Overall 18 years, post degree experience in reputed multinational Oil & Gas (7 years), chemical/petro chemical process (8 years) and food process-utilities (3 years) industries with emphasize to project execution, workshop management, inventory control and plant maintenance.

Presently working as a Mechanical engineer in the technical office with M/s. Nigerian Agip Oil Company (Eni Group) in Nigeria for the past 7 years. Technical coordination with consultants, equipment manufacturers, vendors, contractors for the execution of expansion projects, plant revamping projects, oil flow lines laying, turn around maintenance programmes in the gas plant and in oil flow stations.

Well experienced to implement & manage multiple oil & gas facilities projects. Conducting site survey, technical feasibility studies, preparation of sketches, technical specifications, detailed engineering, scope of work, and technical appraisals of bidders for contract awards.

Good in guiding and leading a team of competent engineers, technicians from various engineering disciplines, effective utilization of equipment, manpower, materials etc., to deliver relevant targets, key dates and milestones.

Successful installation and commissioning of Idu oil field, flow station reactivation project (50,000 BPD), expansion of Oshie oil field, flow station project (25,000 BPD) with strict adherence to HSE and quality norms in the capacity of team leader from client side.

Successful completion of Turn around maintenance projects in the gas plant viz: - Revamping of gas dehydration plants-glycol contactors, regenerators, molecular sieves change out activity, revamping of absorbers, regenerators and reboilers in CO2 removal plant, Mercury removal units, revamping of NGL storage and delivery systems, NGL flare system modification project etc., by managing internal / external project teams for optimizing the plant efficiency.

Thorough knowledge to installation and commissioning, operation and maintenance of static & rotating equipment and fixed structures in on-shore oil & gas facilities, chemical process plants. -Turbo compressors, turbo pumps, CAT generators (gas & diesel), instrument air compressors, oil separatos, gas boot, oil storage tanks, oil flow lines & pipe lines.

Thorough knowledge to process and operational functions of Oil & Gas Equipment and systems and have good experience to implementation of HSE at all stages of projects and maintenance etc.,
Knowledgeable to read and interpret design drawings such as P & IDS / PFD, S

Proficiency with PRIMAVERA, MS Office, Auto Cad, Lotus notes and SAP R/3 (PM)
Familiar with International Codes and Standards of Pipes flanges -API, ASTM, ASME, and BS
Carried out corrosion control studies in chemical process industries to optimize material selection and usage. Handled wide varieties of stainless steel for various corrosive atmospheres.

Bachelor degree holder in Mechanical Engineering from a reputed University in Tamil Nadu, India.

Employment History

1.Organization

Presently working with M/s Nigerian Agip Oil Company, Nigeria under contract to M/s.Netco Dietsmann as Mechanical Engineer- Technical office attached to Land Are Maintenance department since 'Nov' 99 to till date.

Plant Details-Gas Separation Plant at Ob-Ob Nigeria

It is the most advanced DCS controlled Gas separation plant (24 millions scmd NGL/LNG) having the following systems and equipments,

* Arrival manifold-oil flow lines from various oil producing wells, gas re-injection pipe lines etc.,
* Gas/Oil separators- high, medium and low-pressure separators, oil stabilization towers, and oil delivery system.
* C02 Removal plant with absorbers, regenerators, reboilers, carbon filters, condensers, steam boilers, DM water treatment plant, various process pumps.
* Gas dehydration plants with glycol contactors, regenerators, flash drums, gas heaters etc.,
* Molecular sieve separators, Mercury removal units, Demethinizer columns, condensers, evaporators, turbo expanders, gas liquefaction and NGL storage /delivery systems.
* Gas compression and reinjection systems-low, medium and high-pressure turbo compressors.
* API skimmers, oil recovery, burning pit, flaring and waste water treatment & disposal systems.

Oil Flow stations

* There are 6 different oil flow stations functioning under our control in the land area supplying about Capacity 250,000 BPD crude oil.
* Gas /Oil separators, gun barrel tank, gas boot, gas compression, crude oil delivery, API skimmer oil recovery, burning pit, flaring and waste water treatment & disposal systems

Major Responsibilities

* To conduct site survey, technical feasibility reports, preparation of sketches, technical specifications, bill of materials, cost / time estimation, scope of work for the execution of expansion projects, revamping projects, implementation of turn around maintenance projects, and major shut down maintenances in the gas plant and in oil flow stations.
* To organize and conduct pre-tendering site visits for the potential contractors to enable them to understand well about the project scope and site impediments if any before making their bid submissions.
* Technical appraisals of the bidders for contract awards for on going projects, procurement of equipment & spares and for other service contracts.
* To review all P & IDS / PFD S, detailed engineering drawings, vendor drawings before the commencement of the project.
* Checks and approves contractor's method statements, CVS, project schedules, construction equipment, tools and materials before site mobilization.
* Responsible for the planning and co-ordination of all manpower, equipment, materials and contracted services, co-ordination meetings, follow up installation, pre-commissioning check lists, debugging, commissioning and hand over the projects as per scope.
* To ensure strict implementation of the Company's HSE management system at all times.
* Analyze contractor's schedules and compare with project master schedule as to identify critical path and to take appropriate corrective measures in case of deviation. Monitor and deliver project progress reports on a daily, weekly and monthly basis.
* To check and certify all claims of the contractor for milestone payments and passes to commercial section as to fulfill the contractual obligations.

Key Accomplishments

1.Successful installation and commissioning of Idu oil field, flow station reactivation project (50,000 BPD/ 40 million $US), expansion of Oshie oil field, flow station project (25,000 BPD/ 20 million $US), with strict adherence to HSE and quality norms in the capacity of team leader during the year 2003-2005.

2.Successful completion of Idu / Akri oil fields flow line laying projects 18 / 25 kms long followed by bush clearing, excavation, burying, back filling, provision of pipe supports wherever necessary.

3.Successful accomplishment of oil / gas pipeline spillage containment (up to 24" lines) under difficult working environments to control major pollutions with strict adherence to HSE policies in coordination with public affairs dept., safety & security team, contractors, production and in house maintenance team.

4.Successful on time completion of Change out programme of 3 nos. molecular sieve separators as a part of turn around maintenance plan that has been completed recently during Mar 2006 –Oct 2006, with the following major activities in the gas plant,

* Preparation of scope of work, bill of materials, cost / time estimation, technical appraisal of bidders for the selection of capable contractor.
* Preparation of blind list requirements for plant isolation using P & ID's, removal of used mol sieves, venting, N2 purging, etc., as to ensure gas free atmosphere for safe entry in to the system.
* Kick off meeting for the review of operational standards, safety instructions related to shutdown /start up activities, identification of equipment / tools required, mobilization of men and materials, and job execution.
* Removal of old molecular sieves and ceramic balls using a powerful vacuum pump and to collect in poly bags for safe disposal in the presence of HSE squad.
* N2 purging as to ensure acceptable LEL (Low explosion level) before the entry as to perform internal inspection of the vessels- visual inspection, UTM and die penetrant test.
* To effect necessary repairs on the damaged refractory lining embedded inside the side wall of the vessels, damaged screens, etc., as per procedures, replacement of damaged field instruments, repair or replacement of bad valves etc.
* Pressure testing of the vessels using Liq nitrogen at 90-bar pressure.
* Recharging of new molecular sieves, with ceramic balls, installation of screens and boxing up.
* Jet cleaning of associated fan coolers tubes, hydraulic testing, draining, Nitrogen purging, overhauling and resetting of all PSVs and field instruments in the system.
* Replacement of damaged thermal insulations, site cleaning and waste disposal
* Co-ordinate with production department for the preparation of commissioning checklist, removal of blinds & spades job completion and sign outs.
* Preparation of job completion certificate, contractors billing documents etc for settlement.
* Capturing, recording and updating job history records.

5.Technical and maintenance coordination in the capacity of Team leader for the successful on time completion of breakdown maintenance of 2 nos. Gas dehydration units-Glycol contactors, regenerators, flash drums etc., during 2005 Apr-Feb 2006

6.Performed turn around maintenance on 2 nos. C02 Absorbers, Regenerors and Reboilers in the CO2 removal plant during, 2004 Feb –Nov 2004

7.Performed Statutory inspection of 4 nos. NGL storage spheres followed by NDTs, hydraulic test etc., with strict adherence to HSEs, during May 2005-Sep 2006

8.Commissioning of 2 nos Demag Delaval (7350 KW) MP gas turbo compressors.

2.Organization

M/s. AVT McCormick Ingredients Ltd., Cochin, India. Manufacturer and exporter of value added spices. A joint venture of McCormick Ingredients Inc.U.S.A.
Senior Manager- Projects & Engineering. Jun'95–Aug'98.
Carried out Installation, pre-commissioning checklists, debugging, commissioning, operation and maintenance of a PLC controlled spice-processing plant (20 million $ US) in the capacity of project manager. Latter took in-charge of entire plant operations and engineering functions.

3.Organization

Tamilnadu Magnesium and marine Chemicals Ltd., Ramnad, Tamilnadu, India. Manufacturer of Magnesium metal from seawater.
Asst. Manager (Mechanical Maintenance)
Mar'90–Jun '95.

Carried out Installation & commissioning of plant equipment and continued to look after plant maintenance.

4. Organization

Tamil Nadu Chemical products Ltd., Karaikudi, India.
Methanol distillation and recovery process, manufacturing of sodium hydrosulphite in Technical collaboration with M/s. Mitsubishi Corporation Japan, Liquid SO2 and sulfuric acid plants in Collaboration with M/s. Garbato of Italy.
In charge–utilities, Nov'87 – Mar'90.

Looked after routine plant maintenance and took part installation and commissioning of expansion of Liq So2 plant.

Equipment /Systems Handled

Crude oil arrival manifolds, oil separation, and oil stabilization systems.
CO2 Removal plant - DEA absorption & regeneration processes
Glycol dehydration, molecular sieve separation processes.
Mercury removal process, gas compression
Demethinizer, turbo expansion, deep refrigeration
NGL storage and distribution system
Gas compression for oil well reinjection
Pressure vessels, heat exchangers, columns, regenerators, etc.,
Boiler and water treatment plant
Bingham make centrifugal type crude oil turbo pumps -3500 HP
United Pignone centrifugal multistage DEA chemical pumps 1000 HP,
Worthington, Sulzer, Flow serve multistage centrifugal process pumps of various models and capacities for crude oil pumping
Peroni plunger pumps of various capacities for glycol
Gabbionetta centrifugal multistage pumps for NGL delivery system
Dresser Rand boil off gas compressors
Ingersoll Rand and Nuovo Pignone reciprocating gas compressors
Nuovo Pignone and Garbato rotary compressors
Atlas copco air compressors both, stationary and mobile types of various models
N2 gas production and supply system
Mechanical seals of various types & sizes-Flexi box, John crane, Flow serve etc.
Carrier and Kirloskar refrigeration compressors.
Large capacity blowers cooler fans etc.
CUMMINS /CAT (gas & diesel) engines

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2251 to 2300 of 15477)Go to Search Parameters...
Brief Description
SCADA and Automation and I&C Engineer
Mechanical Engineer with18 years experience to projects/plant maintenance (rotating/static equipment)in Oil & Gas-7 years, chemical/petrochemical-8 years and food process-utilities maint.-3 years.
(PRODUCTION MANAGER)
I am an Instrumentation Engineer, having 15.5 years of experience in the field of instrumentation from Project execution to maintenance in Refinery and Petrochemical Industries. Having work experience in SAP R/3 plant maintenance module (PM) to carry out day to day maintenance.
15 years experience in the construction industry.Professional Engineer from Ghana and MBA from the University of Houston. Plan to be certified in the US as soon as possible.
Energy industry economist and manager with broad experience in both the private and public sectors covering exploration & production, refining & marketing, transportation, utilities, public policy and regulation.
Serching for the job in hydro geology .
Commissioning/SCADA systems/Electronics/mining industry
Team Oriented Land Drilling, Production and Management Professional
I have 15 years experience in Oil and Gas Industries as Electrical Maintenance supervisor, 5 years an Electrical Commissioning Supervisor, 5 years in Electrical construction and hook up and 5 years at the Electrical Workshop.
11+ years experience (10 years with Landmark, 1+ years with Schlumberger) as G&G consultant worked on OpenWorks, GeoFrame, Petrel suite of applications. Currently working with Schlumberger helping clients in Petrel and GeoFrame workflows, presenting new features & updates, Petrel Testing & Training
Experienced in gas lift design, well optimization, nodal analysis, well integrity, surveillance techniques, trouble shooting, water shut-off, formation damage evaluation and treatment, interpretation of production logging , PVT & multiphase flow, water injection project, and witness rigless operati
Engineering Manager, Project Manager, Engineering Specialist
Actively seeking a position in „o PROJECT ENGINEER „o With an organization needing a professional demonstrating ability in providing consistent, cost effective methods improving quality of products while meeting best engineering practices
1. Oil and gas EPC experience for four years. 2. Design and engineering of static equipment. 3. 10 plus years' experience in mining industry. 4. Expertise in maintenance of static, rotating and utility systems. 5. Bachelor's degree in Mechanical Engineering and Master's degree in Maintenance Mgmt.
Chief Engineer STCW95 unlimited with Master's Degree. Experience on drillships, AHTS, tugs, etc. Ability to manage all engineering operations on board the drilling vessel to ensure proper operation and maintenance of propulsion machinery, drilling equipment and others whilst at sea and in port.
Project engineering and management, electrical and process engineering, project cost control and schedule, business development, power generation equipment, Russian speaking, technical translations, oil & gas, minerals and metals, FEED (front-end engineering design)
A qualified and experienced valves, piping and vessels engineer who is looking to return to mainstream engineering applications ideally as a contractor working overseas. Knowledgeable in the design and manufacturing of pressure vessels and pipework as well as valves/controls used in pressurised
A dynamic professional with more than 24 years of rich experience in Marketing, Sales, Business Development, Planning, Procurement, Process improvement, Manufacturing and Man Management.
Instrument and Control Systems Engineer, WorleyParsons, Qatar
Field operations and producing technology, Workover & Completion, Production Optimization, Water Flooding, Well Test Design and Interpretation, Artifial Lift Design and montoring, Well Planning and Development drilling, Strong software skills
I have experience as a tool pusher and driller.
Free! Drilling Superintendent: 21 years’ of progressive experience in land drilling, including extensive experience in international environments, with comprehensive management background.
8 year experience in materials, corrosion, thermal insulation and piping for the oil and gas industry, including FPSO’s, Offshore production platforms, Offshore offloading buoys, Onshore plants, LNG terminals.
Maintenance oriented. Highly skilled and experienced.
I have been in the excavation industry for over 30 years having owned my own Excavation company for 16 of those years. I can operate a variety of equipment as seen on my resume
Rig manager(workover) - Sudan, Field supervisor(workover and completion rigs) - Egypt, Company representative - Libya/Canada. Project supervisor - Libya
i can manage site maintanace,fabrication and erraction
A result-oriented professional with nearly 14 years experience in Piping Design, Operation & Maintenance, Quality Assurance and Relationship Management. Handled a varie
Skillful, energetic and dedicated Project Controls Planner/Cost Analyst with extensive international Oil & Gas experience. Seven plus years interfacing with engineering, procurement, manufacturing, finance and accounting plus one year marine construction; installation and vessel operations with emp
I am a Chemical Engineer and have a master's in Heavy Crude Oil Refining. i also have a master's in Work Health and Safety. I have extensive experience in Oil Refineries in the Construction and Maintenance of new plants. i am willing to travel.
Im a fitter with alot of skills, like winder fitter, hydraulic fitter, maintenance, heavy duty fitter. Hydraulic and pneumatic experience, reading off hydraulic drawing. do designing, planning and building of new power packs for raise bores aswell.
27 years underground -production&movecrew&dead work,good worker&very dependable.
scaffolding supervisor / co-ordinator /instructor
Extensive work in Gas, Liquid and C02 Measurement
Automotive Painter
32 years process maintenance, budgeting, maintenance planning, condition monitoring. set up PM programs. scheduling. manage personnel. training. project management. Reliabilty Centered Maintenance.liner configuration.
SEASONED MAINTENANCE AND PROJECT MGMT. PROFESSIONAL
SR PROCESS CONTROLLOR,LAB INCHARGE,FIRE ASSAY TECHNICIAN,PRECIOUS PLANT SHIFT INCHARGE,SUPERVISOR
32 years experiance in the mining industry. I worked as a Shaft Timberman(17years),Shift Boss on Developing, Tramming& Construction (9years), Diamond Drill Supervisor/Foreman/Site Manager(4years)
Senior Drilling Engineer
8 years' experience in petroleum refining; process modeling; profitability studies; production planning; LP (linear programming); PIMS; HYSYS; Petro-SIM; CrudeManager; Spyro; ProcessBook; DataLink; MS Office; M.Sc. in chemical engineering (specialized in petroleum processing)
I am a petroleum engr, US citizen, with 20+ years experience as Drilling Supervisor, on & offshore, in drlg, completion, workover, testing, in the US and many other countries. Familiar with deviated drlg, horizontal, drlg underbalance, H2S, wkg in remote locs. Fluent English & Spanish.
Workover & completion supervisor
Extended experience in Supply Chain Management process and strategies development, Service integration packages, negotiations, tender exercises, purchasing, logistics, Inventory control and Warehousing.Dynamism, efficiency, objectivity and perseverance
Over 20 years of experience in Plant Operations or Maintenance.
PCS Manager - Cost and Planner Engineer
I have 9 years experience as Material -Procurement/ Expediting/Materials co-coordinator, the assignment which included handling of all aspects of Oil and Gas Industry related SAP-SCM/ Oracle 11i5.9 based EBS, EAM,CPL modules.
I am a Geologic Engineer with more than 9 years of experience. I have worked for multiple mining companies in Peru. Basically I have worked for open pit operations, but I also have experience with underground mines. I am experienced whit mine geology (ore control), porphyries of Cu-Mo, epithermal.
Instrumentation Engineer with 12 years experience of Instrumentation & control scope of project engineering and plant maintenance in Oil & gas,petrochemical and chemical industry.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   [ 46 ]   47   48   49   50   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com