Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #59324 next resume »»
CONTACT INFORMATION:
View contact information...

Date of Birth: 9th January 1965

Place of Birth: London

Nationality: British

Marital Status: Married with 3 children

Current Work Location: Port Harcourt, Nigeria

Education
1. Diploma in Civil Engineering from Lagos State College of Science & Technology Nigeria (1985).
2. Bachelor of Science (B.Sc) in Civil Engineering from Obafemi Awolowo University Ile-Ife Nigeria (1989).

Career Prospects
Seeking positions in a senior Project engineering / management or Pipeline engineering capacity.

CAREER SUMMARY
A highly experienced and versatile project management and professional engineer with over 15 years of engineering and project management experience in the Oil and Gas industries. Extensive experience in front end / detailed engineering design, project initiation, coordination and monitoring, contract administration, and application of various engineering, project /data management and enterprise software.

Formulation of strategies and concepts, delivery of specifications, management of execution, interfaces and project delivery; planning and scheduling; analysis and performance improvement; cost engineering; budget monitoring and control; value/ project delivery and assurance reviews

Skilled in development of basis for design, project execution plans and functional Specifications; selection, specification and evaluation of equipment piping/utility systems, pipeline and flow lines and construction and commissioning of equipment, subsystems and plants

Work experience includes, handling of multidisciplinary engineering/construction activities related to setting up of new facilities, expansions, upgrades and modifications of oil and gas process plants, flowlines and pipelines. Experience in handling major technical and commercial activities from front end engineering designs (FEED) through cost estimating, evaluation of bids, vendor development and expediting, contracting and contract administration, project planning and scheduling, and implementation of HSE programs, and construction management. Good knowledge of major international codes and standards with extensive oil and gas industry knowledge and highly effective communication skills.

Experienced in development of projects through front-end loading, value assurance reviews and stage gates reviews. Skilled in opportunity framing, benchmarking, preparation of concept selection reports and project execution plans.

Highly skilled in preparation and execution of contracting strategies; selection and pre-qualification of suppliers/contractors; request for tenders and tendering processes; technical/commercial bid evaluation and contract award processes; development of contract execution plans; management of contractor performance; management of variation in contracts and resolution of contractual disputes

ATTRIBUTES
Excellent oral communication and written skills
Strong interpersonal and negotiating skills
Excellent analytical abilities
Good team player and ability to work within multi-racial teams
A self starter and proactive, with ability to mange time effectively
Excellent computer skills

COMPUTER SKILLS
Proficient in the use of several computer programs (Excel, Word, Powerpoint, MS Project, SAP, AutoCAD, etc)

DETAILED PROFESSIONAL EXPERIENCE
SHELL PETROLEUM DEVELOPMENT COMPANY PORT HARCOURT NIGERIA – November 1992 to date

2004 – Date: Project Leader/Manager

Projects currently being handled
1. Bonny/Kalaekule integrated oil and gas development: The project covers the development of several offshore gas & oil fields in the K Block (Kalaekule, Koronama, Kugbe) off the coast of Bonny to produce 200-300 MMstb recoverable oil volumes. (Project value $1billion)

2. Bonny Crude Loadding platform demanning: Engineering, Procurement, Installation & Commissioning of demanning of a crude loading platform in 27 metres of water off the coast of Bonny. The project comprised Engineering, Procurement, Installation & Commissioning work to achieve: remote operation of 36" motorised ball valves via telemetry; primary power supply from Solar system, emergency power supply from diesel driven generators and new distribution system; equipment Module and Temporary Shelter for equipment and maintenance staff; Intruder prevention and monitoring (CCTV) system; boat landing modification; navigational aids (marine lantern, foghorn, beacon) replacement and miscellaneous structural renovation to ensure structural integrity of the platform for the next 25 years operation. (Project value $35 million)

Responsibilities and accountabilities
* Participate in front end activities such as opportunity framing, project initiation to concept selection, schedule and cost assurance reviews.
* Develop the project contract strategy, manage the development of the technical scope of work ensuring adherence to the appropriate Company, Group and International standards and specifications
* Issue ITT packages, evaluate the contract bids, obtain necessary approvals and award the contracts to the successful bidders.
* Manage the activities of the Project Team and the Contractors, so as to complete the construction and commissioning of the project facilities, in accordance with the specified standards and specifications, on time and within budget.
* Manage contracts as per the SPDC Contract Management Guideline with special emphasis on the HSE issues.
* Ensure effective stakeholder involvement in all relevant aspects of the projects.
* Manage the QA/QC process during the construction phase and demonstrate the Technical Integrity of the facilities.
* Maintain good communications with the relevant Communities and Statutory bodies, and ensure that all required permits are obtained as required
* Manage the interfaces between the various Contractors, and with other SPDC departments and Project Groups, to ensure effective co-ordination of construction activities.
* Ensure adherence to Company's HSE and technical policies and specifications, without affecting the Contractor schedule.
* Effectively manage concurrent work and the interfaces between existing facilities and the new development, to achieve safe tie-ins and minimal production disruption.
* Manage contractual scope of work, and schedule to minimise variations and claims.
* Engage Asset teams to ensure a high level of operational readiness, and a seamless start up and handover of the new facilities.
* Direct supervision of several engineers and management of large number of contractor and sub-contractor personnel.

2000 – 2004: Senior Project Engineer
Senior project engineer on a multi-discipline complex shallow offshore platform upgrade project which was producing 30,000bbls/day. The project involved fabrication and installation of a new 270 ton jacket, rehabilitation of process facilities comprising: three stage separation of oil/gas, fuel gas systems, crude export pumping capacity, flare system, metering skids, installation of equipment items, installation of new electrical system, rejuvenation of instrumentation, replacement/modification of process piping, installation of 5km of umbllicals.
(Project value $150 million)

Responsibilities
Responsible for provision of Project management and Engineering expertise through all phases of the project from design, procurement, construction, commissioning, hand-over and initial operations. Ensuring the Project is designed and executed to specified Shell and international standards and meets the objectives of the Project Execution Plan. Planning and scheduling, monitoring of project capital expenditure, supervision of fabrication of jacket at sub-contractor's yard in Lowestoft United Kingdom; direct supervision of 6 engineers/inspectors and management of numerous contractor/sub-contractor personnel peaking at about 500 during construction period.

1997 – 1999: Lead Project Engineer
Lead project Engineer on Alakiri Gas Plant Debottlenecking and rehabilitation project. This gas plant was one of the major plants supplying gas to two major customers for production of fertilizer and aluminium. The project involved increasing the capacity of the gas plant from 90million SCFD to 120 million SCFD to meet increased demand of the customers. The project scope covered: Installation of three new heat exchanger skids; Installation of three new emergency shutdown valve skids; installation of new inlet manifolds; modification of free liquid knockout vessel internals to meet new maximum demand; replacement of internal of low temperature separator vessels to maintain gas specification; installation of two new inlet gas / sales gas heat exchangers; Installation of new flare spillover skid; installation of new high Pressure flare stack; replacement of damaged existing low pressure flare tip; various civil works including relocation of road within plant, extension of perimeter fencing; instrumentation upgrade of plant (replacement of all obsolete instrumentation); rehabilitation of plant utilities such as generators, pumps, air compressors, water bath heaters and glycol reboiler system.
(Project value was $30 million).

Responsibilities included leading a multi-disciplinary team of engineers to oversee all aspects of project delivery. This included development of design/specifications and procurement for equipment and piping; monitoring of yard fabrication and supervision of on-site construction activities; planning, scheduling and implementation of construction/commissioning activities; provision of support to operations personnel in plant /system optimization and integrity assurance. The project was completed on schedule and within budget.
1996-1997: Asset Team Project Engineer
Activities carried out during this period include:
* Pipe laying operations of several hundred kilometers of 4 inch and 6 inch flowlines in the swamps- including cleaning, gauging, hydrotesting operations.
* Minor modifications of oil and gas facilities such as flowstations/gas plants to optimize oil and gas production.
* Replacement and installation of equipment such as gas compressors, pumps, tanks, turbines, sump caissons and heat exchangers.
* Yard fabrication activities (boat landings, heli-decks and piping spools).
* Risers and tie-in spool installations.

Responsibilities included development of contracting strategies, resource and contract planning, preparation and evaluation of tender documents, supervision of project execution, planning, progress monitoring/ reporting and cost management.

1993-1995: Pipeline Field Engineer
Projects handled during this period include:
* Construction of two major pipelines (36 inch and 20inch diameters) on land with associated manifold stations and several river crossings (Project value $250 million)
* Decommissioning of unserviceable pipeline and flowlines
* Preservation of newly completed 36" pipeline not yet ready to be put into use

Responsibilities included project execution, planning, progress monitoring/ reporting, cost management. Development of contracting strategies, resource and contract planning, preparation and evaluation of tender documents. Supervision of site activities including: site clearing, coating of linepipes, pipe hauling and stringing of pipes, trenching, welding of linepipes, NDT, field joint coating, backfilling of trenches, 3km of river crossings, manifold works, cathodic protection works, construction of access roads, decommissioning of old lines and commissioning of new lines. The projects were completed on time and within budget.

Nov 1992-April 1993: Project Engineer
Project engineer on Upgrade of Bomu Gas Compressor station
Responsibilities included project execution, planning, progress monitoring/ reporting, cost management. Development of contracting strategies, resource and contract planning, preparation and evaluation of tender documents and supervision of site activities.

FEDERAL MINISTRY OF WORKS AND HOUSING – November 1990 to October 1992
Nov 1990 – Oct 1992: Civil Engineer
The first one year was spent on training going through the three divisions in the ministry namely: highway and bridge design, construction and materials and research. After completion of one year pupilage, I was assigned to construction division where I worked as Quality control engineer responsible for inspections and control of all activities in order to assure the application the correct codes and job specifications on various road projects.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 3051 to 3100 of 15488)Go to Search Parameters...
Brief Description
10+ years of experience in the field of GIS & construction industry with wide ranging domain and industry expertise.
I have developed over the years a very good and unique network in Africa and have had a chance to only work for multinational companies and one institutional investor company, business development and expansion, sales, corporate strategy, management are my fields.
Certified Welding Inspector (aged 30 years) with more than 10 years experience (Six years in Saudi Arabia having valid Driving License , Singapore & UAE) Oil & Gas / Petrochemical Projects & Semi-Submersible Rigs, Offshore / Onshore Process platforms seeks a challenging position in Inspection Field.
Performance driven procurement and logistics manager offering 14 years expertise in reducing costs while increasing efficiencies in international production and exploration operations. Builds and leads internationally diverse supply chain teams.
3D models PDS, Smart plant Review, PDMS, Autocad, Miicrostation, isometrics, Orthographic Drawing Production
Having 16 years experience in the oilfield, I am a highly motivated, conscientious and experienced professional with a proven ability to work beyond the parameters of the role and to prioritise effectively to meet deadlines.
PRIMAVERA, M.S Office, AutoCAD-2007
Mud Engineer
Total 12+ years of experience (8 Years in India & 4+ Years in Middle East) in Quality Assurance / Quality Control, Inspection and Welding Engineering from Raw Material stage to Final Stage in Fabrication, Construction, during Shut Down / Maintenance, Repair / Renovation work in Oil and Gas, Petroche
Bsc of mechanical engineering 1994, onshore and offshore rigs expernice, joy stick touch screen rigs
Graduate Chemical Engineer with 08 years experience in field of Internal Corrosion and Chemical treament in oil and gas field.
Post Applied for: Planning Engineer / Sr.Planning Engineer (Primavera and MS-Project).
SOFTWARE SKILL: PRIMAVERA-P3 ,P5 ENTERPRISE , P6 PROJECT ENTERPRISE V.6.0 AND PM+
Directional Drilling Operator,Locator and Site Supervisor.ITI Electronics
-
Seeking A Challenging Overseas Position in a professional org MSProj & Premevira
BTech in Mechanical Engineering specialised in Designing HVAC systems.........
Geophysicist with more than 20 years experience, out of which 9 years in marine seismic data acquisition, QC, Party Manager & HSE. Good academic background with an M.Sc. in Geophysics and MBA in Admin.Management, with wide experience working in 2D & 3D seismics.
Manager for techno commercial jobs in mining machinery
A highly experienced and versatile project management and professional engineer with over 15 years of engineering and project management experience in the Oil and Gas industries. Extensive experience in various types of oil and gas projects.
Business Plan Modeling, Project Management, Motivational Team Leader
I have twenty five years mining/supervisory experience in exploration,construction,mining, and reclamation. A true professional in my field
Landman work; Due Diligence; Assignment breakdowns; Figuring ORRI, NWI, NRI; Curative;Title research; Title abstracting; Ensuring complince with governmental and enviromental regulations; Acquisitions; Right of way; Leasing; Geophysical permitting; Mapping skills; Extensive computer knowledge
ESTIMATING, PROJECT MANAGEMENT,HEAVY EQUIPMENT OPERATOR, UNDERGROUND UTILITIES
Algerian petroleum geologist with +8 years of experience in the area of petroleum exploration and geomechanical engineering. Looking for an international carrier in the area of petroleum geology or geomechanics
Underground fitter/machinist, with hydraulic experience, and am proficient in all types of welding. Reliable, motivated, self-starter, that is safety oriented. I have great interpersonal skills and work well with others. I go that extra mile to get the job done efficiently.
I have over 22 years in the underground mining industry in all aspect of operations
During 8 years experience in Oil & Gas industry, I was fully in charge of Reservoir Engineering. I have done 3 reservoir simulation jobs , PVT Analysis, Static Pressure Analysis, Transient Pressure Analysis, Reserve Estimation, Material Balance, Decline Curve Analysis ,field job supervisory
Over 20 years managing equipment. Large tunnel, heavy civil jobs and managed jobs across state and states. I have been involved in training and presentations to improve and maintain safety and service. I enjoy a challenge and enjoy reaching goals and working with a team or teams to reach a common go
Management
I would like to continue my career in mining as an equipment operator or a supervisor/foreman. I have worked in or around mines for the last 25 years, the last 5 as a supervisor.
A. Competencies/Skills for over fourteen (14) years of experience in different projects as Crane Operator and Heavy Equipment Mechanic a. ARAMCO-Certified Crane Operator in oil and gas wells for all required works in drilling and rig moving b. Qualified Crane Operator for underground civil works c.
24 years experience in completions and workovers.
Well site supervisor for 4 years specilizing in horizontal, directional, underbalanced, reentry wells.
I am a HVAC /Electrical Lead technician with 22years experience 19 years in Multi-national oil companies both onshore and offshore for production platforms and perform preventive maintenance activities, job scheduling including preparation of JSA with relevant parties .
Electrical Engineer
Metallurgical process supervisor/trainer Experianced on Gold ,Copper and Uranium
I am 46 years old, hardworking and trsupervision. Seeking permanent employment overseas. ie: Dubai.ustworthy. My attendance is 100%, never having had any sick time from my work in 25 years of full time employment. I can use my own initiative, and am able to work without supervision.
Workover/Completion Consultant/Supervisor
Production foreman with twenty years of experience in oil and gas industry.
Occupational Health and Safety Engineer with Industrial Hygiene Background. Worked on Variety of Oil & Gas Project
26 yrs in manuufacturing,buying scheduleing,inventory control,lean manufacturing,JIT,Kanban
pressure welder
Working with Multinational Oil Company HALLIBURTON WORLD WIDE LTD, in Pakistan as a Senior Service Leader.
Accomplished Engineer With 14 Years Of Diverse Experience In Production, Planning, Materials Management
Equipment handled are : Feed Treating, Reforming, Purification, Synthesis Gas Loop, Ammonia Refrigerant System.
Having served 7.5 years as a Mine Manager, 5 years as a Plant Manager, 8 years as a Purchasing Manager , 5 years as a Sales Manager and interact with ethnic diverse populations, I am confident that I can make a valuable contribution to your organization’s future projects.
I am a fully qualified Cost Engineer and Estimator and have contract claims experience. Please see resume for details.
Senior Executive with verifiable performance in the fields of Project / Operations Management and Techno-Commercial management in Shipyards and Oil & Gas industry.
Experienced General Manager with Emphasis on Sales and Operations
First   Prev   51   52   53   54   55   56   57   58   59   60   61   [ 62 ]   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com