Date of Birth: 20th May 1953 Designation: Senior Operations Engineer
30 years experience in Oil/Gas Industry, 11 years Superintendent experience, 15 years Supervisor
Locations worked: Indonesia, Kazakhstan, Russia, Netherlands, Tunisia, Libya, UK
SUMMARY OF PROFESSIONAL EXPERIENCE
An experienced superintendent with the necessary skills required for the safe commissioning and operation of oil and gas treatment plant, whether sour or sweet, with onshore, offshore and, extensive overseas experience. Associated with all aspects of plant handover, development of procedures, management control systems and associated documentation. Experience as OIM leading multi-discipline teams, planning and co-ordination of work activities (construction, commissioning and operations). Computer literate with industry standard software packages; Windows, Office, Document Management Systems etc. OPITO D32/D33 competence assessor and familiar with industry standard competency programmes.
CAREER HISTORY
June 2006 – Present Karachaganak Petroleum Operating BV
Aksai, West Kazakhstan Oblast
Senior Operations Engineer Republic of Kazakhstan
(Sour Condensate/Gas facilities 7% H2S)
Karachaganak 4th Train/CRL Expansion Project
The scope of the project is to provide a 4th Oil stabilization and sweetening train, additional gas compressors, and the provision of a condensate rail loading facility to the existing processing complex increasing production rates to 10.27 MTA. Joined the project at the pre FEED stage, carrying out design reviews, SIL/HAZID/HAZOP procedures and existing plant tie in works. Ensuring input of existing plant modifications and debottlenecks are incorporated into the detailed design. During the construction activities, preparation of system/sub-system documentation for input to WinPCS database, development of commissioning procedures and startup/operations documentation. Input to 3D model development for optimum plant and equipment design layout.
********************
Jan 2006 – June 2006 Companie des Petrolie TOTAL Libye (CPTL)
Mabruk Field, Libyan Desert Location
Phase IV Start Up Manager Contracted to Total SA through IOTA, Geneva
(Black Oil Processing – 200 ppm H2S)
Mabruk Phase IV Development Project
Joined the project during the construction phase, developed the plant start up sequence, start up/operations procedures. Desert location heavy oil processing plant. New technology replacing an old manually controlled plant. Expansion of the field to increase production to 28000 bbls/day. Familiar with Opercom and ICAPs systems.
********************
May 2002 – Jan 2006 Kufpec Indonesia (Kuwait National Oil Company)
Bula, Seram Island, Maluku Province
Operations Superintendent Eastern Indonesia (Remote Location)
(Sour Crude Oil Processing & Product Export facilities 2% H2S)
The Oseil 1 Development Project
Initially based in Jakarta developing Operations and Maintenance systems for the O & M phase to follow on from the Commissioning and start up by the EPIC contractor. Development of a Production/Maintenance Management system including a Permit to Work System., implemented for an early temporary crude oil production programme, initiated because of delays in the construction and commissioning phase. Recruitment/selection of all Indonesian national O & M personnel (total 260) from all areas of Indonesia, to work in a politically/religiously sensitive region of the country. Identification and procurement of operating spares and operational equipment. Oseil phase 1 facilities designed for 20000 bbls throughput, fractionation into heavy fuel oil and Naptha, storage and export of products by marine tankers. Provide commissioning assistance to EPIC contractor in preparation of commissioning management system. Responsible for the whole operation from well through to product loading of marine tankers, and operate within budget constraints. Since start up, carry out plant optimization and debottlenecking to improve plant performance and efficiency. Selection and optimization of chemicals. Management of catering contractor for two camps and warehousing system for spares inventory. Implementation of training programme for local personnel to eventually become operators and technicians. Maintain and instill high standards of environmental awareness in a totally unspoilt area of Indonesia.
********************
August 2001 – May 2002 Karachaganak Integrated Organisation (KIO)
Aksai, West Kazakhstan Oblast
Senior Operations Engineer Republic of Kazakhstan
(Sour Condensate/Gas facilities 7% H2S)
The Karachaganak Development Project (phase 2)
Senior member of the Commissioning/Operations integrated team, setting system limits for the Main Works Contractor. Mechanical Completion Handover, and development of individual system commissioning and start up procedures. Prioritisation of systems/sub-systems for phased commissioning programme. Modification proposals to plant systems to allow unhindered simultaneous construction and commissioning activities. Permit to Work control of systems/areas under commissioning control.
********************
December 1998 – August 2001 TotalFinaElf Exploration UK plc
1 Claymore Drive, Bridge of Don
Operations Superintendent Aberdeen AB23 8GE
(High pressure/temperature fields)
The Elgin Franklin Project
Joined the project in the pre-production phase, initially based in the Aberdeen office developing the start up, operating and production management procedures followed by a period at the construction yard involved in platform familiarisation and onshore system commissioning. Once offshore, involved in hook up and commissioning activities and preparing systems for process start up. Elgin Franklin is a three-platform development to produce approx 175000 bbls/d of hydrocarbon condensate into the Forties gathering pipeline and 14.6 mmscm/d of sales quality gas into the SEAL gas export to Bacton and Europe via Interconnector. Supervision of a multi skilled shift team on process plant comprising separation, gas dehydration, sweetening, NGL recovery and compression. Start up of the Elgin/Franklin facilities commenced March 2000 with production rate increased to design by June 2000. The Franklin platform is operated normally unattended, and I was responsible for the development of the detailed strategy and procedures for this part of the operation. An extensive training and familiarisation/competency programme was carried out prior to start up, with all personnel gaining knowledge of plant operation, equipment, and operating/maintenance procedures.
********************
April 1997 – November 1998 JSC KomiArctic Oil (British Gas Joint Venture)
Usinsk, Komi Republic
Superintendent - Field Operations Central Independent State of Russia
(Sour Oil and Gas - 4% H2S)
Central Production Facility (CPF) for the Upper Vozey Field (Arctic location)
Prior to the commissioning phase of the new processing facility, development of a new more simplified permit to work system based on western standards, start up procedures, plant operating procedures and administration controls. Plant start up and optimisation during arctic winter conditions of Canadian designed processing plant, comprising 60000 bbls/d oil/water separation, degassing, metering and international export. Sour gas compression and MDEA H2S absorption with sweet gas transmission to the local domestic market. Final systems acceptance from the commissioning group. Site verification/amendment of Process Operator guides. Training of Russian operations personnel in western oil and gas treatment plant operations and control systems. Engineering solution and implementation of change/improvement plant modifications.
********************
October 1996 – April 1997 Fluor Daniel BV
Norg Underground Storage Project
Commissioning Handover Engineer P.O. Box 324, Westerstukkenweg
(Sweet Natural Gas) 9300AH Roden, HOLLAND
The Norg Underground Storage Project
Responsible for the smooth transfer of plant systems through the commissioning phase of a natural gas injection/production treatment plant, comprising 2 Sulzer Siemens 50MW compression packages, silica-gel adsorbtion/regeneration, water injection and condensate disposal. Development of commissioning procedures and documentation dossiers for each system handover to the client (NAM). Plant preparation/ P&ID verification prior to initial chemical inventory fill and start up. Plant performance evaluation following start up, and clearance of outstanding punch list items.
********************
March 1995 – October 1996 BHP Petroleum plc
Point of Ayr,
Production Supervisor. Talacre,
(Sour Oil and Gas 1.5% H2S) Holywell, Clwyd. CH8 9RD
The Liverpool Bay Development Project
During the onshore commissioning phase, involved in the commissioning and handover of process and utility systems at the different locations of the platforms' conversion/building. Co-ordination of outstanding items for inclusion in handover documentation, i.e. punch lists, commissioning procedures etc. Vetting of system operating/emergency procedures. Issuing Authority for the permit to work system, Operation of Fisher Rosemount Provox integrated DCMS system, (Operations representative on DCMS enhancement project). Commissioning and operation of sour oil and gas sweetening and separation plant (gas compression, methanol recovery, water injection, wellheads, ESP's, chemical injection etc.)
********************
September 1994 - March 1995 TA Engineering Services (Tunisia) Ltd.
for British Gas Tunisia Limited
Mech/Process Commissioning Hannibal Gas Treating Plant
Engineer (Sour Gas) Sfax, Tunisia.
The Miskar Project
Following departure from the Morecambe Gas field, joined the Miskar project for the construction to operations phase. Commissioning and start up of the onshore sour gas treatment plant comprising Amine CO2 /H2S removal, N2 removal, glycol and molecular sieve drying and sulphur recovery. Condensate stabilization and disposal. Fresh water generation by reverse osmosis. Plant control by Foxboro touch screen DCS. Development of system commissioning and start up procedures, system punch listing, and P&ID verification. Final plant start up and performance evaluation.
********************
May 1984 - September 1994 British Gas {Exploration & Production) Ltd.
Production Engineer 1 Morecambe Field Support Base,
(Production Supervisor) Heysham, Lancs. LA3 2UH
The Morecambe Bay Projects
More than 10 years with British Gas in the Morecambe fields gaining experience in all aspects of project work, hook-up and commissioning activities, along with gas production, processing and treatment operations.
2 years with the North Morecambe Project (Offshore) as Engineer 1, setting up operations management systems and commissioning/acceptance of plant and equipment. Development of commissioning and operating procedures and handover documentation both at the topsides fabrication yard and during the offshore hook-up and commissioning. Operations representative for the development of a PC based DCS training simulator providing technical support to the software house. Intervention OIM during stand alone phase completing outstanding project items, planned maintenance and recertification work leading a multi-discipline intervention team from the onshore base.
5 years experience as Shift supervisor/shift operator involved in the construction, commissioning and operation of the South Morecambe onshore gas processing terminal. Gas separation, hydrocarbon dew point control by refrigeration, condensate stabilisation and sweetening and marine tanker loading operations. Zinc Oxide absorber H2S control
3½ years experience offshore in the South Morecambe gas field as Engineer 1 Production, in operations. Drilling/well completion activities, hook up and subsequent commissioning of compression modules and satellite platforms. Intervention OIM role leading a team of people to NUI installations for planned maintenance and shutdowns. Permit to work authority ensuring safe control of work and isolation of plant & equipment.
********************
August 1976 - April 1984 London & Overseas Freighters Ltd.,
8 Balfour Place,
London W1Y 6AJ
Senior Watchkeeping Engineer (seagoing)
Responsible to the chief engineer. In complete charge of the ships' machinery spaces in a watchkeeping rota. Machinery includes main engines, generators, pumps, compressors, and all ancillary equipment. Supervision of engine room crew. Certificate held which gives qualification to take watch in British flag registered ships (both steam and motor propelled). Ship classes include VLCC's., product carriers, and bulk cargo carriers.
********************
January 1975 - August 1976 BP Tanker Company Ltd.,
Britannic House,
Moor Lane,
Fifth Engineer Officer (seagoing) London.
Employed as first assistant to the senior watchkeeping engineer, involved with similar plant/equipment as previously described, on VLCC's and product carriers.
March 1973 - December 1974 Edgar Pickering Ltd.,
Phillips Road,
Whitebirk Industrial Estate,
Skilled Engineering Fitter Blackburn. Lancashire
Involved in the construction and factory installation of carpet manufacturing machinery. e.g. latex foam backing plants, carpet dye driers and tufting machinery.
********************
August 1969 - May 1973 Foster, Yates and Thom. Ltd.
Manner Sutton Street,
Apprentice Engineering Fitter Blackburn. Lancashire
Involved with the construction of heavy rolling mill plant, hydraulic presses, and Admiralty contracts.
During apprenticeship passed Industry Training Board Modules H4 and H25 in mechanical fitting.
EDUCATION AND QUALIFICATIONS
1964 - 1969 Bangor Street Secondary Modern/Billinge Grammar School Blackburn, Lancashire.
Examinations passed: GCE O level Geometrical & Engineering drawing.
1969 - 1973 Blackburn College of Technology and Design
Examinations passed: City and Guilds Certificate
1980 South Shields Marine and Technical College, Tyne and Wear
1981 Examinations passed: Dept of Trade & Industry
Class 2 certificate of competency (with the exception of Engineering Knowledge)
JOB RELATED TRAINING
O.P.I.T.O. Montrose Fire team leader and various firefighting courses.
Management of major emergencies, OIM competency.
S.C.O.T.A. Aberdeen Offshore first aid, Dangerous goods by air
Helicopter landing officer, OIM regulations
H.O.T.A Hull Lifeboat coxswain, Radio telephony (restricted)
Heriot Watt University Gas production facilities
Edinburgh Wireline and well completion, Offshore gas processing
Numerous other vendor equipment specific and company training courses applicable to each project I have been associated with.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1951 to 2000 of 15509)
Go to Search Parameters...
Brief Description
An experience individual with excellent knowledge of Sales/Marketing, Freight handling, Imports/ Exports Management with the objective of achieving organizational goals and making it a strong profit center seeks an opportunity in managerial capacity
I offer a broad range of upstream petroleum business skills and leadership experience covering exploration/development planning and LNG project execution, subsurface and production facilities planning, economic analysis, strategic planning, commercial/legal negotiations and corporate communications.
Five tears of experience in the field of industrial environmental monitoring specially related to petroleum and petrochemical complexes.I have sound knowledge of US EPA regulation. I can also design air air polltion control systems.
Senior Project Manager, International Industrial Multi-Disciplinary &Muli-Cultural Projects
I am having vast experience (22 Years) in Maintenance & Projects and in diverse fields. I am suitably qualified (BE, ME, PGDM, PGDIT) to take up any challenging assignments across the globe.
Negotiations, planning, economics in international joint venture gas and midstream projects for past 14+ years. Started career as reservoir engineer with Exxon.
Trade and degree qualified welding engineer and m,etallurgist with 25+ years experience in petrochem, power, onshore rig contruction and computerised welding documentation management.
M.Sc Applied Geology. M.Tech Min Expln,PG Dip In Envt Mgmt & PGDip In Env Scs, 22 years of experience in govt industry. opte vrs ,desg Manager (Environment)
Electrical engineer - building electrical design and rapid transit systems; proposals and specifications; CAD.
Analytical chemist in the fields of oil & gas, petrochemical, fertilizers, pesticides and pharmaceuticals.
Senior mechanical engineer with experience in engineering for material handling, industrial installations and conveying machines in steel industry, mining, cement & chemicals. Start-up assistance for steel industry.
Technical / Lead Safety Engineer
NDT inspector LVL II
reclamation and quarry
11 years experience in offshore construction, field engineering, planning, offshore and onshore project scheduling, field supervision for installation of offshore platforms pipelines spools, pigging and hydrotesting. Preparation of installation procedures, rigging calculations, material procurement
With 12 years in the Oil Field Industry, working in Brasil as well as other countries such as, Colombia, and USA. I became proficient and experienced in Completions, such as Sand Control (Gravel Pack, Frac Pack, High Water Pack, Horizontal Gravel Pack) Upper Completion (single/dual string), Expandab
Network and security Engineer
HR Officer, Recruitment and Administration, Hiring Officer, Hiring Consultant, Marketing
Close supervision of projects handle and monitoring
Degree in Petroleum and Natural Gas Engineering. New Mexico Institute of Mining & Technology (NMT), Socorro NM.
I have masters in Water Resources Management followed by Bachelor of Engineering. Skills in Construction management,people management,sub conatractor mangment,quality control,health and safety
Extensive field application and R&D experience in hard rock drilling rigs, rock tools, DTH hammer, strong trouble shooting skills of hydraulics
I have basic education, knowledge and experience as for Project Metallurgist
Core business is scaffolding; Consulting, controlling, supports, execution business. in Oil & Gas industry and construction industry
Nearly 15 Years QA/QC composite Experince in Electrical Manufacturing as well as Construction of Oil & Gas Central Processing Platform
A result oriented and self-motivated M.Tech Civil Engineering Professional with over 18 years of rich & qualitative experience in Project Management, Civil Engineering and Construction Management of infrastructure projects including Airport Terminals, Buildings Roads and Flyovers.
ASQ Certified Quality Technician with over 8 years Experience in the development and implementation of Quality plans and manufacturing procedures used in the Petroleum and natural industries for Rotary drilling equipments. Regulatory compliance, QA/QC, NDE, Material testing and Inspection
Human resources
A highly motivated professional with 10+ years of diverse hands-on experience in conceptual process design, technical services and developing/upgrading of upstream oil processing facilities. Worked on petrochemical projects, oil sands technologies and water/wastewater treatment plants from front end
Piping Designer with 12+ years of experience in piping design & detail engineering involving Equipment layouts, Piping layouts, Piping isometrics, Tie-in Schedule and Pipe supports for Onshore & Offshore Oil & Gas, Power and Petrochemical Plants. Have good knowledge of all national & international c
A senior logistics specialist - currently pursuing MBA - with 9+ years of track record in administration, logistics, contract and fleet management with cross competencies in MIS report analysis. Seeking a challenging position with a dynamic organization to apply accrued expertise in achieving tangib
Seeking a career change to obtain a challenging Project/Process Engineer position in a Water Management company.
Seeking suitable opportunities in the field of CP including offshore and onshore -industries, oil companies, contracting companies and power sectors, to harness my technical skills & acquired knowledge- to it's best, so as to bring out the best in me and thus to attain the highest degree of progress
Current Position as Air Separation Unit Technical and Process Specialist for Petronas Gas Berhad with previous experience with Air Products Chemical Incorporated and Messer Griesham. Some college from Texas Tech University, Lubbock, Texas USA.
Engineer Graduate with 09 years experience in Automotive Field as Sales ,Warranty, Technical Engineer
Process Engineer Resume Oil and gas
Over 25 years in the construction industry
Heavy Equipment Mechanic Journeyman including Redseal certification. Ten years experience on machines and equipment such as coaches, trucks, trailers, lifts, and others. Also knowledgeable in areas such as A/C, Electrical, Hydraulics, and Air Systems.
Experienced (+29 years) professional geologist with field and laboratory background and prospecting/exploration for gold, PGE and base metals.
Piping Field Engineer – Technical Office
I have generated prospects in several basins. I am a proven oil finder and a team player.
HEALTH, SAFETY & ENVIRONMENT SPECIALIST WITH 20+ YEARS OF EXPERIENCE
mine management, mining engineering opencast & u/g, planing & designing the mine , liaisoning
14 years experience in welding technology ,Have extensive experience in welding(SMAW ,GMAW,FCAW ,SAW,TIG etc) of CS ,Alloy Steel ,C-Mn steel , and SS , DUPLEX STAINLESS STEEL , CU ¡VNI , NI ALLOY AND OTHER CORROSION RESISTANCE MATERIAL
Bachelor of Commerce, Budgetary Control, Inventory Control, Planning & Analization of materials, setting up new storage system, Vendor development, Administration skills.
PETROLEUM ENGINEER WITH 11 YEARS OF INTERNATIONAL EXPERIENCE
An experienced superintendent with the necessary skills required for the safe commissioning and operation of oil and gas treatment plant
I've been self employed since 1994 as a baker selling fresh baked goods to people restricted to a gluten free diet. Not only have I been the chief baker, I started the business, do all the office work, do all the marketing, maintain the website, etc.
Senior structural engineer with 15 years experience. National Diploma (Civil Engineering)Bachelor of Technology (Structural)
Over 14 years work experience in various fields i.e. IT/MIS/Help Desk, Storekeeping, Banking and Finance, Clerical and Production
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
[ 40 ]
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com