Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #39664 next resume »»
CONTACT INFORMATION:
View contact information...

Over 24 years of extensive experience in progressively responsible positions in the Construction Industry. I have strong organizational and people skills. I communicate well with the craft and customer, both written and verbally, I am also computer literate. I can read and interpret mechanical, civil and electrical drawings. I have hands on experience in welding and I have trained welders, pipefitters and riggers.

EMPLOYMENT HISTORY:
Sunoco Oil Refinery, Oregon, OH
Contract Administrator, ANR, 02 to present
Oversee station torque program, monitored contractors and craft performing torque on exchangers, piping flanges, vessels and valves.

Valero Oil Refinery, Ardmore, OK
P3 Scheduler, Innovated Turnaround Controls, 01/06 to 02/06
Assigned to station contractor, using Primavera P3 software, I scheduled and monitored 3 major piping modifications for upcoming turnaround, including installing 1 new tower and new pumps and drum. I also did a complete material takeoff and a manual project estimate.

Valero Oil Refinery, Delaware City, Delaware
Contract Administrator, Pro Tech Engineering 8/05 to 11/05
Walked down work orders, ordered material, took photos, developed piping field sketches including weld symbols, estimated task, monitored budget, schedules and craft for piping and valve replacement/repairs during the Coker fall turnaround. Provided scheduling my estimates. material take-off, sketches and photos for work package development

Pipe Welder, 2/14/04 to 8/15/05
Certified chrome, stainless and carbon steel pipe welder, assigned to various co-gen, coal and peaker plants throughout the USA..

Fermi II Nuclear Plant, Newport, MI
Construction Superintendent, Washington Group International, 01/26/03 to 4/15/03
Developed estimates, prepared schedule, ordered material, interacted with customer and developed and coordinated completion of punch list for 2 Aux Boiler installations. I also monitored and assisted Superintendents and Engineers to meet goals and ensure project remained on-schedule and within budget.

Turkey Point Nuclear Plant (Unit #3 & 4), Homestead, FL 10/07/02 to 12/31/02
Construction Planner, Samico Professional Services
I Prepared both Modification and Maintenance work package's using PASSPORT and Portal G programs. Packages included weld maps (using Visio), weld documents, Sect. XI repair/replace plan and work instructions, procedures and parts. Prepared schedule, ordered parts, prepared estimates and managed and oversaw progress, changes, budget and insured that applicable drawings were updated.

Prairie Island Nuclear Plant, Welch, MN
Construction Planner, Larkin Enterprises Inc. 10/01 to 10/02.
Duties were developing complete Maintenance Work Packages and PM's using CHAMPS, EMPAC, Visio and Word. I prepared both ASME Sect. XI and non-safety packages to repair or replace pumps, valves, turbine, main condensers, HVAC, pipe supports and heat exchangers and had to provide rigging schemes in work package, including all weights, size of shackles, chokers, etc. I used Visio to develop weld maps. I prepared a budget, scheduled and assigned Work Order to applicable work group. I monitored the Work Order through completion, making changes and insuring Work Order did not exceed budget.

Indian Point Two & Three Nuclear Power Station, Buchanan, NY
P3 Scheduler, Williams Power, 09/00 to 10/01
Responsible for scheduling and monitoring outage activities on the night shift.

Fermi II Nuclear Power Station, Newport, MI
Superintendent, Raytheon Engineers & Constructors, 03/00 to 05/00
Responsible for directing craft for ISI activities and piping Modifications.

Sequoyah Nuclear Power Station, Soddy-Daisey, TN
Field Engineer, Stone & Webster thru Caliper, Inc. 01/00 to 03/00
Field Engineer – Prepared cost estimates and schedules for assigned Modifications and provided technical direction for ECCS orifice installation and robotics weld overlay repairs on lower canopy seal welds.

D.C. Cook Nuclear Power Station, Bridgeman, MI
Maintenance Planner, Sun Technical 01/97 to 07/99
Assigned to Maintenance Dept., developing maintenance Work Orders and PM's using PIM's planning system. This involved walkdowns, preparing cost estimates, scheduling, instructions and parts for work package assembly and approval to work. Planned Work Orders for piping replacement, valves and pump replacement including Section XI and non-safety.

Indian Point 3 Nuclear Power Station, Buchanan, New York
Construction Engineer, Sun Technical, 1/97 to 8/97
Performed the planning, field engineering, cost estimates, monitored the installation and activities performed by the contractors on assigned modifications, construction projects and maintenance tasks. Approved job estimates, rigging plans, scope changes, performed constructability reviews, field walkdowns in support of design development for assigned modifications and construction projects. I was accountable for the safety, quality, schedule, cost and close-out of feedwater piping change-out.

Fermi II Nuclear Power Station, Newport, Michigan
Superintendent, Raytheon Engineers & Constructors, 9/96 to 11/96
Responsible for 'Visco damper,' main steam vibration eliminators, gland steam and lube oil major modifications, this included verifying all parts and materials were in hand before work tasks started, monitored schedule and budget.

Waukegan Fossil Station, Waukegan, Illinois
Maintenance Planner, Sun Technical, 6/95 to 5/96
Responsible for fly ash handling system, bottom ash hoppers, soot blowers, burner inspections, repair and testing. I developed work orders to replace defected or degradated parts, I ordered parts from the OEM for the fly ash system, bottom ash hoppers.

Quad City Nuclear Station & Dresden Nuclear Power Stations
Maintenance Planner, Sun Technical, 10/93 to 7/94
Assigned to Bechtel's Materials/Parts Group as night shift materials/part's analyst. This entailed coding Electrical & Mechanical parts (complete description, cost shelf life, size, material type, cost, vender part number, manufacturer and supplier), from this a stores item number was assigned. Prepared material withdrawal tickets, verified material complied with applicable codes, standards and plant procedures. This included ensuring that packages were constructable, parts verification and in compliance with applicable codes, specifications and procedures. Packages, including weld documents were assembled and applicable tests (hydro, inservice leak or pneumatic) completed per instructions (ASME SECT. XI and ANSI B31.1). These test included valve lineups, test pressures, hold time and gauge locations.

Vermont Yankee Nuclear Power Station, Brattleboro, Vermont
Project Manager, TTI Engineering, 4/90 to 6/92
Assigned as the Responsible Project Manager for the replacement of two feedwater heaters (31/2 million). This included detail estimated of project and setting budget. Bid out construction to contractors. Selected best proposal and contractor and awarded project. Monitoring budget details, design specifications, ensured all parts were correct and on hand and for the installation and test instructions via EMPAC. The 'I&T,' installation and test instructions, encompassed complete detailed instructions for the feedwater heaters, associated piping, valves, instrumentation and electrical removal, repair, modifications or replacement. The 'I&T' also included complete test instructions for the new feedwater heaters and associated piping. Conducted weekly safety meeting, managed the financial aspect of the project, monitored and controlled construction, insured project was on schedule and within budget. I interfaced with customer, chaired weekly project meeting.

Getty Oil Refinery, Delaware City, Delaware
Superintendent, Catalytic Inc., 5/84 to 1-87
In charge of piping, valve and equipment repair and replacement for Coker, Cat Cracker and Acid House scheduled turn-around's. Assigned work crews, monitored and followed up crafts work. Prepared work and fire permits, conducted safety meetings and developed turn-around punch list and ensured completion. Prepared work and fire permits, conducted safety meetings and developed turn-around punch list and ensured completion.

Superintendent, Catalytic Inc. 1979 to 1984
Mohave Generating Station, Laughlin, NV
I was responsible for the forced outage repairs for both units. Also, high and low pressure feedwater heater replacement and failed boiler tube repair.

U.S. Sturges Floating Nuclear Plant, Gatun Lock, Panama
Superintendent, Catalytic, Inc. 1977 to 1978
In charge of installing fabricated spool pieces for ECCW in place on ship and system start-up.

Pipefitter Welder - Certified to weld on all primary and secondary piping systems during the construction of various Oil Refinery's, PWR and BWR Nuclear Power Plants throughout the U.S. 1970 to 1977

EDUCATION:
Aiken High School, Aiken, South Carolina, Massey Technical Institute, Jacksonville, FL
PWR Systems Training (1998) and (2001)
COMPUTER SKILLS: PASSPORT, Portal G and Visio, MEGA PARTS, ECP, ETS, EWECS, EMPAC,NPM, ECAP, TJM, PIMS, MIMS, Windows, Microsoft Word, and CHAMPS, PRIMAVER P3 Scheduling Course 102, Primavera at Bala-cynwyd, PA.
Typing skills 50+ WPM

United States Navy, Honorable Discharge

View contact information...
«« previous resume next resume »»
Search Results (Resumes 5051 to 5100 of 15507)Go to Search Parameters...
Brief Description
Area of Interest AVO/AVA, Inversion, Reservoir characterisation using Pattern Recognition and Spectral Decomposition and Attenuation.
Completion and workover engineer (11.5 years experience)
Mineral processing engineer, AutoCad drafter and transportation system design
Experience in field development plan, identification of workover requirements, well completion, acquisition of subsurface data, optimization of well performance and project management,
I beleive my strong college degree and work experince in mining, construction and logistics operations will be an asset for any organization.
Over 13 years of professional experience in all facets of highway engineering covering planning, design using MXROAD software and AUTOCAD, including widening of national highways and Expressways. Experience cover route selection of Highways, geometric design, pavement design of pavements etc.
Contract Oil & Gas Technical Writer Twenty years of progressive responsibilities in oil and gas industry.
mapping, remote sensing, exploration, aerial primary data acquisition.
Schlumberger 17 years Coiled Tubing / Nitrogen services/Fracturing
Design and drafting OIl and Gas processign facilities, Structural, Piping, Civil. 7 Years experience with 3D CADWORX modelling on Canadian and international projects. Recently worked on Enterprise's Meeker II facility as well as Green River Gas Plant (PROPAK) early 90's.
Bilingual English-Spanish Project Manager with over 6 years of experience working for diverse industries including the Oil, the light and heavy construction, and the Steel Production.
Smelter expert - ISA smelter; waste Heat Recovery Boiler (WHRB), DM Plant, Electric Arc Furnace, Rotary Holding Furnace (RHF), Converters, Anode furnace, casting wheel and Sulfuric Acid plant.
I would like to apply with your company for the position of a INSTRUMENT SUPERVISOR /TECHNICIAN I have 11 years of oilfield ,gas plant ,power plant and some process plants experience as an SUPERVISOR, TECHNICIAN . I am having good work experiance with clients like ENI , IRAN PHASES 4 & 5 KOC -
Responsible for crude evaluation, expansion project related configuration studies, perspective planning and scenario analysis and retro analysis.
Exploration Geologist
Graduate /Diploma in Computer Application, Tally , Corel draw, Typing Speed @ 40 W.P.M.
I have completed my Masters degree in Chemical Engineering from Lamar University. I have experience in ASPEN PLUS, ASPEN DYNAMICS, HYSYS, PRO-II for two years. I did my internship in Dynamic Engineering Purity Inc. for six months.
mechnical welding and NDT inspector
I am a mechanical engineer and I have been in the OIL & GAS DRILLING profession for past five years as rig mechanic, who is engaged in repair and maintenance of RIG equipments. I have good communication skills as well as great commitment towards work
HYSYS simulations, process design, optimization, Process flow diagrams (PFD) and P&ID
Never give up persom and full of integrity
Presently I am working with M/s B. S. Chaudhry & Co. as a Mud Engineer on E 760-II (1600 HP SCR), M 900-1 (900 HP), M 750 (750 HP), Cardwell-6, & Cardwell-7 since Jan.-2007 to till date continue at Mehsana Asset under MMC contract with ONGCL
M.Tech-Control Systems Engineer with 2 years of Experience in Teaching and Projects Handling
Retain & supervise outside professionals (including attorneys & land professionals) for lease and property acquisitions. „X Negotiate, prepare and administer oil & gas leases, operating, farm-out, and exploration agreements. Build Abstracts of Title. Sharp, innovative, quick learner and have
2 years and 3 months of experience as geologist of underground mine of Au/Ag and the exploration to ore deposits of Au, Ag, Cu and W. All this in my country, México.
Having experience in Mechanical Engineering in the field more than 10 years of Oil and Gas and Manufacturing industries mostly in engineering and inspections. Has worked in INDIA,and SINGAPORE on Onshore & Offshore.
my educational in Highway Engineering has been balanced by actual work experience. I have worked for a leading Infrastructure contractor Arabtec Construction from November 2004 to Jan.2007 and recently I¡¦m working with a leading government authority RTA as Traffic Safety Engineer
over 10 years experience in electronic and over 2 years offshore electrical.
Geologist with strong work ethic & 5 years exprience in Appalachian Basin with a sturdy skill set.
Substation Automation engineer with 5 years of experience
DCS, Control system and Maintenance Engineer
MCA with 2 Years exp in asp.net,vb.net,asp,vb,c#,html,sql,access
Regular visits of unmanned platforms and Taking care of all production / maintenance activities on day to day basis.
I am working as a highway engineer from past 6 years. I have over 3 years of experience with MX design software, 2 years with Inroads one year with Land Development Destok. In my past experience I involved using Indian code, dutch codes and AASHTO codes.
As a Land / Hydrographic Surveyor with 19 years experience covering a variety of harbour surveys, ocean, dredging, engineering, buildings, breakwater construction, jetty construction, roads and offshore construction surveys working with numerous projections and spheroids.
Experienced Consultant Wellsite Geologist with 10 years of International Experience
Project management of a quarry/mining operations.
Experienced Electronics and Communication Engineer for 13 years, performing electronics and communication task which includes bench troubleshooting, repair, maintenance, installation and commissioning. Performing Assistant Supervisory task.
E & I designer
Currently Working with PCPL (PETRONAS CARIGALI PAKISTAN LTD). As a FMC Field & Materials Coordinator
Establishment of Health, Safety and Environment Management function
Higher secondary (Pre Degree Certificate, Kerala University in India) & • Three Years Diploma in Mechanical Engineering (Technical Education Department Kerala, India.)
Seven year experience in HVAC design and maintenance
I am NACE International’s CIP Level 3 (Peer Review) Certified Coating Inspector having over 13 years of experiences in QA/QC Inspection of Corrosion Prevention Activities & Insulation Inspection for Oil & Gas Projects.
Safety Director, Electrical Construction
Over 24 years of extensive experience in progressively responsible positions in the Construction Industry. I speak Russian.
Throughout my 10+ years of technical experience as a Instrumentation and Control Systems Engineer, I have acquired a strong knowledge. I am currently working for Aker Kvaerner in Canada, leading a group of engineers to design 1.443 MMSCFS gas plant located in Iran
Construction Resumé
Mechanical Engineer: Engineering experience: 2 yrs, Erection,commissioning and maintenance experience: 4 years, static equipments, aluminium smelter
Experience in Shared Service Center, experience in SAP system on Account Payable, Account Receivable, Cash and Bank, Fixed Asset as well as Month End Process
First   Prev   101   [ 102 ]   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140   141   142   143   144   145   146   147   148   149   150   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com