Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #78318
next resume »»
CONTACT INFORMATION:
View contact information...
PERSONAL INFORMATION:
Date of Birth: June 28, 1954
Place of Birth: Silay City, Negros Occidental, Philippines
Civil Status: Married
Citizenship: Filipino
Height: 5ft 10inches
Weight: 180 lbs.
Gender: Male
BENEFICIARY: Eruce Lee B. Paez
EDUCATIONAL BACKGROUND:
Tertiary:
West Negros College
Bacolod City, Negros Occidental, Philippines
B.S. Mechanical Engineer
Date Graduated: 1974
Secondary:
Silay Institute
Silay City Negros Occidental, Philippines
Date Graduated: 1970
Primary:
BO. Tanza Elementary School
E.B. Magalona Negros Occidental, Philippines
Date Graduated: 1970
EMPLOYMENT RECORD:
POSITION HELD: Piping Supervisor/Field Engineer
INCLUSIVE DATE: November 9, 2007 to September 27, 2008
LINE OF WORK:
Conducting a piping training program from zero skill up to a skill trainees supervising the assigned work from planning, organizing, leading and controlling.
Performed piping work activities from designing and drawing the piping tie-in to existing pipelines, drawing various structural platform such as: valves operator platform, workshop structure, pipe racks, pipe supports, pipe shoes and guides.
Conducted the technical methods in piping erection, installation, fabrication and hydro testing.
Checking and correcting the pipelines for punch list and unknown repairs.
EMPLOYER:
Consolidated Contractors Company Co. W.L.L. Khursaniyah Gas plant Project Al-Khobar, Kingdom of Saudi Arabia
WORK PERFORMED:
Procurement of materials for sulfur process lines such as: pipes, pipe fitting and I-beams for pipe racks and pipe support for superheated water pipe lines and compressed air pipe lines at train #1 and train #2 sulfur process plant.
Designed, drawing and rectify pipe support for sulfur foam pipe lines.
Checking and correcting pipe lines from sulfur loading to sulfur process plant at train #1, #2, and #3.
POSITION HELD: Piping Supervisor/Field Engineer
INCLUSIVE DATE: July 24, 2006 to July 25, 2007
EMPLOYER:
Contracting and Trading Co. (C.A.T.) Abu Dhabi Branch, P.O. Box 250
Email: catnt@enirates.net.ae
Telephone: 6721626
WORK PERFORMED:
Procurement of materials for Fujairah oil tank farm project such as: pipes, pipe fittings and I-beams (for pipe racks and support).
Designed, drawing for valves operator platform and pipe support for Mussafah Ghq. District cooling scheme project.
Designed, drawing for piping tie-in to existing pipelines for black oil pipelines manifold #3 at Fujairah oil tank farm project.
Conducting the fabrication, installation and hydro testing for 32"Ǿ suction and 20"Ǿ discharge header pipelines at Fujairah terminal phase-V expansion (oil tank farm project).
POSITION HELD: Workshop Supervisor and Compaction Foreman
INCLUSIVE DATE: July 30, 2005 to May 30, 2006
LINE OF WORK:
Supervising of work such as: fabrication and erection of ten tons overhead crane, pipe support, ducting and diesel tank.
Supervision of soil compaction for Doha New Airport Reclamation Area.
EMPLOYER:
International Engineering and General Contracting (I.E.G.) P.O. box 40111 Block #3, 4th Floor Al Jaber Towers Opp. Museum Doha,
WORK PERFORMED:
Compaction of new airport reclamation area.
Fabrication and erection of ten tons overhead crane, pipe support, ducting and oil tanker.
POSITION HELD: Mechanical Piping Foreman
INCLUSIVE DATE: February 18, 2004 to September 27, 2004
LINE OF WORK:
Supervision of piping such as: piping erection, installation and hydrostatic testing.
EMPLOYER:
Hyundai Engineering and Construction Co. Ltd. P.O. Box 753991-111 Assaluyeh, Islamic Republic of Iran
WORK PERFORMED:
Erection and installation of mechanical pipelines at on sure gas plant facilities.
Hydrostatic testing and re-instatement of mechanical pipelines at offshore oil rig platform south pars development phases (SPD) #6 and #5
POSITION HELD: Mechanical Piping Gen. Foreman
INCLUSIVE DATE: July 15, 2002 to August 12, 2003
LINE OF WORK:
Supervision of piping activities in all areas of responsibilities.
EMPLOYER:
Mohammad Al-Mojil Group (MMG) P.O. Box 11, Dammam, K.S.A. 31411
Telephone: 8421111
WORK PERFORMED:
Fabrication/installation, hydrostatic testing of pipelines for Khuff condensate oil refinery at Rastanyra, K.S.A. and Jueg EO/EG plant (petro chemical plant) at Jubail, K.S.A.
POSITION HELD: Mechanical Piping Supervisor
INCLUSIVE DATE: September 21, 2001 to November 28, 2001
LINE OF WORK:
Supervision of mechanical piping activities at:
Kapeo Phils. Co.
Dong Won Ahe Co. Ltd.
Dong Won Engineering Co.
Kephilco Thermal power plant
EMPLOYER:
Flour Daniel Pacific Inc.
WORK PERFORMED:
Dismantling of element ¡V re-cladding, removal of insulation, casing removal and removal of elements
Replacement of element¡XElement installation,casing insulation, full welding and re-cladding, pro testing was performed as per specifications.
Fabrication and installation of 40,000 gallons crude tank vessel. Fabrication/installation of accessories pipe lines
POSITION HELD: Piping Foreman
INCLUSIVE DATE: Jan. 08, 1996 to July 19, 1996
LINE OF WORK:
Offshore Constructions of Mechanical pipelines/Structural Platforms for Oil Wells Oil Control Platforms.
EMPLOYER:
ARAMCO¡XSponsored by: AGAP ARABIA, LTD.
WORK PERFORMED:
Monitoring Meiscor (Sub-contractor) daily activities for Sendet Bar Plant pipeline installation and equipment tie-in.
Rectifying all failures due to faulty material and/or workmanship as per piping spec/piping general requirements.
Tracking down installed quantity/punch list materials.
Assisting Meiscor (Sub-contractor) in performing hydrostatic testing for acceptance
POSITION HELD: Piping Foreman
INCLUSIVE DATE: Dec. 6, 1992¡XDecember 14, 1993
LINE OF WORK:
Lekhwair Oil and Gas Facilities.
EMPLOYER:
BROWN and ROOT MID EAST, L.L.C
WORK PERFORMED:
Supervising the constructions of mechanical pipelines, Pipe,support,instrument tubing, hydro-testing and Functional test from oil well heads to riser for oil well Platforms.
Supervising the construction and modifications of elevated access platform for well heads.
Supervising the installation of electrical equipments such as: transformers, fiber optic box, cable trays and brackets for oil control platform.
POSITION HELD: Mechanical Piping Foreman / Supervisor
INCLUSIVE DATE: October 16, 1991¡XApril 30, 1992
LINE OF WORK:
Erection of 350 Megawatts/Unit Steam Power Plant.
EMPLOYER:
MITSUBISHI HEAVY INDUSTRIES, LTD. Az-Zour, Kuwait
WORK PERFORMED:
Fabrication/Installation of small and large bore stainless steel pipe as per Dwg. Spec. for Sulferox Chemical Plant.
Erection of large bore carbon steel pipe from bulk separator vessel trim to pipe racks (tree units).
POSITION HELD: Piping Foreman
INCLUSIVE DATE: Dec. 13, 1984 to Aug 8, 1985
LINE OF WORK:
Coal Mine Conveyor System.
EMPLOYER:
ENGINEERING EQUIPMENT, INC. (EEI)
WORK PERFORMED:
Scheduling/distribution of activities to my subordinates
Report any deviation from the constructions dwg.
Report progress of work in terms of installed quantity and no. of men utilized.
Controls materials, tools and equipment being used for the accomplishment of work.
Enforces company rules and regulations and safety.
POSITION HELD: Piping Foreman
INCLUSIVE DATE: April 23, 1983 to Feb. 14, 1984
LINE OF WORK:
MWSS ¡V Pump Lift Sta. Rehabilitation.
EMPLOYER:
ENGINEERING EQUIPMENT, INC. (EEI)
WORK PERFORMED:
Structural erection and installation of BSPI transfer tower.
Assembly/installation and alignment of BSPI transfer transfer mechanical accessories.
Structural/mechanical installation and alignment of four Drive Sta. Unit
Belt frames and conveyor tail Sta. Installation/alignment.
Belt frames roofing installation/alignment.
Functional testing. Service and maintenance.
POSITION HELD: Piping Foreman
INCLUSIVE DATE: Feb 14, 1984 to June 9, 1984
LINE OF WORK:
Oil Rig Platform.
EMPLOYER:
BROWN and ROOT INTERNATIONAL, LTD. Abu-Dhabi, U.A.E.
WORK PERFORMED:
Demolition, lay outing, sheet pile installation, rebars fabrication/installation.
Forms fabrication/installation.
Dewatering, conc. pouring, structural roofing installation.
Installed sanitary service pipelines and 6" „w D.I.P. exhaust pipeline.
POSITION HELD: Pipe fitting Trainer/Interviewer
INCLUSIVE DATE: July 8, 1981 to March 18, 1982
LINE OF WORK:
Manpower Development Program.
EMPLOYER:
ASIA INTERNATIONAL BUILDERS CORP. (AIBC)
WORK PERFORMED:
Designed/fabricated/assembled self-invented pipe bender machine.
Installed/fabricated spools/pipe support at offshore.
Hydro-statis testing of pipe lines.
Fabrication of as per Dwg. Specs.
POSITION HELD: Training Supervisor
INCLUSIVE DATE: Jan. 15, 1981 to July 7, 1981
LINE OF WORK:
Manpower Development Program.
EMPLOYER:
CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS. (CDCP)
WORK PERFORMED:
Teaching theoretical and practical method of pipe fittings.
Fabrication and piping system importance to industrial plant. It includes the usage and functions of pipe fittings.
Basic hand tools, equipments and job safety.
POSITION HELD: Piping Foreman
INCLUSIVE DATE: Aug. 18, 1980 to Jan. 14, 1981
LINE OF WORK:
Water filtration Plant MWSS-Balara.
EMPLOYER:
CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS.
WORK PERFORMED:
Teaching piping system/fabrication of pipe fittings, trade mathematics and advance techniques of piping fabrications/installation.
Develop zero skill trainees to become full skilled workers.
POSITION HELD: Piping Leadman
INCLUSIVE DATE: June 14, 1980 to Aug 18, 1980
LINE OF WORK:
Sugar Refinery Construction ¡V BUSCO.
EMPLOYER:
CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS.
WORK PERFORMED:
Fabrication/installation of polyvinyl chloride plastic(PVC) pipe line at chlorination house.
Replacement of damaged 24" „w and 36" „w D.I.P. bell and spigot type.
Replacement and repair stirring paddle exhaust mud.
POSITION HELD: Piping Leadman
INCLUSIVE DATE: May 4, 1979 to April 5, 1980
LINE OF WORK:
Thermal Power Plant Bo. Malaya (M-2 Project).
EMPLOYER:
ENGINEERING CORPORATION OF ASIA (ECCO-ASIA)
WORK PERFORMED:
Fabrication/installation of 24" „w carbon steel pipe.
Line/pipe support from screen house up to condenser.
Installation of pipe line from vacuum pan, crystallizer to centrifugal basket.
Erection of syrup tank as per DWG spec.
Hydro static testing/functional test.
POSITION HELD: Piping leadman
INCLUSIVE DATE: July 2, 1977 to April 20, 1979
LINE OF WORK:
ATLAS MINING CORPORATION ¡V CICG SUPPLIED.
EMPLOYER:
Copper Mining Plant Construction Cebu City
WORK PERFORMED:
Installed 8 feet „w circulating water pipe line from screen house up to condenser.
Installed large and small bore pipes/support from dearator, boiler feed pump sailing water, high pressure heat, economizer inlet header, turbine and condenser.
Installed large and small bore pipes/support from gland condenser to low pressure heater (four units).
POSITION HELD: Tinsmith/Welder
INCLUSIVE DATE: May 15, 1977 to June 27, 1977
LINE OF WORK:
Car plant.
EMPLOYER:
DELTA MOTORS South Super Highway
WORK PERFORMED:
Installed large bore pipes/support from cell units to ball Filter.
Installed large bore carbon steel underground pipe line from thickener No. 5 up to disposal area.
POSITION HELD: Pipe Welder
INCLUSIVE DATE: Nov. 22, 1976 to May 12, 1977
LINE OF WORK:
Raw Sugar Mill Construction ¡V BUSCO.
EMPLOYER:
CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS.
WORK PERFORMED:
Assembled chassis of basic utility vehicle (Toyota Tamaraw) using riveting machine, Jigs and Arc welding machine.
POSITION HELD: Welder
INCLUSIVE DATE: Jan. 13, 1976 to July 28, 1976
LINE OF WORK:
Shipyard and Repair.
EMPLOYER:
EL'NOR SHIPYARD Mandaue City, Cebu
WORK PERFORMED:
Fit-up/full weld of pipe line fro vacuum pan up to crystallizer.
Production welds of pressure vessel (dearator).
Production welds of chimney (smoke stack).
Erection/fit-up and full weld pipeline from ball mill up to pump house.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 601 to 650 of 15509)
Go to Search Parameters...
Brief Description
I have got above 20 years of experience in mining field including 13 year oversas exposure, vell experienced in quarrying and control blasting operation, good with safety, management, record maintainence, billing, coordnation with clints. etc...
Long skills for work-over & completion well site supervisor , coiled tubing & snubbing too
Electrical / instrument designer
PDS and Smart Plant, Auto Plant(3D), Microstation, AutoCAD, MS Excel, Word etc.
Experienced Well site & Ops Geologist. Adaptable, strong inter-personal & communication skills, multi-disciplinary team worker. Follow up Operations Geology activity for Operated & Non-Operated assets, supporting Drilling & Completion. Can work independently with minimal supervision. B.Sc, Geology
Industrial Eng. with master degree in HSE. Title obtained: HSE eng. Specialist
Extensive open pit mining experience in most diverse and difficult cultures, in Africa , Central Asia ,India , hands- on project construction experience at a 40 Million USD Dephosphorisation Plant ,Acquisition of Mining properties in West Africa
Financial Accounting, Costing, Budgeting and Project Accounts
An experienced construction planner and P3, P6 user. He has both design and site experience. His strength is in planning, construction sequence, resource optimization and cost application. He has been working in Singapore for more than 17y.
*Twenty-seven (27) years of experience, have been working in MIDDLE EAST, EUROPE and in Far East Asia. Highly professional with strong communication and leadership skills. Well organized with flexibility and common sense. Computer literate in WIN 95/98,Office 2000,MS XP and Internet task.
Positions - Project Manager, Project Control Manager, Planning Manager and Director in the area of process simulation, predictive control and risk. Hands on, onshore plants (oil, gas), aluminum, ammonium nitrate, offsite and utilities, offshore platforms and pipelines. Capex from $100M to $5Billion
A production/well completion engineer with over 20 years experience in Canada and overseas
Drilling Financial Controller responsible for all drilling expenditures
15 plus years of Rig and Merchant Naval experience with good administrative and communication skills as a Radio Officer/Purser/Fleet Administrative Officer on board foreign going vessels and rig. Have good experience in handling chopper program, boat program, material movements, crew changes, crew t
Responsible for entire Process monitoring, Trouble Shooting/ Rectification or modification for optimum Production in each section.
I have Very good Experience in the Petrophysical Operation, Studies and Well reservoir Survillance. Have experience in QC/QA of integrated studies. Have leadership experience
30 YEARS OF INTERNATIONAL PROJECT MANAGEMENT EXPERIENCE
Geoscientist
Honor degree in Mechanical Engineering form UK and have gained more than twenty five years experience in the fields of major sub-sea assets management, assets integrity, offshore operations, projects and contracts management, inspection, maintenance and marine related projects.
Marine Pilot/ Mooring Master/ Loading Master
Sr. Technical Writer with Software, O&G expeience, PMP Cert
Materials Controller/Warehouse Supervisor/Logistics Supervisor
Multi skilled engineer, Technical Advisor, Mud Engineer
Over 19 years experiences in construction of storage tanks starting from pre contract stage to execution including cost estimation, manpower and equipments planning, scheduling, material procur2ement, customer and engineering general correspondence, progress calculation , progress tracking, and i
15 years Mechanical Engineer within Oil / Gas & refinery industry, inclusive 5 years maintenance experience; 5 years for nuclear power project; P.Eng of APEGGA, Canada
Can perform both technical work and sales work involving oil/gas industry more specifically as an advisor, planner, support or salesperson.
Have a wide range 4yrs experience as Safety Engineer in a construction firm. I develop and implement safety programs to minimize losses due to injuries and property damage hey try to eliminate unsafe practices and conditions in industrial plants, mines, and stores as well as on const
Drilling Engineer – DCWO planning, programming, engineering, operations evaluation, performance analysis; deep HPHT gas wells, high deviated, ERD and horizontal oil wells, sidetrack wells; land operations; harsh desert (Middle Asia) and arctic (Siberia) environment; English-Russian-Slovak
Over thirty years of experience in major US and International design/build facilities programs where responsibilities have included senior-level Project Management, Construction Management, Engineering and Design Management, equipment selection, installation and start-up. P&L responsibility for all
In search for the position where my background would be valuable, your esteemed organization came to my attention as one that might find my experience of interest. The enclosed professional profile will provide you with information concerning my overall education and capabilities for your review.
I have over 28 years of experience in the field of Electro- Mechanical Engineering of which 6 years in Middle East and 7 years in Nigeria with European MEP Contracting Company. My responsibilities include Pre Tender estimation, Estimation of manpower and material for the projects, supervise and impl
Senior Mechanical Engineer experienced in detailed mechanical / thermal / process and E&I design of Fired Heaters, Reaction Furnaces, Reformers, SCR’s WHRU’s, Boilers, Incinerators, Flares and associated ancillary equipment. Very strong E&I, DCS / PLC & BMS skills.
By working 17 years in the field of petrochemical field, I experienced all kinds of key projects like FCCU, Hydro-cracking unit, Hydro-treating unit and have expert ability to do piping static and dynamic stress analysis. Also I have five years working experience as a mechanical engineer in refinery
35 years of experience in the process industry working for engineering firms, equipment manufacturers, chemical company
Proven track record in project management in oil refinery handling bid projects with multinational contractor, excellent team leader with motivation schele
I am proficient in researching title and court records, including but not limited to conveyances, mortgages and other indexes, along with curing said title when needed. I am able to determine from said title or records mineral and/or surface ownership in Louisiana, Mississippi, Alabama and Texas.
Conducting a piping training program from zero skill up to a skill trainees supervising the assigned work from planning, organizing, leading and controlling. Performed piping work activities from designing and drawing the piping tie-in to existing pipelines, drawing various structural platform
Twenty years of professional experience in, design, consultancy, construction and maintenance, covering a broad range.
25 years of experience in construction, installation, commissioning, testing and maintenance of Electrical, Electronics and Instrumentation equipments and controls in Petrochemical Industry
Graduate Mining Engineer having vast experience in mining operation, Drilling & Blasting and Marketing / export of explosives.
Have more than 20 years experience in Piping Design and Engineering including Stress Analysis and Piping Materials Control for various projects in petrochemical plants, refineries and commercial chemical plants. Presently working in Worley Parsons (Colt Engineering Corporation), Calgary, Canada
A challenging position in a result-oriented company that seeks an ambitious Person, where acquire professional skills and devotion towards safety on priority, sharing of knowledge as a learning point and grow with the company in allocated budget and high safety/quality services to the client.
A result-oriented and talented professional with an extensive experience 26 years in the oil & gas industry . Expertise in commissioning, DCS control room operations, oil refining processing , crude oil & gas processing, oil & gas operational environment.
PMS-Planned Maintenance and Spares & Purchase Database administrator and building.
Underground: Project Engineer (evaluation, design, development & production; metals mining), Senior Engineer or Technical Services Supervisor
Rig Manager/ Drilling Superintendent/ Drilling Supervisor.
Canadian, B.Sc. geology, 28 years experience in mineral exploration, evaluation, development, production and administration, particularly in gold. Lived and worked in Canada, Saudi Arabia, Botswana, Russia, Iran and assignments in Kazakhstan and Uzbekistan. Computer literate.
I am a qualified Metallurgist and in addition to I have extensive Metallurgical experience in the Diamond, Base metals and Andalusite fields. I am an innovative and enthusiastic person. I have been involved as Senior Process Engineer, Plant Design Engineer, Chief Diamond Sorter and Plant Manager.
Over 18 years experience in 2D and 3D seismic data processing. Processing land desert and mountain data. Processing experience gained in Geofizyka Krakow Ltd, WesternGeco and CGGVeritas. User knowledge of Unix, Linux , excellent Omega SPS and Tango, basic ProMAX. Good MS Office skills.
Exploration ,Mining
First
1
2
3
4
5
6
7
8
9
10
11
12
[ 13 ]
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com