Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #77951 next resume »»
CONTACT INFORMATION:
View contact information...

CAREER OBJECTIVE

Looking for a challenging Senior Managerial position wherein my team player attributes, Experience & Communication skills can be utilized in obtaining personal career goals and those of the employer.

ACCADEMIC QUALIFICATION

Bachelor of Engineering (Mechanical) from Bangalore University, India in 1991.

COMPUTER SKILLS

Working Knowledge of MS Windows, MS Excel & MS Word.

PROFESSIONAL OVERVIEW

A result oriented, self motivated and committed B.E Mechanical Engineering professional with over 17 years of rich and qualitative experience in Project Management, Site Management of multi disciplinary projects including prestigious High Rise Building, Commercial Malls, Hospitals, 5 Star Hotels, Research Institute. Adept in planning, executing and spearheading construction projects involving method engineering, development, contract administration and resource planning with a flair for adopting modern construction methodologies in compliance with quality standards. Proficient in swiftly ramping up projects with competent Cross-functional skills and ensuring on time deliverables within pre-set parameters. Possess exceptional communication and interpersonal skills and the ability to relate well to people.

CORE COMPETENCIES

Project Engineering & Management.

* Evaluations of project, present cost / benefit analysis at project decision points.
* End to end execution of projects dealing with procurement, installation and commissioning of plant, machinery & equipment.
* Reviewing the design drawings, schedules / plans and recommended alterations/ modifications / approval as applicable.
* Detailed planning and scheduling to ensure execution of project within time & budgetary parameters.
* Effective site management and monitoring the progress of work in terms of cost, resource deployment, time over runs and quality compliance.
* Liaison with External Agencies, Clients, Architects & Contractors in determining technical specification, smooth execution and obtaining on time clearances.

Site Construction Management

* Expert knowledge of Project Construction & Financial Management Procedures.
* Extensive knowledge of current design concepts, construction materials, products and procedures.
* Ability to manage overall design and construction of large projects including management of staff to best utilize manpower, monitoring projects and work loads as necessary to meet dead lines and schedules, and budgeting / monitoring of approved project funds.

Contract Administration

* Exceptional Contractual Negotiation Skills & ability to establish and build strong long term relationship with customers.
* Exceptional ability and experience in managing change order claims (Evaluated and negotiated over 250 Variation Orders related to HVAC Works).
* Familiar with FIDIC based contracting practices and working English.
* Exceptional ability / Experience in project correspondence related with Contractual matters, Variation Orders, Payment Claims & disputes.

Commercial Operations.

* Preparing technical & commercial offers / proposals along with handling tendering / ordering / contract / billing / related formalities and documentation.
* Business development/ corporate mission fulfillment.

Quality Assurance & Control.

* Preparation & review of method statements, work specific quality control plans, HSE documents etc.
* Inspection of works and materials for compliance to specifications and drawings.
* Proactively identifying the areas of quality failure and taking appropriate corrective measures.

Resource Planning & Control.

* Material planning & developing vendors for obtaining timely procurement of materials and equipments at cost effective prices to ensure smooth execution of projects.
* Ensuring suitable deployment of manpower & timely availability of manpower.

ACHIEVEMENTS

* Exceeded expectations and produced multimillion dolar results, reduced management overhead.
* Evaluated personal accountability and motivation among associates, heightened morale, reduced employee turn over and increased client satisfaction through development of new performance based staff incentive programs.
* Proven track record of successfully managing to completion of Major HVAC Projects valued from USD 2.75 to 39.5 Million.

EMPLOYMENT HISTORY

Since December 2000 till date.

BADER AL MULLA & BROS. CO.
ENGINEERING GROUP, KUWAIT.

COMPANY PROFILE

Engineering Group has diversified engineering operations covering projects, services, technology and manufacturing. Certified to ISO 9001:2000, its more than 350 Engineers & 4000 Technical Staff provide quality assurance to its distinguished Clientele and are committed to achieving customer success and leadership in each of its businesses.
Engineering Group is active in Executing Projects in the field of Electrical & Mechanical services, Fire Protection & Security, Building Automation & Control, Precision Environmental & Power Systems.

CAREER PATH WITHIN THE COMPANY.

August 2008 onwards working as Project Manager.

Promoted to Sr. Project Engineer (Major Projects) in January 2007.

December 2000 to December 2006 as Project Engineer (Major Projects).

RESPONSIBILITY AREAS.

* To review and evaluate technical submittals and shop drawings prior to submission to Consultant / Clients according to required project standards and obtain necessary timely approvals.
* Act as the team leader controlling all aspects of the work including planning, administration, commercial, engineering, site work & documentation. Leading team of 2 Project Engineers, 4 Foreman & around 350 Site Operatives.
* Tracking of all major activities, timely release of shop drawings to site engineers upon approval, Purchase Order Requests, Manufacturing of in-house designed items through Vendors.
* Closely coordinate with Procurement Department regarding expediting and timely delivery of materials / products.
* Handle Project Procurement Activities and Prepare Sub-Contract Agreements in accordance with Company Procedure and Project Management.
* Participate in weekly and monthly progress meetings with Client, Consultant, Main Contractor along with Project Manger.
* Regular visit to project site for global monitoring of site activities in respect of quality, safety and progress and advise project manager of findings, areas of concern and corrective action.
* Monthly cash flow statement preparation and analysis.
* Cost Control Analysis and Reports.
* Progress Payment Claims and approvals.
* Contractual / Financial evaluation of Variation Orders & Additional Cost Claims.
* Prepare QA/QC Reports according to company policy and contract requirements to furnish accurate records of the work done.
* Ensure safety standards and procedures are implemented and followed in accordance with project requirements and company guidelines.
* Build relationship with, and influence, Customers at all level.
* Ensure Customer Satisfaction and responsiveness to Customers.
* Ensure that Contracts are closed out completely and customers are totally satisfied.

LIST OF MAJOR PROJECTS HANDLED.

Project: International Hospital Complex

Client: Kuwait Medical services.((KMS)

Project Manager's: United Medical Services (UMS)

Design Consultant: Gilbert Dabbous.

Supervisory Consultant: Gulf Consult.(GC)

Project Value: MEP Works. USD.20.00 Million.

: HVAC Works. USD.7.30 Million.

Project Duration: 15 Calendar Months.

PROJECT DESCRIPTION.

The International Hospital Complex Project Consist of two buildings, (Building - 1 Hospital Block having operation theater's, ICU, Rooms, OPD & Laboratories and Building - 2 Annex Tower having Patient rooms and isolation rooms.)

HVAC works executed in Co-ordination with multi trade services

CENTRAL PLANT ROOM, Capacity 2000 TR.

High side HVAC equipment Comprising of:

* 4 Nos. 500 TR Water Cooled Centrifugal Chillers, Make: Carrier, USA.
* 4 Nos. 600 TR, Stainless Steel Cooling Tower, Make: Truewater, Malaysia.
* 4 Nos. Horizontal Split Case Centrifugal Primary Pumps. Each 25 HP, Make: PACO; USA
* 4 Nos. Horizontal Split Case Centrifugal Secondary Pumps. Each 60 HP, Make: PACO; USA
* 4 Nos. Horizontal Split Case Centrifugal Condenser Pumps. Each 75 HP, Make: PACO; USA
* 1 Nos. Side Stream Sand Separator Make: PEP, USA.
* 2Nos. Expansion tanks. Each 500 ltr Make: PEP, USA.
* 1 Nos. Air Separator size 400 mm dia. Make: PACO, USA.
* Chemical Dosing System.

Low Side HVAC Equipment Comprising of:

* 6 Nos. Roof Mounted Fresh Air Handling Units with Supply Return Fans and Heat recovery Units, Make: InterKlima, Greece.
* 9 Nos. Floor Mounted Hygienic Air Handling units with Supply, Return fans and Heat recovery Units and VFD's Make: InterKima, Greece.
* 42 Nos. Floor mounted Air Handling Units. Make: InterKlima, Greece.
* 36 Nos. Ceiling suspended Air Handling Units Make: InterKlima, Greece.
* 164 Nos. Fan Coil Units, Make; InterKlima, Greece.
* 56 Nos. Axial Extract Fans. Make: Elta UK.
* 7,300 Mtrs of Chilled Water and condenser water Piping ranging from 20 to 400 mm dia pipe size
* 5,400 sqr mtr of S.S Ducting with related Insulation works.
* 18,500 sqr mtr of G.I Ducting with related Insulation /Cladding Works.
* Building Automation System.
* Associated Electrical Works.

Project: "The Avenues", Phase I & II

Client: Mabanee

Main Contractor: Alghanim International Co.

Design Consultant: NORR (Dubai Based)

Supervisory Consultant: Pan Arab Consulting Engineers (PACE)

Project Value Phase I & II: MEP Works USD. 105 Million,
HVAC Works: USD. 39.5 Million

Project Duration Phase I&II: 30 Calendar Months / 18 Calendar Months.

PROJECT DESCRIPTION

The Avenues is a 2 storeyed with a Basement having 14 blocks of buildings, consisting of 11 Cinema Halls Owned by KNCC, IKEA, CARREFOUR ENTERTAINMENT AREA (BAR QUE), MAGIC PLANET, BIG & MINI ANCHORS, FOOD COURTS, RESTURANTS, CAFES, and around 400 retail outlets spread over 190,000M2 Area.

The shopping mall has a Car Park to accommodate 8500 Cars having beautiful land scapping and extensive water features inside as well outside the mall.

HVAC Works executed in Coordination with multi trade Services.

CENTRAL PLANT ROOM PHASE– I, Capacity 8100TR.

High side HVAC equipment comprising of:

* 9 Nos, 900 TR Water Cooled Centrifugal Chillers, Make: Carrier, USA.
* 9 Nos. 1125 TR, Stainless Steel Cooling Tower, Make: Baltimore, USA.
* 9 Nos. Full Stream Sand Separator, Make: Lakos, USA
* 9 Nos. in line centrifugal split coupled Primary Pumps each 25HP, Make: Armstrong, Canada.
* 9 Nos. in line centrifugal split coupled Condenser Pumps each 100HP, Make: Armstrong, Canada.
* 5 Nos. in line centrifugal split coupled Secondary Pumps each 250HP with VFD, Make: Armstrong, Canada.
* 3 Nos. in line centrifugal split coupled Secondary Pumps each 100HP with VFD, Make: Armstrong, Canada.
* 14 Nos. end suction centrifugal Tertiary Pumps, ranging from 40 to 100HP with VFD, Make: Armstrong, Canada.
* 6 Nos. expansion tanks each 800 Ltrs, Make: Armstrong, Canada.
* Chemical Dosing System.
* Refrigerant Leak Detection System, Make: Trane, USA.

CENTRAL PLANT ROOM PHASE–II, Capacity 5700 TR.

HVAC Equipment Comprising of:

* 6 Nos, 950 TR Water Cooled Centrifugal Chillers, Make: Carrier, USA.
* 6 Nos. 1200 TR, Stainless Steel Cooling Tower, Make: Baltimore, USA.
* 7 Nos. Full Stream Sand Separator, Make: Lakos, USA
* 7 Nos. in line centrifugal split coupled Primary Pumps each 25HP, Make: Armstrong, Canada.
* 7 Nos. in line centrifugal split coupled Condenser Pumps each 120HP, Make: Armstrong, Canada.
* 7 Nos. in line centrifugal split coupled Secondary Pumps each 75HPwith VFD, Make: Armstrong, Canada.
* 4 Nos. in line centrifugal split coupled Secondary Pumps each 60HPwith VFD, Make: Armstrong, Canada.
* 2 Nos. expansion tanks each 2000 Ltrs, Make: Armstrong, Canada.
* 1 No. Tangential Air Separator size 600 mm dia, Make: Armstrong, Canada.
* Chemical Dosing System.
* Refrigerant Leak Detection System, Make: Trane, USA.

Low side HVAC equipment comprising of:-

* 19 Nos. Roof Mounted Fresh Air Handling Units with Supply, Return Fans and Heat recovery wheels, Make: Carrier, KSA.
* 40 Nos. Roof Mounted Air Handling Units with Supply, Return Fans and Heat recovery wheels and VFD's, Make: Carrier, KSA.
* 48 Nos. Roof Mounted Air Handling Units with Supply, Return Fans, Make: Carrier, KSA.
* 10 Nos. Roof Mounted Air Handling Units with Supply, Return Fans and Heat recovery wheels and VFD's, Make: Petra, Jordan.
* 20 Nos. Roof Mounted Fresh Air Handling Units, Make: Carrier, USA.
* 54 Nos. Roof Mounted Air Handling Units, Make: Carrier, USA.
* 1030 Nos. Ceiling Suspended Air Handling Units, Make: Carrier, USA.
* 556 Nos. Fan Coil Units, Make: Carrier, Malaysia.
* 520 Nos. Axial Extract Fans, Make: Woods, U.K.
* 94 Nos. Toilet & Wash Room Exhaust Fans (Centrifugal Type), Make: Greenhek, USA.
* 65,000 Mtrs. Of Chilled and Condenser Water Piping ranging from 20 to 750mm dia pipe size.
* 225,000 M2 of G.I Ducting with related Insulation / Cladding Works.
* 1250 Mtrs. of Double Skin round ducting ranging from 150 to 1400mm dia.
* Building Automation System.
* Associated Electrical Works.

Project: Waterfront Phase V (Marina Hotel & Club / Tower)

Client: United Reality Company SAK.

General Contractor /: Ahmadiah Contracting & Trading Co.
Programme Manager

Consultant: Salem Al-Marzouk and Sabah Abi-Hanna (SSH).

Project Value: MEP Works: USD 7.00 Million,
HVAC Works: USD 2.75 Million.

Project Duration: 14 Calendar Months.

PROJECT DESCRIPTION

Marina Hotel Club is 2 Storeyed Building consisting of 92 Guest Rooms, 1 Presidential Suite, 1 VIP Suite, Business Centre, Meeting Room, Health Club, Pools & Restaurant.

Marina Tower is 2 Storeyed Building with Basement & Ground Floor. It has restaurant on Ground Floor and viewing deck on Roof.

CENTRAL PLANT ROOM - Capacity 1,440 TR.

HVAC Equipment comprising of:

* 4 Nos. 360 TR each Air Cooled Reciprocating Chillers, Make: Carrier, USA.
* 1 No. 100 TR Air Cooled Reciprocating Chiller, Make: Carrier, USA.
* 2 Nos. 50 TR each Air Cooled Chiller, Make: Carrier, USA.
* 2 Nos. 60 TR each Air Cooled Reciprocating Chillers, Make: Petra, Jordan.
* 4 Nos. inline Centrifugal Split coupled pumps each 40 HP, Make: Armstrong, Canada.
* 8 Nos. inline Centrifugal closed pumps each 10 HP, Make: Armstrong, Canada.
* 3 Nos. Heat Exchangers shell & tube type, Make: Armstrong, Canada.
* 4 Nos. Roof Mounted Fresh Air Handling Units, Make: Euroclima, Austria.
* 2 Nos. Fresh Air Handling Units (FAH's), Make: Petra, Jordan.
* 15 Nos. Roof Mounted Air Handling Units, Make: Euroclima, Austria.
* 271 Nos. Fan Coil Units, Make: Carrier, Malaysia.
* 1 No. Kitchen Exhaust Unit, Make: Trion, USA.
* 42 Nos. in line & Axial Fans, Make: Woods, UK.
* Pressurization Unit & Air Separator, Make: Armstrong, Canada.
* 3 Nos. DX-Split Units, Make – Daikin.
* 6000 Mtrs. of Chilled Water Piping ranging from 20 to 250mm dia pipe size.
* 18,000M2 of G.I Ducting with related Insulation / Cladding Works.
* Chemical Dosing System.
* Building Automation System.
* Associated Electrical Works.

Project: Kuwait Oil Sector Complex, (KOSC).

Client: Kuwait Petroleum Corporation, (KPC)

Construction Managers: BOVIS - Projacs

Consultant: Salem Al-Marzouk & Sabah Abi-Hana (SSH).

Project Value: MEP Works: USD. 22.8 Million,
HVAC Works: USD. 6.5 Million

Project Duration: 30 Calendar Months.

PROJECT DESCRIPTION

Kuwait Oil Sector Complex is a twin tower of 20 & 15 Storeyed, Basement & Ground Floor, Office Complex including extensive water features and landscaping.

HVAC Works executed in coordination under Multi Bid Packs environment.

CENTRAL PLANT ROOM – Capacity 2530 TR.

HVAC Work comprising of: -

* 4 Nos. 633 TR each Water Cooled Centrifugal Chillers, Make: Mcquay, USA.
* 4 Cell Ceramic Cooling Tower, Make: Tower Engineering, USA.
* 4 Nos. Horizontal Split Case Centrifugal Secondary Pumps each 40HP, Make: TACO, USA.
* 5 Nos. Horizontal Split Case Centrifugal Secondary Pumps each 100HP with VFD, Make: TACO, USA.
* 4 Nos. Fresh Air Handling Units, Make: ABB, Sweden.
* 22 Nos. Air Handling Units, Make: ABB, Sweden.
* 227 Nos. Fan Coil Units, Make: International Environmental, USA.
* 790 Nos. variable volume boxes, Make: Invensys, USA.
* 86 Nos. Axial & Centrifugal extract fans, Make: Woods, UK.
* 12 Nos. DX-Units, Make: Carrier, USA.
* Pressurization Unit, Air Separator & Sand Separator.
* Shelter equipment viz Blast valves & Gas tight valves, Make: Temet, OY Finland.
* 10,000 Mtrs. of Chilled & Condenser Water Piping ranging from 20 to 500mm dia pipe size.
* 45,000M2 of G.I Ducting with related Insulation / Cladding Works.
* Building Automation System.
* Associated Electrical Works.

January 2000 to October 2000 as HVAC Project Engineer

Intertec Contracting Co. A/S Kuwait.

RESPONSIBILITY AREAS.

* Prepare Submittals for Client / Consultant Approval.
* Develop Shop Drawings in coordination with other agencies and obtain Client / Consultant Approval.
* Arrange material procurement & monitor material movement.
* Supervise & coordinate site installations with various agencies.
* Interaction with Client / Consultant for Inspection Requests (IRs) and Request for Information (RFIs).
* Monthly Progress Payment follow up with Client / Consultant.

Project Handled: Sabah Adult Psychiatric Hospital, Kuwait.

Client: Ministry of Public Works (MPW)

Consultant: Gulf Consult

Project Value: MEP Works: USD 18.50 Million,
HVAC Works: USD 7.0 Million.

Project Duration: 36 Calendar Months.

PROJECT DESCRIPTION

Sabah Adult Psychiatric Hospital is a 350 bed hospital having, 2 Storeyed building with 2 levels of Basement.

CENTRAL PLANT ROOM – Capacity 2700 TR.

HVAC Equipment comprising of:

* 3 Nos. 900 TR each water cooled centrifugal chillers, Make: Carrier, USA.
* 3 cell ceramic cooling tower, Make: Tower Engineering, USA.
* 3 Nos. horizontal split case centrifugal primary pumps each 40HP, Make: Belt & Gossett, USA.
* 4 Nos. horizontal split case centrifugal secondary pumps each 100HP with VFD, Make: Belt & Gossett, USA.
* 3 Nos. horizontal split case centrifugal condenser pumps each 100HP, Make: Belt & Gossett, USA.
* 12 Nos. end suction type centrifugal production pumps ranging from 20HP to 40HP with VFD, Make: Belt & Gossett, USA.
* 2 Nos. end suction type centrifugal boiler pumps each 40HP, Make: Belt & Gossett, USA.
* 70 Nos. Air Handling Units, Make: Carrier, KSA
* 250 Nos. Fan Coil Units, Make: Carrier, USA.
* 390 Nos. variable / consultant volume boxes, Make: Greenheck, USA.
* 42 Nos. Axial & Centrifugal extract fans, Make: Greenheck, USA.
* 2 Nos. DX-Split Units, Make: Carrier, USA.
* Boilers, Sand Separators & Air Separators.

* 18,000 Mtrs. of Chilled & Condenser water piping ranging from 20mm to 500mm dia pipe size.
* 55,000M2 of G.I & related Insulation / cladding works.
* Chemical Dosing System.
* Building Automation System.
* Associated Electrical Works.

July 1995 to December 1999 as HVAC Project Engineer.

Saran Enterprises, India.

September 1991 to June 1995 as HVAC Engineer

Ambience Services, India.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1101 to 1150 of 15497)Go to Search Parameters...
Brief Description
Free! Experienced Heavy Civil & Design Build Construction Project Manager with additional experience with Project Controls/Scheduling/Claims Resolution Management.
I am a professional process engineer with over 15 years experience
Free! Health, Safety & Environment Manager - Crane Inspector - OHSAS 18000 Lead Auditor - Senior Trainer - HSE Master Degree
NHD Mining, Project and Contract Management, Mine Manager, Technical Consultant
Techno-commercial acumen, Procurement & Vendor development
Electrical Engineer, B.E qualification and 22 years of Electrical Power Distribution Design experience
A highly competent Senior Electrical/Instrumentation Engineer who has developed supervisory capabilities; QA / QC inspection skills; installation maintenance expertise; pre-commissioning, testing and commissioning competence; safety awareness; organising and co-ordinating flair; fault-diagnosis
Had 27 years of work experience on Commissioning, Start-up and Operation of numerous Oil/Gas Production facilities, Petro-chemical, Chemical and Power Plants. Currently working as Operation Support/Pre-Start up Safety Coordinator in Oil/Gas/Sulphur Plant plus almost 7 years of Supervisory position
Managing Oil Field Operation and maintain high safety and low budget operation. FPSO Project Engineering.
More than 28 years of experience in oil industry
22+ years solid background of Piping Design in the petroleum contracting industry, covering all aspects of design activities
Versatile mechanical engineer within the oil and gas industry
Mining Engineer. Management of costs and Budgets. Application of methodology PDCA of Deming. Selection of Mining Equipment. Handling of Explosives. Management of Contractors. Application of the Environmental Standards and Normative
Senior Petroleum Engineer, 20 years experience in petroleum engineering. Areas of interest: Well test analysis. Production optimization & forecast. Productions operations Work over & completion design
Experienced Completing and Producing Petroleum Engineer
Refractory sales and Technical support
Panel operation as well as field operation experience
Expert in conducting ISO 9001 and ISO 14001 audits (consultancy and third party audits) and training with international Certification Bodies (TUV Rheinland Philippines, Inc. and SGS Philippines, Inc.). „X Successfully assisted organizations in achieving ISO certification.
Mr. Amjad has been involved with the Oil & Gas industry and the Energy industry for more than 12 years. He is a Visionary, Target-driven, and Acclaimed in his discipline. He has extensive experience in the industry and a proven track record.
Quality control,Quality Assurance,Inspection,Project Engineering,Surveillance coordinator
B.E.(Mech.) & BEE certified Energy Auditor
I am a civil engineer with more than 12 years of experience in Mauritius. I hold a first degree in civil engineering, a master degree in environmental engineering and another master degree in business administration. I already got my Permanent residence for Australia since July 2008.
Planned and drilled horizontal wells; Drilled Slant and S-typed wells using magnetic single shots and rotary drilling assemblies;Worked with inclination and resistivity at the bit for horizontal wells;Conducted cased-hole and open-hole side-racks;
I've been working for the last 16 years in Oil and Gas industries as a Asst Material Manger, Sr. Material Controller/Coordinator.
Experienced PROJECT MANAGER with 10 years experience training and leading development teams to
Seeking professional enrichment in Petrochemicals Plants In the area of Project ~ Plant Pre-commissioning & Commissioning ~ Plant Operations ~Quality Assurance
ASNT LEVEL 3 /WELDING PAINTING LIFTING I NSPECTOR
Licensed Journeyman Electrician, thirty four years experence, Industrial, commercial, residential, and oil field
Enquiry specs for compressors, turbines, pump, blowers etc. , technical evaluation of bids, preparation of technical recommendations, checking & approval of vendor documents., interface with other disciplines, knowledge of API standards
17 years experience in EPC environment, on oil refineries and petrochemical projects
Drilling Superintendent with over 30 years experience. I have worked in the Middle East and USA. I have Workover & Completions Experience. I am in excellent health and prefer rotational assignments.
Mechanical project &maintenance engineer with 17 years of industrial experiance.
Canadian Drilling Supervisor
Monitoring and surveillance of QC activities in fabrication shop and field for CS, LTCS, ALLOY, SS, LTSS, Claded steel material
Mechanical engineer in cement Plant
Over 16 years of experience in construction industry local and abroad. Responsible for completing the project within time and within cost.
INSTRUMENT FIELD ENGINEER
Senior Corrosion Engineer with 14 years experience at metallurgy fields especialy corrosion & corrosion control. expert at painting, insulations,cathodic protection, materials selection, corrosion inhibitors, corrosion monitoring, coatings inspection . I am serious at work.
HVAC Professional Having 17 Years of rich Experience in Major MEP projects,expert in handling fast track projects with in project time frame and budget..
Experienced Environmental Program Manager
A Geophysicist/Seismologist ,Graduated from St Louis University(PhD),and an MS from Stanford University. Have long experience in Teaching, Research, Academic Administration and Management. Bilingual (Arabic and English),A US Citizen. Seeking a post in Northern Virginia (Washington DC Metro Area).
As a well sit geologist for six years, including one year for Coal Bed Methane, familiar with StripLog, SDL_9000 geological logging software, strong organization ability
Electric Engineer with MSEE with more than 15 years of work experience in oil and energy industry, occupying positions in electric maintenance, utilities plants operation and project engineering management and construction,
I am a postgraduate in civil engineering from the prestigious Indian Institute of Science, Bangalore. My major experience is in Oil industry. I have vast experience in Contracts Management in India & abroad.
Engineering and construction executive with MS in civil engineering and construction management and BS in general engineering, with extensive hands on and executive level experience in project, construction, and contract management in multi-deceiplinary projects in the international arena.
Estimation of Oil and Gas EPIC Projects
I am looking to join a company that values its customer services staff and with whom I can build a great career.
Senior Electrical Engineer currently working For SonaHess Company (association Sonatrach & Amerada Hess), El gassi Hassi Messaoud.
• 12 years of experience in geology, geophysics and reservoir engineering, drilling operations (including horizontal, ubd, rotating BOP etc)
I have almost twelve years of solid experience with potential clients, presenting effective technical and commercial support and closing deals mainly in Industrial batteries, AC & DC Industrial back-up systems and Low Voltage power distribution solutions.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   [ 23 ]   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com