CONTACT INFORMATION:
View contact information...
B.SC. in Petroleum Engineering
PERSONEL INFORMATION:
Date and Place of Birth: May 11, 1967, Ankara
Marial Status: Married, 1 child
Languages: Turkish, English
Driving Licence: B Class, 1990
Military Service: Performed in between July 1992 and January 1993
Computer Knowledge: Programming in FORTRAN, BASIC, and COBOL
MS Windows XP, MS Office
PROFESSIONAL EXPERIENCE:
Hema Enerji A.Þ.,
Bartýn-Zonguldak, Turkey April 2007 to present
Has been working as drilling, well completion and production supervisor in Coal Bed Methane(CBM) project in drilling and well completion of multi-lateral hozirontal wells. Also, working as Drilling and Well Completion Supervisor in natural gas and crude oil exploration project on onshore and offshore gas exploration operations.
Nobel Oil
Baku- Caspian Sea September 2006 to April 2007
Worked as Field Workover and Well Completion Supervisor in offshore project. Supervised the fishing, milling, squeeze cementing and drilling operations on offshore natural gas and crude oil wells with two workover rigs.
Petoil A.Þ March 2006 to September 2006
Ankara- Turkey
Worked as Operations Manager in Natural Gas and Crude oil exploration operations of Company.
Botaþ International Ltd.,
Ankara Turkey March 2005 to March 2006
Worked as Regional Manager in Bakü- Tbilisi- Ceyhan Crude Oil pipeline.
Managed the pumping station operations and related section of 42" pipeline (400 km). Also, worked as deputy commissioning and start up manager of pipe line operations during start up period.
N.V. Turkse Perenco,
D.Bakýr, Turkey Jan. 2003 to March 2005
Worked as production manager in oil and gas production field. The field had 150 production wells, 35 water injection-disposal wells, 50 km of natural gas pipe line and gas process and ten gathering station is 150 km extent. Supervised all field natural gas and crude oil production operations. Also, supervised design of free water knockle-out vessels and pneumatic and electrical control systems, production optimization, production block station modification, natural gas processing, workover operations.
Amity Oil Pty. June, 2002 to Jan. 2003
Thrace, Turkey
Worked as field operations manager.
Project planning and management. Managed the natural gas pipe line constructions, seismic, drilling and production operations of the company as field manager and contract adminisrator.
Enron Thrace Exp. & Prod. B.V. November, 2000 to June 2002
Tekirdag, Turkey
Worked as Drilling and Workover Manager
The company drilled natural gas wells in and around Tekirdag city in Thrace.
Supervised all drilling and well completion operations.
Managed supply of all necessary drilling, completion materials and services in and out of country.
Trained the drilling crews on Well Control and HSE.
Coordinated the repair and maintenance of drilling rigs and equipment with respect to API standards.
Similarity to reservoir aspects and log interpretation.
Aladdin Middle East, Ltd. Co. March, 1993 to November 2000
Ankara- Turkey
Worked as head of drilling and production group.
Worked as project manager and rig supervisor in drilling and production operations.
Managed the transportation of oil through pipe lines.
Supervised workover and technical operations such as fishing, casing cutting, DST, acidizing, cementing, squeeze cementing. Prepared drilling, well completion and re-entry programs.
Designed down hole production pumps (ESP, horse head, cavity pumps).
Supervised workover operations in production and water injection wells (Acid Stimulation, down hole pump failures and retrievals, fishing, casing patch, production packer failure, plugged string, casing and window cutting etc.) with two workover rigs. Worked as company man in contract drilling and completion operations.
Aladdin Middle East, Ltd. Co. July, 1990 to July 1992
Ankara- Turkey
Worked as rig supervisor in drilling and workover rigs of the company until military service. Supervised every phase of drilling and well completion operations mainly in turn-key projects in Southeast Region of Turkey.
SUMMER PRACTICES:
Drilling study for 10 weeks in Diyarbakir oil field of Aladdin Middle East Ltd., Turkey in 1987
Drilling and well completion study for 8 weeks in Gaziantep exploration field of the same company in 1988.
RESEARCH:
Solution of Dimensionless Pressure Distribution in Rectangular Hydrocarbon Reservoirs Using Instantaneous Source and Green's Functions by Numerical Integration Method, B.Sc. Project, Pet. Eng. Department, METU Ankara 1990
EDUCATION:
Petroleum Engineering Department: Middle East Technical University, Ankara, June 1990
CERTIFICATES:
IWCF, Well Control Certificate, Valid until July 2009,
Defensive Driving by Demir Bükey, N.V. Turkse Perenco, April 2003.
Advanced Fire Fighting Certificate, Botaþ International Ltd, Houston Texas, BP Center, August 2005
REFERENCES:
Will be provided
View contact information... |