Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #79319
next resume »»
CONTACT INFORMATION:
View contact information...
Date of birth 6th August 1966
Nationality Malaysian
Race Malay
Marital status Married
Language English / Malay
(Written & spoken)
Hobbies Reading, cooking
E mail rozinabdulmajid@hotmail.com rozinabdulmajid@yahoo.com
Education
1. Diploma in Mechanical Engineering ¡V Further Institute Technology
2. Certificate in Piping Design ¡V Institute Kemahiran Mara
3. Certificate in Mechanical Drafting-Institute Kemahiran Mara
4. Certificate in Piping System in Power Plant ¡V (Erlangen - German )
Computer Literacy
Word processing - Microsoft Word
Spreadsheet - Microsoft Excel
Management & Planning - Microsoft Project
Microsoft Access / Lotus Notes
CAREER SUMMARRY:
Total more than 22 years in Design Engineering Consultancy, Construction and installation projects, Maintenance chemical Plant and fabrications.
The experiences include Piping/Mech./Pipeline engineering in Onshore and Off-shore field. Involve in effective man-power control, schedule control, quality controlling, technical review, resolving technical issues, coordinating with inter departments and coordinating with clients and vendors. Worked as lead engineer, Maintenance manager, project manager for Refinery, petrochemical, LNG, Power plants and oil/gas projects.
Have resolved numerous technical problems related to piping connected to Gas turbines, Static and rotating equipments and other mechanical / piping technical issues.
On - shore Piping
„«
Involved in developing new plot plan / Equipment layout and Review / checking of plot plan, equipment layout, vessel Nozzle orientations, piping GA's, Isometrics and MTO.
„«
Preparation / review of piping material specification, technical specification/data sheet for piping, fittings and valves and other piping items and preparing technical bid evaluation and purchase order requisition.
„«
Reviewing the PEFS/UEFS and furnishing mech. Comments to process.
„«
Involve in material selection for piping, valves etc.
„«
Involved extensively in pre-bidding / Front engineering and Cost estimation.
„«
Preparation of statutory Drgs. and documentation, pipe rack load calculation.
„«
Detailing / reviewing support engineering.
Review Civil/structural / foundation drawing for Piping / Mechanical interface.
„«
Review /checking of U/G piping layout.
„«
Assisting process and involve in Surge Analysis calculation for the Oil line networks.
„«
Offering tech. Supports for slug analysis carried out for Multi phase Oil lines.
„«
Preparing specification for GRE piping and involved in technical evaluation of GRE piping and fittings.
„«
Involved in detailing of the Production / test manifold for oil & gas flow lines.
„«
Participate in Hazid, Hazop & QRA meetings and closing technical Issues.
„«
Attending constructability review.
„«
Preparation of tender documents for EPC contractor and involved in Bidder's technical clarification.
„« Involve with all the construction works, fabrication, installation and shutdown.
„« Control the staff for chemical plant shutdown execution.
„« Control the site office financial.
„« Prepare the shutdown schedule with manpower execution.
„«
Conversant with ASME, API, Shell DEP, ext.
OFF- Shore Platform piping
Review / checking the plot plan and equipment layouts of platforms for the modification/ additional of equipments
„«
Involved in technical study of locating new equipments on the platforms.
Review piping GA's, Support drawings and internal coordination with civil for any deck extension.
„«
Review / check emergency diagram of platforms.
„«
Review the proposed well /conductor locations and Well hook-up drawings.
Coordination with Well head group, pipeline group and Operation team for relevant technical issues and input.
„«
Participate in Hazid & hazop and closing tech. issues related to Mechanical / piping
Pipeline Engineering (On shore pipelines)
Preparation of design basis and detail design engineering, ISO drawings complete with MTO and material selection.
„«
Check/ review Route plan / map drawings and pipeline alignment drawings.
„«
Check and review of Flow line routing drawings and tie-in interface drawings.
„« Check / review of scraper facilities, Well pad and Manifold area drawings.
„« Preparing technical specification, TBA, purchase specification for pipelines,
„« fittings and accessories, barred tees, corrosion coupon/probe, pig signalers, Ball valves, relief valves, choke valves etc.
„«
Detail stress for above/under ground pipelines.
Conversant in ASME API, Shell DEP ext.
Mechanical engineering
Static Equipments
* Preparing Technical specification, involved in detail Technical Evaluation (TBE), Purchase specification, Vendor drawing review for the major items like Bulk separator, electric heater, filter separator,
* Involved in preparation of mechanical data sheet and specification for surge tank, de-hydration tank, skim tanks and preparing detail spec. for Tendering.
* Basic designing of static equipments like separators, reactors, columns, tanks, MTO verification, review of fabrication drawings
* Reviewing Nozzle strength of vessel.
* Co-ordination with vendor for expediting the fabrications, delivery, painting, blasting drawings, document submission and resolving technical issues.
* Involved in clearing the technical issues raised during installation and commissioning of Equipments.
Rotating equipments:
* Review the pumps and compressor specifications
* Involved in preparation pump specification for the off ¡Vshore platform, used for FW and Portable water purpose.
* Technical Evaluation and Vendor drawings review of Pumps.
* Review of Compressor A drawing / documents.
* Interaction with vendor and expediting the technical issues.
* Attending Design review/ Hazop meeting and closing technical issues related rotating Engineering
Working Experience
September 2007 to present
Company:- Ramunia International Service Limited
Designation: Lead. Piping Engineer
* Prepare Material Take Off piping for bidding
* Monitor all the piping design working progress produced by engineering consultant.
* Liaison both with consultant and client Messer. Oil N Gas Corporation India (ONGC) for offshore project.
* Review the piping Material specification and critical pipe line list document.
* Review the entire piping plan at main deck, cellar deck, Quarters, at process platform and wellhead platform.
Projects involved / undertaken:-
1. B23AA Wellhead platform ONGC India
2. B193AP Process Platform ONGC India
3. B193 AQ Quarters Platform For ONGC India
4. ICPR process Platform ONGC India.
5. MNH Platform ONGC India.
6. R12& R14 PlatformONGC India.
7. Lock gate Panama canal
___________________
May2007 to August 2007
Company:- LFE Engineering Qatar W.L.L
Designation: Snr. Mechanical Piping Manager
Duties & Responsibilities:-
Base at Doha Qatar site office.
* Checked shop drawings piping layout at detention pond which consist of submersible Axial Pumps and Sump pump
* Prepare the piping fabrication material submittal, method statement and ITP
* Prepare material submittal for fire suppression and fire specialty.
Projects involved / undertaken:-
1. New Doha International Airport project (NDIA)
________________
May 2004 to April 2007
Company:- Malaysia Liquid Natural Gas Sdn. Bhd.
Designation:- Lead Piping Engineer/Project Manager
Duties & Responsibilities:-
1. Full time assign at Malaysia Liquid Natural Gas Bintulu Sarawak. Responsible for piping updated and prepare all the material take off match to the specific mesc code (Petronas Standard).
2. Prepare the exception list (work transfer to maintenance department to execute the task).
3. Prepare the schedule for the engineering department to execute the engineering for the specific responsibility through the plant schedule shutdown and the schedule for the Vapor Line Expansion Loop Project.
4. Prepare materials take off for the Vapor Line Loop Expansion Project.
5. Update all the as built process flow diagram and check accordingly.
6. Prepare, design and coordinate with the draftsmen, for the technical documents such as schematic drawing, equipment layout, water treatment process flow.
7. Attend the management meeting.
8. Prepare the entire mobilization plan and staff mobilization.
9. Liaised with the entire supplier for the delivery item and inspection for permit to enter the plant.
10. Coordinate with Kementerian Perdagangan Dalam Negeri for approval buy and transport Diesel for equipments consumption in the plant.
11. Monitor work progress accordingly the schedule and all the subordinate working activities.
12. Ensure with all the safety and Qc working method practice to all subordinate site activity.
Projects involved / undertaken:-
1. MLNG Rejuvenation and Revamp Project.
2. Vapor Line Expansion Loop Project
3. Slug catcher
4. Cleaning Bottles Slug catcher
_______________________________
January 2003 to February 2004
Company:- TOYO Engineering & Construction Sdn. Bhd.
Designation:- Construction Manager
Duties & Responsibilities:-
1. Responsible for the preparation of overall project planning involving the preparation of Master Implementation Plan (level I & II) (including S-curves both for physical and financial progress), Manpower Planning and Construction Equipment Planning. Also involve in the estimation for projects' direct and indirect costs.
2. Responsible for the preparation of subcontract documents and carried out tendering exercise for projects ¡VBid evaluation. Handled all tender inquiries both technical and commercial aspects.
Projects involved / undertaken:-
1. Urethane Pre Polymer Plant at Pulau Indah, Kelang for Messrs. Cosmo Scientex Sdn. Bhd.
2. Glycerin Processing Plant at Kuantan, Pahang for Messrs. Felda Proctor Gamble Sdn. Bhd.
______________________________
January 2002 to January 2003
Company:- LARRZOR Engineering Sdn. Bhd.
Designation:- Project Manager / Contract Manager
Duties & Responsibilities:-
1. Responsible for the overall management and overseeing of projects undertaken by the company from start-up to close-out. Ensure physical works executed according to schedule and within budget, maintained QA/QC and ensured safety procedures are adhered. Carried out all the risk costing and schedule for the project execution, construction, fabrication, installation, mob and demobilization all the staff and equipments. Provide information to support the engineering solution and packages, to enable the design and construction execution.
Projects involved / undertaken:-
1. Offshore Fire Fighting Upgrade for EPMI
2. Teluk Gong Power Plant for SIEMENS
___________________________________
December 2000 to December 2001
Company:- BOCCARD (M) Sdn. Bhd.
Designation:- Maintenance Manager
Duties & Responsibilities:-
1. Responsible in the execution of various maintenance contract(s) works undertaken by the company. These involve the scheduling, deployment and monitoring of workmen and plants/static and rotating equipment including all consumables required. Attended periodical meetings with client and carried out periodical meetings with workers. Ensure that works are carried out within budget and provide monthly physical and financial progress.
Project involved /undertaken:-
1. Acrylic Plant Shutdown in Gebeng, Kuantan.
_________________________________
January 1998 to November 2000
Company:- Foster Wheeler (M) Sdn. Bhd
Designation:- Snr Piping Engineer
Duties & Responsibilities:-
1. Work on full time basis at the site office in Kerteh, Terengganu. Supervise, assist and coordinate all works with subcontractors and client with regard to design change, design specification, field inspection, commissioning and testing.
2. Undertake the design of drainage system for future extension and existing areas where there's insufficient drainage within the plant.
3. Was also responsible to design and prepare all the spools for steam blowing and hydro-testing.
4. Carried out checks on all free issue material for steam blowing such as the spool, flange, gasket for HHS, HS, IS & LS. Also carry out checks on installed materials & equipment and piping 'line check'.
5. Responsible to clear punch list items and coordinate with commissioning department in carrying checks for approval to commence hydro testing procedures.
6. Prepare test pack
7. Update CED(change engineering data sheet)
Projects involved / undertaken:-
1. Centralized Utility Facilities (CUF) in Kerteh, Terengganu.
_____________________________
July 1994 to December 1998
Company:- Siemens Power Generation Asia Pacific (M) Sdn. Bhd.
Designation:- Project Engineer / Piping Engineer / Mechanical Engineer
Duties and Responsibilities:-
1. As Piping Engineer in the Gas Turbine Power Plant Project, Oakey, Australia carrying out the preparation of engineering proposals (Invitation to bid) which include engineering design, preparation of line, schematic & isometric drawings, preparation of technical specifications, carry out material take off for fabrication & erection, assist in expediting procurement of materials, preparation of quality control procedures and carry out liaison with clients and contractors either in Malaysia or overseas.
2. As Project Engineer in the Gas Turbine Power Plant Project in Serdang, Malaysia and the Gas Turbine Power Plant Project in Bang Pakong, Thailand fully responsible for the basic designs of piping yard and water treatment plant. Also involve in the supervision of site erection and installation. Assisted Project Manager in providing the Plant Management Plan before 'handing over' the Gas Turbine Power Plant project which include finalizing the Process & Instrumentation drawings (P&ID), compiling and catalog plant operations & systems manual, compiling & catalog spare parts as required under the contract and carry out liaison works with client and authorities as and when required. Carried out all the risk of costing and schedule for analysis.
3. As Mechanical Engineer in the Combined Cycle Power Plant Project executing the fabrication, installation and testing of boilers, pressure vessels, filter house and compressors. Also involve in the preparation of technical specifications & system description for inquiry document and carry out design works including the preparation of preliminary and general piping drawings. Provide all the information required by the contract department for costing and schedule project. Responsible with all the company negotiation system regards to project cost and schedule. Carried out all the cost evaluation solution regards to design solution, packages, safety, quality and delivery for project execution, fabrication, construction, installation and maintenance
(spare part) confirmation of subcontractor to provide all the document related to plant management (operation and manual doc. and spare part list doc.)
Projects involved / undertaken:-
1. Gas Turbine Power Plant in Oakey, Australia
2. Gas Turbine Power Plant in Serdang, Selangor, Malaysia
3. Combined Cycle Power Plant in Senoko, Singapore
4. Gas Turbine Power Plant in Bang Pakong, Thailand
________________________________
September 1992 to July 1994
Company:- Cegelec (M) Sdn. Bhd.
Designation:- Piping Design Engineer
Duties and Responsibilities:-
1. Was responsible in carrying out piping and pump house designing works and produced isometric and schematic drawings for the YTL Metering Station Project. Also provide material take off using French Softwares i.e. 'Acad Matos' and 'Cabutil'.
2. Was entrusted to carry out site checks to identify required replacements for the upgrading of the air conditioning, ventilation and hot water system at Club Mediteranee, Cherating, Malaysia.
Projects involved / undertaken:-
1. YTL Metering Station in Paka & Pasir Gudang, Malaysia
2. Club Mediteranee Mechanical Systems Upgrade in Cherating, Malaysia.
______________________________
March 1988 to August 1992
Company:- Ranhill Fluor Daniel (M) Sdn. Bhd.
Designation:- Senior Piping Design Engineer
Duties and Responsibilities:-
1. Was assigned to carry out piping design and drafting for downstream refinery projects undertaken by the company. Also carried out material take off and periodical checks on site.
Project involved / undertaken:-
1. Hydrocracker project in Port Dickson, Malaysia
2. Shell Refinery
3. Middle Distillate Synthesis in Labuan, Malaysia
4. MSN Platform in Indonesia
5. PDR No.2 Powerformer in Port Dickson, Malaysia
6. ESSO Refinery
7. Improvement Facilities in Port Dickson, Malaysia
8. ESSO Refinery Offsite in Port Dickson, Malaysia
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 551 to 600 of 15477)
Go to Search Parameters...
Brief Description
22 years experience in milling & mineral processing operations, laboratory testworks and project studies in both large and small-scale operations.
Twenty (20) years in Oil and Gas Industry. Working primarily at wellsite offshore and onshore, involved in exploration and development wells. Drilling Vertical and Deviated including Horizontal and Extended Reach Wells. Working onshore and offshore, Jackup and Tender assisted drilling rigs
Skills: Excellent communicator•In depth experience in drilling and workover in Romania and Libya; Highly motivated;•Expert skills in foreign languages: French, English;
Construction- and Project management, Engineering and Supervision of mechanical, piping and welding works, e.g. for oil and gas pipelines, pig-, pump/ compressor and metering stations, industrial plants, storage-tanks, structural steel, filling stations, town-gas and water distribution systems, work
Reservoir Simulation (Petre and Eclipse)
A highly qualified Mechanical Engineer with an extensive experience in developing design basis, specifications, data sheets, technical bid evaluation and vendor data review of various mechanical equipment packages for oil & gas projects
10 years in Analytical Instrumentation & 10 years in Process Instrumentation of highly skilled experience gained here and the Middle East. Adept at providing analytical and technical equipment support through troubleshooting, repairing, maintaining, calibrating, adjusting, and installing industrial
Extensive general geophysical experience, last number of years in airborne geophysics. Experienced in Africa operations.
I seek a position as ETO where my experience, training and good work habits will be an asset to your Company. I have 17+ years experience at sea.I have experience with Kogsberg Simrad SDP 21 onboard DSV DP2.I have got DP Technical & Maintenance Course.
Civil Engineer, with 27 years of Construction Management experience doing LNG berthing facilities, schools, petrochemicals, operation & maintenance of power & desalination plant, roads, water distribution system, accomodation camp.
Water Treatment Sales
Experienced Quality Engineer with Six-Sigma/Lean experience
I have more than 27 years experience in oil and gas industry in India and the middle east countries like Oman, UAE ( Sharjah and Abu Dhabi) both in offshore and onshore . I have worked in pipelines/piping design in consulting , EPC and also operating companies in the above countries
Commercial Project Control Manager with International EPC EPCM Experience on Mega Projects in Rail, Power & Mining Industries
OIL / GAS Industry professional with 35 years experience, strong organizational visual, Expert strategist, Designer, Analyst, Planner, Team Leader, Proven track record combines expertise in Quality Control Inspections, Cathodic Protection (Impressed &Sacrificial Anodes System
I am a graduate Mechanical Engineer with 20 years of HVAC experience.
Experienced Cutting Tool Sales/Production
In-House Landman
Construction Manager
Free!
PDS Piping Designer with Over 20 years experience within the Oil and Gas, Petrochemical, Refinery, Textile, Pharmaceutical and Nuclear Waste Industries
Twenty (20) years professional experience executing multi-million dollar projects in both domestic and international locations, acting as Owner representative in project controls and business management on major EPC, Lump Sum Turnkey and Joint Venture projects supporting Oil projects
A dynamic professional with over 2 decades (25 years) of rich experience in Project Machinery Planning & Execution, Erection & Commissioning, Maintenance, Quality Assurance, Process Enhancements and Man Management.
Senior Manager - Domestic & International Mining Experience - Strategic Planning / Mine Planning / Technical Evaluation / Permitting / EPCM / Project Development / Mine Operations / Project Evaluation
ArcGIS 8.x/9.x, ArcGIS Server, ArcObjects, Virtual Earth, C#, VB.NET, ASP.NET, VB6
Over 13 years of experience in the field of Environmental Consulting – EIA’s SEA’s, Audit etc., Waste Management & Ecological studies
Control & Instrumentation Engineer
Design Expert, Team Leader, Hardworking, Cost Control, Result oriented Instrumentation Engineer who can work on FEED/DD projects with equal proficiency.
Research & Development, Formulation, Manufacture, Maintenance, Project work
Working as a senior mechanical engineer having 19 years experience in hvac,fire fighting and plumbing
Over 16 years of wide and varied experience in the area of engineering consultancy for Design and Detail Engineering for Oil & Gas, Offshore / Onshore, Refinery, Petrochemicals, Alumna Plant, Pipelines, Gas Processing & LNG projects. I am fully conversant with all types of Process Control & Instrume
I am a Senior Environmental Project Manager (> 16 years experience) specializing in Environmental Remediation and Construction Management. My areas of expertise include project management, construction management, scheduling, document control, cost control, quality assurance, and quality control.
Skilled technician expert in Installation, Commissioning, Start-up and Maintenance over machines and equipments for Petrol, Pharma, Chemical and Oil&Gas sector.
WELL COMPLETIONS AND TESTING ENGINEER
engineering-mechanical-management- oil & gas
22 years mining maint expierience cat bucyrus komatsu and drills,6 years expat work in 4 countries in supervisory training superintendent planning roles , extensive MARC exposure .
Professional Engineer in corrosion, NDT, and failure analysis with 14 years experince
Skill Structural Designer with 20+ year of experience
Senior Manager educated to Bachelors degree in Welding Engineering with over 20-yrs of experience in the Oil/Gas Industry
22 years experience in engineering,construction,fabrication,installation both onshore and offshore for refinery, Petrochemical, Oil & gas, LNG and power plant
Seeking Senior Corporate assignments in Business Process Management and QHSE with an organisation of repute, involved in engineering procurement and construction of Mega project or Technical consultancy field of Oil & Refinery, Petrochemicals, LNG Storage Terminal, Cross country Pipelines,
Bachelor of Civil Engineering with Professional Designation
24 years of experience as a Cartographer, I am expert at Topographic maps and Nautical charts. I have designed and created atlas and sheet maps. I operate AUTOCAD to digitize maps and covert manual maps to digital maps. I am known for quality work, productivity, and organization.
Coal Executive with 30 years experience B.S. Mining Engineering 1980 Penn State University
I have got above 20 years of experience in mining field including 13 year oversas exposure, vell experienced in quarrying and control blasting operation, good with safety, management, record maintainence, billing, coordnation with clints. etc...
Long skills for work-over & completion well site supervisor , coiled tubing & snubbing too
Electrical / instrument designer
PDS and Smart Plant, Auto Plant(3D), Microstation, AutoCAD, MS Excel, Word etc.
Experienced Well site & Ops Geologist. Adaptable, strong inter-personal & communication skills, multi-disciplinary team worker. Follow up Operations Geology activity for Operated & Non-Operated assets, supporting Drilling & Completion. Can work independently with minimal supervision. B.Sc, Geology
Industrial Eng. with master degree in HSE. Title obtained: HSE eng. Specialist
Extensive open pit mining experience in most diverse and difficult cultures, in Africa , Central Asia ,India , hands- on project construction experience at a 40 Million USD Dephosphorisation Plant ,Acquisition of Mining properties in West Africa
First
1
2
3
4
5
6
7
8
9
10
11
[ 12 ]
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com