Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #5321
next resume »»
CONTACT INFORMATION:
View contact information...
Curriculum vitae
Date of birth 7 October 1947
Status Married, no children
Occupation Senior Cost-Engineer
Member of DACE
Education and courses
1959-1964 H.B.S.-B
1965-1967 School for chemical analysts
1969 English commercial correspondence
1972 Spanish commercial correspondence
1981 Network-planning
1983-1984 AMBI-module T2 (Cobol)
1983-1984 Teleac-Pascal
1984-1985 AMBI-modules B1/B2 (File-organization)
1991-1993 DACE-course Cost Engineering
Professional experience:
2002 till today:
Employer: Petro Canada Netherlands
Function: senior cost controller
• Cost control for the Operational Expenses of the F2A Hanze platform
• Set up of a complete cost control system whereby the information flow from the platform, from the Integrated Service Contractor and from the various Petro Canada departments such as Procurement, Operations, Shorebase and Finance are combined in an easy to read monthly report.
• After the termination of the contract with the Integrated Service Contractor the Maximo Maintenance program also became a major source of information, because Maximo was also adopted as ''The Purchasing Program''.
Projects
• Cost control for the P10-4 & F6-3 drilling projects.
• Set up of a combination cost control system whereby the daily costs made during the drilling program were combined with those made at the Home office in order to produce a daily cost control report.
• This combined daily report was discussed and agreed during the morning call with the drilling rig.
• For the project management team a detailed monthly report was produced.
• Cost control for the ''De Ruyter'' pre-development project in P11-B
• Set up of a cost control system whereby in this case the consumed manhours in comparison with the budgeted manhours were the most important part. As a large part of manhours were made in the UK the initial set up of a timely information flow was a major task.
• This cost control report also included sections for the cashflow forecast, the performance graphs and an expanded narrative section whereby all major – and minor over- and underspendings are explained.
1999 till 2002:
Employer: ASC Benelux B.V.
Function: senior cost-engineer
Project: Clyde Petroleum Exploratie B.V. – The Hague
• Cost engineering for the following projects:
• Q4A: Total refurbishment of a used platform including a 35 km pipeline and installation on the North Sea. Investment value around NLG 172,000,000.
• P6D, Q4B and P9A: The re-use of a Multi Purpose Platform including pipelines and a relocation from the original location to the present and future ones. De value of these investments is around NLG 280,000,000.
• As member of the project team responsible for all budget-estimating including allocation, the set-up of a cost-contol-program not only to be used as a reporting tool, but also as the basis for accounting; estimating of scope- and design-changes and the effect on the total projects; part-supervision of the purchasing department and the project reporting to the project – and company management and
1995 till 1999:
Employer: PromateS Amsterdam B.V.
Function: senior cost-engineer
Project: Bluewater Engineering B.V. Hoofddorp
• Cost engineering for the building of 2 Floating Production, Storage and Offloading facilities (FPSO's) with final destinations respectively the Durward and Daunless field for the ''Glas Dowr and the Ross field for the ''Bleo Holm''. The value of both projects is around USD 650,000,000.
• As a member of the coreteam responsible for all financial matters inclu-ding an early determination of the Estimated Final, Risk assessment, Best - and Worst case Scenario's, Contingencies, etc.
1994 till 1995:
Employer: ASC Benelux B.V.
Function: senior cost-engineer
Project: Stork Ketels B.V. Hengelo
• Cost engineering for the building of a powerplant for Rotterdam/Capelle (RoCa 3) and one for a papermill in Indonesia with a value of respectively NLG 91,000,000 and NLG 7,000,000.
• As member of the project management team responsible for all financi-al matters in the project including the reporting to the corporate mana-gement. For the Indonesia project also responsible for the purchasing activities.
1990 till 1994:
Employer: BAK (International) B.V. Barendrecht
Function: senior cost-engineer
Project 1.: ELF Petroland B.V. (function: senior project buyer)
• Purchasing of the main equipment for two drilling platforms and one production platform on the Dutch K5-part of the Continental shelf. Pur-chasing equipment for several small projects such as modifications, tie-ins, etc.Total value: NLG 150,000,000.--.
Project 2.: Stichting Europoort-Botlek Belangen (E.B.B.)
• The set-up and supervision of an inquiry into the quality of the transport-pipelines in the Europoort-Botlek area. A questionnaire was sent out to all major pipeline owners. The results of the inquiry were processed with a computer-program of the American Battelle Institute which was adapted to the Dutch requirements.
Project 3.: Ballast-Nedam Group Amstelveen
• Cost-engineering for the building of a military airbase including a small village and roads near Riyadh in Saudi-Arabia. Due to the fact that du-ring the early stages of the project priorities were changed, it appeared that no more money was available for the original project. The project was abandoned.
Project 4.: DOW Rotterdam (European Engineering and Construction Services)
• Estimating and cost control for expansion of 4 chemical plants in Stade, Germany and debottlenecking of one in Delfzijl, the Netherlands with a value of about DEM 310,000,000 respectively NLG 25,000,000.--
1986 till 1990:
Employer: BAK (Nederland) B.V. Barendrecht
Function: cost-engineer/subsidy-engineer (free-lance)
Project 1.: Total Raffinaderij Nederland N.V. Vlissingen-Oost
• Expansion of the existing refinery with a hydrocracker unit. Value: about NLG 860,000,000.--
• Submission to the Dienst InvesteringsRekening of the Department of Economic Affairs of the environmental - and energy subsidy as part of the W.I.R.
• a. pinpointing of the equipment which will be considered, following the governmental indications which change yearly
• b. gathering of the relevant technical - and financial information
• c. determination of the method to calculate the factors and the overhead which will be used versus the method of complete material take-off.
• d. total calculation of the environmental - and energy subsidy and sub-mission to the authorities of the Dienst InvesteringsRekening in Zwolle including the follow-up
• e. total amount of the environmental - and energy subsidy for this pro-ject: about NLG 20,000,000.--
Project 2.: Kuwait Petroleum Europoort
• a. expansion and modernization of the lube oil plant (L.O.M.-project) Value: about NLG 40,000,000.--
• b. building of a jetty with loading and unloading facilities for very large product carriers, i.e. larger than 250,000 tons (V.L.P.C.-project) Value: about NLG 280,000,000.--
• c. building of a plant for leadfree petrol (Gasoline-pro-ject) Value: about NLG 280,000,000.—
• Submission to the authorities of the environmental - and energy subsidy as part of the W.I.R. similar as mentioned in project 1 (Total).
Project 3.: Caldic Chemie Zevenbergen
• a. construction of a formaldehyde-plant Value: about NLG 15,000,000.--
• b. expansion of the storage facilities Value: about NLG 8,000,000.--
• c. construction of a computerized filling-installation including a storage facility for drums etc. Value: about NLG 7,500,000.—
• Submission to the authorities of the environmental - and energy subsidy as part of the W.I.R. similar as mentioned in project 1 (Total).
1984 till 1986:
Employer: PFW (Nederland) B.V. - Amersfoort
Function: cost-control-engineer/subsidy-engineer (free-lance)
Project: construction of an aroma-chemical plant, phase I of a new chemical industry-complex in Barneveld Value: about NLG 33,000,000.—
• a. Reporting to the management on the financial status of the project using a self-developed cost-control-program.
computer: IBM-PC/XT and Compaq Deskpro programs: Lotus 123/dBaseII/dBaseIII
• b. Development of a computer aided maintenance management system computer: Compaq Deskpro with 30 Mb harddisk program: Modcam
• c. Submission to the Dienst InvesteringsRekening of the Department of Economic Affairs of the environmental - and energy subsidy as part of the W.I.R.
Total environmental - and energy subsidy: about NLG 700,000.--
1980 till 1984:
Employer: Tebodin Consulting Engineers B.V. - The Hague
Function: project buyer
Project: Zuidhollandse Pletterijen B.V.- Delft/Rijswijk, renovation of the existing factory value: about NLG 15,000,000.--
• purchasing of part of mechanical equipment and instrumentation
Function: cost-control-engineer/computer-programmer
• Development of a computerized estimating program showing all discipli-nes including budgets, contingencies etc.
• 2. Reporting to the project-managament on the estimating status of projects using a self-developed cost-estimating/control-program.
computer: Harris S500
language: Cobol
Projects:
• 1. Mead Johnson - Nijmegen (1981-1984), construction of a plant for baby-food value: about NLG 69,000,000.--
• 2. Fuji Photo Film - Tilburg (1982-1984), construction of a plant for photographic materials - stage I, value: about NLG 35,500,00.--
• 3. Fuji Photo Film - Tilburg (1983-1984), construction of a plant for photographic materials - stage II, value: about NLG 115,000,000.--
Special projects:
• Development and testing of programs for registration of forecasted -, scheduled - and actual manhours as used on small - and large projects.
computer: Hewlett-Packard 85
language/program: Basic/Visicalc
• b. Development and testing of programs for a Vendor-Document-Control-System, a Project-Cost-Estimate-System and a Record-Budget-Informa-tion-System (simple type of Cost-Control)
computer: Harris S500
language: Cobol
• c. Reporting on the financial status of a project using customized standard programs computer: IBM-PC/XT
language/programs: Basic/Multiplan/dBaseII/dBaseIII
1977 till 1980:
Employer: Morrison-Knudsen-Saudi-Arabia-Consortium - Delft
Function: project buyer
Project:
• Construction of 3 complete computer-controlled concrete plants and a tile-plant in Saudi-Arabia to construct a military city for about 40,000 people, value of the total project: about NLG 3,000,000,000.--
Purchasing-activities:
• 1. At the start of the project: purchasing of the complete office inventory, varying from simple stationary till the complete furnishing of the drawing-rooms.
• 2. During the project: purchasing of mainly the mechanical equipment neces-sary for the concrete plants and the tile plant.
• 3. At the end of the project: purchasing of the normal and urgently required spare parts and consumables for all disciplines. The value of the purchased spare parts was about NLG 15,000,000.--.
1973 till 1977:
Employer: Tebodin Consulting Engineers B.V. - The Hague
Function: cost-control-engineer
Projects:
• 1. Compagnie Neerlandaise de l'Azote - Sluiskil (1973-1975), renovation of the nitrogen plant, value: about NLG 25,000,000.--
• 2. Compagnie Neerlandaise de l'Azote - Sluiskil (1976), modification and extension of the cooling water distribution, value: about NLG 15,000,000.--
• 3. ARCO Vondelingenplaat - Botlek (1975-1977), building of a plant for heavy mercaptan, value: about NLG 43,000,000.--
1969 till 1973:
Employer: Hotam Travel Agency B.V. - The Hague
Function: promotor touringcars
All commercial activities regarding:
• 1. organization of touringcartrips for one or more days
• 2. hiring out of touringcars
• 3. organization of school- en clubtrips
1965 till 1969:
Employer: Koninklijke Nederlandse Gist- en Spiritusfabriek - Delft
Function: laboratory assistant in the yeastcontrol-laboratory
(November 1967 till March 1969: compulsory military service)
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 5901 to 5950 of 15434)
Go to Search Parameters...
Brief Description
See resume body
DOCUMENT CONTROL MANAGER Successful, motivated, qualified with over 25 years extensive experience, covered all levels of data and admin management pro-active hands-on team member / leader. Experienced in all levels of computerised & manual document control.
Accountant with considerable experience in industry
Dear Sir or Madam: I hope you take this CV in your database for future reference. If there is an opportunity on this moment as a Barge Engineer or Offshore Installation Manager within your company on international base I appreciate if you contact me.
1) GULF EXPERIENCE (21 YEARS). 5 YEARS EMPLOYED AS PROJECT ENGR IN ALMORAM CO SULTANATE OF OMAN. 2)Past 9 years from 1989 to 1998 worked as E& M Engineer at UNITED CONTRACTING Company. 3)3) 7 Years ( 1977 – 1984) worked as maintenance supervisor in ARAMCO at SAUDI ARABIA.
Objective To provide solutions that will maximize productivity and profits Status
33 years in various survey disciplines. 21 years onshore and offshore experience in hydrographic, engineering & seismic survey (hands-on surveys), & more currently in the last 13 years, navigation QC and Project Management.
Presently have 32 years of sawmill and planner mill experience Operated all heavy equipment involved with lumber operation Safe work habits witch are indicated by 1 incident in 32 years Excellent mechanical knowledge
The last 8 years I have been working mostly in Asia in Instrument and Metering engineering and Process Supervisor positions. I am experienced in working with Nationals and using CBTA on the job training and assessment methods. I currently have a valid BOSIET certificate.
PMP,MBA with 20+ years experience in accounting management in multi locations and foreign country experience. Energetic, creative, self-starter with consistently demonstrated leadership, strong analytical and problem solving skills
Profesional in the industry with technical management and sales background.
PERSONAL RESUME
24 years experience in the environmental field, General A Engineering Contractor, Project Manager, Sales, Marketing, work plan development, heavy equipment operator, hazardous waste management (RCRA, CERCLA< HSWA), UST management, design, installation of remediation treatment systems (all types).
23 years project management
Over 20 yrs of QA/QC Manager, Construction Manager, Project Manager
20 yrs in Oil/Gas Operns, QC/QA, Inspn, Constn and HSE matters. Specialty in HSE Man't wrt Leading and setting up of HSE teams, training, Audits and compliance to standards. Interfaced on behalf of client with intern'l contractors e.g. Technip, Toyo, Kvearner and Bechtel.
Industrial and Heavy Equipment Technician
SUMMARY Over 25 years international experience in engineering and supervisory/management positions in the exploration and production of oil and gas for offshore and land drilling/coil-tubing/work over/completion operations.
Environmental / Safety Engineer More than 10 years experience
25 years experience operator / contractor experience willing to relocate status: single
Looking for work as an instrument tech. in the oil industry.
21 years in oil & gas From Insp Eng to welding inspector Exp on new and in-service plant QA/QC & clients rep on jacket & module fabrication Senior insp sub-sea pipelines, offshore platform hook-ups Insp Eng and plant insp on oil & gas platforms Familiar with most intl. codes & standards
Full Project Life-Cycle Control and Maintenance Implementation.
To gain a position that will utilise my knowledge and skills gained through extensive professional experience.
I’m a Power Control Systems Operations Specialist with 20 years operational / supervisory expertise and experience in High Voltage distribution / generation. I’m available for immediate placement, willing to relocate and I will make myself available at your convenience for an interview.
Objective Employment with a company desirous of a dedicated, hard working, creative, team player, offering 25 years of experience in the Instrumentation field.
Maintenance Specialist
I am a professional construction supervisor - Self-motivated with strong construction management skills, backed by extensive O&G industry experience, onshore /offshore.
as per attached
31 years experience (10 years international) in project and contract management of large scale industrial projects in the oil & gas (onshore & offshore), alumina, petroleum, brewing, iron ore, nickel, gold and general mining industries.
20+ years in Mining/Smelting/Construction Industry. Gold, Nickel, Industrial Minerals (ilmenite, garnet). Exstensive international experience for large companys. Contact Tel +47 917 09 554 email brian_ballou@yahoo.com
To secure a challenging and rewarding career in the Electronic Repair Industry that puts emphasis on increasing responsibilities, personal growth, professional achievement, continued education and a company that offers opportunities for career advancement.
Interrested in rotational international opportunities in Maintenance Management or Senior Maintenence Planning positions
GIS Professional with an excellent background in Geomatic and engineering work. GIS experience included pipeline route planning utilizing GIS/DSS, land use changes utilizing GIS/RS data, advanced RS researches using Airphotos, Hyperspectral image analysis.
Resume for employment
Electronics / Electrical Technician
Im a computer programmer since i started working in 1990 i know cobol,unix,informix ,sql,v.basic,oracle
I am a safety minded well versed toolpusher with 26 tears experience in the oilfield. I have worked on all sizes of land rigs in various parts of the world. I am currently looking for a similar position or even as a company man.
24 years in Pipeline Construction, Operation, Inspection, Precommissioning and Commissioning both Onshore and Offshore
A dedicated, committed individual who is both practical and adaptable positive and versatile a self-starter with an ability to motivate individuals to achieve results a team player. Years of experience in the industry, available for work anywhere, longing to work oversea's, reliable and felxible.
I am very interested to offer years of hands on construction management and or supervision to you for the unannounced position in the selected communities in the areas you mentioned anywhere in the USA.
I have worked in different parts of the world in management positions and field operations.My strengths lie in my ability to communicate and work with people of different cultures and producing a team to reach the common goal of excellance by not reducing quality over quanity.
My duties as a Rig Mechanic have included the installation, repair, maintenance, and commissioning, of the rig and all equipment associated with, and involved in the drilling operation.
Please see resume for full details. Thank you
logistics supervisor, supply chain, rig manager, transportation dorector
The computer skills I have apply primarily to Landmark (Unix, SunSolaris, Oracle) and Kingdom (SMT) seismic workstations. I am proficient with most PC applications as well. My work history is stable and I have good references.
Experienced UK qualified accountant. Finance and administration Manager in large construction projects in North Africa employing 1,500 site construction workers.
Over 26 years experience, 16 of which are with major foreign oil companies employment in specialized gas field operations which have included pre-commissioning and commissioning activities in the onshore and offshore Oil and Gas industry.
Seeking a position as a driller where my experience, training, loyalty and good work habits will be an asset to your company. I have over 27 years of oilfield experience offshore and on land with expertise in the following: supervision, operations, trouble shooting, safety and derricks.
to secure a responsible position as an electrical engineer.
First
Prev
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
[ 119 ]
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com