Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #80158
next resume »»
CONTACT INFORMATION:
View contact information...
_____________________________________SUMMARY______________________________________
Successful Advanced Purchasing Project Manager with expertise analyzing and evaluating Chinese manufacturing sources. Supplied the following Japanese manufactures: AW, CALSONIC, CME, KOYO, HL-A, MITSUBA,TOYOTA BOSHUKO, OGURA,TISA and TRIN. Experience in managing all aspects of multiple projects effectively from initial concept to PPAP between customer, supplier and own internal/external engineering, quality and manufacturing departments.
PROCESS & COMMODITY EXPERIANCE
* Die/Sand/Mg/Al Castings- heads, intakes, manifolds, steering column, super chargers, interior/exterior mirrors, window/door lifts, steering wheel, ABS, Airbag hsg, Steering knuckles, Electronic Throttle Body and EGR's.
* Injection Molding- interior/exterior, seats assemblies, outside rear mirror, gas tank, engine sight shield, ETC Hsg.
* Stampings- seating assemblies, adjustable foot pedals assy and Heat sinks.
* Powder Metal- air compressor, clutch, exhaust, NVH, sun & roof rack and shock absorbers.
* Forgings- Shifter forks, Pulleys and Gears.
____________________PROFESSIONAL EXPERIENCE____________________
Pierburg GmbH, Nuess Germany, Auburn Hills, MI & Greenville, SC Jan 2008 ¡V Dec 2008
A $1B German manufacturer of EGRs, Electronic Throttle Controls, oil, and secondary air pumps.
Manager Advanced Purchasing- North America- Managed $40M for 6-new Diesel engine projects for Electronic Throttle Controls & EGRs, from concept to PPAP. Major responsibilities included updating project budgets & ECO's, BOM Monitored / tracked PPAP dates, prototypes, coordinated supplier APQP meetings & presenting recommendations to sourcing committees for new suppliers. Communicated daily w/Germany & South Carolina Purchasing & manufacturing facilities. Sole Purchasing representative (under no direct supervision) acting as single point-of-contact for a group of 15 engineers performing the above tasks.
„X EGR assemblies consisted of 58 new part components such as machined Aluminum Die casting, 24v motor plastic gear assembly with plastic housings. Vacuum actuator assembly. Turned shaft assembly with welded flap stampings and turned Valve Discs. Powder metal assembly, PBC assembly, stainless steel gaskets and O-rings.
„X ETC assemblies consisted of 22 new part components such as machined Aluminum Die casting, 24v motor plastic gear assembly with plastic housings. Turned shaft assembly with welded flap stampings and magnetic end. Powder metal assembly, PBC assembly and O-rings.
„X Negotiated $4.73 initially quoted component down to $1.93 prior to PPAP, for a resulting annual cost save of $500k.
„X Successfully achieved overall project-targeted budgets by working with internal engineering & suppliers.
„X Created a newly comprehensive supplier-tracking matrix resulting in improved project "visibility".
„X Created individual supplier project history network files resulting in improved negotiating leverage.
„X Improved supplier & internal engineering relationships resulting in deterioration of "them vs. us" environment.
„X Identified a number of viable Chinese Die casting suppliers due to the various requirements of our castings needs, such as: Tight tolerances; Thin-wall-to-thick-wall transitions; Number of machining operations required: Casting machines size required to insert cast Stainless steel rings, etc.
„X Indirect management of 2-Junior Buyers who split their time 75% / 25% between commodity purchasing and advanced purchasing.
Tenneco Automotive, Monroe MI (contract) May 2007- Oct 2007
A$6.2B manufacturer of shock absorbers, brake assembles and muffler assemblies.
Senior Buyer- Responsible for investigating LLC suppliers with emphasis on China, for Shock Absorber, Muffler Assemblies and Brakes.
„X Identified Spanish & Malaysian muffler suppliers resulting in negotiating 10% - 15% cost reduction. This was accomplished during analyzing Make-vs.-Buy cost comparison between supplier's mfg processes, cycle times, raw materials cost and Freight/Shipping.
„X Identified and brought into supply base, Chinese brake supplier based on suppliers' overall capabilities such as machinery, engineering support, similar parts produced for competitor, and quality certificates achieved, etc.
„X Significantly improved Indian supplier's delivery, quality & working relationship by implementing daily conference calls reviewing schedule of parts & tracking numbers to be shipped along with QC reports. Improved internal Tenneco manufacturing order release communications back to the supplier.
„X Improved suppliers' invoice payment timing by following up w/Tenneco incoming Receiving, making sure they entered "Parts in stock" vs. "Parts received in". The results of this activity eliminated suppliers from threatening to stop shipment on future orders and improved relations.
N. James Ogden & Associates, Lapeer Michigan June 1990-Jan 2007
Privately owned Sales Rep Company
Global Account Manager- Coordinated internal and external requirements cross functionally between principal and GM, Ford, Tier 1's and Japanese German transplants engineering, purchasing and quality departments.
* Single handily managed & supported Chinese suppliers for seat assy & Powertrain Iron castings during all phases of the production process, starting with initial sales contact through production shipments. Ensured proper documentation for PPAP, APQP, FMEA's, DFMEA, PSW, PSA's and ECN's were complete and correct to facilitate speed in launch activities. Communicated daily with Chinese suppliers updating projects progress.
* 3 years of extensive travels in China identifying potential Chinese manufactures.
* 2006 Identified Chinese Iron Casting supplier. Within 6 months, received L.O.I. from Top 5 Tier 1.
* 2006 identified Chinese seating supplier, resulting in production to U.S. in 8 months.
Single point of contact managing all phases of the production process between Chinese and US customer.
* 2005 GM POWERTRAIN China Sourcing Conference- Shanghai. Represented potential Chinese manufacturing company for GM-Powertrain's, casting " 1st phase footprint". Commodities entailed Intakes, Heads, Covers and Oil Pans.
* 2005 GM POWERTRAIN $69 MILLION CHINA market test of Intakes, Cylinder Heads, Engine Blocks Covers.
* 2005 VISTEON $8.5 MILLION casting market test for Transmission, Differential covers and housings.
* 2004- Attended 1st ever, "Match making" Trade conference in Shanghai, China. Interviewed approximately 200 Chinese suppliers in 10 days.
* 2001-2006 Ogura Compressors. Initiated 1st Powder Metal clutch hub replacing domestic Japanese Forged Hub. Overcame many road blocks and hurdles. Managed all phase of the production process between principal and Ogura.
* GM Saginaw 1996-2000 Cadillac STS. Magnesium Die casting Assy of Tilt/Telescope steering column. Managed 132 ECN's between "design freeze" and SOP. Managed all phase of the production/sales cycle between principal and GM Saginaw.
* Brose USA 1995 Corvette Window regulator Assy. First American Die caster used by Brose Germany for Mexico assembly plant. Managed all phases of the production process between principal & Brose USA/ Mexico/Germany.
* SACHS 1992. Initiated Powder Metal clutch hub design replacing Forging. Cost savings $1.00/part. Yearly savings $250k. Managed all phases of the production process between principal & Brose USA/Mexico/Germany.
Smith Aerospace & Defense. Grand Rapids, Michigan MARCH 1988- FEB 1990
Buyer. Stamping, Plastics, painted parts, military/commercial guidance systems.
General Motors Saginaw Division, Saginaw, Michigan. DEC 1986- FEB 1988
Buyer Advanced Engineering- rack & pinion, steering columns, power steering pumps and steering gears.
________________________________EDUCATION_____________________________________
2004-present Eastern Michigan University, M.S. Engineering Management (graduation Spring '09;)
1994-1999 Eastern Michigan University, B.S. Plastic Manufacturing.
____________________________________ HOBBIES______________________________________
Competitive runner.
Attend Chinese language classes Washtenaw Community College, Ypsilanti Michigan
___________________________________REFERENCES________________________________
Will be provided
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 5801 to 5850 of 15498)
Go to Search Parameters...
Brief Description
Civil Engineer specialized on Structures working towards Masters Degree.
Mechanical Engineer,University Politehnica Bucharest
Bachelor in mining engineering
Technical and Application Engineering Support for the new concepts being introduced and promoted.
I have had both mechanical and condition monitoring experiences which will make me a very competitive candidate to fulfill condition monitoring and/or mechanical position. I have had ISO Cat-II vibration analyst for condition monitoring.
Responsible for liaising with customer representatives on completion designs, hydrostatic calculations & tubing movement simulations (Cyberstring/WellCat), work planning, and procedures.
I am a qualified mechanical Engineer specialized in Acoustics
Having +10 years of Gas Processing, Fertilizer & Petrochemical Plants operational and supervisory experience.
Over 8 years experience as a piping team member and leader involved in oil, gas and petrochemical plants. Participated with famous European companies (Foster wheeler, Lurgi, Davy Process Technology, AKPG Kvaerner) as the main contractor, sub contractor or consortium member
Responsible, highly motivated, active and knowledgeable employee who has a wealth of drilling experience for your company.
Having a good experience in Export Business, Purchasing, Design, Material Planning, and Scheduling. An executive with experience in Business Development, Negotiations, Operations, Planning and Scheduling with a solid perspective of organizational priorities, potential and limitations.
Mechanical Supervisor
Mechanical Engineer with 4.5 yrs experience in Oil & Gas Industry
Masters in Industrial Chemistry , Master¡¦s Thesis -Oil well Cementing and Fluid loss admixtures for better fluid loss control and zonal isolation in oil wells. High Temperature High Pressure Filtration Cell, Consistometer, DLS, Zeta potential, TOC, GC, HPLC, Rheology, Spectrophotometers.
Wonderware Integration Expert & also In Sap xMII
I HAVE 5 YEARS EXPERIENCE AS PRODUCTION OPERATOR AND I HAVE COMPUTER SKILLS(ICDL) AND GOOD SPEAKING AND WRITING ENGLISH LANGUAGE
Experience Petroleum Landman
Petroleum Engineer with experience in ESP & PCP installation, Well testing, Workover & Completion
I am currently employed as a mine planning engineer. My responsibilities are preparining Life of Mine designs, schedules and plans. Make sure that all long term plans are being executed by short term planning & mine prodcution personnels. Infact I am also involve in cost analysis of pit designs.
Reporting and consolidation,Management accountant,project accountant
My skills among others include good use of tools and ability to troubleshoot
Qualified Minerals Process Engineer and Certificate IV Workplace Trainer and Assessor with experience in coal processing, coal process plant design, training of process plant operators.
I did Master's of Geology from Banaras Hindu University with 85.4% in June, 2007. Presently working as Geologist with Australian based company called India Resources ltd. (E&P), India. Here I am doing Mine Planning and Design , Ore body Modelling of Surda Mine .
Piping Design Stress Analysis Engineer
Calibration of Instruments,online routine and corrective maintenance,troubleshooting, field calibration, calibration in workshop, commissioning, precommissioning
Journeyman Plumber and Gasfitter
I am very safety conscious and believe that safety is first priority. I am a great leader and have good communication & organizational skills. I work well with others. I am punctual and reliable. I take pride in my work and am always eager to learn. I will make a good addition to any organization.
I am a In-house Landman with 5 years experience.
Purchasing China
I am a Rig Manager on a Service ( Workover) rig. I have experience with oil and gas completions and workovers in Alberta canada. Deep and shallow. I also have experience with heavy oil in Albania and Canada.
Planner with primavera 3.1
Worked as a geophysicist in the E&P industry for a period of two years. • M.S Geophysics, Rice University
Diploma in Civil Engineering (3 Years)
Planning & Scheduling Engineer with more than 4 years experience in India & Gulf
Documentation Controlling System with Electronic & Manually with Proper Procedure and i am qualified in DCE , Computer Application
Experienced Landman: running title, curative, due diligence, right-of-way, lease negotiations & acquisition, etc
Geophysical Supervisor, logistics, drill,survey, sample supervision.
•Excellent abilities on using PLC to control the machine,and I have held the certificate of Siemens Training Center.
Instrument engineer
Handles a group of people with a different kinds of work trade in quality assurance, inspection, records, work evaluation and recommendation.
Sr Rotating Equipment Engineer
Journeyman Heavy Duty Technician
I have 8 years experience in a large cement plant where I was a Millwright for 6 years. I also was a leader of the Safety Committee and I have a strong knowledge of the MSHA regulations
Technical Writing – Software documentation, Online help, Functional specifications, User guides, Presentation, Research, Editing and Proofreading.
Structural PDMS Designer
PROCURE A POSITION AS PROJECT MANAGER CONSULTANT
Maintenance Manager/Welder Skills include Management, Design, welding, machinist, hydraulics, electrical, HVAC, mechanical, fabrication,and construction.
I am a successful experienced large pulp and paper industry production supervisor with extensive knowledge working in a high paced, no errors environment. I believe my experience would transfer over well contributing to be proactive in company and personal growth.
20 years experience in Production/Operations onshore and offshore. Ex Marine Engineer officer.
Almost 14 years of experience in the Project engineering, system design and detailed engineering of 400/220 kV AC substations and ¡Ó500 kV HVDC Substations.
First
Prev
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
[ 117 ]
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com