Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #4944
next resume »»
CONTACT INFORMATION:
View contact information...
PROFESSIONAL EXPERIENCE
Archirodon Construction (Overseas) Co. S.A. July 2003 - till date
Senior Instrumentation & Control Engineer
The company is a leading construction company in the world with branches in over 20 countries. The company has been behind the construction of almost all the ports in the Middle East and specialized in all kinds of civil works and electro-mechanical works on large scale sector.
Project: Topside facilities to the Multi-Products Berth at Mesaieed Ind. City, Qatar
Duration: July 2003 - till date
Description:
* The work under this contract includes survey, detailed engineering, procurement, installation and commissioning of the topsides facilities to the multi-products berth for the export of crude oil, Naphtha, NGL C5+, etc at Mesaieed Industrial City in Qatar.
* Replacement of existing SCADA control system with new DCS control system in the new Terminal Control Building
* Replacement of existing PCS system with new PLC system for the crude oil tank farm and ARAB-D Condensate tank farm including interface with the existing tank gauging and pumps vibration monitoring systems.
* A new ESD system and F&G system including all field F&G sensors and transmitters and interface them with the master DCS system
* Supply of two new metering system and upgrading the existing five metering system along with the new metering panel & PLC system.
* Installation, Testing & Commissioning of new CCTV system, PA/GA system, Fire Monitoring & Fire Foam System.
* Installation, Testing & Commissioning of Five Loading Arms for Crude Oil and NGL and associated control systems in the new Local Control building.
My responsibilities:
* Deputed as Section Leader of the Instrumentation and Control Division
* Responsible for survey, detailed engineering, procurement, installation, testing and commissioning of complete instrumentation and control system in the project.
* Study and evaluate the contract specifications and drawings, selection of suitable PLC/DCS system, field instruments and all other materials, process the Qatar Petroleum's approval, and procurement of the same
* Carrying out on-site supervision for the installation of impulse tubing, calibration, testing, installation and commissioning of all field instruments, F&G sensors and transmitters, CCTV system, Telephone System, ESD system, communication equipment, Public Address / General Alarm system, etc.
* Preparing P&ID¡¦s, Instrument schedule, cable schedule, cable routing, Instrument Loop Diagram, Control Schematics, Wiring Diagram, Input/Output allocation table, control philosophy of the system based on the process requirement, Flow chart, Workstation mimic displays development, and Ladder Logic diagram development, etc.
* Supervising the installation of control panels, instrument & control cables, Fiber-Optic Cables, Patch panels, termination, loop checking, pre-commissioning, functional testing and commissioning of the same
* Preparing various documents and manuals such as field instruments calibration forms, Quality Control manuals, Testing & Commissioning procedures, Various Checklists for plant start-up and shutdown activities and other related documents required for the initial acceptance inspections
Saudi Archirodon Ltd. April 1999 - July 2003
Instrumentation & Control Specialist
Instrumentation & Control Engineer
Projects Handled
Project: Upgrading the Reverse Osmosis Units and its support Facilities
Duration: June 2000 - September 2002
Description:
* Upgrading the R.O. units and its Support Facilities, which consist of construction of three complete new R.O. units and upgrading the existing four units
* Constructing two new pretreatment plants and upgrading two existing pretreatment plants
* Upgrading two pump stations and drilling eight new deep wells
* Upgrading the PLC control system (Siemens S7 series) associated with each of the above
My responsibilities:
* Deputed as Section Head of the Instrumentation and Control Division
* Responsible for design verification, preparing diagrams for various layouts and installations
* Study and evaluate the contract specifications and drawings, selection of suitable PLC system, field instruments and all other materials, process the Royal Commission approval, and procurement of the same
* Carrying out on-site supervision for the installation of impulse tubing, calibration, testing, installation and commissioning of all field instruments such as pressure, temperature, level, flow indicators, transmitters, switches, analyzers (chlorine, pH, ORP, conductivity, H2), Motor Operated Valves and Flow Control Valves (Electro-hydraulic), etc.
* Preparing Instrument Loop Diagram, Control Schematics, Wiring Diagram, Input/Output allocation table, control philosophy of the plant based on the process requirement, Flow chart, Workstation mimic displays development, and Ladder Logic diagram development
* Supervising the installation of control panels, instrument & control cables, termination, loop checking, pre-commissioning, functional testing and commissioning of the same
* Preparing various documents and manuals such as field instruments calibration forms, Quality Control manuals, Testing & Commissioning procedures, Various Checklists for plant start-up and shutdown activities and other related documents required for the initial acceptance inspections
Project: Modifications of Industrial Waste Water Treatment Plant.
Duration: Aug. 1999 - June 2000
Description:.
* Project was undertaken to do modifications on Industrial Waste Water Treatment Plant, which consist of construction of four new multimedia territory filters, a PLC system (Quantum series from MODICON) to control the automatic backwashing system for these new filters as well as existing eight filters, thereby increasing the capacity of two pump stations including the complete modifications on power and control system and upgrading the chlorination system
My responsibilities:
* Preparing P&I diagrams and detailing out various layouts and installations
* Studying and evaluating the contract specifications and drawings, selection of suitable PLC system, field instruments and all other materials, process the Royal Commission approval, and procurement of the same
* On-site supervision for the installation of impulse tubing, calibration, testing, installation and commissioning of all field instruments, modifications to existing power supply panels, preparing marshalling cabinet wiring table
* Preparation of Input/Output allocation table for PLC, control philosophy, Flow chart, Workstation mimic displays development and Ladder Logic diagram development
* Inspection of the materials received on the site from the suppliers, to carry out off-site inspections and co-ordination among civil, electrical and mechanical engineers
* Supervising the installation of control panels, instrument & control cables, termination, loop checking, pre-commissioning, functional testing and commissioning of the same
* Preparing all documents, manuals and checklists required for the plant start-up and shutdown activities, as well as for the initial acceptance inspections
Project: Seawater Cooling System Expansion Project (Phase - 2)
Duration: April 1999 - June 2000 & July. 2002 - ongoing
Description:
* It is the World biggest Seawater Cooling System Expansion Project
* The expansion consists of fourteen new Seawater Pumps from Ebara Japan (13.5m3/sec. capacity fitted with Mitsubishi synchronous motor 1900 kW, 4.16kv) controlled by a Local Control Panel dedicated to each pump, seven new Drum screens (Bracket & Greene, UK) controlled locally by a Allen-Bradley PLC system, Four chlorine production trains & their associated pumping station from Mitsubishi, controlled locally by ABB AC-160 & AC-70 PLC system and Electrical substation (Westinghouse) for all the Phase-II equipment controlled locally by a Modicon PLC provided with two additional internal network of GE-Multilin Relays network (RS-232/485) and Cutler-Hammer WPONI, IPONI devices connected through a Gateway to BM-85 Multiplexer
* All the Local Control Panels and PLC systems are connected to a centralized DCS System (ABB AC-450 Master System) through remote I/O cabinet, Modbus Communication, Advant Fieldbus communication and Modbus Communication.
* Apart from the above, there are many standalone equipment & their controls including 50 Ton Gantry Crane controlled by Siemens PLC, Trash Rack & Workshop Cranes, controlled by Siemens PLC and Cathodic Protection System controlled & monitored by Cylon Controls CU & RMU system
My responsibilities:
* Solely responsible for the entire Instrumentation and Control section
* Studying and evaluating the contract drawings and preparing the shop drawings for the installation of instrumentation and control related items
* Design and develop the operating philosophy of various control system and engineering the interface with the DCS
* Coordinating with various PLC vendors such as Allen Bradley, Modicon, Siemens and ABB to have a complete workable control system
* Preparing cable schedule, Instrument Loop Diagrams, Control schematics, Wiring Diagram, Functional block diagrams and flow diagrams for the complete interface of seawater cooling system (including pumping station, drum & bar screens, wash water system, chlorination plant, electrical sub-station) with DCS
* Review of instrument catalogues and procurement of the same as per requirement of Royal Commission
* Supervising the team of technicians and electricians in installation of field instruments, calibration, testing, installation of cables, termination of cables, loop checking
* Planning & scheduling day to day construction activities, handling manpower and material management, preparing daily activity reports and reporting to the management
* Designated Team leader for the Testing & Commissioning for the complete project, which involves various activities such as inter-department coordination, scheduling & performing the pre-commissioning and commissioning activities, providing training of all installed equipment & control systems, and preparing of handing over documents and related files
Zamil O&M Co. Ltd.
Technical Service Supervisor July 1996 - April 1999
Roles & responsibilities:
* Supervising the Operation and Maintenance of World biggest Seawater Cooling System
* Supervising a team of Technical Support Engineers, Planning & Scheduling Engineers, Computer Engineers, QA/QC Inspectors, Computer programmers and operators
* Study, evaluate and modify the existing instrumentation system for easy interface with ABB Distributed control system
* Prepare Input/Output list, feasibility report, review application engineering and assist ABB in mimic displays development
* Controlling, planning & scheduling the preventive maintenance program
* Coordinating work authorizations, labor and cost estimates, maintaining progress status and providing technical assistance on the execution of major works under way within the System
* Preparing subcontract packages, technical procedures and O&M manuals
* Carrying out all technical inspections of all major works carried out in the system
* Providing engineering advice and consultations
NAFA Maintenance & Services
Instrumentation Engineer June 1993 - Jan. 1996
Roles & responsibilities:
* Team member in the Electrical & Instrumentation section of of Seawater Cooling System
* Supervising a team of Technicians in the day-to-day maintenance of all types of instruments and its associated circuits and panels placed in pumping station, chlorination systems, turbines and control related equipment
* Guiding and assisting the technicians with trouble shooting, calibration and repair of all instrumentation systems
* Operation and maintenance of RTU's placed in 33 outstations in the open canals, which read information from transducers and transmit to the central control room by telemetry system
* Preparing daily task schedule, and preparing and submitting periodic reports to the management
EDUCATION
Bharathiar University, Coimbatore, India 1991
B. E. - Instrumentation & Control Engineering
PROFESSIONAL DEVELOPMENT
* Undergone Operation & Maintenance Training in ABB Instruments by ABB
* Operation & Maintenance Training in ABB DCS by ABB
* Training in Siemens PLC-S7 - Engineering, Programming, Testing & Commissioning by Siemens
COMPUTER KNOWLEDGE
* Completed Honors Diploma in Computer Science from Lakhotia Computer Center, Calcutta in 1993
* Undergone an Advance Diploma course in RDBMS from Software Technology Group, Coimbatore in 1996
* Proficient with the use of Windows, MS Office and the internet
* Knowledge of AutoCAD, Primavera and all kinds of Application Software
STRENGTHS
* Strong knowledge of engineering, construction, testing & commissioning of all kinds of Instrumentation & Control Systems
* Knowledge of Engineering, Programming, testing and commissioning of PLC & DCS systems
* Worked on multiple projects simultaneously effectively handling teams to deliver positive results
* Strong at understanding the working of systems and implement them accordingly
* Good team leader with strong communication and inter personal skills
PERSONAL DETAILS
Date of birth: 23rd May, 1970
Marital status: Married
Languages known: English, Hindi, Tamil, Malayalam and Arabic
PREFERRED LOCATION
No location constraints, willing to relocate to any city or country
REFERENCES
Available on request
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 8601 to 8650 of 15508)
Go to Search Parameters...
Brief Description
geology, hydrology, hydrogeology, hydrochemistry, water resources and environment studies
Over ten years of experience in the field of Electronics and Computer Engineering
Instrument design engineer in BHEL (Bharat Heavy Electricals Ltd), Hyderabad, India in Control & Instrumentation (C&I) department in Steam Turbine, Compressor & Gas turbine Engineering division. DNV certified HSE lead auditor
Since 1995, I have worked as a Planning Engineer / Maintenance Planner in Oil & Gas Industrial, both on offshore and onshore terminal, worked for ARCO, BP and CNOOC companies. Response for Opertioans and Maintenance work activities, good at CMMS-MAXIMO, MS Project, P3 Project Planner.
• 16years of work experience in India/Indonesia in Welding, QC and Site/Construction management in EPC turn key projects (Polymer, CTA, PTA, and Steel). • CSWIP 3.2 Senior Welding Inspector •ASNT NDT Level III in RT, PT & MT •Computer literate in Project Management tools.
Completions/Production Engineering Experience
Experienced health and Safety professional, excellent Computer Skill, knowledge of H&S MS (OHSAS 18001); EMS (ISO 14001) and QMS (ISO 9000:2000; Qualified Auditor, Training Instructor.
working in Malaysia ( far east) from 3 and 1/2 yrs. Looking for jobs in oil & gas fields . In field operators or panel operators position with better salary as a long term contract basis preferable in far east or middle east.
Successfully completed the Final Bill of Saudi Riyal 120 million Steel Plant project (Civil Works) with the Main Contractor Awabeded Ssang Yang- Korea and successfully completed the Internal Audit before the External Audit to obtain ISO 9002 Certification for Company's Quality System.
Technical and Operations Experience. Currently Long Range Planner / Dispatch Engineer. BEng educated at Laurentian University School of Engineering in Sudbury, ON, Canada. I am looking for advancement opportunities, in a fast-paced and team-oriented workplace.
Total 7 years of industrial experience in the large manufacturing set-up/project, in the field of Environmental Management and Resource Conservation and Infrastructure Development projects planning, operation and monitoring.
I am a degree holder in Mechanical Engineering, having more than 13 years of experience in various types of Refinery and Petrochemical project.
Cost Engineer with exposure to Planning. Russian-mother tongue. English - fluent. Arabic - working knowledge
13 Years Strong Experience & Exposure in The Arena Of I&C Systems Successfully handled numerous large scale projects Worked with SCADA, PLCs and DCS Strong at commissioning, testing, documentation and handling of O&M Effectively led teams to deliver positive and timely results
16 years experience in the mining field both surface and underground, hard & soft rock. Construction and Development. Supervisory exp. Drilling and blasting & instructor. BCOA Supervisory Trained and a Certified Surface and UG MSHA Trainer. Illinois Certified Supervisor. Shot Fire Certified.
Request/Application for the Opportunity - geoscience/Environmental positions
I am the Environment, Health and Safety Practice Leader in Western Canada for a national consulting firm. I have 10 years of experience in managing and coordinating a multitude of EH&S projects for clients across Canada. I am looking to expand my experience base within private industry.
13 yrs Professional Exp.which include Project Management, Engineering and Estimation. Responsible for the Implementation of QMS(ISO9001-2000). Countries of Work Exp: India,Singapore,UAE Languages Known:English,Hindi,Kannada,Tamil & Telugu.
I try to get better conditions and get better live with my skills and competency
My Nine years and Six months of experience , I have exposure in Power & Utilities. I have hands on experience for Gas Turbines, Steam Turbines, D. M. Water Plant, Plant & Instrument Air Package comprises of Dryer and Compressors, Raw Water Treatment Plant, Cooling Tower, and OSBLs.
Global experiance in the construction field from horizontal to vertical projects and from start to finish level.
Around 8 (plus) years of experience in various fields such as Project management, Project execution, Project Co-ordination, Industrial
MATERIALS ENGINEER/CONTROLLER/SPECIALIST-CATALOGUING-INVENTORY-PREPARE PURCHASE DESCRIPTION-ERP-SAP MM-CMT-STRING-E-SPIR-MMS Etc.
I am a CWI, Level II in MT, UT, PT and RT film interpretation. I have US and overseas QA/QC project and manufacturing supervisory experience in the construction, petroleum, mining and aerospace industries. References and copies of certs. will be provided upon request.
Professional trainings and practices in Geological and Mining Institutes including well site practices, modeling of gas reservoirs and underground gas storage production, geological prospecting and drilling geophysics, control properties of mud-logging and cementation
-
south african openpit blasting ticket
Team Leader Shift Supervisor, Trainer: Operation at Refinery Processing Plants, Remote Oil & Gas Production Field and High Pressure Systems at NGL Processing Facilities LPG Plant including Petroleum & Petrochemical Utilities. Professional member MInstLM & MCMI UK, MBA Prod. Ops. Management, BSc, BA
Comprehensive practical and commercial experience since 1997 in every aspect of cathodic protection systems on all types of structures, comprising detailed design preparation / engineering calculations and Preparation of proposals with design etc.
Automotive Engineer Trade certificate. Post trade Diesel Fitter Trade Certificate. Over 30 years of wide ranging experience including heavy euipment and mining equipment. Excellent diagnostice skills.
Worked on Procedure High Pressure Vessels, pipe welding,Millwrights, Mine Maintenance Supervisor Worked for 5 years (1994-1999) Steam and pressure pipe fitter, welding
Heavy Equipment Operator with 30 years experience both underground and open pit
I have served 20+ years in the Marine Corps and possess great Manager skills. I have an active Top Secret/SCI Clearance. Security+ certification (Network Security). I am looking to make a difference in the Civil sector as I have in the military.
Diploma in chemical eng
Planning, market analysis, oil pricing mechanism/simulation and modelling, forecasting, market research, oil industry management, downstream oil industry facilities monitoring, fuel quality monitoring and evaluation, project management, project proposal preparation, oil and gas project evaluation,
Four years experiences in 3D seismic data processing (PP, SS, PS) and reservoir characterization (fracture detection using AVAZ; AVO and inversion), more than six years experience in commercial geo-software development.
-fabrication procedures (elaborate and implement) cutting, rolling, bending, drilling, grinding, welding, visual inspection, etc.-WPS and PQR elaborating in accept with ASME Sect.9 and EN 287+288 -technical drawing analyze for fabrication :assembly, materials necessary, order or erectionWelders/fitt
More than 30 years experience as a Contract Engineer, Contract Administrator and Quantity Surveyor, including expertise in Project and Construction Management; working with Oil Companies, E.P.C. Contractors and Consultants on a variety of Oil & Gas, Petrochemical, Building, Civil and Power project
I have 5 yrs experience in the Oil Industry, 3 of those years were in Operations where I Utilized Total Quality and Safety Management Principles to operate successfully in a stressful, fast-paced, deadline-oriented, ¡§no errors¡¨ environment.
Experience in Project Management and Marine Construction
Planning, Scheduling, Project Controls
Piping engineering-layouts/specification/plot plan/isometrics
Production operator at oil and gas company, experiences more than 8 years, 12 years education ( technical high school)
NEBOSH- International General Certificate in Occupational Health and Safety(United Kingdom) Abu Dhabi
Versatile IT Project Manager with > 15 yrs experience in the IT and Upstream Petroleum Industry implementing IT solutions (including software, hardware, firmware);evaluating and recommending solution options, supervising solution implementation, and QA. Able to deliver Projects on time and on budget
Subsea Project Engineer - Project Management - Deep Water Installation
Twelve (12) years of diversified working experience in Quantity Surveying/Measurement, Cost Estimation, Cost Control/Monitoring and Contract Administration of miscellaneous projects relevant to Oil & Gas and Petrochemical Industries.
Resume - Nilesh Roy - Service Delivery Manager - IT Infrastructure - 12+ years of experience.
Operation and maintenance of Boilers, combined cycle gas turbine power plants, and utility services
Procurement/Supply Chain/Materials Management
First
Prev
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
[ 173 ]
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com