Mechanical Engineer having more than 15 years of working experience in multi discipline M & E projects. The work experience includes Monitoring of project execution activities, liaisining with regulatory authority for necessary approvals, execution planning, support project organizational and administrative activities, monitoring and reporting on costs, budgets and progress, manage internal & external project interfaces with sub contractors, office and work site, support to engineering team, preparation of close-out documents and drawings etc. Can lead a multi disciplinary project execution team and manage execution/ organization plans. Independently handled Projects in Nigeria, Oman and India. Presently working in Nigeria as Project Manager in an Italian Electromechanical Contracting Company.
Professional Experience:
(August 2005- Till date)
Frate (N) Limited, Nigeria. A leading Italian MEP Contracting Company in Nigeria. Working as a Project Manager. Areas of operations include monitoring project progress, budget and cost, attending site progress meetings, manpower and material planning, material ordering, liaising with various govt. regulatory authorities, architects, consultants and clients for necessary approvals. Handling project execution team, sub-contractors and vendors. Preparation of closeout documents such as built drawings, O & M manuals and training to end users.
From Dec. 2003 to June 2005)
Elektrint (Nig.) Limited. An Italian MEP contracting operating in Nigeria. Worked as a Project Engineer and handled mechanical project at Aba, Abia state. Responsibilities included supervision, material and man power planning, attending regular site meetings, co-ordination with client/consultants/Architect for materials and work approvals.
Major Project handled:
The 'LATTER DAY SAINTS CHURCH OF USA' at Aba, Abia state, Nigeria: The mechanical system comprises of the following:
HVAC system including D-X type AHU-Condensing units combination system, hot water system for humidity control, split a/c system for allied buildings, DDC controllers, extraction system installation.
Plumbing system including installation of sanitary items and fittings, internal water distribution, hot water system and calorifier installations, font system installation etc. Borehole and water treatment plant and external water distribution system. PMS and AGO system installation including dispensers, underground tanks etc. Fire fighting system, storm and rain water management system etc.
(From April 2002 to Nov. 2003)
GENETCO LLC, Muscat, Sultanate of Oman. Worked as a Project Engineer (EPS Division), and carried out various HVAC project installations. Area of operations include Preparation of work schedules, Heat load calculations, selection of equipments, Preparation of shop drawing (ducting, piping, electrical etc), Material approvals & procurement, Monitoring & supervising site progress & attending regular site meetings and coordinating with consultants & architects, Negotiating & finalization of material order with vendors, Handling a team of supervisors, technicians & CAD operators.
Major Project Handled:
Library Project, Sultan Qaboos University, Oman - 963TR
Technical Affairs Directorate Building, Sultan Qaboos University, Oman - 190TR (Direct-Expansion system)
Multipurpose Hall for Ministry of National Economy, Oman - 260TR (Combination of package & split units)
Al Khaleej Polypropylene Product co. Sohar, Muscat - 190TR (A/C & ventilation system)
(From September 1993 to March 2002)
Voltas Limited, New Delhi, India,
A TATA group companies, one of the largest central air conditioning companies operating in India.
Worked as a Area Sales Manager- central plant sales (ACBD division) New Delhi Branch responsibilities included: project costing, preparation of strong techno-commercial bid, attending sales meeting, follow-up and negotiations with the clients for bid approval, liaisining with the consultants, architects etc. Project presentations with cost benefit analysis.
Worked as a Project Engineer (ACBD division), responsibilities included: Heat load calculations, equipments selections, designing of varieties of air-conditioning system including air-cooled, water-cooled D-X and chilled water system, installation of low temperature process chilling plants, low RH cold rooms, Brine chilling plants, designing & Installation of air-cooling systems. Preparation of working drawings and material selections, site supervising, attending regular site meetings, payment collections and handing over of site as per technical and commercial terms.
Major Projects handled:
1. DVB, Dadri 220MW power plant, Delhi region.
2. Delhi Metro Rail Corporation (DMRC), Shastri park station and depot, New Delhi.
3. Times of India building, Sahibabad, Delhi region.
4. National Brain Research Centre, Govt. of India, Gurgaon.
5. CCE R&D Jagadalpur project with ministry of defense.
Computer Knowledge:
Packages: MS-Office, MS- Projects, ERP package.
Training courses attended:
A 21 days technical training programme at Voltas Limited, Mumbai India. The course was planned for awareness of preliminaries of planning, heating/cooling load estimation, duct designing, water and refrigerant pipe sizing, designing and selection of chiller, condensers and reciprocating compressors for various process chilling & cold room plants.
Attended various technical seminars, workshops and personality development programme organized by Voltas Limited and GENETCO.
Attended ISO 9000-2001 Programme for internal Audit. (Certified internal Auditor)
Represented Voltas for REFRICON-2000, New Delhi, India.
Education:
Bachelor of Engineering in Mechanical (1993) From Govt. Engg. College, Jabalpur (M.P.), India.
Personal:
Date of birth 17-10-1970.
Marital Status: Married with two children.
Nationality: INDIAN
Passport No. E 0588461 (Valid till 2012)
View contact information... |