Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #67507
next resume »»
CONTACT INFORMATION:
View contact information...
Objective:
To be professionally allied with an organization that offers career escalation, an opportunity to utilize my skills and dedication to perform quality work with an objective to accept challenges.
Profile:
A self-motivated and committed engineer with more than 20 years of professional experience in various aspects of Detailed Engineering, Field Engineering and Construction supervision & commissioning activities related to Control & Instrumentation (C&I) System for the following KEY areas.,
* Oil & gas
* Refinery,
* LNG
* Petrochemical
* Chemical
* Power & Synthetic Yarn Plants
Career History
Period Employer & Place of Assignment Designation
October 2005 ¡V Till Date SAIPEM-INDIA Chennai / France PRINCIPAL ENGINEER ¡V Instrumentation
April 1996 ¡V May 2005 IDEA/IDPE Chennai./ France / Netherlands Engineer / Sr.Engineer ¡V Instrumentation
May 1988 ¡V March 1996 SPIC ¡V SMO Chennai / Kuwait Inst.Tech/Sr.Tech/ Supervisor.
Educational Qualification
Diploma in Electrical & Electronics Engineering with FIRST CLASS in the year 1988.
Present Employment
Presently working as "Principal Engineer ¡V Instrumentation" with M/s. SAIPEM INDIA PROJECT SERVICES LTD. (ENI Group) Chennai, INDIA.
Professional Experience:
1.Detailed Engineering:
Expertise in engineering design of instrumentation and control system. Actively involved in the following engineering activities as LEAD / TASKFORCE ENGINEER.
Review of Client supplied documents, Drawings and Project Specifications.
Preparation of data sheets and specification for field instruments and Control Valves etc. for "Material Requisition".
Guidance and leading of DESIGNERS & DRAFTPERSONS for development of hook-ups, instrument installation details, instrument support fabrication details, instrument MTO, junction box layout & terminal details, interconnection diagram, cable ladder & support details, cable schedule etc.,
Review of P&ID and preparation of Instrument index, I/O list for DCS, ESD & F&G, Control Schemes, Logic and sequence diagram, Inst. loop diagram etc.,
Co-ordination with other discipline and review of their drawings & documents etc. for smooth and quality work in the project task force.
Co-ordination with Procurement and review of Vendor documents & drawings, interaction with Suppliers for technical queries and preparation of Technical Bid Evaluation.
Co-ordination with Project and updating the status of instrumentation deliverables, Progress, Man-hours etc for timely completion of the Project.
2. Field Engineering.
Involved as Field Design Engineer in co-ordination with Site / Projects under BECTEL / RELIANCE JAMNAGAR for their gross -root Refinery complex in India for the following Field Engineering activities at site.
Preparation of the FINAL layout drawing for Instrumentation cable trays (Main) from CCR to various plants / Complexes in PDS/PDMS in co-ordination with construction team of the respective plant /complex and Projects.
Preparation of FINAL routing instrumentation cables from CCR to various plants / complexes by using BECTEL software called "SET ROUTE"
Preparation of FINAL instrument location drawings in co-ordination with Construction team.
Preparation FINAL / Revision of instrumentation bulk MTO in co-ordination with Construction team.
Participation in meeting with construction team / Projects and making corrective actions like changes in the drawings & Documents and AS BUILT correction as per the site modification.
Development of Hook-ups, Instrument installation details, Instrument support fabrication details, Instrument MTO, Junction box layout & terminal details, Interconnection diagram, Cable ladder & support details, cable schedule etc.,
DCS-input/output (I/O) list, Control Schemes, Logic and sequence diagram, Inst. loop diagram and Inst. Hook ups etc.,
„« Co-ordination with other discipline and review of their drawings & documents like Civil, Equipment & Piping layout, electrical cable routing etc. for smooth and quality work in the project task force.
„« Co-ordination with Procurement and review of Vendor documents & drawings, interaction with Suppliers for technical queries and preparation of Technical Bid Evaluation.
3. Construction supervision & commissioning activities.
Involved as Consultant / Site Engineer for the following Construction activities.,
„« Planning & scheduling for over all Instrumentation activities at site & strictly adhering to all safety norms at site.
„« Preparation preliminary estimation of Man-hours required for entire instrumentation construction & Commissioning activities at site.
„« Ensuring timely mobilization of Material, Manpower and Machinery by the contractor.
„« Supervision of contractor's work with final Approved for Construction drawings like Cable tray routing, Laying of cables, Impulse tubing & Air Piping, Calibration of Instruments, Installation and Termination of Instruments and Field Junction boxes, Loop checking, Testing and Pre-commissioning activities etc.
„« Resolving the discrepancies / constraints during construction at site.
„« Preparing Reports & participating in Weekly / Monthly review meeting with the Client and Contractor to discuss about the Site progress, Constraints, Resources and Action plan etc.
„« Preparation of the mark up drawings for "AS BUILT" for the changes made at site
System Handled / Involved for Instrumentation Control & Operating System:
Honeywell TDC 3000, Yokogawa & Foxboro (Invensys) IA series
Computer Skills: Working Knowledge in Windows XP 2000 (MSOffice),
Software Handled: Customization of Instrumentation Design Tasks using INTOOLS
Control Valve Sizing ¡V Fisher
Safety Relief Valve Sizing ¡V Consolidated-Dresser
Flow Elements ¡V Flow well
PROJECT HANDLED THROUGH IDEA / IDPE/ SAIPEM INDIA PROJECT SERVICES LTD.,
Current Assignment:
Client: RELIANCE, India
Project: JERP Project, Jamnagar
Period: April 2007 onwards
Responsibility: Instrumentation Engineer (Taskforce at Chennai).
Previous Assignments:
Client: RELIANCE, India
Project: PVC / VCM
Period: Jan 2006 to March 2007
Responsibility: Lead Engineer (Taskforce at Chennai).
Client: PETRONET LNG, India
Project: KOCHI LNG Terminal (Proposal Engineering)
Period: July 2006 - Sep 2006
Responsibility: Instrumentation Engineer (Taskforce at Chennai).
Client: FLUXYS, Belgium
Project: Zeebrugge LNG Extension Project, Belgium (Detailed Engineering)
Period: June 2005 ¡V April 2006
Responsibility: Instrumentation Engineer ((Taskforce at Chennai).
Client: SEIC, Russia
Project: Sakhalin II Pipe line (Detailed Engineering)
Period: Oct 2004 ¡V April 2005
Responsibility: Instrumentation Engineer (Taskforce at Chennai).
Client: Foster Wheeler, UK
Project: South Hook LNG Terminal, UK
Period: July 2004 - Sep 2004
Responsibility: Instrumentation Engineer (Taskforce at Paris, France)
Client: JANA, KSA
Project: JANA ECH, KSA ¡V EPC Epichlorethlene
Period: Jan 2004 ¡V May 2004
Responsibility: Instrumentation Engineer (Taskforce at Chennai).
Client: TOTAL Nigeria
Project: AKPO (FPSO)
Period: Sep 2003 - Dec 2003
Responsibility: Instrumentation Engineer (Taskforce at Paris, France)
Client: TOTAL, France
Project: SRU, Normandy, France
Period: Aug 2003
Responsibility: Instrumentation Engineer (Taskforce at Chennai).
Client: Dolphin Energy, Qatar
Project: Dolphin
Period: June 2003 ¡V July 2003
Responsibility: Instrumentation Engineer (Taskforce at Chennai).
Client: ADCO, Abudhabi, UAE
Project: Bu Hasa (Estimation)
Period: Feb 2003 ¡V April 2003
Responsibility: Instrumentation Engineer (Taskforce at Paris, France)
Client: ADCO, Abudhabi, UAE
Project: Bu Hasa (Proposal Engineering)
Period: Nov 2002 ¡V Dec 2002
Responsibility: Lead Engineer for Instrument activities (Taskforce at Chennai).
Client: SEIC, Russia
Project: Sakhalin II Pipe line (Proposals)
Period: July 2002 to Sep 2002
Responsibility: Instrumentation Engineer (Taskforce at Paris, France)
Client: Bouygues Offshore, France
Project: EPC-3, NIGERIA MOBIL
Period: May 2002 to June 2002
Responsibility: LEAD Engineer (Inst.) for Pre-bid-Engineering activities
Client: Bouygues Offshore, France
Project: Sakhalin II, Oil & Gas project, Russia.
Period: Feb 2002 to April 2002
Responsibility Project task force Engineer for Pre-bid Engineering activities.
Client: Reliance Industries Ltd. Hazira
Project: Polyethylene debottlenecking project.
Period: Oct 2001 Jan 2002
Responsibility: Lead Engineer (Inst.) for Detailed Engineering activities.
Client: Ansaldo Power Projects Ltd
Project: 2 x 210 MW Coal based Power Generation, Neyveli
Period: July.2001 ¡V Oct 2001
Responsibility: Engineering Design Review activities for 2 x 200 MW Coal based power plane NLC Neyveli,
Client: NEM, The Netherlands
Project: HRSG for Dominion Project, USA
Period: Feb.2001 ¡V May 2001
Responsibility: Deputed to NEM, The Netherlands for Detailed Engineering activities for HRSG for Dominion Project, USA.
Client: Indian Oil Corporation Ltd. (IOCL)
Project: MS Auto blending & Tank gauging system at IOCL Barauni Refinery.
Period: Dec.2000 ¡V Feb 2001
Responsibility: Lead Engineer for Detailed Engineering activities for M/s.Tata Honeywell, Pune.
Client: Indian Oil Corporation Ltd. (IOCL)
Project: Eastern India Refinery Project, Paradip, Orissa.
Period: Oct.2000 ¡V Nov.2000
Responsibility: Project Task force Engineer(Inst.) for Pre-bid engineering activities for M/s.L&T, Baroda
Client: Punj Lloyd Ltd. New Delhi
Project: Chemical dosing system for CW System
Period: Aug 2000 ¡V Oct 2000
Responsibility: Lead Engineer (Inst.) for Detailed Engineering activities
Client: M/s.Punj Lloyd Ltd., New Delhi
Project: Ammonia Heavy Water Plant, Baroda, India
Period: May 2000 ¡V July 2000
Responsibility: Lead Engineer (Inst.) for Pre-bid engineering activities.
Client: KNPC, Kuwait.
Project: New Oil Pier & Offsite facilities at KNPC MAA Refinery.
Period: March 2000 ¡V April 2000
Responsibility: Project Task force Engineer(Inst.) for Pre-bid engineering activities.
Client: Tamilnadu Petroproducts Ltd. (TPL), Manali, Chennai, INDIA
Project: LAB (Linear Alkaline Benzene) expansion project.
Period: Dec.1999 ¡V Feb 2000
Responsibility: Consultant Engineer (On behalf of UOP USA) for field Instrumentation.
Client: Cochin Refineries Ltd. (CRL), Cochin, Kerala, INDIA
Project: DHDS
Period: Nov.1999 ¡V Dec.1999
Responsibility: Commissioning Engr. (On behalf of L&T Chiyoda) for Commissioning activities.
Client: Reliance Petroleum Ltd. (RPL) Jamnagar, Gujarat, INDIA
Project: World's biggest grass root Refinery complex, Jamnagar, Gujarat.
Period: Apr1998 ¡V July 1999
Responsibility: Field Design Engineer.
Client: Cabot Sanmar Ltd, Mettur, Tamilnadu, INDIA
Project: Fumed Silica Project
Period: July 1997 ¡V Feb.1998
Responsibility: Consultant Engineer for Field Engineering / Construction Supervision & Commissioning.
Client: Raymond Synthetics Ltd. (RSL) Allahabad (UP), INDIA
Project: POY ¡V II Plant
Period: June 1996 ¡V Feb 1997
Responsibility: Consultant Engineer for Field Engineering / Construction Supervision, Commissioning.
PREVIOUS EMPLOYMENT FROM 1988 ¡V 1996: SPIC ¡V SMO, Chennai / Kuwait
PROJECT HANDLED THROUGH SPIC ¡V SMO
Assignment ¡V 7
Project: PETROCHEMICAL INDUSTRIES CO., KUWAIT, Fertilizer Plant
Period: Aug 1995 ¡V March 1996
Designation: ASST.ENGINEER
During the above period involved in Supervision of Instrumentation shift maintenance work in Ammonia, Urea Plant and work shop activities, co-ordination with control room and stores. Installation, commissioning and maintenance of field instruments, like transmitters, switches, control valves, level trolls, etc. conductivity meters, analysers, panel instruments, loop checking, etc.
Assignment ¡V 6
Project: KNPC, MAB REFINERY, KUWAIT, Refinery Maintenance activities
Period: 1993 - 1996
Designation: SR.TECH / SUPERVISOR
During the above period involved in Supervision of Instrumentation shift maintenance work in New Refinery & Old Refinery Plants and work shop activities, co-ordination with control room and stores. Installation, commissioning and maintenance of field instruments, like transmitters, control valves, level trolls, etc. conductivity meters, analysers, panel instruments, loop checking, etc.
Assignment ¡V 5
Project: DOHA WEST POWER STATION, KUWAIT, 8 x 300 MW Power Generation
Period: Dec 1992 to Mar 1993
Designation: SUPERVISOR
Involve in calibration of transmitters, switches, control valves, etc., Loop checking and interlock protection check of ID & FD fan, feed water pump, Rotary air preheater etc. Also, involved in burner control management.
Assignment ¡V 4
Project: INDIAN OIL CORPORATION LTD., BARODA, Hydrocraker Project
Period: June 1991 to November 1992
Designation: SENIOR INSTRUMENT TECHNICIAN
Involved in construction work. Review of P&Ids instrument installation, calibration of various instruments like transmitters, switches, control valve, safety relief valves, level trolls, etc. Also, involved in cable laying, loop checking, control room panel erection and termination.
Assignment ¡V 3
Project: PARADEEP PHOSPATE LTD., PARADEEP, ORISSA, Sulphuric Acid / Phosphoric Acid Plant Commissioning activities
Period: November 1990 to May 1991
Designation: SENIOR INSTRUMENT TECHNICIAN
Involved in commissioning activities for Sulphuric acid plant, and phosphoric acid plant.
Erection and calibration of field instruments, loop checking and monitoring and maintenance of I&C system.
Assignment ¡V 2
Project: GAS AUTHORITY OF INDIA LTD. (GAIL), LPG PLANT, VIJAIPUR, M.P.
Period: From March 1989 to September 1990
Designation: SENIOR INSTRUMENT TECHNICIAN
Involved in commissioning activities for LPG plant. Stroke checking of control valves, calibration of transmitters, switches, level trolls controllers, etc.
Assignment ¡V 1
Client: OIL & NATURAL GAS CORPORATION, ONGC Gas Processing Complex Hazira, Gujarat.
Project: DPDU Phase ¡V II
Period: June 1988 ¡V Jan 1989
Designation: INSTRUMENT TECHNICIAN
Construction, pre-commissioning and commissioning of Dew Point Depression Unit. Supervision, planning and reporting of day-to-day works. Co-ordination with consultant for daily activities in the field of instrumentation.
Personal Profile:
Date of Birth: 05.04.1968
Nationality: Indian
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1701 to 1750 of 15306)
Go to Search Parameters...
Brief Description
Electrical Technician with 20 years experience in the oil and gas industry.
Executive Recruiter, Recruiter, Contract Recruiter
Over 20 years experience in both Supply and Project Logistics in both Oil and Gas as well as Mining. I also have direct Freight Forwarding experience including multi modal transport involving bulk, express, heavy haulage and over dimensional.
Piping Designer (HVAC Piping and Plumbing Systems)
am right now working at OXY in Santa Cruz with WO & Completion jobs related.( as a work over site Manager) am interested in your global opportunities so Ihave attached my resume with actual phones and emails.I have experience managing different kind of peoples and oil specialties.
been welding for 25 plus years...
A total of 10+ years experience in Pipe Stress Engineering and Mechanical Stress Analysis in
Good knowledge in delivering commercial operational management including specialist area of hydrocarbon business and regulatory compliance and administration (Production Sharing Contract, Joint Operating Agreement and Gas Sales Purchase Agreement, fiscal terms)
My underground mining experience begins from 1986. Over those years I was involved in all aspects of Underground mining. Beginning from manual labor, operating underground machineries, supervising crew, training new operators, to take role as Mine Foreman
Electrical Superintendent
Graduate in Chemistry with 10 years Cement experience in Chemical Analysis OR a Graduate in Science (Chemistry ) with 14years background in Cement Plant Quality Control procedures.
Current position held: Project Exploration Geologist, Reefton Gold Project. Gold exploration 1993 - 1995, 2000 - present. Oil exploration 1996 - 1998
QA Manager with 23+ years diverse experience
All STCW certificates are valid and available
More than 26 years of experience in this feild and capable of handling induvidual stores
Water-flooding, reserve estimation, production forecasting, economic & risk analyses, reservoir characterization, tracer & pressure transient analyses. Well surveillance for development opportunities. Some thermal experience. Simulation experience to predict performance & optimize development plans.
22 Years of experience in Granite and Minerals Industry. Project Head and Managerial cadre experience.
Strong technical and practical knowledge of mining and mineral processing. Over 20 year’s industry experience, in large and small mining operations, experiences in hard rock, sand and gravel, limestone, cement rock, and industrial minerals facilities. BS Mining Engineering.
15- Years experience of selling Trucks, Construction, material handling and Agricultural tractors of Saudi Arabia
Bitumen storage terminal construction and all bitumen products manufacturing expereince
Having 20 years of professional experience in various aspects of Detailed Engineering, Pre-bid engineering and Construction supervision & commissioning activities related to Control & Instrumentation (C&I) System for Oil & gas, Refinery, LNG & Petrochemical and power plants.
An experienced daimond core drilling engineer seeks employment.24 years wide range experience in daimond, rotary and DTH drilling methods.Operation,maintanance and fishing,trouble shooting.Had overseas experience in Tanzania during 1995.
Petroleum Engineer with 13 years experience in the Oil and Gas Industry with solid knowledge in Geopressure analysis, Well design, MWD operations and rock properties analysis; project management skill (estimating/cost, control/scheduling); bilingual Spanish-English; APEGGA EIT# 92804 and Worldwide.
Coal Resource Geologist,Minescape software modelling skills,working in Coal field at Indonesia for past 2yrs,Having experience in various experience & skills Geological fields.
To obtain a position as Suitable position in process control Instrumentation that allows me to expand my current skill set with technical challenges and career development opportunities to enhance the achievement of corporate goals.
Highly Qualified Draughtsman
Science bachelor degree & safety management diploma and HSE Supervisor Technician with 13 years of experience, Worked for drilling operation, Production operation on offshore and onshore as a HSE technician, advisor and supervisor. Drilling experience as well as driller hand ,Experience managing
A competent & self motivated professional with the ability to work independently and as part of a team within a highly pressured, fast moving environment with 10 years of qualitative and enriching experience in the field of Logistics, Supply Chain, Freight Forwarding, & Operations
An astute, detail-oriented professional who excels under the pressure of time constraints and possesses the determination to always exceed expectations. 

Summary of selected Accomplishments responsible for career total of more than 500 placements!
Rock physics, Petrophysics, Quantitative seismic Interpretation, AVO, reservoir modeling, generation of synthetic seismograms
Total Of 16 Years Experience In Drafting And Detailing Of Piping Drawings And Other Drawings In Compliance With The International Standards. Experience Achieved Is In Line Of The Chemical / Petrochemical / Refinery And Connected Utilities Piping Jobs.
Seeking employment as Telecom Engineer in a competitive environment for a position offering challenge, diversity and opportunity for professional advancement, having strong learning aptitude along with analytical and interpersonal skills.
OBJECTIVE: To obtain contract or full time position as a Document Control or Records Administrator and/or other related job.
PDMS mid-level piping designer with a specialty in PDMS DRAFT, Misc. pipe supports, equipment modeling and sloped pipe.
Production/drilling engineer hold Master from IFP; working in Workover operation
Free!
Worked as a Drilling Fluids Engineer / Technical Service Coordinator for the past 13 years.
Installation, commissioning, testing & operation of transformers, Power Control Centre, Machine Control Centre Panels
Mechanical building services design engineer. Experience in design HVAC, Plumbing & Fire Fighting along with site supervision and project management activities.
M.Sc with 15 years Laboratory experience in Analytical Lab.
Excavator-grapple, mobile shear, excavation, demolition, scrap handling, stripping, quarry work
Instrumentation technician with 20+ years of experience
I have 32 years of millwright and supervisory experience with gyro and cone crushers,ball and sag mills up to 36 ft. Knelson concentrators, CIL leach systems, gold and copper systems, conveyors, screens, gold refining equipment.
Chief engineer, marine with 14 yrs. of sailing exp.hands on exp. in maintenance of diesel engines,power plants,air conditioining,pumps and turbines.etc.
I am a consultant working for Devon Energy in the Ft. Worth area and have worked for several major oil companies doing directional wells and taking them from start to finish, building locations and put them on production.
Over 30 years as supervisor.
Mechanical Designer with over 20 years experience preparing process piping layouts, hydraulic and pneumatic schematics, isometrics, assembly, P&ID’s, and detail drawings, as well as laying out the placement of mechanical equipment. Adept at performing field walkdowns, surveys, and meeting with clie
10 years as maintenance manager, 10 years in africa. congo, mali. and guinea.
Electrical Engineer
Piping Engineer (PDMS)
PDMS AUtocad 3d Multisteel Civil/Structural Design Draughtsman
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
[ 35 ]
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com