Possess Degree in Engineering and more than 10 years of Professional Experience in Project Engineering, Project Planning and Controls through various project phases such as Front End Design, Detail Design, Procurement, Manufacturing and Construction for various Oil & Gas, Refineries -Petrochemicals and Chemical projects.
I have exposure with International Clients such as Shell EP (Petroleum Development Oman), Sasol, Conoco, Cairn Energy, Bechtel, Petrofac, Kvaerner E&C, Reliance, Larsen & Toubro and Engineers India Limited on their projects. Worked closely with the Top Management and Multidisciplinary Engineering, Procurement & Construction Teams.
I have been approved as Planning Engineer as well as Project Engineer by Petroleum Development Oman. Member of 'The Institution of Engineers India' (Membership no. M-131529/8).
EDUCATION
1995 Bachelor of Engineering (Production), Bombay University, India computer skills
Planning Tools: Primavera P3 version 3.1, P3e version 5 (Basic Course), MS Project
MS office Applications, AutoCAD
Others: Procurement Tracking System (Bechtel), Win PCS (for Commissioning)
LANGUAGE SKILLS
English - Fluent
Indian (Hindi, Gujarati) - Fluent
EMPLOYMENT RECORD
2004 to date Tebodin, Oman
2000 ¡V 2004 Aker Kvaerner, India
1998 ¡V 2000 Essar Projects Ltd, India.
1997 ¡V 1998 Reliance Petroleum Ltd, India.
1995 ¡V 1997 Indofab Industries Ltd, India.
ASSIGNMENTS
2004 ¡V to date Tebodin & Partner LLC, Oman
Tebodin has local design services contract (LDSC) to provide multi-disciplined engineering design and support services in order to assist the exploration, development and operational activities of Petroleum Development in Oman (PDO).
Aug'05-to date On secondment to Oil South Directorate of PDO as Engineering Projects -Control Engineer.
Accountabilities:
* Planning and Project Control functions across multiple Engineering projects portfolio.
* Coordinate within Engineering team and liaise with the Finance department on budget phasing, expenditure projections and monthly financial reporting issues.
* Conduct Monthly performance reviews for individual teams to monitor the progress in terms of project milestones as well as budget expenditure Plan against Actual.
* Liaise with Sub surface to develop integrated plans for Clusters to cover activities across various project phases like Field Development, Surface concept selection and Project Engineering in accordance with requirements of the new OPMG / VAR processes.
* Collate and issue the weekly and monthly management information reports such as Financial performance, Milestones report, KPI report, Project Close out performance report, Service contract performance report, OSE Performance Review pack etc.
* Annual Engineering group Resource planning.
* Assist project engineers in delay analysis and carrying out critical path analysis to identify potential threats to the project completion schedules and suggest recoup plans.
* Project Close-out tracking, Group HSE actions tracking, Review meetings actions tracking & monitoring.
* Implementation of P3e as project control tool to monitor all the projects in portfolio.
Mar'04¡VJul'05 In Tebodin Office:
As Assistant Project Engineer in Tebodin office
* MAF Terminal Facilities Project, Gulf Petrochemicals Services, Oman.
DD and Procurement services to EPC contractor GPS for the expansion of Oman Refinery Company's Terminal Facilities at Mina Al Fahal. The project consists of a new 24" Oman export blend feed pipeline, jump-over line between existing 40" LR line and 40" OEB line, 12" LR line, utility pipelines, Tank Farm (3 nos. 50,000 m3 floating roof tanks), Booster Pump, Main Pumps, metering system, leak detection system (LDS), SCADA and telecom facilities.
* Nimr E1 Header and Loop Line Replacement Project, GALFAR, Oman.
DD and Procurement services to EPC contractor Galfar for the 18" pipeline replacement of the existing 12" Nimr E1 header and installation of the loop line replacement.
„ÏYibal Depletion Gas Compressor Project, Gulf Petrochemicals Services, Oman
DD and Procurement services to EPC contractor GPS for Depletion Gas Compressor Project at Yibal. The project comprises Depletion Compressor package, Instrument Air package, Separators, Coolers, Drain Pumps & vessel DCS/FCS/FGS and 33KV GIS.
As Project Engineer in Tebodin office
* Harweel Phase 2AB WINPCS project
* Harweel Phase 2 RAM Study Project (Reliability Availability Maintainability )
* Runib-Rima Pipeline (16",28 km) Basis for Design Project
* CP services for PDO ONO team
* SAP and Procurement Services for PDO GGE team
As Planning Engineer in Tebodin office
* Using Primavera Project Planner (P3) and MS Project as Scheduling & Monitoring tool.
* Planning: Planning and Scheduling for FED, DD, EPC projects. Resource Planning for FED & DD projects. Preparing Discipline Budgets.
* Monitoring: Setting weekly / daily Targets for Engineering Deliverables & Non Deliverables and follow up using Look-ahead schedule. Projects control using Float analysis, S-curves, Early-Late schedules.
* Reporting: Progress Measurement Reports, S-Curves, Performance Reports, Productivity Indices, Various reports from Primavera, Concerns, Critical Activities and Executive summary.
* Saih Rawl South Field Development Project
* Fuel Gas Pipeline & SOGL Interconnector for Mukhaizna Power Station
* Marmul to Nimr MOL Section Replacement
* New Lekhwair RMS Bulk Line Expansion
* Inter-connector to SOGL from Salala Gas line at Nimr
* Hubara/ Sahmah Booster Pump stations- Detail Design
* Barik Depletion Compression facilities
* Saih Rawl Pipework replacement, Phase 2
* Al-Huwaisah to Yibal Pipeline Replacement
* Kauther Pipelines
2000-2004 Kvaerner Power Gas (I) Ltd, India (now Aker Kvaerner)
Kvaerner is a world-class Anglo-Norwegian E & C Group offering complete range of services including a portfolio of advanced process technologies, R & D, test work, a full range of project studies including feasibility reports, total project management, engineering and design, procurement, construction and maintenance services. Detail Engineering is carried out using PDMS / PDS-3D modeling software.
Project Engineering Function:
* Assist Project Manager for Project Management and Engineering function
* Inter-Discipline coordination and follow-up for Design Inputs in Multi-discipline Design project.
* Conduct internal Taskforce Meetings; prepare MOM and follow-up for necessary actions.
* Prepare department man-hour Budgets and preparing periodic Performance/Efficiency Reports for control purpose.
* Monitor Vendor drawing review and approval turnaround schedule.
* Liaise with Client for periodic approval on work done for invoicing purpose.
Multipurpose Chemical Terminals, Reliance Petroleum Limited, India.
Products: MS, SKO, HSD, Naphtha, ATF
Capacity: 278 KL/day to 1377 KL/day Throughputs
Scope: Detail Design
Project Control Function:
* Using Primavera Project Planner (P3) as Project Control Tool.
* Planning: Logical Structuring of activities of Work Package and Preparing Overall/ Detail Schedules. Resource Planning.
* Controlling: Setting Weekly / Daily Targets for Engineering Deliverables & Non Deliverables and follow up using Look-ahead schedule & Monitoring Charts. Projects control using Float analysis, S-curves, Early-Late schedules.
* Reporting: Progress Measurement Reports, S-Curves, Performance Reports, Various reports from Primavera, Concerns, Critical Activities and Executive summary.
* Billing schedules and Cash Flow reports
* Gas Treatment Plant Project, CONOCO, Syria.
Product: Export Gas, LPG, Condensate & Butane
Capacity: 4.25 MM scmd Export Gas (Grass Root Plant)
Scope: Detail Design
* Detergent Alcohol Project, SASOL, South Africa.
Product Detergent Alcohol
Capacity: 120,000 TPA
Scope: Detail Design
* Multipurpose Chemical Terminals, Reliance Petroleum Limited, India.
Product MS, SKO, HSD, Naphtha, ATF
Capacity 278 KL/day to 1377 KL/day Throughputs
Scope: Detail Design
* AGT/SCP Oil & Gas Pipelines Project, BP (Azerbaijan-Georgia-Turkey)
Oil Pipeline ¡V 250 km ¡V 50MTA Capacity
Gas Pipeline ¡V 750 km ¡V 21.5 MMscmd Capacity
Scope: Lumpsum Turnkey Project (Secondment to Petrofac, Sharjah)
* Gauri Field Development Project, Cairn Energy (I) Pty Ltd, India.
Wellhead Platform, in Four deck configuration, supporting
9 well conductors (6 nos. for Gas & 3 nos. for Oil).
Production capacity: 75 MMscfd Gas.
Scope: Detail Design
* PTA Project, Indian Oil Corporation Limited, India
Capacity: 556,000 TPA
Scope: Detail Design
1998-2000 Essar Projects Ltd, India
Essar Projects Ltd is an EPC company part of ESSAR group which is one of India's largest corporate houses with interests spanning the manufacturing and service sectors in both old and new economies: steel, power, shipping, constructions, oil & gas and telecom.
Planning Engineer (Construction Function)
* Fabrication & Construction Scheduling using Primavera Project Planner
* Material Estimation and Management
* Weekly & Monthly Reporting for construction progress.
* Resource Planning (Man, Machine & Material)
* Certification of subcontractor Bills.
* Billing schedules and Cash Flow reports
* Cost Estimation for Construction Tendering.
* Crude Oil Refinery Project, Essar Oil Limited, India.
Capacity: 15 MMTPA, Consultant: ABB Lummus Crest, NES: Engineers India Ltd.
1997-1998 Reliance Petroleum Ltd, India
Reliance is India's largest business house The Group's activities span exploration and production (E&P) of oil and gas, refining and marketing, petrochemicals (polyester, polymers, and intermediates), textiles, financial services and insurance, power, telecom and infocom initiatives.
Expediting Engineer (Procurement Function), under supervision of Bechtel
* Coordinating between Vendor and Bechtel Engineering Division for Design clarifications and Approvals.
* Coordinating between Vendor and Procurement & Finance Department for Commercial issues.
* Coordinating between Vendor and Logistics Department & Warehouse for Equipment Delivery related issues.
* Coordinating between Vendor and Construction Site for Installation related issues.
* Expediting to ensure Supplier Compliance with Contractual Requirements.
* Evaluate Supplier Manufacturing schedule and Progress Reports.
* Visiting Supplier Fabrication shops to expedite and ensure Work progress.
* Monitoring Procurement progress using Bechtel Procurement Tracking System comprising 6 Modules, viz., MRP, Requisitioning, Purchasing, Expediting, Logistics and Inventory.
* Expedited for Equipment such as Heat Exchangers, Compressors, Pumps, Vessels, Prefabs of Riser & Flare, Silencers, Strainers, EOT Crane and Gratings.
Project
* Refinery & Petrochemical Project, Reliance Petroleum Limited, India.
Capacity: 24 MMTPA, Consultant: Bechtel
1995-1997 Indofab Industries, India
Indofab is medium scale fabrication & manufacturing company executing Fertiliser and Sugar plant projects.
Engineer (Manufacturing Function)
* Planning & Control of Manufacturing and Fabrication
* Cost estimation
* Supervising & Monitoring Workshop activities
* Inspection of various fabricated equipment
* Involved in Fabrication activities of Equipment like Vacuum Filter, Slaker, Classifier, Granulator, Hydrocyclone, Screw Conveyor, Duplex Filter & Tanks.