Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #4365
next resume »»
CONTACT INFORMATION:
View contact information...
Date of Birth May 01, 1967
Nationality Canadian
Education o MBA / Technology Management, (Current), The University of Phoenix, Phoenix, USA
o B. Sc., Mechanical Engineering, Petroleum University of Technology (Abadan Institute of Technology), Ahwaz, Iran, 1985 ¡V 1991
Registrations, Affiliations and Memberships o Member of the American Society of Mechanical Engineers (ASME), 1995 ¡V 1997
o Member of the American Welding Society (AWS), 1995
o Member of the Iranian Society of Mechanical Engineers (ISME), 1994 ¡V 1996
o Professional Engineer Reg. No. 10 ¡V 04 ¡V 2300, Tehran, Iran, 1996
o Alberta Professional Engineers, Geologists and Geophysics of Alberta, in progress
Trainings ƒ³ ADNOC Group's Contractors' HSE Management System Awareness
ƒ³ Cathodic Protection of Pipelines
ƒ³ Welding Procedures and Radiographs Interpretation
ƒ³ Non destructive Testing and Mechanical Insp. of Refinery Equipment
ƒ³ Pumps
ƒ³ Industrial Hydraulic Systems, Production Line and Quality Control Methods
ƒ³ Safety in Oil Tankers and Industries
ƒ³ Protection Against Radiation in Industries
Knowledge of software programs Poses competent knowledge of following software programs:
o MS Projects o Caesar II
o Auto Pipe o AutoCAD
o Micro-Station PDS
o Micro-Station Design Review o MS Office Programs
Strengths ƒ³ Vast familiarity with oil, gas and Co-Generation industries, onshore and offshore.
ƒ³ Possess competent knowledge of International Codes and Standards.
ƒ³ Experienced in:
o Supervising large multidiscipline groups on EPCM projects, offshore and onshore o Preparing projects scope of work, execution plan and procedures manual o Change Management and negotiation skills o Review and approval of projects' deliverables o Providing technical supports and services to field personnel and construction managers during plants construction and start-up and also trouble shooting of systems during plants operation o Man-hour estimation, Tenders management, subcontracts review and scope of work definition in large projects o Controlling the planning and scheduling by utilizing MS Project, progress monitoring and preparing progress reports o Updating and modifying departmental procedures to increase the efficiency of work flow o Reviewing resumes, interviewing and hiring competitive Engineers, Designers and CAD operators o Mentoring junior Engineers and advancing their Engineering capabilities o Piping systems design and material selection o Stress analysis of piping systems in extreme services of temperature and pressure o Mechanical inspection of static equipment in refineries, petrochemicals, gas plants and drilling facilities and plants to assure their safe operation after maintenance and renovations
ƒ³ Possess competent knowledge of piping systems and experienced in developing detailed piping specifications for projects.
ƒ³ Demonstrate creativity, adaptive thinking and mature Engineering judgment in anticipating and / or solving complex or novel Engineering problems.
ƒ³ Researched on "Thermal Stresses in Heat Exchanger Pipes", the results of which were presented in the Sixth International Chemistry and Chemical Engineering Conference, in Iran.
Experiences VECO ENGINEERING Nov. 23rd, 2002 to date
Project Engineer
Responsible for the execution of the projects by managing multi discipline task forces, as per VECO Project Execution Manual.
ADCO ASAB Water Injection Upgrade
VECO awarded to do the Conceptual study and Front End Engineering and Design for upgrading the following sub-systems within the ASAB water injection system:
o Water injection network (interconnection between clusters)
o Disposal system for high TSS (Brackish) water o Corrosion inhibitor dosing system o Power skids and O/HL terminal pole/equipment (insulating switches and cables)
o Water injection surface pumps skids foundations including new shed and fence o Relocation of the mechanical seal package and SCADA shelter o All required piping modification
The total project value is estimated to be 2,000,000 USD.
ADCO Engineering for Tie-in of Single Gas Injectors BU-511 and BU-512 at Bu Hasa
VECO awarded to do the detail design and prepare the construction contract package for connecting these two single string gas injector wells to the existing headers running near the location of the new wells.
Total FinaElf Kharir Produced water Handling Facilities upgrade, FEED
VECO awarded to do the Basic Engineering Design for this project. The facilities under this project were designed to separate and treat 50,000 BWPD (produced water) for injection at 12,000 KPag. This project mainly involves FEED activities pertaining to the installation of the following major equipment:
o Inlet Separator o Filters o Hydro-cyclone o Water Injection pumping system o Oil recovery tank and pumping system o Control system o Power generation using Crude Oil as fuel o Instrument air compressor o Chemical Injection
TECHNIP-COFLEXIP, Dec. 1st, 2001¡V Nov. 28th, 2002
Abu Dhabi
Senior Lead Piping Engineer
Responsibilities as per Job Description included but were not limited to following:
o Responsible to the project for all the duties performed within the group o Administrative and technical management of personnel within the Piping drafting and Design and Piping Material and Stress engineering groups o Distribution and coordination of activities for specialist engineers and squad leaders o Responsible for budget, costs and schedule o Control the quality of all documents issued by the group o A list of tasks for proposals and contracts o Ensure that all methods and procedures are rigorously applied throughout the contract o Participate during the establishment of basic documents, specifications and standards for proposals and contracts o Coordination between T. P. G. and subcontractor design offices o Assist department head with training, advancement and assessment of personal o Improve the operation and function within the group o Develop working methods with the approval of the department head o Issue the necessary documentation and consultation for piping fabrication and installation o Ensure the uniformity of documents presentation and approve documents before issue o Establish the necessary liaisons with project, design coordinator and the heads of other sections and departments o Participate in coordination meetings and assist the project, concerning technical matters with the client, vendors and contractors o Compile the minutes of meetings, report to project and department head o Establish the closeout report at the end of contract. This report may be completed by the squad leaders depending on the importance and type of contract o Review and approve documents by Signing before being issued
Leading the Piping Engineering task forces and fulfilling above-mentioned duties, successfully have been working on following projects:
Saudi ARAMCO Sulfur recovery unit in Riyadh Refinery
As an EPCM project, Technip was awarded to do the Front End Engineering and Design endorsement and complete detail design and construction. The project included:
o Sulfur Recovery Unit o Amine Treating Unit o Revamp work in the existing units o Addition of 93 tie ins to existing process and utility lines o Addition of one sour water tank and two sulfur storage tanks o Loading bay
ADCO Bu Hasa Units "G" and "F+D" Development Project
Technip did the Front End Engineering and Design (FEED) of this project to inject Water And Gas (WAG) into Bu Hasa oil reserves for pressure maintenance. The facilities had to be designed to inject a nominal flow rate of 95 MMSCFD of gas at an injection pressure of 375 bars as well as 120,000 b/d of water at an injection pressure of 2000 Psi.
Shell, NPCC and NIOC joint venture Soroosh - Nowrooz Integrated Field Development Project, Khark Island, Iran
Front End Engineering and Design to Detail Design of the topside facilities of three production platforms, two living quarters and 2 wellhead platforms connecting together through four bridges.
As The lead on this project coordinated the work and scheduled the piping engineering tasks, to meet project specific dates. Implemented and used a detailed, per line, progress monitoring system linked to MS Project. Managed design reviews and interactions with the Client and the Project.
DELTA HUDSON ENGINEERING LTD., Oct. 6th, 1997¡V Dec. 01st, 2001
(JACOBS CANADA)
Senior Piping Engineer
Responsibilities as per Job Description included but were not limited to the following items:
o Responsible for the design and coordination work and leading the Piping Engineering Task Force on a project o Provides decision making and recommendations that are recognized as authoritative and with significant impact on engineering activities o Preparing piping Engineering specifications including line classes, detail piping component purchase descriptions o Developing detailed design and fabrication specifications for the project by utilizing the client and/or DHEL specifications o Preparing the technical sections of inquiries, reviewing tenders and making recommendations leading to the selection of vendors for piping specialties o Conducting stress analysis for piping systems and working with Piping Designers to achieve the workable solutions to problems o Review and sign piping Engineering documents o Ensure that piping Engineers assigned to the project are familiar with and follow related procedures o Developing complete knowledge of piping systems such as piping material specifications, code requirements, valve specifications and materials, and stress analysis programs o Preparing or assisting in the preparation of the cost estimates for bids and proposal work o Participating in departmental performance evaluations for piping Department staff o Assisting in providing technical advice to other levels of piping staff o Assisting in organizing and maintaining departmental design guidelines o Providing piping material Engineering support for pressure piping systems o Provide technical support/ consultation to projects during design and construction o When required on a project, coordinating checkout and start-up of field activities and coordinating work with Construction Superintendent o Assisting in organizing and maintaining departmental Engineering design guides o Ensuring compliance with departmental Engineering design guides and procedures o Advising the Piping Engineering staff in solving complex problems arising in different projects o Technical orientation of new Piping Engineering staff o When assigned by the Chief of piping design, carry out the responsibilities of a "Lead" on a given project including but not limited to the following:
* Developing and maintaining project scope and schedule and discussing areas of concern with the Chief of Piping Design and if necessary, the Project Manager
* Determining the detailed Engineering designs criteria to be employed by the design team
* Prioritize work and assign Engineering work to other members of the design team
* Ensuring consistency and integrity of design throughout project
* Complete project control information including project budget forecasts and progress reports
* Communicating with vendors and consultants regarding related technical problems (e.g. the substitution of specified materials)
* Attending project coordination meetings
* Coordinating design criteria with other disciplines and resolving any conflicts arising from requirements
* Maintaining regular contact (phone or site visit) with the Construction Superintendent regarding construction problems
* Developing estimates for change requests
* Assisting with design work
* In conjunction with the Piping Squad Leader, preparing the Project Wrap Up document
Leading the Piping Engineering task forces and fulfilling above-mentioned duties, successfully have finished following projects:
ESSO Imperial Oil Resources Ltd., Mahkeses, Cold Lake, Alberta
A two and a half billion dollar project. Front End Engineering and Design to Detail Design and Construction. The Mahkeses project is a new oilfield development that will add 46 Million cubic meters (287 million barrels) to proved reserves at cold lake.
Suncor Energy Inc. Suncor Millennium Project, Alberta
A three and a half billion dollar oil sand project. DHEL did the Preliminary Engineering, detail design and procurement for the Sulphur Complex of the Upgrading section at Suncor's Tar Island facility at Fort- -McMurray, Alberta
TransAlta/Air Liquid Dow Fort Saskatchewan, Alberta
Engineering, Procurement and Construction Management for the cogeneration facility with one General Electric 7EA Gas Turbine rated at 80 Site MW and one General Electric Condensing Steam Turbine rated at 40 MW
AMOCO Canada Petroleum Company Ltd. Empress Phase V Project, Alberta
Grass roots plant within an existing complex designed to remove ethane and natural gas liquids from natural gas. Natural gas is supplied to the plant from the Nova and Foothills Pipelines
Foothills pipeline Foothills pipeline
Designed the pipeline and pump stations for foothills pipeline
Novagas Clearinghouse Ltd. NGL Fractionation Facility, Redwater, Alberta
The project consisted of Front-end Engineering and Design (FEED) for a single train fractionation plant with De-Ethanizer, De-Propanizer and De-Butanizer towers, designed to process up to 60,000 BPD of liquids.
NATIONAL IRANIAN OIL COMPANY (N. I. O. C.) 1994 - 1997
MINISTRY OF PETROLEUM, (EXPORT CONTROL AND TECHNICAL INSPECTION AFFAIRS)
SENIOR MECHANICAL ENGINEER
Responsibilities as per Job Description included but were not limited to following items:
o Mechanical inspection of all installations and equipment owned by sections, industries and companies that are subsidiaries of Ministry of Petroleum, such as refineries, petrochemicals, exploration and drilling installations, upstream and downstream installations, during overhauls, emergency shut-off or routine maintenance, in-shore and off-shore o Doing required inspections to assure safe operation of equipment after maintenance and renovations o Determine the safe work duration of equipment and plants, and scheduling future technical inspection times o Supervision of technical inspection affairs and execution of new projects for exploration and production of petroleum products all around Iran o Calculating mechanical strengths based on related codes and standards o Prepare technical identification documents for equipment based on statistics prepared by technical protection section o Taking part in meetings related to technical inspection of equipment before and after overhauls, to plan the inspection, maintenance and estimation of required parts and equipment for procurement o Technical Inspection of all installations and plants related to exploration, production, refinery and petrochemical, inland or offshore o Technical inspections of offshore petroleum export platforms, fixed and portable cranes owned by all affiliated sections, industries and companies, in Iran o Detection of critical condition of equipment to propose methods for prevention of failures o Technical inspection of elevators and gondolas owned by Ministry of Petroleum o Technical inspection of pressure vessels and steam generators owned by ministry of petroleum in clubs, hospitals and buildings o Preparing technical inspection reports for minister of petroleum and related section management.
o Review the designs done by other national or international companies to assure their compliance with codes and standards o Materials selection and recommendation of new materials
Reported all works done as listed below to the Minister of Petroleum via Technical Inspection, Safety Department manager:
o Taken part and supervised technical inspection of static equipment in refineries during overhauls of Iso-max, Hydrogen, Vis-breaker, and other plants in Tehran, Tabriz and Isfahan o Checked the designs and detected the causes of failure in a fired heater in iso-max unit of Tabriz refinery after an explosion o Issued work orders for improvement and maintenance of refinery equipment o Provided technical support to different groups during overhauls in refineries o Inspected and reported the technical and safety condition of 32 drilling rigs owned and operated by National Iranian Drilling Company.
o Accepted and certified different industrial products before and after purchase for N.I.O.C.
o Inspected electric elevators and gondolas periodically and for acceptance.
o Proved capacity of oil tankers before and after loading crude oil o Translated a manual entitled "Safety Precautions in Oil Tankers" from English to Persian for N.I.O.C. staff use
NATIONAL IRANIAN OIL COMPANY (N. I. O. C.) 1991 - 1994
RESEARCH INSTITUTE OF PETROLEUM INDUSTRY
Mechanical (Detail Design) Engineer
Responsibilities were as follows:
o Actively participate in a team for detail design and stress analysis of plants for refineries and petrochemicals o Use AutoCAD, CAD Pipe and different SAP programs o Design and review general arrangement drawings o Prepare and review piping material specifications o Design piping and equipment layout plans o Design pressure vessels, shell & tube and air¡Vcooled heat exchangers as per international standards
PARS CRANE COMPANY 1993 - 1997
Mechanical Engineering Consultant
Working as a Mechanical Engineering consultant, designed and supported the manufacturing process of multi-speed hoists with 3.2, 5, 7, 10, 1, 20, 25, and 32 tons capacity. The major design works that needed to be done on each of the above mentioned capacity hoists are as follows:
o Gearbox design for multi-speed vertical movement, utilizing a supplementary gear box and electric motor (Fein Hub)
o Improving the clutch design for better engagement and longer life o Complete design of hoist body structure o Improving trolley design for better maneuver o Design of gearbox body using aluminum alloys for reducing total weight without compromising strength
JIHAD-E-KHODKAFAEI, Tehran, Iran 1991 - 1993
Mechanical Engineer
On a contract basis supervised the mechanical installations and maintenance group and finished following projects successfully:
o As an EPC project, Designed, Procured and constructed pressure vessels, piping systems, boiler room layout and sized unit heaters for hot water heating system of nearly 10,000-sq. m. roofed area o Designed and supervised construction of a 4 ton below zero and an 8 ton above zero refrigerating rooms o Supervised and provided technical support for material selection and purchase of equipment and components for above-mentioned projects
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 5101 to 5150 of 15344)
Go to Search Parameters...
Brief Description
More than 16 years of experience in all areas of steel pipe manufacturing, including shop production, sales, distribution, and production management. Possesses excellent leadership, communication, and project management skills. Able to work independently or in a team environment.
Project Engineering, Project Management, Mechanical Engineering, Piping Engineering
Experience in the Power, Water and Wastewater automation and process control. Designing and developing automation solutions for PLC/ SCADA systems. Project management of automation and Telemetry projects. Leading role in design, engineering, testing and commissioning
19 years process background in varied complex plants. Success gained in expatriate, residential and remote work environments. Utilised strong leadership ideals and practices to promote and empower subordinates and effected communication to all levels of management.
8 years experience as a Drilling Engineer, Drilling Supervisor, Directional Driller & Well Performance Engineer(Onshore & Offshore).
Mechanical Commissioning & Maintenance, Maintenance Planning Scheduling
1.Accurately process and record all technical documentation in accordance with agreed procedures. 2.Input progress mark-up information into Document Management System (DMS). 3.Receive, check accurately record into DMS system and distribute all project technical drawings and documentation
Extensie background in instrumentation and analyzers. Lots of CEMS experience.
Fourteen years Welding/Materials/NDE experience in fossil power industry, oil&gas industry, engineering, fabrication and construction
Currently Sr. piping designer on Bentley 3d and piping design checker. Experienced in all areas of piping Including high temperature and high pressure piping systems, lined and jacketed pipe, stress analysis, p&id’s, specifications, process, utilities, sulfonation, pharmaceutical, pharmaceutical val
Procurement Professional with over 15 Years Oil and Gas Industry Experience whose Strengths and Skills Saved Millions of Dollars.
Corrosion /Pipeline engineer with 5 years experience
Instrumentation/control/Automation/PLC programming/Robot programming
piping engineer with 5 yrs exp. in piping detail engineering with pdms as a 3D piping software, and PDMS administrator
IT Support/ personnel
Total 5 years engineering experience and new graduate from managment school.
I'm an Electromechanical Engineer with 5 years of related experience within the UAE and GCC.
Technician Komatsu Heavy Duty Machinery
Drilling standard directional, horizontal, “S” (build and drop), and build and hold wells for Shell Petroleum, Saudi Aramco, Encana, ConocoPhillips, EOG, Petrobras, Agip, Mobil, Elf, Chevron etc., with MWD/LWD tools and mud motors.
Involved in Sales Support, System Design & Estimation, Tendering & Engineering Low Voltage / Low Current Systems, including Fire Alarm System, SMATV Systems, Intercom Systems, Security Systems, Automatic Gate Barriers / Swing Gates, etc,.
Marketing,Business Development & Application Specialist of Chromatographic instruments of Pharmaceutical industry.
Mechanical Engineer with over 15 years of technical business experience with emphasis in cost control projects.
Ability to manage multiple tasks in a pressured environment.
I am hvac engineer
12th standard,iti-electrical,1year -diploma-electrical,maitenance,comissioning-crane,mcc panel
slick line supervisor
Working as a Petrophysicist( Logging Opertaion and Interpretation) in RIL India from last 2 years.
An Industrial Engineer working for five years as a Document Controller. A fast learner and once awarded as best employee.
Detailed Engineering for Offshore Plant, Hysys Simulation, Pipe line sizing, safety Valve Sizing, Equipment Sizing
Petroleum geology, well log interpretation, data management, seismic interpretation.Also I am a quick learner, hard working and can handle stress and give you desired results within a deadline.
Senior IT Analyst / Engineer
05 Years experienced HSE Advsior with NEBOSH
11 years extensive experience in engineering and design of all piping system and the overall layout of a plant for both on- and off shore project in the field of oil, gas and petrochemical plants, including plot plan development, plant and piping layout study, equipment arrangement, 3D modeling,
Having over 4 years experience as QC Engineer in various oil & gas indusries like, petrochemical refinery, ship building, offshore wellhead platform construction etc. I have a good background welding & Having ASNT Level 2 in RT, UT, MT & PT
Water/wastewater treatment engineering study, design, modeling, operation optimization for municipalities,oil &gas, refinery,power and petrochemical plants.
Geologist with a very strong experience in most of the oil/gas drilling operations
- Highly educated professional (Ph.D. and M.Sc. in Environmental Geosciences) - Managed portfolio of several environmental projects (NSERC, DIAND, CIDA, ICEF) - Seven years of professional experience in characterization, assessment and monitoring of contaminated sites
3 years in Human resource, 8 years in administration, 3 years in public relation / cutomer service
Electrical Technician Electrical instructor
Qaulity Engineer, ISO 9001. ISO TS16949, Supplier Quality Engineer
Experience in a range of commodity types: VHMS, intrusion-related-, meso- & epithermal-Au and porphyry Cu-Au and Mo style deposits. (Australia, Turkey, Albania, Kyrgyzstan Saudi Arabia & Oman). Reviewed, designed, budgeted & implemented regional & mine-based exploration programmes
More than ten years experience involving in Basic Design & Detailed Engineering, Construction and commissioning in Oil & Gas field. Extensive experience in all phases of Instrumentation Engineering starting from Feasibility Study, Basic Engineering Design Data, Design & Detail Engineering, Construct
Quick learner, motivated and dedicated in getting the job done .
Tertiary qualification in Mineral Processing and Extractive Metallurgy, Good understanding in Met accounting, Good troubleshooting, strong analytical and conceptual thinking skills, Initiative, Team player and hands on the job training, Strong commitment to Training, Safety and the Environment
B.E., (Bachelor in Industrial Engineering from Indian Institution of Industrial Engineering),
B. Sc. Chemistry (Grade Good)
Applying Insulation and Sheet metal Cladding.
Business development specialist with Sales experience
As Storekeeper we serve as the sole staff member responsible for performing all record keeping, issuance, recieving of a large supply materials and responsible for a large function of the storerooms
1st class welder fitter i have six full years expierience in this field
First
Prev
101
102
[ 103 ]
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com