable Surge and find solution and verify that
Surge has been suppressed successfully using Flowmaster software.
Design Pump Station (Preparing Drawing, pump and valve selection), preparing Tender Document, evaluating contractors to find qualified contractor to implementing of projects and surveillance on proper progress of implementing process.
3. Sep, 2003 – Up to Present: TAHA
Head of Oil &Gas Department and HVAC Manager
Preparing Proposal for EPC Projects (Engineering,
Procurement and Construction ) same as:
Phases 15&16 South Pars Gas Field (Well Head, Offshore and
Onshore Piping and Refinery)
Ahwaz - Rey Pump station
4. Dec, 2002 – Sep, 2003: SAIPA
Detail Design and Surveillance on Paint line Construction
Detail Design and Surveillance on construction of Fire
Fighting Piping (CO2 and Wet Sprinkler System), Air Handling Units
5. April, 2000 – Dec, 2002: Iran Khodro
A. Detail Design of Painting Line Piping for Cars, Gears and Front Cradle and included:
Pre Treatment, Ovens, Degreasing, Phosphate Room, Painting (Electro Cathodic Deposition) and Water Treatment (e.g. Soft water, Water Purification) piping.
B. Involved in Drawing of CHQ Wires project which executed by Iran Khodro, as responsible for mechanical department.
6. September, 1998 to April, 2000: SAIPA
A. Quality Control and Inspection Department
Inspection and Test for A/C and Radiators
Of cars, to be assure of required Quality (E.g. Wind Tunnel Test, Vibration and,)
B. CMM Department
3D Measurement of parts by means of CMM Machine
7. September, 1996 to September, 1998: Labor & Social Affairs Ministry
Design Engineer for HVAC systems:
Labor Hospital included: 6 Air washers
(Each 18,000 Kcal/hr), Boilers, HEPA and OLEPA filters
Labor University included: 4 Reciprocating Chiller
(Each 200 RT), 4 Boilers, Pump Station
Labor Sport Complex included: WWT (Water and
Waste Water Treatment) for POOL and Jacuzzi,
4 Reciprocating Chiller and 1 Absorption Chiller
3 Boilers, Pump Stations
Labor Central Building included: 3 reciprocating
Chillers and 2 Absorption Chillers, 3 Boilers, Pump Stations
Projects:
Iran Industrial Services and Support
Providing Engineering Consultancy for Modeling Plants
With Auto PLANT Software (2002).
Namvaran Oil & Gas Co. (EPC)
Providing Consultancy Service for Surge Analysis on their Project.
ILORD Engineering Co.
Piping Design of PMR (Paint Mixing Room) of Paint Shop No.2
in Iran Khodro (more than 20 KM Pipe and all Equipment) (2002)
Amir Kabir Petrochemical Plant
Simulation of plant by Auto PLANT (American Software)
(2001) (Group advisor to handling this project)
Azar Ghand Naghade Sugar Factory
Simulation of the factory included whole of the Piping and
Equipment using Auto CAD R14 and Auto PLANT. (2000)
Wagner
Consultancy for Paint Line Design in terms of equipment selection and piping design. (2000)
SKILLS & ACTIVITIES:
Language: English and Farsi, fluently in speaking and writing
Computer fields:
1. Flow Master2
2. Auto CAD R14, 2000, 2004
3. Auto PLANT (Rebis)
4. Excel
5. Word
6. Windows 98, 2000, XP
Familiar with relevant Standards same as ASME, API, ASTM, DIN and etc.
PUBLICATIONS:
1. New methods of plant design, Thavie& Tabrid magazine No.10 Dec., 2005.
2. HVAC maintenance, Tahvieh matbo magazine No.3 May 2003.
3. Fluent and CFD application, Tahvieh matbo magazine No.2 April 2003.
4. Flowmaster application in Gas industries, Tahvieh matbo magazine No.1 March 2003.
5. How to choose a coupling, Arvand magazine No.15 Dec., 2002.
6. How to choose a valve, Arvand magazine No.14 Nov., 2002.
7. Introduction on Autoplant software, Arvand magazine No.13 Oct., 2002.
8. Pump Selection Software, Arvand magazine No.12 September 2002.
9. VFD application in HVAC, Arvand magazine No.10 July 2002.
10. Centrifugal pumps trouble shooting part2, ISHRAI Magazine, No. 23, Dec., 2001
11. Centrifugal pumps trouble shooting part1, ISHRAI Magazine, No. 19, September 2001
12. Waste water treatment methods, ISHRAI Magazine, No. 15, April 2001
13. Waste water treatment in stadium, ISHRAI Magazine, No. 14, March 2001
14. Selecting Motorized Valve, ISHRAI Magazine, No. 2, Page 40 Apr., 2000
15. Multi Phase Pumps, ISHRAI Magazine, No. 83, Page 47 Jan., 2000
16. Compressor Failures, ISHRAI Magazine (Iranian Society of Heating, Refrigeration and Air-conditioning Industries) No.70, Page 37, July 1999 (SANATE TASISAT)
17. The Sounds of Silence, ISHRAI Magazine, No.76, Page 25 Oct., 1999
18. No Contact Bearing, ISHRAI Magazine, No. 81, Page 27 Dec., 1999
And also more than 15 Publications in 2000, 2001, 2002, 2003 in these magazines and Tahvieh Matbo included top discussion about HVAC equipment like as Valves, Pumps, Pipes, Cooling, Heating, Instrumentation and Water and Waste Water Treatment. All of them are available upon your request.
CERTIFICATIONS:
1. Flowmaster new user training course on 15th and 16th Apr., 2003 in UK, Flowmaster office
2. Flowmaster control and automation course on 14th Oct., 2004 in UK, Flowmaster office
View contact information... |