Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #80125 next resume »»
CONTACT INFORMATION:
View contact information...

EDUCATION

Graduated from SD Negeri Ketilang Cirebon 1988.
Graduated from SMP Negeri 7 Cirebon 1991.
Graduated from STM Negeri Cirebon 1994.
Graduated from Profesional Management Komputer Indonesia Bandung 1995.

COURSES & TRAINING

Training in PT. (Persero) PLN Unit Distribusi Jawa Barat, Bandung from June ~ Sept' 95.
Training Fire Fighting at PT. Gunanusa Utama Fabricators, Cilegon from 28 ~ 29 March 2001.
Training Document Control at PT. Gunanusa Utama Fabricators, Cilegon 15 July 2002.
Training Survival Craft and Rescue Boats at FOCUS Jakarta from 11 ~ 13 July 2002.
Training Primavera at EDP Media Jakarta from 24 ~ 27 January 2003.
Training Survival Craft and Rescue Boats at BSTS Miri Malaysia from 21 October ~ 23 October 2008.
Training H2S at BSTS Miri Malaysia from 24 October ~ 25 October 2008.

WORK EXPERIENCE

I.Oct '08 at Present
EJ Joint Venture SDN.SHD Malaysia as Site Planning Engineer.
Project:
B11IQ OFFSHORE HOOK UP & COMMISSIONING PROJECT
B11P-A Platform
B11DR-A Platform
Responsibility:
Make Daily Report for General Discipline.
Make Actual Schedule refer to Actual Hook Up works
Make Actual Manpower & Man hours Report
Make Change Order

II. October '06 ~ Sept '08
PT. Gunanusa Utama Fabricators as Scheduler.
Project:
TUNU FIELD DEVELOPMENT PROJECT PHASE 11
South Compression Platform with 4.100,00 Ton Weight
South Manifold Platform with 2.300,00 Ton Weight
Client Total E & P Indonesie
Responsibility:
- Make Schedule for General Discipline.
- Make Weekly and Monthly Progress Report.
- Make Two Week & Two Month A head Schedule.
- Make Delay Status for Controlling Project.
- Make Change Order Report
- Make Manpower Plan, Man hours Plan& S-Curve

III. June '05 ~ October' 06
PT. Gunanusa Utama Fabricators as Scheduler.
Project:
SISI NUBI PROJECT – SN1 EPSC1 Project
Deck & Pile with 5.475,24 Ton Weight
Client Total E & P Indonesie
Responsibility:
- Make Schedule Level 0, Level 1, Level 2, Level 3.
- Make Weekly and Monthly Progress Report.
- Make Schedule Onshore at East Kalimantan.
- Make Schedule & Progress Report for Vessel.
- Make Schedule & Progress Report for Sub Contractor.
- Make Delay Status for Controlling Project.
- Make Change Order Report.
- Make Manpower Plan, Man hours Plan & S-Curve.

IV. Sept '04 ~ May '05
PT. Gunanusa Utama Fabricators as Scheduler
Project:
HRSG ASTORIA ENERGY PROJECT
With 4.676,68 Ton Weight
Client Alstom Power Indonesia Responsibility:
Make Schedule Level 3.
Make Weekly and Monthly Progress Report.
Make Delay Status for Controlling Project.
Make Change Order Report.
Make Manpower Plan, Man hours Plan & S-Curve.

V. May '03 ~ August '04
PT. Gunanusa Utama Fabricators as Scheduler
Project:
A. Peciko Offshore Phase 4 / EPSC.2 Project
SWP K – TDD with 108,63 Ton Weight
SWP K – Jacket with 2.494,00 Ton Weight
SWP E – Jacket with 2.775,95 Ton Weight
SWP K – Deck with 1.611,38 Ton Weight
SWP E – Deck with 1.611,38 Ton Weight
Modification MWP with 1.404,57 Ton Weight
Client Total E & P Indonesie
Responsibility:
- Make Schedule Level – 3.
- Make Weekly & Monthly Progress Report.
- Make Change Order Report for Offshore Works.
- Make Schedule & Progress Report for Vessel Works.
- Make Manpower Plan, Man hours Plan & S-Curve.

B. Manifolds & Pig Launcher Matra Section Project
With 104,65 Ton Weight
Client Fedsin / Exspan
Responsibility:
- Make Schedule Level – 3.
- Make Weekly & Monthly Progress Report.
- Make Manpower Plan, Man hours Plan & S-Curve.

VI. March '02 ~ March '03
PT. Gunanusa Utama Fabricators as Scheduler
Project:
A. Peciko Offshore Phase 3 / EPSC.1 Project
SWP G – Jacket with 2.396,72 Ton Weight
SWP G – Deck with 1.567,73 Ton Weight
MWP A Modification with 62,60 Ton Weight
SWP G – Pressure Vessel & Tank with 48,48 Ton weight
Client Total E & P Indonesie Responsibility:
- Make Schedule Level – 3.
- Make Weekly & Monthly Progress Report.
- Make Change Order Report for Offshore Works.
- Make Manpower Plan, Man hours Plan 7 S-Curve.

B. Attaka South Dev. Project
Attaka 'O' Platform – Jacket with 696,89 Ton Weight
Attaka 'O' Platform – Deck with 375,15 Ton Weight
Client Unocal Indonesia Responsibility:
- Make Schedule Level – 3.
- Make Weekly & Monthly Progress Report.
- Make Change Order Report for Offshore Works.
- Make Manpower Plan, Man hours Plan & S-Curve.

C. TN Oily Water Treatment / EPSC.1
OWT Deck with 1.473,28 Ton Weight
Client Total E & P Indonesie
Responsibility:
Make Schedule Level – 3
Make Weekly & Monthly Progress Report.
Make Manpower Plan, Man hours Plan & S-Curve.

D. Tunu Field Dev. Phase 8 / EPSC.1
Tunu 8 / EPSC.1 – Deck & Pile with 6.446,00 Ton Weight
Pressure Vessel Tank with 41,75 Ton Weight
Responsibility:
Make Schedule Level – 3.
Make Weekly & Monthly Progress Report.
Make Change Order Report for Onshore Works.
Make Schedule Level – 3 and Weekly Progress Report for Vessel Works.
Make Manpower Plan, Man hours Plan & S-Curve.

VII.Nov '98 ~ March '02
PT. Gunanusa Utama Fabricators as Scheduler.
Project:
A.GTS Modification Project.
GTS Modification MWP A/B/C/D/E with 1.968,29 Ton Weight.
Responsibility:
Make Schedule Level 3 & Level 4.
Make Weekly and Monthly Progress Report.
Make Schedule Onshore at East Kalimantan.
Make Delay Status for Controlling Project.
Make Change Order Report.
Make Manpower Plan, Man hours Plan & S-Curve.

B.Tunu Field Dev. Phase 7 / EPSC.1 Project.
TCP Platform with 6.220,49 Ton Weight.
Responsibility:
Make Schedule Level 3 & Level 4.
Make Weekly and Monthly Progress Report.
Make Schedule Onshore at East Kalimantan.
Make Delay Status for Controlling Report.
Make Change Order Report.
Make Manpower Plan, Man hours Plan & S-Curve.

VIII.Sept '97 ~ Nov '98
PT. Gunanusa Utama Fabricators as Quantity Surveyor.
Project:
A.Mal & Jam Field Development Project.
Central Platform
Jacket (Incl. Pile & Boat Landing ) with 4.191,12 Ton Weight.
Tender Drilling Deck with 321,47 Ton Weight.
Deck with 1.130,98 Ton Weight.
Satellite Well Platform.
Jacket (Incl. Pile & Boat Landing) with 2.5410,97 Ton Weight.
Deck with 823,86 Ton Weight.
Client Elf Petroleum Asia.
Responsibility:
Make Report for Weekly & Monthly Progress Report.
B.TNOR / EPSC. 1 NPU & Associated Project.
NPU Deck with 3.615,89 Ton Weight.
Technical Building with 130,00 Ton Weight.
Offsite Facilities with 1.702,81 Ton Weight.
Camp Jetties with 538,28 Ton Weight.
Pressure Vessel with 29,85 Ton Weight.
Client Total E & P Indonesie.
Responsibility:
Make Report for Weekly & Monthly Progress Report.
IX.June '96 ~ Sept' 97.
PT. Linggarjati Sakti as Stevadore Foreman.
Responsibility:
Coordination Loading and Unloading at Cirebon Port.

X.Oct '95 ~ June '96.
PT. Indojaya Pan Pratama as Draftsman.
Responsibility:
Make Shop Drawing for Mountoya Fabrication & Taman Rajawali Estate.
Make RAB for Taman Rajawali Estate

View contact information...
«« previous resume next resume »»
Search Results (Resumes 5751 to 5800 of 15356)Go to Search Parameters...
Brief Description
I grew up in the United Kingdom and educated in Europe and the Mediterranean, I am fluent in English written and spoken and I have the ability to learn languages fast, and have an open mind to learn new programs and system, I am loyal and honest and hard working and love to work under a fast pace.
Arc welding all positions all 60 series, 70 series, and 80 series welding rods. Torching and brazing. Rigging of all materials over head either from crane or chain falls or sky track indoor and outdoor. Certified in erecting scaffling. Excellent in layout for installations. Certified in rigging, aer
Civil Engineer specialized on Structures working towards Masters Degree.
Mechanical Engineer,University Politehnica Bucharest
Bachelor in mining engineering
Technical and Application Engineering Support for the new concepts being introduced and promoted.
I have had both mechanical and condition monitoring experiences which will make me a very competitive candidate to fulfill condition monitoring and/or mechanical position. I have had ISO Cat-II vibration analyst for condition monitoring.
Responsible for liaising with customer representatives on completion designs, hydrostatic calculations & tubing movement simulations (Cyberstring/WellCat), work planning, and procedures.
I am a qualified mechanical Engineer specialized in Acoustics
Having +10 years of Gas Processing, Fertilizer & Petrochemical Plants operational and supervisory experience.
Over 8 years experience as a piping team member and leader involved in oil, gas and petrochemical plants. Participated with famous European companies (Foster wheeler, Lurgi, Davy Process Technology, AKPG Kvaerner) as the main contractor, sub contractor or consortium member
Responsible, highly motivated, active and knowledgeable employee who has a wealth of drilling experience for your company.
Having a good experience in Export Business, Purchasing, Design, Material Planning, and Scheduling. An executive with experience in Business Development, Negotiations, Operations, Planning and Scheduling with a solid perspective of organizational priorities, potential and limitations.
Mechanical Supervisor
Mechanical Engineer with 4.5 yrs experience in Oil & Gas Industry
Masters in Industrial Chemistry , Master¡¦s Thesis -Oil well Cementing and Fluid loss admixtures for better fluid loss control and zonal isolation in oil wells. High Temperature High Pressure Filtration Cell, Consistometer, DLS, Zeta potential, TOC, GC, HPLC, Rheology, Spectrophotometers.
Wonderware Integration Expert & also In Sap xMII
I HAVE 5 YEARS EXPERIENCE AS PRODUCTION OPERATOR AND I HAVE COMPUTER SKILLS(ICDL) AND GOOD SPEAKING AND WRITING ENGLISH LANGUAGE
Experience Petroleum Landman
Petroleum Engineer with experience in ESP & PCP installation, Well testing, Workover & Completion
I am currently employed as a mine planning engineer. My responsibilities are preparining Life of Mine designs, schedules and plans. Make sure that all long term plans are being executed by short term planning & mine prodcution personnels. Infact I am also involve in cost analysis of pit designs.
Reporting and consolidation,Management accountant,project accountant
My skills among others include good use of tools and ability to troubleshoot
Qualified Minerals Process Engineer and Certificate IV Workplace Trainer and Assessor with experience in coal processing, coal process plant design, training of process plant operators.
I did Master's of Geology from Banaras Hindu University with 85.4% in June, 2007. Presently working as Geologist with Australian based company called India Resources ltd. (E&P), India. Here I am doing Mine Planning and Design , Ore body Modelling of Surda Mine .
Piping Design Stress Analysis Engineer
Calibration of Instruments,online routine and corrective maintenance,troubleshooting, field calibration, calibration in workshop, commissioning, precommissioning
Journeyman Plumber and Gasfitter
I am very safety conscious and believe that safety is first priority. I am a great leader and have good communication & organizational skills. I work well with others. I am punctual and reliable. I take pride in my work and am always eager to learn. I will make a good addition to any organization.
I am a In-house Landman with 5 years experience.
Purchasing China
I am a Rig Manager on a Service ( Workover) rig. I have experience with oil and gas completions and workovers in Alberta canada. Deep and shallow. I also have experience with heavy oil in Albania and Canada.
Planner with primavera 3.1
Worked as a geophysicist in the E&P industry for a period of two years. • M.S Geophysics, Rice University
Diploma in Civil Engineering (3 Years)
Planning & Scheduling Engineer with more than 4 years experience in India & Gulf
Documentation Controlling System with Electronic & Manually with Proper Procedure and i am qualified in DCE , Computer Application
Experienced Landman: running title, curative, due diligence, right-of-way, lease negotiations & acquisition, etc
Geophysical Supervisor, logistics, drill,survey, sample supervision.
•Excellent abilities on using PLC to control the machine,and I have held the certificate of Siemens Training Center.
Instrument engineer
Handles a group of people with a different kinds of work trade in quality assurance, inspection, records, work evaluation and recommendation.
Sr Rotating Equipment Engineer
Journeyman Heavy Duty Technician
I have 8 years experience in a large cement plant where I was a Millwright for 6 years. I also was a leader of the Safety Committee and I have a strong knowledge of the MSHA regulations
Technical Writing – Software documentation, Online help, Functional specifications, User guides, Presentation, Research, Editing and Proofreading.
Structural PDMS Designer
PROCURE A POSITION AS PROJECT MANAGER CONSULTANT
Maintenance Manager/Welder Skills include Management, Design, welding, machinist, hydraulics, electrical, HVAC, mechanical, fabrication,and construction.
I am a successful experienced large pulp and paper industry production supervisor with extensive knowledge working in a high paced, no errors environment. I believe my experience would transfer over well contributing to be proactive in company and personal growth.
First   Prev   101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   [ 116 ]   117   118   119   120   121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140   141   142   143   144   145   146   147   148   149   150   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com