Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #79954
next resume »»
CONTACT INFORMATION:
View contact information...
CURRENT POSITION: MEP PROJECT MANAGER
Mechanical, Electrical, Plumbing And Civil
Other Duties
Follow up Manager ¡V
Sales and Procurement
Planning and Estimating
Site Mobilization and Demobilization
Client Care
Included a summary of myself and my work experience gained in South Africa, Africa And The UAE
TASKS AS PROJECTS MANAGER
1.1 PROJECT INITIATION
* Establish Project Charter
* Appoint Project Team
* Set up Project Office
* Perform Phase Review
1.2 PROJECT PLANNING
„« Create a Project plan
„« Create a Resource plan
„« Create a Financial plan
„« Create a Quality plan
„« Create a Risk plan
„« Create a Acceptance and Communication plan
„« Create a Procurement plan
„« Contact Suppliers
„X Define selection process
„X Negotiate Suppliers contracts
* Create a Project plan. The creation of a comprehensive Project Plan for the success of the project. Identifies the activities and tasks to be undertaken to complete the project. Identifies the sequencing, duration and dependencies of tasks as well as the generic resources and financial expenditure require to complete the project.
* Create a Resource plan. Do a detailed assessment of the resources required to undertake the project, such as material and labour.
* Create a Financial plan. Determine the total quantity required during each stage of the project. The total cost of each item of labour, Equipment and materials, as well as the total cost of undertaking each activity within the Project Plan.
* Create a Quality plan. Ensure that the project deliverables meet customer requirements. Lists the quality targets that must be achieved,
* Create a Risk plan. Identified all foreseeable project risks within the Project Lifecycle and rated them in terms of their likelihood of occurrence and potential impact on the project. Prioritized the risks and set an action plan in place to reduce the likelihood
* of each risk and its impact on the project should it occur.
* Create a Acceptance and Communication plan. Ensure that customer acceptance is sought for each deliverable produced by the project. keep the stakeholders informed of the progress of the project. Listed each stakeholder and their requirements for information.
* Create a Procurement plan and contract suppliers. Acquire procurement items (such as products, services and specific results) from external suppliers. Plan which items will be sourced from external suppliers and the timeframes and methods for delivery.
1.3 PROJECT EXECUTION- (Monitor and Controls)
* Time management
* Cost management
* Quality management
* Change management
* Risk management
* Procurement management
* Acceptance management
1.4 PROJECT CLOSURE
* Documents
* Final cost, claims and profit review
* Demobilization
* Final project review and closure.
SKILLS / ACHIEVEMENTS
2.1 PROJECT MANAGEMENT, PROCUREMENT, ESTIMATING AND BUDGET CONTROLLING.
ľ STRONG MANAGERIAL, SUPERVISING AND TEAM BUILDING EXPERIANCE
ľ CIVIL AND BUILDING:
PROJECT MANAGER / CONSTRUCTION MANAGER
CONSTRUCTION, MAINTENANCE AND ESTIMATING
(LAY OUTS, BUILDING, PLUMBING & CARPENTRING) (15 YEARS)
ľ ELECTRICAL:
PROJECT MANAGER / CONSTRUCTION MANAGER / SITE SUPERVISOR
INSTALLATION, CONSTRUCTION AND MAINTENANCE,
ESTIMATING AND PLANNING / CONSULTING (24 YEARS)
ľ MECHANICAL: MAINTENANCE, INSTALLATION AND CONSTRUCTION / ESTIMATING AND PROJECTS MANAGEMENT
(10 YEARS)
ľ INSTRUMENTATION: INSTALLATION AND CONSTRUCTION
(3 YEARS)
ľ STEEL STRUCTURALS AND WELDING:
INSTALLATION AND CONSTRUCTION / PROJECT MANAGEMENT, ESTIMATING AND PLANNING
(5 YEARS)
ľ MAINTENANCE ENGINEER AND MAINTENANCE MANAGER
ELECTRICAL, MECHANICAL AND INSTRUMENTATION (13 YEARS)
2.2
ľ COMPUTER LITERATE (S.A.P. R3, EXCEL, MICROSOFT OFFICE, POWER POINT, VISIO, MS PROJECTS AND INTERNET)
ľ PEOPLE MANAGEMENT AND STRONG TEAM BUILDING EXPERIENCE.
ľ FLAME PROOFING EQUIPMENT. (7 YEARS)
2.3
ľ PROCUREMENT FOR ALL DISCIPLANES (Budged control)
COMMENCING WITH MOST CURRENT
LOCAL MEP PROJECTS Company (UAE) (04-2008 /CURRENT)
MEP PROJECT MANAGER
1) CAT III B AGL Upgrade of Existing Runway
Abu Dhabi Airport (ADAC, SCADIA)
(Resident Engineers ¡V PARSONS; Consultants ¡V HALCROW)
„« AED 31,000,000 ¡V 00
„« From Oct 2008 ¡V Current
-------------------------------------------------------------------------------------------------
2) 2K runway AGL fixtures
Subcontract to CCH
Abu Dhabi Airport (ADAC, SCADIA)
(Resident Engineers ¡V PARSONS; Consultants ¡V HALCROW)
„« AED 68,600,000 ¡V 00
„« From April 2008 ¡V June 2008 ¡V (Start Cat IIIB and International city Projects.)
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
3) Street lighting Installation - (International City Phase 2 stage 2 and 3)
Subcontract to Al - Kharafi & Sons ¡V Nakeel
(Resident Engineers ¡V Bovis; Consultants ¡V Wilbur Smith
„« AED 25,888,660 ¡V 00 ( stage 2)
„« AED 33,048,020 ¡V 00 (stage 3)
„« From April 2008 ¡V Dec 2008
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Job Description on Above projects
„« Submissions and Approvals
* Material Submittals
* Suppliers
* Safety Plan
* Logistical Plan
* Shop Drawings
* Method Statements
* BOQ
* Cost Control
„« Scope Installation: Project 1
* New pits installation,
* Installation of Primary and Secondary transformers and controlling devices,
* Earth looping systems.
* Primary cable circuits,
* Ducting installation as per design,
* Secondary cable circuits,
* Extensive re-circuiting, Core drilling and slot cutting for the Follow me milestone.
* Taxiway Centre Lighting,
* New Siemens fitting (8") in existing 12" Siemens base with adaptor rings,
* Thorn fittings in existing Thorn bases,
* Substation Modifications,
* Aprons - Omni-directional active / passive light installations.
„« Scope Installation: Project 2
* Installation of Primary and Secondary transformers and controlling devices,
* Earth looping systems.
* Primary cable circuits,
* Secondary cable circuits,
* Installation and Wiring of o Center Lights o Elevated edge Lights o Inset Lights o Touch down Lights o Threshold lights o Approach Lights (12" inset, Elevated Pole and Mast)
* Logitracts
* Sign Boards
„« Staff
* Project and site Engineers x 6
* Planning Engineer x2
* Draughtsman x2
* Site supervisors x 7
* Electrical Foreman's x 10
* Safety officer x2
* QA / QC Engineer x2
* Secretary / Site Clerk x2
* Electricians' x18
* Labourer's x37
* Drivers x5
------------------------------------------------------
„« Scope Installation: Project 3
* Digging and Laying of LV Cable's
* Installation of 630A and 160A Feeder Panels
* Earthing systems.
* Installation of 6, 10 and 12 m Lamp poles
* Design and installation of over 600 controlling circuits,
* Traffic Control lighting systems,
General Duties on all above Projects.
„« Study & review Contract Documents.
„« Study & analyze scope of work
„« Plan execution of project top match the completion period.
„« Coordination & follow up with project engineers for daily activities
„« Coordination with project consultants.
„« Attend daily/weekly/monthly meetings with consultant & client.
„« Plan the requirement of work force & machineries to match project goals.
„« Report to management in Head Office for project progress.
„« Study & analyze scope of work.
„« Dealing with Suppliers in obtaining the best prices.
RBA (PROPERTY DEVELOPERS ¡V ELECTRICAL AND RESIDENTIAL BUILDING CONSULTANTS
PTY LIMITED) RSA (South Africa)
AREA PROJECT MANAGER and CONSULTANT (JAN 2001 ¡V MARCH 2008)
Major electrical installations (For Industrial Business parks and residential areas)
CLIENTS
RBA. (own projects)
Private investors.
Star properties.
Khutala projects.
Coltex Investments.
JV Investments.
Sasol Petrol and Oil Refinery.
Sasol (SMX) Chemical Explosives
Anglo American (Coal and Diamond divisions)
South Africa Government Low cost residential projects.
„« Major electrical installations ( Electrical Consultants work for residential areas and Minor Airports)
In the Democratic Republic of the Congo (Kasai and Katanga Lubumbashi provinces)
„« Rand 483,730,000 ¡V 00 (In total for all Projects)
„« Electrical
* Installation of HT and LT transformers
* HT Switch gear (Sub Stations) ABB and Siemens
* DC Drives, Taco motors & Frequency control motors
* Motors 380V. 525V
* HT & LT Cable
* Sub Station reticulations
* Generators
„« Civil Construction and Maintenance
* Piling and Foundation Works
* Foundation drill rigs, hydraulic crawler cranes, hydraulic vibrators and bentonite desanders.
* Concrete work o Specialized concrete work (Culms and slabs)
o Shuttering construction o Steel Reinforcing (up 32mm)
o Strip foundations ( Under plinthing)
o Raft Foundations o Roads, excavations, Sewage systems and rain and storm water distribution
* Building construction o Building of Superstructure as a service to other developers o Building of complete units as a turnkey solution o Building 6860 houses and Accommodation units
MINTEK
SENIOR PROJECT MANAGER / ENGINEER ( ESTIMATING AND CONSTRUCTION) (FEB 1998 ¡V DEC 2000)
OPTAINING INTERNAL NASTIONAL DIPLOMA IN PROJECT MANAGEMENT
Experience on following:
„« Civil project
As above
„« Mechanical project and Estimating
* Hydraulic systems
* Presses, Ovens & Rotary ovens
* Oven refectories such as High alumna, Silicon carbide & Hard cast materials
* Diesel forklifts, Vehicles & Cranes
* Pressure vessel & Air blowing systems
* Multi stage pumps HP & LP
* Gearboxes & Bag filters, Bucket elevators & Centrifuges
* Zulser water-cooling towers & Clarifiers
* Rot Mills and Ball Mills
* Jaw / roller Crushers
* Stirrers (agitators)
* Mechanical seals (Burgmann, John Crane & Chesterton)
* Conveyor belts structures
* Air compressors
* Hydraulic power packs, pumps & cylinders
* Bloblulator plants. Bar casting machines. Apic Jigs and silver / God Refinery's
„« Structural steel and pipe project and Estimating.
* Projects ¡V steel structures welding and major Fabrications. Mild and Stainless steel.
* Bloblulator plants. Bar casting machines. Apic Jigs and Silver / Gold Refinery
* Pultruded structures
* PVC< Fiber Glass and all type of Plastics estimations
* Bought Outs and Consumable's
TRIDELTA MAGNETS SA, KWAZULU NATAL
MAINTENANCE / ESTIMATING SUPERVISOR 1989 - 1990
CONSTRUCTION AND MAINTENANCE SUPERINTENDENT 1990 - 1992
PLANT MAINTENANCE AND CONSTRUCTION MANAGER 1992 ¡V 1998
Project manager for new R175,000,000-00 Slurry and Magnet powder Plant (Isithebe Kwazulu Natal SA.(oversee a team of 50 people + Contractors, Sub Contractors, Project management and Consultants teams)
Maintenance Manager / Plant and Utilities
Managed all aspects of the maintenance organization to support the Production Department. Drive the completion of successful capital projects. Orchestrate the preventative maintenance program, including electrical, mechanical and instrumentation aspects. Designed and developed reliability-improvement projects and asset-Breakdown prevention programs. Coordinate major maintenance plant shutdowns. Serve as technical trainer for plant maintenance and capital project. Supervise several engineers, mechanics, and contractors. Drive reliability-improvement efforts and cut breakdown costs by implementing scheduled plant preventative maintenance and plant risk analysis practices.
Manage maintenance budget of SA.Rand5M.
Total control of the Engineering Department and support divisions:
„« Submitting regular monthly maintenance reports
„« Record regular technical plant inspections
„« Controlling and regulating downtime and report to Operational Director
„« Buying
„« Projects planning
„« Estimations of Projects and shutdown estimations
„« Budget control to estimations
„« ISO 9002 and writing of procedures for Quality control
„« Maintenance Planning
„« Breakdowns
„« Planning new installations
„« Shutdowns and shutdown planning
„« Project & work out Bar charts + Scope of work
„« Computer Literate (SAP R3, Excel, Microsoft Office & Power point)
„« Civil project and Estimating (material and labor / man hour)
* Reading drawings
* Foundation Layouts
* Reinforcing design
* Superstructures and Plastering
* Rainwater and sewage reticulation
Experience on following equipment (Electrical)
„« HT Switchgear ACB & OCB Breakers 6.6KV and 32KV
„« HT & LT Transformers
„« Harland DC drives and ABB. AC drives
„« DC Drives, Taco motors & Frequency control motors.
„« Siemens LT motor control 380V, 525V
„« HT & LT Cable Joints
„« Rectifiers
„« PLC fault finding and program changes (Siemens S5, Mitsubishi and DCS control)
„« Power factor corrections
„« Panel wiring, Control & Main circuit design
„« Instrument controllers (ER)) PID, TEMP, Shirt control)
„« Taco motors & Frequency control motors (Dynapar)
„« 380V, 525V, 6.6KV Motor control, HT & LT cable joints
„« SPAM & SPAJ Motor protection units
„« FMCG and Pneumatic Automation systems
„« UPS installations and systems
Experience on following equipment (Mechanical)
„« Hydraulic systems fault finding, modifications and new installations
„« Presses, Ovens & Rotary ovens (REIDHAMMER)
„« Oven refectories such as High alumina, Silicon carbide & Hard cast materials
„« Diesel forklifts, Vehicles & Cranes
„« Pressure vessel & Air blowing systems
„« High Speed Grinders
„« Multi stage pumps HP & LP
„« High speed Gearboxes & Bag filters, Bucket elevators & Centrifuges
„« Zulser water-cooling towers & Clarifiers
„« Rot Mills and Ball Mills
„« LP & HP multi stage Pumps slurry as well as water
„« Jaw / roller Crushers & Stirrers
„« Mechanical seals (Burgmann & Chesterton)
„« Conveyor Belts
„« Air Compressors
„« Hydraulic Power packs, pumps & Cylinders
„« Projects ¡V steel structures welding and major Fabrications (pipelines & steel / plate)
General Duties on all above Projects.
„« Study & review Contract Documents.
„« Study & analyze scope of work
„« Plan execution of project top match the completion period.
„« Coordination & follow up with project engineers for daily activities
„« Coordination with project consultants.
„« Attend daily/weekly/monthly meetings with consultant & client.
„« Plan the requirement of work force & machineries to match project goals.
„« Report to management in Head Office for project progress.
„« Study & analyze scope of work.
Dealing with Suppliers in obtaining the best prices.
ISCOR NEWCASTLE, KWAZULU NATAL
APPRENTICE ELECTRICIAN, MILLWRIGHT (MILITARY TRAINING INCLUDED)1980 ¡V 1984
ELECTRICAL PLANNER 1985 ¡V 1987
ELECTRICAL FOREMAN 1987 - 1989
CAREER OBJECTIVE
1) It is clear from the above that I have the technical expertise necessary to continue my track record of success. Please accept this attached resume as a humble promise of what I can offer your organization
2) To transfer the vast experience that I obtained in South Africa and Africa to any Company and it's personal. In South Africa I been exposed to a very wide field of training and experience, and from a young age been exposed across the engineer field from Electrical, Mechanical and Civil engineering, and through my work experience and the knowledge together with my strong ability to achieve and maintain deadlines of the projects that was assigned to me, I know I will be an asset to any Company.
For a more detailed explanation of my background, feel free to contact me at your earliest convenience. Thank you in advance for your consideration, and I look forward to our conversation.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1801 to 1850 of 15498)
Go to Search Parameters...
Brief Description
I have been in the oil & gas industry for 34 years in working in differenece fields.
I am capable, professional and organized. 19 years service in the engine room on ocean going vessels, including 14 years sailing as Chief Engineer has afforded me the experience and tools to excell in this position.
Qualified applicant with years of experience in the material handling related to Oil & gas construction project. I have good knowledge of the methods, materials, equipments and tools used in the petrochemicals projects. Also conversant with ASTM and API specifications
Qualified Experienced Senior Construction Inspector
G&G and engineering data management, MS-Office applications; petroleum software and databases, industry regulations, regulatory form preparations etc.
I have been working in the mining industry for the past 30 years.
MEP Project Manager, Estimator, Procurement, Mechanical, Electrical, Civil, Plumbing
Qualifications include over 25 years experience in management/supervision positions on various domestic projects and various international projects in countries such as Iraq, China, United Arab Emirates, India, Saudi Arabia, Bahrain and in other locations such as Puerto Rico, US Virgin Islands etc
A result oriented professional with over thirty broad-based years of international experience in the drilling and workover industry. Major strengths in team building, planning, contractual verification, rig design and operational supervision.
I'm a skilled Well Engineer with a wide experience in well construction, stimulations, completions, and workovers. Strong team management and communicational skill with experience to manage the complete well engineering process from well design to drilling execution of exploration projects.
I have had twenty years experience in the Petroleum Industry ranging from Drilling, Production, Completion, and Work-over engineering in all types and configurations of wells and drilling units/production platforms both onshore as well as offshore. I have worked in Canada, Saudi Arabia and Thailand.
CFO & Treasurer - publicly traded oil & gas & mining company
20+ years in offshore engineering; including marine, structural, pipeline, and project engineering
Results driven environmental professional with broad-based experience in consultative sales, project management, and operations administration.
About 25 years of Process Engineering experience including fifteen years with EPC companies in the Arabian Gulf states in the Oil & Gas industry.
An innovative and seasoned Marketing professional with expertise in consultative sales and marketing, strategic planning, brand management, market research, sourcing, procurement, supply chain and logistics, and with 20 years of successful progressive experience in all phases of market consulting.
Project management. Construction management.
Professionally qualified and highly experienced Electromechanical Design/Senior Project Engineer offering over 26 years experience in the design, project management, installation, commissioning and maintenance of HVAC systems and associated electrical and control equipments.
15 years of working exp. looking for a change, having expertise in HVAC (chillers and chilled water system) and other mechanical system installation and commissioning, presently working in nigeria as a project manager.
Dear Sir, I have 21 yrs Exp in a petroleum laboratory as a Sr lab Chemist having knowledge of testing all petroleum products, petrochemicals based on ASTM/IP/BIS methods, handling auto instruments aware about fire and safety rules and regulations.
Sr. Rotating Equipment Engineer with 20years experience in Turbo-compressors up to 42 MW rating of Refinery, Petrochemicals & Ammonia Plants. In depth experience in troubleshooting, maintenance/major overhauling/modifications, failure analysis, condition monitoring and vibration analysis
Backround in Electrical Engineering/Design with emphasis of Project Management, Production/Manufacturing with more than 15 years experience in Electrical Design/Construction work and familiar with Standards Procedures as well as with the Industry standards such as ANSI, API, NEC, etc
Electrical Engineering. Hardware Design. Hardware/Software Testing. Hardware/Software Troubleshooting.
Application for the Post of " Oil Rig Doctor " (Medical Officer/ Doctor/ Occupational Health Consultant / QHSE Rep./ Medical Advisor). (With On & Off Rotation Duty Cycle). (Offshore &/or Onshore).
I have experience in procurement of contractors and consultants, contract administration using FIDIC conditions of contracts and highway designs. I have more than 15 years total experience in above fields.I can therefore engage as a project manager of a road and bridge project.
Over 20 years experience in LNG and Oil Refinery /Panel/Plant-Operator/Supervisor
Thorough knowledge in Primavera, MS Project, MS Office & EVMS
25 years experience in LNG/Refinery plant/panel operations/commissioning
I have done PG in Chemistry with post Graduate in industrial safety from India and also completed NEBOSH - General Certificate from UK
Senior Designer (Architectural)
I have more than 13 years Experience in Construction& Supervision of Highway& Road way
Senior Rotating Engineer
A Process Engineer with a Masters Degree in Chemical Engineering from the University of Waterloo, ON, Canada and 10+ years experience in natural gas and polymer processing industries. Specialize in process optimization, manufacturing and troubleshooting.
I have over 16 years of working experience as a QC Inspector in petroleum and petrochemical construction Industry. I have knowledge and experience as Q/C inspector in various inspection activity like raw material inspection, welding procedure / welder performance qualification,various methods of NDT
HSE Coordinator / Offshore Safety Officer
I've developed leadership qualities and a proactive attitude, all of these combined with my experience in Maintenance and Well Production Operations, supported with software and techniques on Equipment condition analysis, laser alignment, corrosion testing, boroscopic inspection and vibration analys
Thirteen years of problem solving, decision making, upward career progression and increasing responsibility. Extensive hands-on experience administering, planning and managing operations in the following functional areas: facilities management, project supervision, procurement, staff development, bu
Mechanical engineer in Oil&Gas Feild 18 yrs Experience in Installation, maintenance, QC in Static, Rotating equipments.
Able to learn Work Process and new software with ease. Experienced in the refinery of Blueprints, Isometrics, and P&ID¡¦s, Hand Skecthes. Experienced in structural steel supports and familiar in estimating material take-offs. Trouble shooting installation of pipe and assist Engineers in the field.
PhD Petroleum Engineer (Production Technologist)
I am a qualified Mechanical Design Draughtsman and a Fitter Turner Machinist. I have also completed the Management Development Programme through The University of Stellenbosch.
Project Manager, PMP, MBA Finance, B.E
I have 15 years Lab experience such as 6 years of LNG plants, 7 years of Refineries and 3 years of Aromatic and PTA plant Labs experience with 5 new labs commissioned experience. I have a good knowledge regarding the dosing of corrosion inhibitor at wells side. I can conduct Oil & Gas analysis.
Interested in moving back to Texas as a Quality Manager
!$ years rich experience in coal mining both in underground and opencast, Experience in greenfield and brown field project
I have a strong ability to communicate and work effectively with co-workers and management. I am Self motivated, detail and goal oriented person. I am experienced in working with little to no supervision. I posses effective skills in communicating orally and in writing
My name is Bruce Hutcheson and I recently worked as an Assistant Plant Manager at Luck Stone Corporation, located in the Northern Virginia area. As a dedicated manager for over 20 years, I am inquiring about a new opportunity to expand my career while inproving your client’s bottom line.
Talent Management, Talent Acquisition, Talent Development, Change Management and Lean
M tech stctural engineer in Civil department, i am having expeerience in oil and gas as sr engineer in civil and structural department.
I am familiar with almost all of Pennsylvania. I currently have over 30,000 acres available to me for lease, most of it has been identified as being in the marcellas shale regions. this acreage also holds shallow oil and gas reserves. A substantial amount has current production which is available
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
[ 37 ]
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com