Resume #47271
next resume »»
CONTACT INFORMATION:
View contact information...
QUALIFICATIONS
Bachelor of Science in Civil Engineering Cebu Institute of Technology
Cebu City, Philippines 1973
SUMMARY OF PROFESSIONAL EXPERIENCE
Eighteen (18) years of overseas and nine (9) years of domestic experience in project management, supervision, technical advisory on construction methods, procedure, planning & scheduling in Infrastructures, Oil and Gas and Petro Chemical Plants (i.e. residential and commercial buildings, substations, roads concreting, community housing, polymers, refineries, gas plant, ngl, gosp, power plant, tankages, airports, bridges, irrigation, hospital and other in-plant civil and electro-mechanical works) both offshore and onshore.
OBJECTIVE
To be employed by a company where my expertise in the field of engineering and construction could be utilized for mutual benefits.
EXPERIENCE RECORD
I. ARAMCO Project Management Team (PMT)
February 12, 2006-Present Site Superintendent-Civil-Khursaniyah Gas Plant (KGP)
Khursaniyah, Saudi Arabia
Aramco Mega Project of The Year
Project Cost: USD 5bn
Contractors Supervised: Bechtel/Technip/CCC-a total of 5,000 men.
Reporting to Const. Manager
Detailed Duties and Responsibilities:
- Responsible in assisting Construction Manager in ensuring that contractors- adhere to the development and implementation of plans, and programs to meet contractual commitments on safety, schedule, work performance, quality of works, cost and the profitability of the project in Khursaniyah Gas Plants – NGL Trains 1 & 2.
- Closely monitor contractors manpower level in relation to progress to meet volume of activity since this is a fast track project.
Identify priority interface activities and inform contractor of solutions to prevent delays.
- Constantly advice & identify contractors of workable areas in reference to construction schedule to maintain progress.
- Attend weekly meetings with management and contractors to discuss progress, delays and provide suggestions and solutions.
- Conduct daily surveillance on contractors (Technip & Bechtel) activities in the areas of safety, quality & progress.
- Scope includes construction of Electrical Substations, Maintenance & Engineering buildings, massive equipment foundations, piperack fdns., U/G facilities, erection of structural steels, roads/pavement and other minor fdns.
II PRIVATE CONTRACTING
February 2005 - February 10, 2006 Construction Manager-
Construction of Residential/commercial buildings, using galvalum
Project cost: 3.46 Million Pesos
Number of Staff Supervised: Civil Supervisor,
Accountant plus 25 workers
Reporting to PM
April 2003 - February 2005 Construction Manager
Neg.. Or. South Provincial Road Restoration- 45 kms
Project Cost: 91.1 Million Pesos
Number of Staff Supervised: 3 Civil Engineers,
Accountant, QA/QC Engr., Safety Engr., Surveyors,
HEO Supervisor, Material Engineer & 120 workers
Reporting to PM
III. M. AL-MOJIL GROUP (MMG) OF COMPANIES
Dammam, Saudi Arabia
Dec. 1998-Dec. 2002 General Superintendent
Polymers Facility, Yanpet Expansion Project-
PE Powder Silo, Offsite Facilities, 3 Sub-stations and
PE Warehouse.
Royal Commission of Yanbu
Yanbu, Saudi Arabia
Total Project Cost: USD 120.00 M
Client Name: Mitsubishi Heavy Industries (MHI)
and Fluor Daniel Arabia
Number of Staff Supervised: Site Superintendent,
Supervisors, QA/QC Engr.,
Eqpt. Supv., Surveyors, and 980 workers.
Reporting to: Sr. Project Manager
Detailed Duties and Responsibilities:
- Supervise the overall construction of Silo Foundations, construction of PE Warehouse and Sub-stations 2PSU-3601, 2PSU-4101 & 2PSU-3001. Ensuring that safety, quality of works and performance are adhered to.
- Attend regular construction meeting with client and sub-contractors to asses progress and recommend plan of action on delayed activities.
- Coordinate with Field Engineering regarding sub-contractors Technical Querries (TQ) for fast resolution of problem.
- Liaise with Civil, Mechanical, & Electrical-Instrumentation contractors on priority activities.
- Responsible for the planning and execution of the works in a safe and cost
Effective manner.
Directors and GA
Dec.1992-Nov. 1993 Site Superintendent-Construction Division
Abqaiq Extra Light (AXL) Segregation Project-
GOSP- 2 and GOSP-5, Abqaiq, KSA
Total Project Cost: USD 4.00 M
Client Name: ARAMCO
Number of Staff Supervised: 5 Supervisors,
Site Planning/Cost Engr., Surveyor, Nurse, and 300
men
Reporting To: Project Manager
March 1992-Nov. 1992 Site Superintendent-Construction Division
Berri Gas Plant, Inlet Piping- Berri, Jubail, KSA
Total Project Cost: USD 4.14 M
Client Name: ARAMCO
Number of Staff Supervised: 4 Supervisors,
Surveyor and 300 men
Reporting To: Project Manager
July 1991-Feb. 1992 Construction Manager- Offshore Division
Marjan Project Completion
Project Cost: USD 5.50 M
Client Name: Fluor Daniel Arabia/Aramco
Number of Staff: 3 Supt., 12 Supervisors, Boat
Captains, Safety Supv., Timekeeper, Nurse and 190
men
Reporting To: Project Manager
August 1989-July 1990 Civil Works Supt. – Construction Division
SADIP Proj., Dammam, KSA
Total Project Cost: $ 1.3 M
Client Name: Saudi Arabian Ductile Iron Pipe
Number of Staff Supervised: Supervisors, and 150
men
Reporting To: Project Manager
Detailed Duties and Responsibilities:
- Responsible for assisting Project Manager in ensuring development & imple mentation of plans & programs to meet contract commitments on safety, work performance, quality of works, schedule, cost & profitability of the project.
- Manages field operations and site productivity, ensures efficient and suffi-
cient utilization of manpower & equipment.
- Provide timely advise to the PM to ensure that plans and schedules are met.
- Ensure that site safety programs are followed and strictly observed.
- Attends weekly/monthly construction meetings as required and implements systems/plans to effectively respond to client complaints.
- Ensures that QA/QC programs are all followed.
Feb. 1985-June 1989 Civil Works Supv.- Construction Division
King Fahd International Airport- Utility Plants and
Distribution System, Dammam, KSA
Total Project Cost: USD 12.00 M
Client Name: Bechtel and Chiyoda Petrostar Ltd.
Number of Staff Supervised: Foremen, Subcon-
Tractors and 180 men
Reporting To: Construction Manager
Detailed Duties and Responsibilities and Special Skills
- In-charge for all Underground construction and backfilling for Tank Farm
(UJX), Central Pumping Station (UBB), Central Plant (UIA), Irrigation Pumphouse (UIB), Two (2) Lift Stations, Offsite Facilities (UXX)- Underground Piping, large electrical manholes, duct banks, large diameter RC pipes, FRP pipes, Tunnel, retaining walls and anchors.
Jan. 1984- Oct. 1984 Piping Supervisor-Construction Division
Rabigh Refinery Complex-Process Piping, Area 5300
Piperack., Rabigh, KSA
Total Project Cost: USD 12.00 M
Client Name: Petrola
Number of Staff Supervised: Foremen and 100 men
Reporting To: Area Supervisor
Feb. 1983 – Nov. 1983 Civil Works Supv.- Construction Division
Berri Offsite Project, Berri NGL Plant, Berri, Jubail
Saudi Arabia
Total Project Cost: USD 6.00 M
Client Name: Fluor Daniel Arabia/ARAMCO
Number of Men Supervised: Foreman plus 98 men
Reporting To: Construction Superintendent
Detailed Duties and Responsibilities:
- Reporting directly to the Construction Superintendent, ensures that day to day progress and accomplishment is met in compliance to safety, schedule, cost, and quality of works.
- Responsible for all site execution for Civil Works and Piping activities.
- Closely abide by the weekly or monthly schedule to meet and attain progress by monitoring materials and tools availability.
- Prepares tools, materials & manpower forecast to sustain progress.
- Be the frontliner in observing safety in the worksite.
- Ensure that dewatering is sustained prior to concrete pouring of underground foundations.
May 1982 – Dec. 1982 Field Engineer- Construction Division
Juaymah Wastewater Treatment Plant- Juaymah,
Saudi Arabia
Total Project Cost: USD 1.86 M
Client Name: ARAMCO
Number of Staff Supervised: Supervisor, Safety
Engr. and 100 men
Reporting To: Area Manager
May 1981- May 1982 Field Engineer – Construction Division
Uthmaniyah Gas Metering and Gas Gathering Proj.
Uthmaniyah, Saudi Arabia
Total Project Cost: USD 5.06 M
Client Name: ARAMCO
Number of Staff Supervised ; 3 Engineers plus 60
men
Reporting To: Project Manager
Sept. 1980 – May 1981 Field Engineer- Construction Division
Harmaliyah Gas Lift Compressor Station-Contract
Ammendment No. 1- Construction of 128 man-dorm
Harmaliyah, Saudi Arabia
Total Project Cost: USD 5.60 M
Client Name: ARAMCO
Number of Staff Supervised: Supervisor plus 80 men
Reporting To: Project Manager
Detailed Duties and Responsibilities:
- Responsible for the construction of two (2) waste water tank foundations and the erection of the tanks in a safe and cost effective manner.
- Responsible in the construction of eleven (11) gas metering and gas gather-
ing stations, pipe and sleeper supports, pipe anchors for underground pipes & RTU buildings in Abqaiq, Hufuf, Uthmaniyah, and Ain Dar areas.
- Responsible in the construction of additional 128-man dormitory, control building, warehouse, material yard and security fencing for contract amendment No. I of Harmaliyah Gas Lift Compressor Stations.
- Performs Field Design Change Request (FDCR) when required.
Nov. 1979 – Sept. 1980 Planning and Cost Engr.- Construction Division
Gas Lift Compressor Station, Harmaliyah, KSA
Total Project Cost: 6.60 M
Client Name: ARAMCO
Total Number of Men: 200 men
Reporting To: Project Manager
Aug. 1979 – Nov. 1979 Planning and Cost Engr.- Construction Division
Faras Power Plant, Uthmaniyah, KSA
Total Project Cost: USD 5.78 m
Client Name: Saudi Consolidated Elect. Co.
(SCECO)
Total Number of Men: 160 men
Reporting To: Project Manager
June 1977 – Aug. 1979 Planning and Cost Engr.- Construction Division
Seawater Project – Water Supply Station No. – 1 &
Water Injection Plants 1 – 5
Total Project Cost: USD 12.00 M
Client Name: Bechtel/ARAMCO
Total Number of Men: 700 men
Reporting To: Project Manager
Detailed Duties and Responsibilities:
- Develop a Project schedule showing critical activities, manhour densities, material deliveries, & special rigging schedules in the whole duration of the project. Accuracy of the schedule is critical toward developing client confidence regarding our knowledge of the project.
- Determine physical progress that will be expected on a monthly or weekly
- basis by developing a time-scaled construction schedule, a 90-day, construction schedule, or a weekly construction schedule.
- Prepare Lead Time reports on Specially Designed or Foreign ordered Equipment as they usually determine project completion dates.
- Prepare and monitor weekly progress report and advise Project Manager on any deviations from the schedule so that appropriate corrective actions can be taken.
Regularly monitor impact of Field Design Change Orders on manhours and project duration.
- Record weather changes like sandstorm where work stoppage was experienced.
TRAININGS AND SEMINARS ATTENDED
- Disciplinary Case Procedure & Performance Appraisal System
- Management By Objective (MBO)
- Human Behavior in the Organization (HBO)
- Basic Construction Management Seminar
- Basic Safety Supervising Course
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1851 to 1900 of 15478)
Go to Search Parameters...
Brief Description
Project Engineer & System engineer along with detail design experience and product development expertise gained from 20+ years working for NASA.
skilled tradesman. Mobile/Tower crane operator, Heavy duty equipment mechanic, Rigger, Inspector, Apprentice Millwright
An extensive career having an experienced blend of commercial and construction credentials in the engineering/infrastructure field including civil and mechanical engineering works involving co-ordination of consultants, contractors & public utilities, managing deadlines and optimising costs
A professional with 24 years of multi-functional & multi-ethnic/culture experience in Technical and Project Management areas. Experienced in handling multi projects, excellent communication skills & man management capabilities, team building, business road mapping, problem solving abilities
I am a Mechanical Engineer with work experience basically in Oil & Gas and Refining Project Management, Gas Compression Plant Maintenance, and Process Safety Management. Currently I live in Venezuela and planning to relocate to the United States. I have dual citizenship and fluent in both languages.
25 years of professional experience in the Front-end and Detailed Design and Engineering, Projects Engineering, PMC, Factory & Site Acceptance Testing, Supervision of Installation, Testing and Commissioning of state-of-art DCS, SCADA, Safety Shutdown and F&G Systems and field instrumentation
TQM facilitator & instructor /Lead teams to resolve to improve process/ 4 yrs offshore Maintenance Supervisor /2yrs manager offshores field/ 4yrs CMSM coordinator/6 yrs contol management stocks
Masters degree management. 20+ years commercial/ heavy industrial construction. Carpenter based w/15 years management
Field Acquisition QC. Over 20 Years experience in Land Seismic. 3D Design by OMNI and MESA. Field processing of 2D/3D land seismic data (MicroMax,ProMax, VISTA, APEX) . Creating and verification of SPS files. Static correction.
Environmental Compliance Manager Results-driven, Certified Professional Geologist with extensive leadership, knowledge and experience in ensuring environmental compliance.
Working as In charge OIL/GAS LABORATORY TESTING OF LPG/C2C3/NAPHTHA/OIL ETC. PROCUREMENT/CALIBRATION/MAINTENANCE OF EQUIPMENTS
Worldwide experience in planning, managing, designing and implementing a wide range of water resources and water supply projects.
French Engineer with international and overseas experience Contract Management, General Management In the field of Water Treatment.
OBJECTIVE: Add value by leading people and projects, solving problems, bringing order from chaos, turning dysfunction into productivity, in a petroleum exploration or development geology management position.
Management consultant/ environmental scientist specializing in NEPA, RCRA, CWA, CAA, environmental assessments and fraud investigations.
Contracts Experience in Construction, Management and Administration (EPC), Materials Manager (PMC), Materials Control, Procurement & Expeditor; Fluent in English, conversational in French, Russian. Seeking to continue professional career effectively utilizing my skills and gained experience
More than(18) years in piping design & construction. Specialize in stress analysis of piping system using Caesar 11. Worked in oil refineries, onshore & offshore, gas plant & petrochemicals e.g. Saudi Aramco & Saudi Basic Petrochemicals ,Petromin Shell & Jeddah Oil Refinery.
Registered Mechanical engineer with heavy industrial, mining and USACE construction experience.
Specializaion in environmental management in an iron ore industry backerup by the experience in a regulatory body dealing with environment conservation.
-University – Master Science in Geology evaluated by York University. -Environmental adviser course – 1000 hours;
Senior Mechanical Engineer (M.Sc.) having experience as plant manager and project manager, specialist in mining, safety glass, manufacturing plant and brewery investments.
Detailed Structural designs of Civil Structures(RCC structure i,e, Buildings(Multi-storied office and residential), Roads, Bridges, Culverts, earth retaining structures(Retaining wall), Dams, rig & machinery foundations for Gas exploration
More than 10 years’ experience of coordinating structural projects and technology development acquired during the Master and Doctor Courses in Civil Engineering and working as engineer in construction, aerospace, offshore and onshore industries.
Working as a Rotating Machinery Specialist with specialist skills in machinery Componenant condition monitoring by Vibration analysis (CSI RBMware), Bentley Nevada DM2000 online monitoring system, Adre data collection, Flexware performance analysis, Ultrasonic check by CSI sonic scan and etc.
Strengths: detail oriented, flexible, analytical, self-motivated, adaptable, effective communicator and articulate. Experience in field drilling operation management with extensive hands-on technical, administrative and managerial functions; drilling technology assessment & implementation, contract
Presently working as Site Supt. Civil here in the construction of Khursaniyah Gas Plant (KGP) at NGL Trains 1 & 2, Saudi Arabia with Saudi ARAMCO. Representing the client in all civil works aspect of the work, I supervise two (2) major contractors-Bechtel/Technip Joint Venture.
Mining Engineer from with 24 years experience in underground as well as opencast mines. I have exposure in Lead-Zinc, Chromate Mines, Bauxite Mines and Limestone Mines. Presently, working as functional head of Limestone Mines captive to Cement plant.
I am confident and Expert; I am having 14 years experience with FIDIC contracts Worked on projects of Infrastructure Projects, Highway Roads, Bridges, Underpasses, Mechanical, Electrical, Water Work, Strom Water, Sub base Drainage, and Irrigation system, Construction of soft and hard Landscaping
Over 9+ years of experience in Portfolio management, Start stream TLM, Accounts, Operations & system automation.
Structural design of Post Tensioned Concrete Bridge, RCC High Rise Building, Tunnel, Highway Interchange Structure. Familiar with AASHTO LRFD, BS, ACI. Skilled in finite element softwares (MidasCIVIL, SAP, STAADPro, SAM-LEAP5 and AutoCAD). Specification, Report, AIP writing.
An accomplished and result-driven Management Executive with multi-faceted marketing experience. Exceptional communicator with demonstrated success interacting with people at all levels.
Free!
Dear Sir untill now I have more than 9 years experience in construction, conversion & repair of the Supply Vessels, ULCC tankers, Tug Boats & Jack Up Drilling Rigs. 6 years experience as Project Engineer. Currently I work at the position of the Project Coordinator in ship repair.
Lead Process Engineer for Oil& gas Offshore/Onshore projects for Conceptual, Basic /FEED and Detail Engineering, Optimization and De-bottlenecking
I have a total of 13 years of experience working as an Engineer in the Petroleum Industry. For the last 10 years I have been working as a Process Engineer handling all aspects from Conceptual Engineering through to the Detailed Engineering Phase. I am seeking work as a Senior Process Engineer.
Involved in commissioning and pre-commissioning activities.
To secure a long/short-term contract, or permanent position. In Construction, Maintenance, Commissioning etc. My current position is as an Electrical/Instrument Engineer (as to the above position I am negotiable).
Fourteen years of combined experience in petroleum engineering and G&G (U.S. & international.) Experience includes integrated 3D reservoir modeling, numerical simulation, reserves assessment, field development, and reservoir studies.
Three years diploma in Civil Engineering (Technical Education Board of Punjab Pakistan)
„Ï A thorough understanding of risk engineering and Health Safety and Environmental (HSE) management systems in petrochemical, chemical, oil & gas industries, gained in a consulting environment. „Ï Consulting experience related to Process Safety Management & Fire Audit, Dust Explosion
Health, Safety and Environment Specialist/Instructor with National (CIED-PDVSA) and International (North Sea) Certification. HSE and H2S Instructor. 20 years experience in Drilling, Production and Crude Oil Transportation in Safety related areas with National and International Operators and Contract
HVAC PROJECT MANAGER
Professional Oil and Gas Geologist (Masters Level) with 10+ years global Wellsite and Operation Geologist experience. Experienced in pre-planning, supervising and post-well wrap-ups of multi-well/multi-rig programs.
Chemical Engineer, P.E. Petrochemical Design Background Experience
ISO Compliance, 6 Sigma, Asset Mgmt, Vendor Mgmt, Catering, Transport, HK, Costing & Budgeting, HR, Employee welfare, FBT, Guest house mgmt, PF, ESIC, Medical, Fire drill, Security, Solving Employee feedbacks, Auditing, Billing.
I am a proficient project Manager in GIS with ESRI and ERDAS technologies
 11.0 years exp. normal Operations in a petrochemical & Gas plants mainly in operation of centrifugal compressors (cooper, kobelco & Elliott),reciprocating compressors ( IR ,SULZUR & Burckhardt ) ,all type of pumps (mainl
13 years in quantity surveying
18+ years automotive mechanics,11+years powder metal industry blending heatreat operations etc.
Rotating equipment / mechanical maintenance technician / Commissioning technician
Experienced, results oriented, safety minded manager
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
[ 38 ]
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com