Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #5764
next resume »»
CONTACT INFORMATION:
View contact information...
Date of birth: 26 December 1967
Education:
* Dipl-Eng (B.Sc.): 1987-1992 – Technical University of Timisoara – Romania, Faculty of Hydraulic Machines.
Language: English-very good, French-fair, Romanian-mother language.
Overseas experience: Romania, Yugoslavia and India
Key qualifications:
* Specialist in hydraulic and pneumatic system design, troubleshooting and maintenance.
* 12 years of experience in the field of hydropower projects, power hydraulic installations as well as technical and financial expertise.
* Knowledge and experience in working with international teams.
* Good knowledge of industrial environment - ISO 9001-2000
* Mechanical and electrical inclined, good experience in electrical wiring, PLC programming and troubleshooting.
* Excellent communications skills.
Others skills: Computer proficiency: - AutoCAD 14, 2000; Microsoft Office.
Professional experience record:
Previous position – (2003-2004):
* Site Supervisor – ALSTOM CANADA POWER INC.
Chamera II Project – INDIA (400 million dollar project).
Technical responsible for erecting & commissioning of 3 hydraulic turbines units (100 MW each), rotating equipment and main inlet valves, along with relevant hydraulic force installation within the power-house, galleries and dam:
- Hydraulic Power Installation for Spherical Valves – 3 units (DIA 3000) equipped with Servomotors – Length 3500 mm, DIA 400 mm, Nominal Pressure 340 BAR and Butterfly Valves – 6 units (DIA 3000) equipped with Servomotors – Length 2700, DIA 360, Nominal Pressure 340 BAR. (BOSCH & REXROTH)
- Hydraulic Power Installation for single regulating turbine system equipped with high speed rotational hydraulic flow valves, along with 3 pairs of Servomotors for the Wicket Gates mobile ring. (NEYRPIC)
- Hydraulic Pressure Greasing System for all rotational parts: trunions and bushings for the main hydro equipment.
Previous position – (2000-2002)
* Chief of Operations – HIDROELECTRICA – ROMANIA (VATECH partner)
Coordination and follow-up of complete revamping project of horizontal bulb KOTB 10x27.5 MW turbines in Iron Gates II, and KV (Kaplan) 6x175 MW at Iron Gates I (electrical & hydraulic performance improvement):
- Modernisation of the Hydraulic Power Installation for the Main Intake Gates – each Planar Gate is equipped with a Servomotor – Length 17500 mm, DIA 600 Nominal Pressure 315 BAR (built as per REXROTH license)
- Modernisation for the Hydraulic Power Installation of the double regulating turbine system equipped with proportional hydraulic flow valves (BOSCH), along with 10 pairs of Servomotors – Length 5000 mm, DIA 400 mm, Nominal pressure 315 BAR for the Wicket Gates mobile ring.
- Modifications of the main Sealing System of the Runner Blades – Lower seat DIA 3000 mm.
- Part of the technical commission for establishing the right technology for refurbishment of SM – L 17500, DIA 600.
- Contractual technical person for the supplier specialists, for building-up the technical documentation (final stage).
Previous position – (1995-2000)
* Hydro-mechanical Maintenance Manager – HIDROELECTRICA - ROMANIA
Responsible for planning, organising and completing the maintenance works for Iron Gates II – Danube - Power Plant (10 horizontal bulb KAPLAN turbines 27.5 MW KOTB type, water spillway, ships sluice, planar gates, dam components etc.:
- The entire hydro navigational system of IRON GATES 2 - Danube contains more than 50 Oil power pump stations along with relevant command systems (different suppliers – mostly German and Russian technology); 124 types of Servomotors equipped with due hydraulic command blocks (315 BAR Standard); more than 150 different water pump stations.
- Coordination of specific personnel: - 1 engineer, 3 foremen and 65 specialist workers.
- Head hydraulic engineer for Technical Bureau.
Previous position – (1992-1995)
* Assistant Chief Engineer – ENERGOMONTAJ - ROMANIA
Technical responsible for erection & commissioning of various hydraulic turbines, rotating equipments and hydraulic installations:
- 2x27.5 MW, horizontal bulb (KAPLAN) turbines at Iron Gates II, Danube, Romania;
- 1x27.5 MW, horizontal bulb (KAPLAN) turbines at Derdap, Yugoslavia
- 4x75 MW Francis turbines, at Raul Mare Retezat, Romania;
- 4x50 MWW Pelton turbines, at Valiug, Romania
Co-ordination of specific personnel (2engineers, 5foremen, 115 workers).
Technical consultancy within purchasing duties on relation with the equipment suppliers.
Others:
- Driving license – class 5
- Permanent residence – Canada
- Movement disposal
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 7701 to 7750 of 15497)
Go to Search Parameters...
Brief Description
I have been working construction in the Petroleum/Oil/Gas field for the past three years. I have done turnarounds and capital work.
Cogeneration, gas engines
twelve years experiance in mining all open pit running haul trucks and graderds and scrapers dozers and many more
• Results-driven, logical and methodical approach to achieving tasks and objectives
Wide experiences in Occupational Health, Safety and Environment, advisor to the employer on the measures taken in the interest of the safety and Health of persons employed in the place of work. Inspect the place of work to determine whether any machinery, plant equipment substance.
2.6 year of experience in Detailed Engineering work of the refinery units helped me understand the profile and the responsibilities of a mechanical engineer (Static) and to realize how important this field is to the oil refining business and I have learned how important it is to be flexible.
To achieve a job as ¡§Safety Professional¡¨ in an augustive organization where I can deliver the best of my performance implementing managements safety policies and procedures
Highly personable Drilling Fluids Engineer with over three years of experience in laboratory work, project supervision, logistic services both air and land logistics and mud engineering.• Proficient with Microsoft Office System (including Microsoft Word, Microsoft Excel, Microsoft PowerPoint®, Micro
Project Planning & Control Engineer / Scheduler / Earned Value System Designing and Development/Primavera Group Software Developer/I have been working in Engineering and Construction phases of EPC oil, gas and petrochemical projects/PMP (Project Management Professional)/Project Planning & Control
I am a certified lead auditor in ISO ¡V 9001, OHSAS 18001, ISO 14001 standards.
Plant Foreman with ten years experience in gold processing plant.
Monitor daily well progress; provide verbal and written technical input as required to well operations/production department, Prepare well supplemental programs and specifications.
opweration, commissioning,refinery, LNG unloading, termonal operation, plant operator, refinery operator,
Title research and Ownership Reports, Deed Plotting and Runsheet Preparation
Long experienced man, good language skills, oil field experiences and certified as a radio officer, ready to work in the worldwide.
Have worked in all departments of construction project sites, well knowledge in computers
Experienced in Drilling of soils/rock for groundwater exploration and Lignite exploration in Opencast mines
SAP HR Implementation, Recruitment, Training, Compensation Management, employee Relation, Performance management
A chemical process engineer with 12 years experience in oil refining and petrochemical industries
Has served as Supervisor (Mechanical) during shutdown in KNPC, Kuwait and FERTIL, Abu Dhabi. Has experience in the maintenance of Rotary Machinery like pumps, compressors, turbines, etc. and stationery equipments like heat exchangers, columns, vessels and piping. Has computer knowledge.
Licensed Civil Engineer, exposure to project / construction management for 8 years, assigned to do field and office engineering works like field inspection, work monitoring, and cost estimates for 3 years, familiar with basic forms of contracts-FIDIC, CIAP, computer literate - MS office application
Skilled in all planning shutdown, shutdown supervision, servicing, modifications design and total project cost control, mainly in power stations and refineries
Pipeline, Pipe Stress, Piping or MEchanical Engineer
Process Design & Review , Review P & ID’s , Computer Programs (Excel, Word, PowerPoint), Training The Junior Process Engineers & Process Technicians
A professional electrical engineer; more than eight years of active experience in electricity sector of Pakistan in controls, protection, SCADA. BSc Elect. Engg.; MSc Controls; MBA. Has also worked in Northern Electric plc, UK. Technically competent; has ability for business and financial analysis.
I¡¦m a B.E.,(Mechanical Engineering) graduate, graduated from Bharathiar University, Coimbatore (South India) with First class during the year 1992. I have a rich 12+ years of experience in various fields mainly in the area of projects Execution.
An Exploration geologist With experience in Mineral Exploration, Mudlogging, Material sourcing, Mining and Steel
OBJECTIVE A challenging position in managerial level QUALIFICATION FOR THE JOB Good education and fully experienced with engineering and management duties,, have initiative and willing to accept engineering responsibilities.
: PROJECT ENGINEER //SENIOR ENGINEER /ELECTRICAL -- ENGG./(DESIGNS)/PROC./CONSTRUCTION/SUPN./O & M OIL/GAS/PETROCHEMICAL INDUSTRIES ETC.
12 yrs exp in Chemical Industry . strong academic background B.E. Chem +ICWA+LLB+MM (AIM, Philippines) seeking for a suitable opening
cnc turn mill machinist setter
Completing a postgraduate degree in Land reclamation and Restoration, my background is as a scientist with oil and gas exploration and data management experience, with career development into civil engineering land survey in the waste management and construction spheres.
JR. PDS DESIGNER PIPING WORKING FOR WELLCOMPANY IN MUMBAI ON PDS FOR PIPING. GOOD EXPERIANCE OF PIPING.REFER DETAIL BIODATA.
Seventeen years experience in the mining field, surface and underground. BCOA Certified. A Certified Surface and Underground MSHA Trainer for Heavy Equipment and Construction practices. Illinois/Wyoming Certified Supervisor and Shotfirer. FBI/ATF Clearance.
This is the Drafts man C.V for Zueitina Oil Company, Libia.
Please see the attached cv.
PROCESS ENGINEERING OF OIL AND GAS PROJECTS
OBJECTIVE To secure a position with a corporation wherein I can apply the skills, knowledge and expertise obtained during my 18 years in the Health & Safety and Emergency Response fields.
Double Masters in Environmental Sciences (Env. Toxicology and Env. Planning & Management) with expertise in , Environmental Chemistry-Lab analysis, , GIS applications, data analysis, and environmental data management.
Aspire for higher position of Management.
Well Services Engineer/Supervisor
Wide knowledge of UK & International health and safety legislation with extensive experience in risk management Broad experience in the project management. Proven record of achievements in attaining goals in education and employment. Computer literate and fluent in English & Arabic.
Highly skilled hydraulic engineer with 12 years of experience in the field of producing energy, maintenance , commissioning and start-up operations within multi millions contracts. Knowledge and experience in working with international teams.
Seeking a position in Geo-Environmental Engineering providing the opportunity to make a strong contribution to organizational goals through continued development of professional skills.
I’m a civil engineer with studies in HSEQ, I have worked at Cusiana and Cupiagua Oil and Gas CPFs, I have been working for the past 6 years in HSEQ areas an I´m free to go wherever the job is. I speak Spanish as a mother tongue and have good English skills.
A recent graduate student from Ohio University with a Master of Science degree in geological sciences is looking for a career in research, development and application of advanced environmental geological processes.
Application for the post of Control & Instrumentation Engineer. post graduate in Instrumentation engineering having more than 9 years of experience in automation Oil & Gas, Petrochemical and Fertilizers projects.
- 3 years financial model build and auditing; - 6.5 years mining, exploration and resource modelling;
I AM A MECHANICAL ENGINEER WITH 8 YRS EXP IN MANAGING PROJECTSITES AT BPCL,IPCL IN INDIA,FABRICATION AND ERECTION OF PIPELINE,MAITENANCE OF PIPELINE ERECTION OF EQUIPMENT PRESENTLY IN DUBAI ON VISIT VISA AND LOOKING FOR EMPLOYMENT IN UAE.CAN SPEAK BOTH ENGLISH AND RUSSIAN LANGUAGE.
A highly skilled and very experienced Supply Chain Professional with over 15 year’s expertise in Procurement, Logistics and Materials Control in Europe and mainly overseas. Acclimatised to work with varying cultures in diverse countries world wide.
First
Prev
151
152
153
154
[ 155 ]
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com