CONTACT INFORMATION:
View contact information...
OBJECTIVE___________________________________________________________________
To work in a position that allows me to utilize the skills I have acquired through previous employment and education, to provide financially for my family, as well as be a extremely valuable asset to a single organization.
EXPERIENCE___________________________________________________________
February 12, 2007 - Present MUSTANG ENGINEERING
Upstream Divisions/Unlimited ELECTRICAL DESIGNER
Electrical Design and Draft of Electrical Systems: Power and Control, High Voltage, Medium Voltage, Low Voltage, Control Signal, Instrumentation I/O, Marshalling, Cable Tray, PAGA, Lighting, Also Design and Draft of Hazardous Area Classification General Arrangements and Details. Detailed use of AutoCAD, PDMS, Excel, Access, Word, Electrical Calc. Programs, Plotters/Printers/Scanners.
July 15, 2005 – February 9, 2007 P2S SECO - Damage Restoration
Bp/Thunder horse Offshore QA/QC SUPERINTENDENT
Damage Restoration by over seeing power, control, instrument, cable installation, termination. In February I transferred over to QA/QC dept leading 3 foreman and 22 technicians in QA/QC of all affected systems.
System completion package creation and turnover. NCR follow-ups
June 10, 2005 – July 8, 2005 MMR – Bp/ Atlantis Project
Corpus Christi Integration
ELECTRICAL SUPERVISOR (TOP SIDE INTEGRATION TERMINATION)
Power, Controls, Communication "Extensive Permit To Work And Isolation
Training" Muliple system package custody turnover.
April 24, 2005 – June 5, 2005 P2S/SECO – Offshore Process
Bp/Thunder Horse Project
ELECTRICAL TECHNICIAN
Assorted Work Packages: UPS, Lighting, Temp Power, Normal Power, and
Troubleshooting. Commissioning assistance
September 2004 – April 2005 P2S/SECO – Corpus Christi, TX
Bp/Thunder Horse Project
QC SUPERVISOR
QC Checkout Of Korea Work: Cable Replacement, Troubleshooting,
Device Installation Inspection, Punch List Write Up and verification.
System custody package fabrication and turnover.
July 2004 - September 2004 MMR – Atlantis Project – Production
Module
ELECTRICAL SUPERVISOR
P.A.G.A. Installation, Design Field Route Tray Installation, Systems installation:
Fire & Gas/ Motor and controls/ Navagational design cable tray as well as field to route devices. Extensive commissioning assistance.
May 2004 – July 2004 MMR – Maddog Project/Bp
QC TECHNICIAN
Punch List Write Up, Troubleshooting Of Assorted Devices, BP Sign Off Of
Multiple Systems. Commissioning to construction liaison.
February 2003 – May 2004 P2S/SECO Special Projects, Amelia, LA
Bp/Thunder Horse Project
ELECTRICAL SUPERVISOR
PA/GA Installation Supervisor, Lighting Supervisor, Commissioning Assistance
Supervisor Over Production Module: PA, Lighting, Fire & Gas, I/O & Field
Instruments & Temporary Power
January 2002 – December 2002 Infinity Offshore Marine, Galveston TX
Ensco/Pride/Diamond Rig Refurb.
ELECTRICAL TECHNICIAN
Refurb. Of Living Quarters On Pride & Ensco Jack-up Rigs: Lighting, PA, Kitchen
Devices, Receptacles, HVAC Power & Controls, Fire & Gas Detection
March 2001 – January 2002 SECO/Phillips Services Special Projects
Jacksonville Electric Authority
North Side Repowering Project,
Jacksonville, FL
ELECTRICAL TECHNICIAN
Installation Of Powell & Square D Switch Gear, MCC & Bus Duct.
DCS, UPS, Control/Power Cable Termination
Application, Hy-Pot Of 3M Cold Shrink Stress Cones
Termination Of Valves, Fans, Lights, Solenoids, Motor Starters, Pressure
Switches, Thermal Couples, & Other Sensory Devices
EDUCATION________________________________________________________________
Graduate Of Port Neches High School 1993
3M Certification In High Voltage Accessory Applications
Rox & Rise Fire Proofing System Certified
Hawke Glanding Certified
P2S/SECO Meg/Phone/High-Pot. Certified
OJT of Autocad
Plant Design Management System
IEC Standards Product Application Course
REFERENCES_______________________________________________________________
Available upon request.
View contact information... |