Oil Companys Contractors

TotalFinaElf Santa Fe
Conoco Indonesia Inc Ltd Coflexip/Stena/Kenny
Shell Expro Brown & Root / Saipem
Conoco UK Allseas
Arco British Ltd. Momentum Engineering
Gulmar Offshore ME

COMPLETE SUMMARY

A total of 29 years experience in project engineering, procurement and construction activities associated with offshore pipelines, jackets, topsides, bridge links, sub-sea manifolds and control umbilicals. This experience was gained working for both oil companies and contractors during both onshore and offshore project phases. These projects were performed in many areas of the world including North Sea, Sea of Marmara (Turkey), Timor Sea (Australia), West Natuna Sea (Indonesia & Malaysia) and Persian Gulf.

The above activities include:
* Technical and commercial management of subsea developments including pipelines, risers, tie-in spools, subsea manifolds, control umbilicals, shore approaches, testing, precommissioning (de-watering, air & vacuum drying & nitrogen purging), gassing up and decommissioning.
* Interface management between jacket and topsides design, fabrication and installation contractors, including weight control, load out, sea fastening and approval of installation procedures.
* Offshore supervision of all of the above activities as client representative and / or senior project engineer.
* Technical management of conceptual and detailed pipeline design, feasibility studies, economic evaluations, bid preparations and evaluations, preparation and approval procurement packages and specifications together with the preparation and approval of installation procedures.

2003 GULMAR OFFSHORE MIDDLE EAST L.L.C.

Project Manager for a Construction / DSV Contractor in Sharjah, UAE responsible for commercial and technical management of pipeline shore approaches, route surveys, trenching, testing and pre-commissioning activities on a 12-inch gas pipeline between Sirri and Kish Islands in the Iranian sector of the Persian Gulf.

2002 PT INDOSPEC ASIA

Installation Superintendent (Contract) engaged on Conoco Indonesia Inc Ltd Additional Dry Gas Fields (ADGF) Project in both Indonesian and Malaysian waters in the West Natuna Sea.

Responsibilities include:

* Review and approval of all Offshore Installation Documents
* Pre-mob audits of vessels
* Establishing Conoco's Offshore teams for Contractor's vessels
* Company Site Representative on board Derrick Lay Barge Castoro 2 during pipelay and installation of riser and tie-in spools
* Project Site Representative on board Hang Tuah Platform during pipeline hydrotesting, de-watering, air and vacuum drying and nitrogen purging operations
* Offshore coordination of all Contractor's vessels in the field including:
- Derrick Lay Barge "Castoro 2"
- Construction Vessel "Pearl Marine"
- Diving Support Vessel "Miss Marie"
- Survey Vessel "Pacific Oak"
* Offshore management of Conoco's offshore team of up to 17 representatives and inspectors
* Continuous monitoring of Contractor's overall offshore programme
* Management of guard vessel
* Liaison with Hang Tuah and Duyong Platform Superintendents

2001 SINGGAR MULIA

Pipeline Project Engineer (Contract) engaged on Conoco Indonesia Inc Ltd BA20/21 Flowline Replacement project and the Additional Dry Gas Fields (ADGF) Project in the West Natuna Sea.

Responsibilities include:

Review of Pipeline Engineering documents, preparation of scope of work and technical elements of bid package, tender evaluation etc.

1999/2000 OFFSHORE DESIGN ENGINEERING (ODE)

Pipeline Project Engineer (Contract) engaged on TotalFinaElf's Nuggets and Otter Development Projects in the Northern North Sea.

Responsibilities include:

Preparation of Pipeline Pre-commissioning philosophy documents for oil, gas and MEG / Methanol pipeline systems.

Review of design documents to ensure they reflect the requirements for offshore construction.

Bid evaluation of EPIC contracts

Client engineering and construction co-ordinator for Nuggets subsea N1 & N3 sub-sea manifolds.

1999 COFLEXIP STENA KENNY

Test and Commissioning Engineer (Contract) engaged on the Laminaria and Corallina Offshore Oil Development Project in the Timor Sea, Australia.

Responsibilities included:

Supervision of the flooding and hydro-testing contractor during the preparation of procedures to cover riser flooding, leak testing and hydro-testing operations of a number of Coflexip risers, flowlines, manifolds and dual bore tie-in spools.

Supervision of the flooding and testing contractor during performance of the work offshore as described below:

* Riser flooding operations on board of the FPSO "Northern Endeavour" during riser installation operations.
* Flowline and spool leak testing operations from a Supply boat in 400 metres of water utilising a ROV hot stab connected to the subsea manifold.
* Final Hydrotesting operations on board the FPSO "Northern Endeavour" covering all risers, flowlines, manifolds and dual bore tie-in spools.

1997/99 ARCO BRITISH LTD.

Senior Project Engineer (Contract) engaged on the Deben, Bure West and Waveney Development Projects.

Responsibilities include:

Technical responsibility for the pipeline design and installation, testing and commissioning.

Offshore Representative on board the Heavy Lift Vessel "Stanislav Yudin" for the installation of the Waveney and Thames AR Platforms (jackets & topsides) and a bridge link onto the existing Thames AP Platform.

Fabrication of protective structures for subsea wells.

Pipeline Commissioning Engineer for back gassing operations of the Waveney pipeline. Responsibilities included preparation of back gassing procedure, safety reviews and offshore supervision of operation on board DSV

1997 MOMENTUM ENGINEERING

Project Engineer (Staff) engaged on the Kuzey Marmara Offshore Gas Development Project in Turkey.

Responsibilities include:

Engineering support / fabrication supervision during the fabrication, testing and load out and offshore installation of the topsides and subsea tie-in spools.

Preparation of all pipeline procedures, performance of all activities and preparation of reports associated with flooding, gauging, cleaning, hydrotesting, de-watering, MEG swabbing and nitrogen purging operations for the gas and MEG pipelines.

Performance of platform piping leak testing operations and de-commissioning of gas pipeline to allow safe removal of damaged ball and seals on ESD valves

1995/97 ARCO BRITISH LTD.

Pipeline / Sub-Sea Project Engineer (Contract) engaged on the Gawain, Trent and Tyne, Blenheim and Bladon Development Projects.

Responsibilities include:

Technical review, co-ordination and management of pipeline design and installation contractors including their diving sub-contractors. Located offshore on pipe lay vessels and DSV's during critical phases of operations. (Start up / lay down operations, pipeline crossing and wet buckle investigation and retrieval.

On shore Interface management between the Trent and Tyne jacket and topside design / fabrication contractor and the installation contractors. Also responsible for load out and seafastening of jacket & topsides. Client representative on board heavy lift vessel, "Stanislav Yudin", during installation of jackets, topsides and MEG storage tanks.

Conceptual engineering and preparation of work scopes for subsea pipeline tee assemblies for future pipeline tie-ins.

Preparation of work scopes and technical review of gas and MEG pipeline pre-commissioning and commissioning procedures. Arco site representative at Amoco's Bacton Gas Terminal during pipeline hydrotesting, cleaning, de-watering, pre-commissioning, back gassing operations and MEG filling operations.

Technical review and co-ordination of design, manufacture and installation of flexible flowlines, riser bundles, control umbilicals and protective structures for the Blenheim and Bladon field development.

1994/95 BROWN & ROOT

Seconded to Conoco UK Ltd as a Project Engineer (Contract) on the Victor North West Development Project.

Responsibilities include validation of existing riser tee for sub-sea hot-tap tie-in of Victor North west gas export pipeline. Work scope included preparation of offshore inspection and testing programme and offshore supervision of same in order to satisfy the requirements of the HSE. Also responsible for technical review of the hot-tap procedures and co-ordination of Hazops associated with this and the hydrotesting operations.

1993/94 ALLSEAS

Senior Project Engineer (Contract) engaged on the Phillips Judy/Joanne Development Project.

Responsibilities include technical review of all pipelay, trenching and backfilling procedures to ensure compliance with contract requirements. Evaluation and formulation of insulated field joint coating system for high temperature infield production pipelines including supervision of onshore testing and offshore application on pipe-lay vessel "Lorelay". Supervision of onshore fabrication and hydro-testing of inline tie-in spools onboard "Lorelay" prior to mobilisation.

1989/93 ARCO BRITISH LTD

Pipeline Project Engineer (Contract) engaged on the Welland, Pickerill and Orwell Gas Development Projects together with detail design studies for the Blenheim Oil Development Project.

Responsibilities include supervision of pipeline, riser, subsea manifold, and umbilical design contractors and management of technical interfaces for all material suppliers (including linepipe, umbilicals and subsea valves etc.), landfall contractor at Conoco's gas terminal at Mablethorpe, pipeline hydraulics, Works Authorisation Application, pipeline, riser and umbilical installation contracts and pipeline pre-commissioning. The Orwell electro-hydraulic control umbilical is of particular note having a length of approx. 32Km, a world record at it's time of installation.

1988/89 SHELL EXPLORATION AND PRODUCTION

Pipeline Engineer (Contract) engaged on the Sole Pit Gas Pipeline Project. Initially responsible for all pipeline associated materials including preparation of MTO's, specifications and bid documents etc. Responsible for bid evaluations, clarification and pre-award meetings. Also responsible for liaison with material suppliers during manufacture to resolve technical queries.

Transferred to Construction and was responsible for landfall section of trunk-line into the Bacton gas Terminal. Responsibilities included review of installation contractors procedures, liaison with site engineers, review of concessions requests etc.

1987 BROWN & ROOT/SAIPEM

Project Engineer (Contract) engaged on Conoco's LOGGS Project. Duties included liaison between rockdump subcontractor and client during preparation of procedures. Transferred offshore as Saipem's representative onboard DSV "Smit Semi 1" during hyperbaric welding tie-in operations, liaison between diving subcontractor and client.

1987 ALLSEAS MARINE CONTRACTORS S.A.

Project Engineer (Contract) seconded to Allseas Engineering bv in The Hague engaged on the Placid K12 to L10 Gas Pipeline and Riser Installation.

Responsibilities included preparation of construction manual, engineer onboard dynamic position pipelay vessel "Lorelay" during installation of 18" gas line and risers and then onboard DSV to supervise pigging and hydrotesting operations.

1984/86 SHELL EXPLORATION AND PRODUCTION

Pipeline Engineer (Contract) engaged on the Tern and Eider Pipelines project comprising oil, gas and water injection pipelines, retro-fit riser and supports and a J-tube pull.

Duties included preparation of scope of work and technical specifications for conceptual and detailed pipeline designs together with overseeing the design contractor during the engineering phase including preparation of design reports and drawings.
Other responsibilities included review of specifications, riser J-tube drawings and riser lifting and installation analysis. Preparation of linepipe MTO's dimensional requirements for pig traps for intelligent pigs, riser fabrication specifications, hydrotest pressure schedule and design data books.

1979/84 CONOCO UK LTD

Pipeline Engineer (staff) engaged on the Victor to Viking Pipeline Project comprising 16" gas line, 3" piggybacked methanol line and associated risers.

Responsible for overseeing all stages of project from conceptual design/feasibility studies through to commissioning. Duties included preparation of design basis for pipelines and risers, liaison with various government bodies to obtain Works Authorisation, technical review of pipeline design and project services contractor, review of details design, specifications, drawings contracts, bid enquiries and installation procedures. Subsequently based offshore as Company representative during pipelaying, trenching and riser installation operations.

Company representative onboard lay barge during installation of North Leg Gas Pipeline over pipeline crossing of Murchinson oil line.

Staff Pipeline Specialist working in central engineering department providing cost estimates, schedules and cash flow forecasts for pipelines, risers and subsea tie-ins for various economic evaluations of possible North Sea field developments. Also produced various feasibility studies for pipeline and riser installations including retro-fitting of risers to existing platforms and subsea tie-ins. Also conducted technical review of technical specifications, drawings and procedures prepared by partner in North Leg Gas Pipeline system, co-ordinating internal review of pipeline block crossing applications made by other oil companies.

Represented Conoco on United Kingdom Offshore Operators Associations (UKOOA) Pipeline Sub-Committee and at meetings of the Offshore Equipment Utilisation Group.

1974/79 SANTA FE (UK) LTD

Construction Engineer (staff) engaged on various construction, pipelay and trench barges on a number of offshore projects in the North Sea as described below.

Barge Engineer supporting foundation drilling group installing under-reamed and pin pile foundations on various jackets associated with the Ekofisk Field Development.

Barge Engineer/Stinger Operator onboard laybarge "Choctaw 2" during the installation of Cod to Ekofisk Pipeline.

Project Engineer onboard laybarge during installation of Thistle to Dunlin pipeline.

Installation Engineer supervising the erection of 750 ton crane onboard "Choctaw 2". Also supervising repairs, modifications and dry-docking of pipelay/derrick barges and stingers in various shipyards throughout Europe. Other duties included preparation of barge anchor patterns including use of crossing mooring techniques, supervising load-out of drilling equipment for trans Atlantic tow and preparation of cost estimates for various pipelay bids.

1968/73 JOYCE LOEBL COMPANY LTD

Apprentice Fitter producing various small components and sub-assemblies for final assembly into various electronic/optical scientific instruments. Also worked in the Production Control Department and drawing office.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 6551 to 6600 of 15414)Go to Search Parameters...
Brief Description
I'm a Senior CSWIP 3.2 and Radiographic Interpreter 3.4 holder. Having more than Twenty years of experienced in Oil & Gas construction and Inspection work, both Structural or Piping in Onshore and Offshore. Familiarized with various Welding Processes and relevant Code & Standard.
A DIPLOMA IN MECHANICAL ENGINEER HAVING 20 YEARS EXPERIENCE IN CONSTRUCTION FOR VARIOUS INDUSTRIES LIKE CROSS COUNTRY PIPELINE, CEMENT, CHEMICAL, FERTILISER, POWER, ETC., PRESENTLY FOR THE PAST 7 YEARS WORKING AS A DY. MANAGER (CONSTRUCTION) WITH SIMON INDIA LIMITED, INDIA.
20 years experience in the industry and PDMS user since 1997. Extensive experience in PDMS 3D Design and 2D Draft producing engineering and fabrication drawings for a wide range of projects in the following countries: France, USA, Norway, Holland and UK. Experience in AutoCAD and Microstation.
29 plus years in the oil and gas production. All phases in the operation of oil and gas production platforms. Design, build, install and trouble shoot pneumatic and hyfraulic safety and control systems.
State Diploma of Geometer Studies in engineering State Doctorate of Political Sciences - Option " International "
Truck driver
As a fully qualified Mining Engineer i am looking to offer my skills to earth resource projects.
Played as a Coordinator / senior to executed various turnkey EPC Projects incl HVAC system Rich Experience in the Project Management and coordinate to finalise Basic Design, Basic Engineering, Detailed Engineering with Process Engg.
Date of Birth 19 Octobre 1951 Nationality British/Turkish (double nationality) Current Position Beicip Franlab Associate Reservoir Management Consultant
I am applying for overseas MINING appointments
I am at present a Tool Pusher in Chad. IWCF Surface BOP Stack ; Current through 3/06 H2S Alive Certificate, Saudi Arabia Exxon Leadership Safety Training Workshop Eddie Bauer Problem Solving Certificate S.C.R. Rosehill Prodico Certificate
Twenty years experience in global recruitment of oil & gas people: sound knowledge of engineering skills required for design, fabrication, construction, commissioning of FPSOs, LNG trains, offshore platforms, petrochemical plants and refineries.
Maintenance Supervisor/ Superintendent
To join an organization where management skills and experience can be exercised to provide leadership in the areas of design, construction and plant maintenance utilizing my training and 25 years of experience to improve the firm's long term viability as a successful business concern.
June 2003 ©¦EPresent Company: JGC Corp Location: China Position : Schedule Controller May 2002 ¨C March 2003 Company: FAFCO Location: Saudi Arabia Position : Planning & Scheduling Engineer
maintenance electrician moving to Alberta Canada requiring career opportunities
Senior Piping Designer
Objective: To obtain a management or Business Development position with a Service Company in the Oil Industry that will allow me to implement my engineering and management knowledge in Completions and Production
An experience hands-on Marine Superintendent with a reputation of working around problems to get the job done. Has a broad marine background spanning 25 years of oil tanker/terminal and offshore marine operations, including the commercial aspects of the same.
Drilling Supervision, Service Company Management.
Proficient in managing reciprocating and rotating equipment maintenance, supervising general servicing, overhaul, installation, commissioning and troubleshooting of this equipment, ability to set up and operate CMMS programs
14 years of experience working as an Executive Secretary/Assistant. For the past 11 years I have been working in Saudi Arabia with Senior Executives of Companies.
A professionally qualified Engineer and Project Manager, with a total commitment to excellent performance, combining experience that encompasses a broad range of technical, training and management disciplines as well as practical, 'hands-on' involvement.
Seeking a Operation Manager position. Offer extensive hands-on and supervisory experience in multimillion-dollar commercial projects within the construction industry."
Extensive offshore experience within maintenance departments of large scale open pit mining operations.
Over 14 years of Environmental Engineering services in the area of subsurface contamination and remediation of petroleum and non petroleum hazardous waste sites. Skills range from design and supervision to management and business development.
I have over 20 years experience as an On Site Drilling & Workover Supervisor with Exxon Co. USA working out of Midland Texas and for Saudi Aramco. From 1998 to present I have been a Drilling & Workover Consultant.
29 years experience in offshore pipeline project engineering, procurement, offshore construction & commissioning in North Sea & SE Asia. Includes pipelines, risers, tie-in spools, manifolds, umbilical, shore approaches, testing, de-watering, air & vacuum drying & nitrogen purging & gassing up.
I have 20+ years as a Welder. I have numerous certifications in Welding Procedures. I am willing to relocate and/or travel.
25+ years in the pharmaceutical, chemical and petroleum industries as an instrumentation technician. Willing to travel.
11 plus years experience in managing granite quarries.
An enthusiastic, & effective team leader/player, having successfully seen major projects through to completion. Positive disposition, promoting a clear sense of purpose in individuals and teams. Experienced in a wide range of Process Equipment, within Refineries in the UK & Overseas
20+ years in EPC heavy/industrial. Sharpest skills in resource & time control. Expert Planner/Scheduler w/Primavera P3, P3e Teamplay etc. software, 14 years experience (superuser & administrator). Capable Cost Engineer & Good communicator.
Positions attained include Maintenance Manager, Ore Flow General Superintendent, Mill Maintenance Superintendent, Mechanical General Supervisor, Planner Estimator, Machine Shop Foreman, Material Coordinator, Field Repair Foreman and Millwright.
Registered California architect with 14 years construction management experience acting as owner representative for governmental agencies managing the design and the construction of various types of facilities.
Seeking work in the Mining or Oil & Gas sectors in the HR/IR fields.
Enriching a company in the Mid-Atlantic building products market.
Moving To Thomaston Area Georgia need Work 4/1/04
I am willing to relocate for my employer, I am a mature energetic, safety oriented employee.
35 continuous years of national and international commercial construction experience
22 years of experience in the oil field trucks, cranes, forklifts, loaders, pickup's, passenger cars.
I am experience Electrical Instructor who has worked for most of the major Oil and Gas companies. I have experience as both a classroom, On the job trainer and NVQ Assessor. My work experience covers the following areas Middle East, Far East and Africa.
Environmental Scientist with Sales, managerial and training experience.
I am very experienced and have worked at all levels worldwide and also worked with many nationalities. I work very hard and get on well with everybody.
Mechanical & Electrical Engineer Location East London, Essex, Kent, Greater London Salary To £30,000 plus package
Safety Manager Seeking Position
Total 14 years experience: Rich experience in the operation and project environment in the petrochemical and oil industry. Well versed in the use of computer packages, simulator and also TDC-3000 control systems.
Supervisory/Management position in a corporation promoting quality, team effort and excellent customer/worker relations. 20+ years supervising labourers, welders, & fitters on many different jobs and locations. Oil, Gas, Petroleum, & Pipelines. Many trips to Iraq in the 80's
I am currently looking for a job in mining or heavy construction that will utilize my skills and productivity as a heavy equipment operator.
Crane Operator
First   Prev   101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124   125   126   127   128   129   130   131   [ 132 ]   133   134   135   136   137   138   139   140   141   142   143   144   145   146   147   148   149   150   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2010 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com