CONTACT INFORMATION:
View contact information...
Post applied for: Electrical/Instrument QA/QC Inspector
Personal details
Date of Birth: 12th December 1969
Nationality: Indian
Marital Status: Married
Languages Spoken: English, Hindi
Professional Qualification: Diploma in Electrical Engineering
Computer Awareness: MS-Office
Career Summary
An internationally experienced and successful as Electrical & Instrument Construction Installation,Detail Engineering,Maintenance,Testing, Commissioning of MCC,Switchgear,UPS, HT/LT Cables, Cathodic Protection System, DCS, ESD, PLC,having(More than19 years experience15years Abroad&4 years India) This experience has covered works in various large construction projects in Oil & Gas, LNG, Distillation, Refinery, Power Sectors, Petrochemical, Cement Plant, and Fertilizer, Electrical substation, Seawater conversion Plants, etc.
Professional Experience
1.Consolidated Contractor Int'l Co Abu Dhabi (UAE) Project.-HGCE/OAG (GASCO)
From: 11th June 2008 to till date as (Electrical &Instrument QA/QC Inspector)
2.N.S.H Corp. (Kingdom of Saudi Arabia) Project-PP-3 (SABIC Approved)
From: 14th Nov 2007 to 29th March 2008 as (E&I QA/QC Engineer)
3.Heavy Engineering & Shipbuilding Co (KSC) KUWAIT Project-KOC/KNPC
From:24th Dec, 2005 to 30th Sept. 2007 as (E&I QA/QC Engineer)
4.Chiyoda Foster Wheeler Muscat (Oman) Project-QLNG
From: 07th August, 2004 to 22nd March 2005 as (Electrical&Instrument QC Insp.)
5.UTS Kent Co. Ltd Abu Dhabi (UAE) Project -ADNOC/ADGAS/BOROUGE/GASCO
From: 09th Nov 2000 to 22nd May 2004 as (E&I Supervisor, Inspector Engineer)
6.ASAHI Techneion Co Ltd Muscat (OMAN) Project PDO / QLNG
From: 11th Oct, 1997 to 26th Sep, 1999 as (Electrical&Instrument Supervisor).
7.Dodsal PTE ltd Dubai (UAE)Project ADNOC REFINERY& ADNOC FOD
From:13th Jan, 1997 to 27th Aug, 1997 as (Sr. Electrical&Instrument Supervisor)
8.ZAMMR Co Ltd (Kingdom of Saudi Arabia) Project YENPET / ARAMCO
From: 20th Jan, 1994 to 31st May, 1996 as (E &I Construction Supervisor)
9.Bharat Heavy Electrical (Gujarat) INDIA Project BPCL / IPCL
From: 10th Feb, 1991 to 15th Dec, 1993 as (E &I Construction Supervisor)
Summary of Skills:
„«Having Task Engineer/Quality control /Construction Supervisor permit license to raise all types of work permits including electronic permits (PACER, SHELL Standard)inLiveAreaslike PDO/OLNG/ADNOC/ADGAS/YENPET/ARAMCO/RASGAS/ KNPC/FWPP SABIC/KOC/BOROUGE,GASCO,RUSAIL CEMENT CO etc.
„«Attended HSE Induction course like working at height, Management of HSE, Gas-in live areas, Marine induction, Confined Space,H2S awareness, RFSU (Ready for start-Up), STOP (Safety Training Observation Program) ESS (Enhancing Supervisory skills work shop) etc.
„«Familiar to various Electrical & Instrument activities like DCS, ESD, MMS, PLC & SCADA,MCC,SWGR,PCC, System, Hard ware installation and associated cabling and all other Field Instruments such as Foundation Field bus, Smart Transmitters, instrument Calibration, installation, Process impulse tubing, Pneumatic tubing, Cable Gland and terminations, Loop Checking & Pre-Commissioning Activities.
„«Leading team of Supervisors effectively & efficiently, handling of workmen up to 110. Deployment of work men as per projects methodology to complete the activity sequentially. Monitoring of work progress to ensure optimum utilization of resources and obtain maximum productivity.
„«Maintain daily progress report & preparation of two week look ahead schedule, loop checking schedules. Maintaining records as per projects standards. Review on progress of milestone coverage and expedition of accomplishment.
„«Materials take of, coordination with consumable store and plant material store. Checking the records and reconciliation of materials and controlling over the wastage of the materials.
„«Issue of work completion report after onsite measurement/survey and assessing the reports submitted by sub contractor on daily / weekly / accomplishment basis.
„«Schedule weekly meeting with the client and also with supervisors, foreman and discuss projects status / issues and other related matters.
„«Able to communicate at all levels within the organization, help identify problems and propose solutions to improve work practices can work easily with multi-national workforces and clients with international standards.
„«Preparation of megger test reports, loop test reports, cable test reports, equipment test report etc.
„«Maintaining the test reports/records for systems wise and handing over to client& Company.
„«Preparing punch list in erection, activities and organized to attend the punch list.
„«Preparing general & technical specification for installations & testing, commissioning of electrical & electronic equipments etc.
„«Routine Area Surveillance of Electrical &Instrumentation erection activities.
„«Established field inspection & testing procedures for E & I works with the assistance of Site Project Engineers.
„«Inspection and Installation of Field Mounted Instruments, like transmitter,switches,Gauges, Junction Boxes, LCP, Street Light,HT/LT Cables Motors HI-Pot test, I/R test,Function test and Continuity Check for Electrical and Instrument Cables.
„«Preparing QCP and ITP and Inspection Checklist for procurement and construction according to project quality plan (PQP).
„«Preparing and Answering Project technical Query (PTQ).
„«Overseas the Documents Control management and ensures the availability of Current Client Engineering standards, procedures and industrial Codes and Standard.
„«Familiar with International standards like NACE, ASTM, DIN, BSI, IEC, ANSI, API, NEC, NEMA etc.
„«Also familiar with latest Calibration Certificates, all test and measuring instruments are in operational and calibrated condition which will be utilized.
„«Also responsible for checking, verifying and Reviewing the Construction drawings Covering Specification, IFC, P&ID,ILD, and other attachments.
„«Effectively Co-ordinates with other related disciplines.
„«Also aware of safety rules and regulations, Conducted weekly safety Auditing and reporting, participated weekly safety meetings and familiar with all relevant safety induction like 100% Fall Protection, Confined Space Entry and Pre-Commissioning priority etc.
„«Experienced in developing and implementing, Technical and project specific procedures, ITP, Method statements and other quality management system procedures to international codes and standards.
View contact information... |