CONTACT INFORMATION:
View contact information...
APPLIED FOR THE POST OF E& I QA/QC INSPECTOR
SNOPSIS: Having 09 years 6 Months extensive experience in field of Instrument Installation, Inspection for the Installation of Instruments on site and cable meggering and continuity test and their final Installation Inspection, reviewing the P & ID ILD and standard Installation details also witnessing and there loop checking, (Erection of various Instrument in various types of Industrial projects like Refinery project, Mina Al Ahmadi Project, Paste Plant, Gas Plant project, Chemical Plant, Industrial. Oil field plant, Anesthetic Gas Plant working as E & I QA/ QC Inspector.
PERSONAL PROFILE
Date of Birth: 16th August 1979.
Permanent Address: Vill & Post – Adsar
Biharr (811307)
Cell No: 09931999199
Tel No.: 06345 – 245065
Nationality: Indian
Religion: Islam (Muslim)
Gender: Male
Marital Status: Unmarried
Languages Known: English, Hindi, Urdu & Arabic.
Passport Details: Passport No: E – 6397398
Date of issue: 02.01.2004
Date of Expiry: 01.01.2014
Place of Issue: Patna
ACADEMIC QUALIFICATION
S.S.C Passed from J.H.S Adsar, Jamui.
TECHNICAL QUALIFICATION
Diploma in Instrumentation Engineering.
COMPUTER KNOWLEDGE
I have knowledge about operation of different computer software for example, MS-Word, Ms-Excel, Ms-Power Point, Ms-Dos all the versions of windows and internet etc.
EMPLOYMENT RECORD
GULF EXPERIENCE
Company: M/s Hyundai
Project: KGC Project Khurais Saudi Arabia
Position: QA/QC Inspector(Instrument)
Duration: 9th june 2008 to 14th August 2008
Responsibility: Installation of different types of valves, field Instrument such as transmitters (pressure, Temperature, Level and flow)Witnessing the Calibration of all types of Instruments and their loop checking.Cable Meggering and Continuity test, their final installation Inspection.
Installation of Inspection and quality checking of Instrument system and accessories.
Though inspection and quality checking of Instrument system Execution of accessories.
Execution of fire and gas wiring system and associated connection.Over all Instrument distribution system related to plant and Instruments.
Company PFD(KENTECH )
Project: SGP Project Tyngiz Kazakhastan
Position: E & I QA/QC Inspector
Duration: 26th April 2006 to 12th October 2007
Responsibility: Inspector for the Installation of Instrument on site and cable meggering and continuity and their final installation inspection.
Throughout inspection Instrument panel and its control system including all cable network.
Executive of fire & gas wiring, system and associated connection.
Also witnessing the calibration of all types of instruments and their loop checking.
Execution
Company: IMCO
Project: Minal Al-Ahmadi Refinery, Kuwait.
Position: QA/QC Inspector(Instrumentation)
Duration: 20th June 2004 to 31st March 2005
Responsibility: Reviewing the P & ID and standards installation details.
Loop checking installation, smart and pneumatics transmitter, like FT, PT, LT, TT, DPT, Level troll all types of gauges PG, TG, LG, VG.Control valves, ESD valve, MOV valve solenoid valves, all types of switches. Installation of different types of valve, gauges and transmitter.
INDIAN EXPERIENCE
Company: UB ENGINEERING
Project: Baroda ( Gujrat)
Position: Instrument supervisor cum inspector
Duration: 17th August2002 to 24th Dec 2003
Responsibility:
Supervision of Inst. Installation, Inst cable laying, conduit installation, JB Installation, Hook up installation, inspection, calibration, loop checking, site acceptance test, punch list clearance system sign off, site modification as required at site condition, discuss & finalize with clients changes required at site, finalizing FCN. Co-ordination with vendor checking/commissioning, ESD/F&G system modification/start up loop by loop transfer. Co-ordination with client kick off meeting, monthly progress review meeting, close out report hand over as built documents/drawings, survey changes, field changes /spares etc.
Company: ICB LTD.
Project: R.I.L Motikhavri Jamnagar, Gujrat
Position: Instrument Foreman
Duration: 11th October 2000 to 17th June 2002
Responsibility:Reviewing the P & ID and ILD and standard installation details.
Loop checking, installation smart and Pneumatics transmitter like FT, PT, LT, TT, DPT, level troll, all types of gauges PG, TG, LG, VG.Control valves ESD valve, MOV valve, solenoid valves all types of switches. Installation of different types of valve, gauges and transmitter.
Company: PETRON ENGINEERING
Project: Tarapur Automic Power Plant.
Position: Instrument Technician
Duration: 08th February 1999 to 18th August 2000
Responsibility:
Calibration loop checking, Commissioning, Pre-Commissioning, Instrument mounting.
Installation for smart & Pneumatics Instrument FT, PT, LT, TT Gauges like TG, LT, VG, control valves ESD valve, solenoid valves all types of switches.
Repairing of Pneumatics and Electronics Instrument in the maintenance department.
Carrying out the preventive and corrective maintenance of the plant.
Company: LARSEN & TOUBRO LTD.
Project: Bharuch, Gujrat
Position: Instrument Technician
Duration: 15th January 1997 to 17th December 1998
Responsibility:
Calibration loop checking, Commissioning, Pre-Commissioning, Instrument mounting.
Installation for smart & Pneumatics Instrument FT, PT, LT, TT Gauges like TG, LT, VG, control valves ESD valve, solenoid valves all types of switches.
Repairing of Pneumatics and Electronics Instrument in the maintenance department.
Carrying out the preventive and corrective maintenance of the plant.
NATURE OF EXPERIENCE:
Project inspection unit for project inspection and stage wise activities for witness /hold point. Co-Ordination and corresponding with the client.
Involved in installed inspection, testing & Commissioning job with following responsibilities.
Field instrument installation, cable meggering & continuity check, instrument component installation inspection and final commissioning of the instrument.
Witnessing combined instrument loop check, commissioning at all instrument loop required for inspection and final acceptance and mechanical completion reports as per project requirement.
Execution of installation inspection and test plan for each phase E & I activities arrange inspection with client for final acceptance.
Assist in preparation of the project quality control for awarded contract project.
Assist preparation and answering (PTQ) project technical query review & update project specification drawing and update of company's quality control manual & operating procedure in accordance with the ISO 9000 quality system.
Familiar with latest calibration certificate all test & measuring instrument are in operational and calibrated which will utilized in supervising, digital clap meter, hypotonic, tester, calipers dial indicators, micro meters, thread gauges over torqrech etc.
Prepared procedure for QC list & inspection documentation for handling over the QC dossier as well as initiate or recommend corrective action for non-conforming checked items during the process of inspection & reports to concerned authorities for final dispersion.
Involved in Installation inspection activities as such tray and conduit support, installation as per nema standard junction box, frame installation, LCP, ZLP frame local control panel for box frame ZV valves, instrument stanchan installation and air line installation cabinet frame installation cable tray support installation under false tiles in PIB (process interface building) and CCR(Central control room)
Involved in field instrument calibration installation and termination activities as such pressure gauges, pressure switches, pressure transmitters, differential pressure transmitters sorice DP head transon – flow switch, level transmitters level switch, interface level troll (capacitor type displacer gauges) switches gauges, temperature transmitter, temperature switch, switch gauges glasses thermo well thermocouple, resistance temperature detector (R.T.D) control valve I/P converter, solenoid valve, MOV valve(motor operated valve), ESD valve (Emergency shutdown valve), On off valve vibration switch (Vibration element)familiar with different types of DCS-Honeywell, TDC-3000 system delta V(Rosemount), Yokogawa CS-300 system Foxboro 200 system ABB triguard.
PLC (Programming Logic Control) triconix I/A series.Loop checking pre commissioningm function check commission.
Well familiar with fire & gas safe guarding as such heat switch BGV(Break glass unit), smoke detector gas detector, UVR (Ultra Violet ray), IR Detector (infra ray), sounder open path detected.
I am fully conversant with P & ID process Flow Diagram, Functional Logic / Ladder Diagram, and IL Diagram.
View contact information... |