Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #39614 next resume »»
CONTACT INFORMATION:
View contact information...

PRESENT POSITION: Senior Marine Facilities Engineer

RESUME OF EXPERIENCE:
Sixteen years experience in structural analysis, design and construction, specializing in marine terminals, harbor and coastal structures, onshore and offshore pipeline installations, of which the past five years have been with major Oil & Gas Company, Infrastructure Development and Projects Department, responsible for all Port Infrastructure Development, Planning, Projects and Day-to-day engineering issues relating to a fully operational Port. Experience covers, LNG, LPG and Liquid Product Berth Structures and Topside Facilities, Harbor Design and associated Dredging and Reclamation, Breakwater Design and Construction Works, Master Plan Update Studies, Infrastructure planning and design, Seawater Pump House, Intake/Outfall Structures, Common Pipe Rack Structures, Offshore Submarine Pipeline Installations and Shore Crossings, Building Structures, Roads and Bridge Structures, together with associated temporary works design. Oil Spill Contingency Planning.

EXPERIENCE INCLUDES:
Structural analysis and design of reinforced concrete, mass concrete blockwalls, piled structures and Steel structures. Permanent works design and construction of Harbor and Coastal Structures. Preparation of Contract Documents, Scope of Works, Technical Specifications and Conceptual Design. Partake in Tender Technical and Commercial Bid Evaluations, FEED and Detailed Design reviews, liaison on design issues both as Design Engineer and Client Project Engineer/ Representative. Breakwater Physical Modeling and Desktop Design and Construction. Mathematical Wave Agitation Studies, Dynamic Mooring Analysis, Wave loading, Berthing Energy and Fender Design. Focal Point on multiple projects, conduct site inspections, compiling of snag list items responsible for final acceptance on handover or Contract closeout. Offshore marine pipeline installation techniques, shore crossings and launch analysis. Cofferdam and Piled structure design and construction. Construction methods and the design of associated temporary structures and heavy lifts., 3-D Space Frame and Finite Element (FE) stress analysis. Proficient in the use of AutoCad, STAAD-III, MathCad, MS Office and MS Project.

DETAILED PROFESSIONAL EXPERIENCE RECORD:
29 Sept 2000 - Present: Qatar Petroleum (QP) - Senior Marine Facilities Engineer
Ras Laffan Industrial City (RLC)

Ras Laffan Industrial City/Port is set to become the largest LNG and GTL exporting Port in the World, both in physical size and volume of product exports. As Sr. Marine Facilities Engineer, responsibilities include all Port Infrastructure - planning, design and construction, ensuring that the necessary Port Infrastructure is in place to meet the anticipated growth of Ras Laffan Industrial City and the planned increase in LNG, GTL, LPG, Hydrocarbon and Petrochemical exports.

Provide marine expertise on all Marine Infrastructure projects within Ras Laffan Industrial City/Port.

Identify, develop, evaluate and optimize all new marine infrastructure projects and related facilities project requirements. Including carrying out of conceptual studies, obtaining projects approvals by raising Project Initiation Numbers (PIN), developing Statement of Requirement (SoR), Scope of Work (SoW), preparation of bid documents, budget estimates, perform cost analysis and provide recommendations to RLC Management. Participate in HAZOPS, as well as Tender and RFQ technical and commercial bid evaluations.

Interface with Major End-users and End-user PMT and EPIC Contractors to discuss technical/ construction/safety related issues and recommend appropriate solutions.
Authorized final signatory on Consolidated Permit to Work, (CPW), ensuring all work is performed safely, in accordance with HSE policy.

As Customer/Client/Owner's Representative/Focal Point on multiple marine projects, represent their interest by overseeing the construction & engineering efforts by the EPIC/EPC Contractor.

Responsible for review and approval of all technical submittals and ensure technical compliance during the detailed design, procurement and construction phases. Ensure that appropriate International Maritime Design and Company Engineering Standards and Codes of Practice are complied with during the project execution stage.

Projects include Engineering, Procurement, Installation and Commissioning (EPIC) Contracts as follows:

LNG Berth 3 - US$20million Civil Marine Works, US$100million complete with Loading Lines and Topside Process Equipment, designed for New Generation LNG QMAX Vessels, responsible for all client design approvals. Reviewed Berth Geometry Studies, Dynamic Mooring Analysis, Design Basis and structural design. Attended design review meetings in Milan, Italy.

LNG Berth 5 - Attended Vessel Manoeuvring Simulations, at the premises of M/s Force Technologies (formerly known as Danish Maritime Institute DMI), in Denmark. Reviewed Passing Vessel Study, which found the planned Berth Location to be unsuitable, for present speeds at which vessels need to enter the Port. This has lead to an alternative site selection.

Liquid Product Berths 1A/B & 3A/B - US$60million, Client focal point responsible for all client design approvals and construction issues. Reviewed all design and material submittals, together with participation and review of the FEED, Quantitative Risk Assessment (QRA), Berth Utilization/ Occupancy Simulation Study, Geometry Studies and Mooring Analysis, as conducted for the Berth, for multi-products and a large spread of vessels size, ranging from 20 000DWT to 300 000 DWT.

Common Facilities and Utilities for Liquid Product Berths 1A/B – Includes Berth Control Room, Fire Pumphouse, Switchgear Building, Loading Arm Trestle Structure, Metering Platform, Piperacks extending from the Jetty Root to Loading Platform, Gangway Structure, Velocity Approach System together with display boards, Emergency Quick Release System etc. Client Project Lead Engineer, responsible for coordinating Discipline Engineer comments, client design approvals and construction issues.

New Service Berths - US$25million, 7No. Service Berths, complete with berth furnishings and bunkering facilities, for offshore support vessels. Client focal point, responsible for all design approvals and construction issues.

Tank Farm Land Reclamation Project - US$27million, 1.2million m3 Reclamation Fill, protected by Breakwater, which was designed as a Dynamically Stable Breakwater. Prepared the necessary project budget and approvals, Statement of Requirement SoR, Scope of Work (SoW) and Contract Document. As Client focal point, responsible for all design approvals and construction issues.

Common Pipe Racks - US$17million, for End-user Loading Lines, from Tank Farm to Multi-Product Liquid Berths – 5km long. Client Project Lead Engineer, responsible for coordinating Discipline Engineer comments, design approvals and construction issues. Developed a very flexible design which allows for all possible combinations of cross-overs and tie-ins to and between 10 Multi-Product Berths, with up to 11 Lading Arms per Berth.
Common Cooling Water System - US$300million, Pump House, Outfall Structures (Phase 1 – design flow - 300,000 m3/hr) and Intake Structure Breakwaters – 3.5km total length of breakwater, 2.0million m3 Dredging to Intake channel and Stilling Basin Area (design flow - 1.5 million m3/hr). The project involved over 100km of large diameter carbon steel pipelines (2.4 to 3m O.D.) together with associated Road Crossings and Utility Crossings. Responsible for design reviews, approvals and construction issues, on all marine aspects of the project, as well as Road and Utility Crossings. Attended Intake Structure Physical Model Study, in Milan, Italy. Involved from Front End Engineering Design (FEED) stage through to completion.

MASTER PLAN UPDATE STUDY – Member of the project team. The study involved updating the Master Plan, based on increased gas utilization projections. The study included the Design of the Expanded Port Layout, to cater the increased product exports. To this end, the design included review of Wave Agitation and Current Mathematical Model Studies, as carried out by the Danish Hydraulic Institute (DHI), Full Bridge Vessel Manoeuvring Simulations, as carried out by Force Technologies (Denmark). To ensure competitive dredging rates it was recommended to RLC Management to perform a Seismic Refraction Survey of the extended Port Area. The resulting track plots and rock head contours show exact areas where hard rock is to be found, and so to be avoided, which has resulted in the rearranging of the basin areas as far as feasible, to reduce expensive hard rock dredging. Conversely softer areas have been identified, which can be exploited for dredging for reclamation fill material.

RAS LAFFAN PORT EXPANSION PROJECT – Involves an EPC Contract for the Dredging, Reclamation and Breakwater Construction. The project will involve construction of over 19km of Breakwater, in water depths ranging from +2.0m to -13.0m CD, together with some 18 million m3 of dredging and 40 million m3 of fill for land reclamation. Obtained necessary project and budget approvals, by raising the necessary Project Initiation Numbers (PIN) and justifications. Participated in drawing up Tender Documentation, Conceptual Design and participated in the Tender Technical Bid Evaluations. The Port Expansion Project was awarded late Q4, 2005.

1995 – 29 Sept 2000: Lama International Contractors Ltd. – Senior Structural / Marine Engineer

Murray & Roberts International – Construction of the Mongochi Bridge – Malawi - Construction of a balanced cantilever bridge consisting of two 60m approach spans and a 100m central span. Responsible for the design of a temporary access jetty 200m long, in 8m water depths, for a 60ton crawler crane, together with appropriate bridge loading. The design of the 2No. temporary sheet piled Islands (16m diameter x 8m deep), required for the construction and sinking of the pier foundation caissons, prediction of Caisson Jacking forces and designed the Jacking Frame.

Stolt Comex Seaway S.A. - Mossgas E-M Field Control Buoy Gravity Base Installation - East Coast South Africa - Responsible for the design of a 68tonne net uplift Stabilization Buoy, required for an offshore gravity base installation. The stabilizing buoy, a multi-compartmented buoy consisting of a single central pontoon (1.2m O.D. x 9m long), fitted with padeyes both ends and 6No abutting side pontoons (1.5m O.D x 7.4m long), was designed to withstand a 100m hydrostatic pressure. Internal ring stiffeners were designed in accordance to the API Recommended Practice. 3-D Finite Element Models (FEM) was used for the design of the pontoon end caps and the internal bulkheads.

Sonils – Luanda Quay Expansion – Angola - A design and construct project, for a 400m Quay wall, constructed from counterfort units, each 14.5m high and weighing 285t. The project was unique, in that the units were constructed in South Africa and shipped to Luanda. Responsible for performing Finite Element (FE) Analysis on the counterfort unit, in order to determine the best handling methods to lift the unit on board the heavy lift vessel. Designed the spreader frame used for the 285t Heavy Lift. Further responsibilities include the R.C design of service trenches, cover slabs, stormwater outfall structures within the berth area.

Batu Hijau Project – Sea Water Intake Structure - Sumbawa Indonesia - A joint venture between PT Thiess Indonesia and Lama International Contractors. The contract involved the construction of a Seawater Intake Structure (SWIS) and the installation of outfall and seawater intake HDPE pipelines. Responsible for the design of the circular sheet piled cofferdam 39m in diameter and 13.6m deep, required for the construction of the SWIS, together with the pipeline cofferdam, linking the SWIS with the sea. Spent time on site, in Indonesia, overseeing the construction of the cofferdams.

Sappi-Saiccor- Extension of Existing Marine Outfall -South Africa - The existing effluent pipeline extended approximately 3 km offshore. It was extended a further 3.5km, with a new 1210mm O.D pipeline. Responsible for carrying out the pipeline launch analysis for determining the launch angles, installation stresses and support loads. Project Engineer for the construction of the launch structure, at site.

Sapref Single Point Mooring (SPM) Replacement-South Africa.
Responsible for the design of a 350m long temporary structural steel access jetty, required for the installation of an offshore Single Point Mooring (SPM) replacement pipeline 1.45m OD. Constructed in the surf zone, the jetty was designed for 6m breaking wave conditions, and a 60ton crawler crane. Carried out the pipeline launch analysis for determining the launch angles, installation stresses and support loads.

Murray & Roberts Cape Limited – Sable Road Bridge – Cape Town – South Africa - An incrementally launched, bridge construction project. Responsible for predicting the stage-by-stage bridge launch, holdback and lock-off forces, together with the design of associated pulling, holdback and lock-off systems. Designed the temporary concrete bearings and launch nose connection details.

Murray & Roberts Cape Limited –Bridge 5961 – Cape Town – South Africa - Responsible for the formwork, for a concrete bridge deck 1m thick (80m3 cast). The bridge deck was spanning a railway line, which was in use. Hunnebeck girders spanning 16m were utilized, with formwork suspended from the girders, by means of tie rods.

Check Lap Kok - Aviation Fuel Receiving Terminal - Hong Kong - Member of a design team for the design of the new twin offshore five-island tanker berths for offloading aviation fuel for the new Check Lap Kok Airport, a design and construct joint venture between Leightons Asia and Lama International Contractors. Responsible for the design of the steel Walkway and Pipe Bridge structures interconnecting the various structures and the R.C design and detailing of all pre-cast beams and slabs to the offloading and service platforms. Further responsibilities include site liaison and responding to site queries during the construction period.

Butterworth to Penang Submarine Pipeline – Malaysia Installation of twin pipelines, 1.2m diameter and 4km in length, a joint venture between Leighton's Asia and Lama International Contractors. Responsible for the design of temporary steel launch structure, 110m long, and performing the pipeline launch analysis.

Walvis Bay, Namibia - Structural analysis, design and detailing of three 70m long reinforced concrete finger jetties, for fishing vessels (1000 DWT). The jetties consisted of a piled deck structure spanning between the abutment structure and a strong head section, provided with raked piles. The deck was constructed from pre-cast trough units (8m span), with four vertical piles at each bent.

1992 - 1995: ENTECH - Consulting Engineers - Structural Engineer - Marine and Coastal Structures

Gonubie, East London - Design of "The Boardwalk" a timber walkway (400m long), with selected beach access and lookout points. Renovation of tidal pool.
Ganzekraal, West Coast - Design of tidal pool, boat ramp and parking lot together with access road.

Alkantstrand, Richards Bay - Structural analysis, design and detailing of a lifesavers building and public ablution block facility.

Pelican Island, Richards Bay - Design and construction of rubble groyns, for stabilising gradual erosion of island.

1990 - 1991: Coode Blizard Ltd / Coode & Partners, Purley, UK - Contract Design Engineer
Port Klang, Malaysia - Upgrading existing North Port's wharves for Post Panamax Container Ships (80 000 DWT). Increased crane and berthing loads were analyzed with the use of a computer 3-D model.

Matola, Mozambique - Design and preparation of drawings for mooring and berthing dolphins.

Limmasol, Cyprus - Design for container and passenger terminals, special consideration for earthquake loading.

Belgrave Bay, Guernsey - Preliminary design of a three-island berth for oil tankers and LPG carriers consisting of berthing, mooring dolphins and loading platforms.

La-Collette, Jersey - Stability analysis, on a gravity block seawall.

1989: Anstey Blignaut & Clogg - Engineer in training

Design Engineer for residential development, shopping centre development, new lecture theatre complex, and major water supply pipeline. R.C design and detailing, design of roads and services, and site supervision.

1982 - 1984: Hytec Cape Ltd - Technician in Training –Design, preparation of drawings, manufacture, installation and commissioning of power hydraulic systems.

1991 - 2001: The Civil Software Shop - Executive Member -Marketing STAAD III structural analysis software package.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 8901 to 8950 of 15339)Go to Search Parameters...
Brief Description
Bachelors degree in Electrical Engineering Technician. Interested in any position utilizing my degree. Very detailed oriented and committed to completion of projects. New graduate seeking employment.
Exploitation operator level 2
Hello! Please consider my resume for your mining needs. Thanks for taking the time to look at it.
I have 29 years of management and engineering experience. Excellent references available.
CAD and IT Administration and Development
I have completed my B.E in metallurgy and materials from Mehran UET Jamshoro .Sir i am fresh graduate looking for job
Courses and trainings: Bosiet – trainings in The Netherlands – Falck Nutec Rotterdam: 06.10.2006 - 06.10.2010 – Air Pocket Plus, 06.10.2006 - 06.10.2010 – Basic Safety and Emergency Preparedness, 06.10.2006 - 06.10.2010 – Basic Offshore Safety Introduction, 06.10.2006 - 06.10.2010 – Basic Offshore
I am career driven and goal oriented person. My aim is to work hard and maximise my employer turnover and at the same time achieve my vision.
Qualification: Higher National Diploma in Microbiology Skills: Grammar fluency, initiative, receptiveness, physical and mental alertness,good team player,good communication and interpersonal skills
I have 32 years of experience in the oil and gas industry. I have been an Operations Manager for 15 years and have managed fields in 7 different states.
Construction Civil Superintendent (Earthworks, Infrastructure and Concrete)
Geotechnical skills , transportation skills, autocad and any other thing that a fresh civil engineer is expected to be knowing .
Advanced diploma holder of the city and Guilds of london institute in mechanical engineering. Maintaining a high standard of performance on assigned machines in terms of minimizing the number of breakdowns that occur, and the amount of unplanned downtime that is incurred
BS Geology, wth leadership capacity,mangemental skills and sound(audio) technician
Computer skills are MS Word, Microsoft excel, MS Power point, GIS, AutoCAD 2002, 2004, 2006, NMax v6.50, Windows Movie Maker, 3D Home architect, Photo Studio 2000, & Cyberlink Power Director. I can also oper8 instruments such as Nikon DTM-332 Series Total Stn., GPS( Sokkia, Leica, Epoch 10, Etrex)
Adaptable and ambitious graduate in Mechanical Engineering with proven experience,skills and a fundamental understanding of Engineering. Able to lead others in demanding circumstances. Self motivated, hard working individual. In-depth understanding of technologies. Proficient user of word processing
I am a well-rounded mining engineer from the Colorado School of Mines (CSM) with 18 years experience, looking for an opportunity to help a surface mining company meet its goals.
Driller/Directional Driller Wellcap,H2S,Firstaide/CPR
I am currently looking for a position as a maintenance manager, supervisor, or engineer. I am a highly qualified maintenance professional have over 20 years of leadership experience in the manufacturing and production industry. I have obtained exceptional skills and experience in maintenance manage
New grad in mechanical engineer
Mineral Title, Permit Title, Flowcharts, Ownership Reports, Mapping, Deed Plotting
Analytical, Innovative and Resourceful. Posses Leadership Skills and Result Oriented. Excellent Interpersonal, Presentational and Communication Skills. Excellent Listening Skills, capable of working effectively in a team and have ability to handle challenges with ease. Proficient in the
I am a fresh,sensational,young graduate full of aspirations ready to yield the initiatives,innovations and creative abilities bestowed on me by very proficient scholars of distinguished characteristics during the course of my studies back in school.
15 years of hands on experience in erection, commissioning, troubleshooting, overhauling, preventive maintenance, shutdown maintenance of rotary and static equipments in the Mechanical field, Alignment, Assembling of Mechanical seals etc.
Self-correspondence, good computer skills, good filing and record system, good communication, Administration skills, Customer Service & Coordination, Customer Grievance Handling, Generating Reports and Audit Assistance
position as an MEP Design management, Sustainable Design, LEED Facilitation, Building Commissioning, and Building Energy Modeling for High Performance Buildings.
30 years experience in civil and horizontal projects
all types of welding, vessel, tanks, erection and fabrication, piping and structure, all solutuions of welding requirements,
Have a strong :Managerial and technical skill, leadership skill, agent of change, interpersonal and intrapersonal skill, Communication skill, Good motivator, Familiar with API and ASME Codes Standards, Familiar with P&ID, Familiar with ITP, Familiar with Rotary and Static Equipments, Installing Rota
I'm an Electrical Engineer and since 2005, i occupy the post of Maintenance Engineer (Electricity, instrumebntation and mechanic) in a mining industrie.
Seasoned professional sourcing, procurment Manager with 19+ yrs experiences with Fortune 10 company and others in Middle East and South East Asia.
Master of Science in Chemical and Process Engineering
For Programmer five of Programmer with my specification in VB, ASP, PHP. For Analyst fourth of Analisys systems with Data Oriented and OOA and UML Lecturer so one of Lecturer spesification AI, Neural network and OOP
Havin total 30 yrs experience out of which 20 yrs in all types of cranes-and 6 yrs in Bulk material handling field like stackers/Reclaimers etc.
Lab Technician MSc Organic Chemistry Karachi University 2004 & Computer Literate MS Office-97
QC Inspector-Multi-discipline / on Various oil& gas Projects
Detail-focused and culturally-sensitive professional offering more than 20 years of increasingly-responsible experience. Track record of completing complex projects on time and under strict budgetary guidelines without sacrifice to overall project quality
Senior Security Supervisor/Manager
QC/Welding Engineer/ASNT NDT Level III
Civil Structural Design Engineer with over 6 years of experience in the field of Design, Finite Element Analysis, Stress Analysis. Currently working on fast track multimillion dollar, complicate & intricate International construction projects in a contracting company in Dubai, U.A.E.
Im an Mechanical Engineer I have full training and exposure in Safety Health environmental code Im fully aware of the OSHA, NFPA, the ISO 14000, ISo 18000, and the ISO 2000 im an auditor for safety health and environment also an inspector for HVAC facilities.
M.Sc. in mechanical engineer / planning engineer in oil company for more than 3 years & Head of mechanical engineering department in Faculty of petroluem technologies for 2 years
Piping Design Engineer
Pipeline Engineer with strong basic pipeline engineering background and capable using pipeline engineering software such as Offpipe, Abaqus, Orcaflex, AutoPipe, PlusOne, Ceasar, and Catia. All pipeline design/ analysis accordance to DNV, API and ASME standard.
I have now gained more than 9 years work experience as a production operator/Senior Operator & Control room operator/Production Supervisor and have assisted in the conversion and modification of FPSO IKDAM in Malta dry dock.
B.Com (India), ACA (India), Grad CWA (India), M.S.Finance (Canada)
Senior Marine Facilities Engineer, Highest qualification: B.Sc (Eng) Civil, University of Cape Town, 1989, Overall working experience 16years, specializing in Marine Terminals, Harbor and Coastal Structures, Oil & Gas Development and Port Infrastructure Projects.
Free! Bosun experience -aboard an ammunitions ship ,underway replenishment tanker in support of the Irag war - 2002 2003. Navy Bosun’s Mate - refrigerated stores ship - fleet oiler 4 years.
Presently working with ENGINEERING MAINTENANCE COMPANY (EMCO-QATAR), Doha Qatar as a Camp In-charge (Admin., Staff Welfare, Operation, Maintenance and HSE Auditor OHSAS 18001:2007) from 2007 to till date for their various projects, reporting to Branch Manager.
With my 7 years of transferable skills and experience on interpersonal, analytical, time management, technical, optimization, and supervisory skills on offshore oil and gas, coupled with MSc on Offshore and Ocean Technology in Cranfield University UK, I have identified the needed offshore skills
First   Prev   151   152   153   154   155   156   157   158   159   160   161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   [ 179 ]   180   181   182   183   184   185   186   187   188   189   190   191   192   193   194   195   196   197   198   199   200   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com