Has more than fourteen (14) years of continuous experience in Engineering, Operation and Project Management. Experienced on preparing Engineering Design such as FEED preparation package and Detail Design preparation package including procurement and planning support activities and projects involves are TOTAL FPSO, Off- shore Facilities, On- shore gas plant, semi- conductor plant, pharmaceuticals plant, International Airports, Industrial plant, Military Facilities and Hospitals. HVAC System involves are: Centralized Chilled Water and Air Cooled System, Process Cooling Water System, Split-A/C System, Pressurization System, VAV/ CAV System, Clean Room System, Heat Wheel Recovery System, Special Type Ventilation System and related HVAC Control and Electrical System. Also involved on project management installation works of Compressed Air System; Vacuum System; Sanitary Plumbing System; Fire protection System; and related Electrical and Controls System (DDC and PLC). Also, proficient in tender cost estimating and scheduling of Mechanical Works System.

WORK EXPERIENCES:

A) Company: WORLEY PARSONS- Sdn Bhd- Malaysia
Project Name: Integrity Restoration (IR)- SHELL Malaysia (SSB/ SSPC) Offshore Facilities
Offshore Projects: Barton, Sth. Furious, Kinabalu, F23, F06, M01, M03, E11 and B11
Onshore Projects: Labuan Crude Oil Terminal and Bintulu Crude Oil Terminal
Duration: October 2007 to PRESENT
Appointment: Sr. HVAC Engineer (Lead- IR Project)

Duties and Responsibilities
1. Review and collation of technical data relating to IR work including FAIR/ AISV, CSR's and CAW's, inspection reports, maintenance records (inc. SAP) PCR's and site survey reports to gain a thorough understanding of the nature and extent of the integrity issues.
2. Determine root cause of integrity issues thru conducting actual site survey to Offshore Platforms.
3. Develop comprehensive site survey scopes of work that when executed will provide the necessary data for root cause analysis and accurate definition of the work scope for design and execution phase.
4. Prepare SCC paper and TRP documents as per requirments on ITB and Tender Plan processing.
5. Prepare and develop the basis of design (BFD) Package for basis of preparation of Detail Design.
6. Obtain approval of the Basis of Design from the appropriate Shell Client Technical Authority (TA).
7. Prepare BFD packages and Project Execution Plan (PEP) package deliverables for presentation to Shell/ Petronas PCP Approval Committee for project sanction.
8. Lead in preparing Detail Design Package for the whole HVAC system like detail scope of works, detail drawings (Mechanical and Electrical/ Instrument Interface), Calculations (Heat Load, Equipment sizing, Ducting sizing and Piping sizing), Technical Requisition Packages (TRP), Data Sheets, VDRL, Work Pack Package, SIMOPS, etc
9. Establish the International, National, Shell and Industry Standards and Codes of Practice applicable to the theme.
10. Identify shortfalls and potential improvements in the current inspection and maintenance strategies pertaining to the IR project activities. Develop recommendations and work with the TA's to gain acceptance and approval.
11. Evaluate alternative/ advancements in technology for application on the IR project. Promote opportunities to improve technical integrity and reduce lifecycle costs through adoption of new technology.
12. Ensure HVAC designs produced address Safety in Design issues including constructability, maintainability and operability.
13. Develop detailed CTR's and the planning of engineering, design and drafting requirements corrective actions. This involves the development of work scopes, determination of the resource categories required and estimates of man- hours to execute the work. CTR's will be developed in Control with assistance from project services group.
14. Agreeing Engineering, Design and Drafting resource requirements with the company Theme Coordinator and Engineering Manager.
15. Identify long lead procurement items or services in a timely fashion and assist the procurement team to develop SCC and TP documents.

B) Company: THERMO Engineering LLC
Project Name: DUBAI INTERNATIONAL AIRPORT EXPANSION, Phase 2. Dubai, UAE.
Owner: Department of Civil Aviation, Government of Dubai UAE.
Duration: April 2006 to September 2007
Appointment: Sr. HVAC Engineer

Duties and Responsibilities
1. Prepare Discrepancy Report on HVAC System based on Tender Drawings, Bill of Quantities and HVAC Specification for submission to DAR Consultant.
2. Performs engineering calculations to verify pump design flow rates, system hydraulic head & losses on Chilled Water Pumps.
3. Select proper model of Pressure Reducing Valve (PRV), sizing of Thermostatic Mixing & Tempering valves serving Plumbing fixtures based on leaving pressure serving Plumbing fixtures.
4. Used ASHRAE Duct Fitting Database Software in calculating External Static Pressure for Air Handling Units/Fan Coil Units.
5. Perform Heat Load Re-calculation on Electrical Rooms, Telephone and Computer Rooms based on actual heat dissipation on procured electrical distribution board and computer facilities.
6. Verify Air- conditioning capacity of Elevator Machine Room and Garbage Treatment Room by re-calculating the Heat Load capacity of the rooms.
7. Perform complete HVAC design on Kitchens based on parameters given on HVAC specification.
8. Select Chilled Water Pumps model using Armstrong Software.
9. Coordinate with Technical Offices for the management and control of the technical data.
10. Check drawings using Auto-Cad/Bentley Software.
11. Monitor installation progress in the site.
12. Assist the Engineering Manager in updating all HVAC mechanical equipments information data
13. Extensive used of Microsoft Excel as software tool in calculations
14. Perform QA/QC review on HVAC Shop Drawings prepared prior submission to consultant.

C) Company: KOREA NATIONAL OIL CORPORATION (KNOC)
Location: Hyundai Offshore Yard, ULSAN, South Korea
Project name: RONG DOI Gas Field Development OFF- Shore Vietnam Project
Client: KNOC Joint Venture with Petro Vietnam
EPIC Contractor: HYUNDAI Heavy Industry (HHI)
Duration: March 2005 to March 2006
Appointment: HVAC Package Engineer

Duties and Responsibilities
1. Prepare and update HVAC data sheets, specifications and drawings for basis of quotation of qualified HVAC vendors. Hyundai (HHI) initially prepares specification, data sheets and drawings.
2. Prepare Material Requisition for Quotation (RFQ) on HVAC Package for quotation on qualified HVAC vendors experienced in Off- shore project.
3. Prepare Technical Bid Clarifications for HVAC vendors base on vendor technical bid offer and to check the compliance on HVAC specification and completeness of scope of supply.
4. Prepare Technical Bid Evaluation (TBE) for comparison of HVAC vendor offer and recommend the best suitable HVAC vendor.
5. Prepare HVAC Material Requisition for Purchase (MRP) for final quotation of selected HVAC vendor after TBE.
6. Arrange and prepare minuted HVAC Bid Clarification Meeting with the selected vendor prior issue of final recommendation of HVAC TBE.
7. Arrange and prepare minuted HVAC Kick off meeting with the selected vendor prior issue of Notice to Proceed (NTP) and Purchase order (P.O) by KNOC procurement.
8. Arrange and list all HVAC vendor documents to be submitted by HVAC vendor as per related construction schedule of the project.
9. Check, comment and expedite HVAC Vendor Data Requirement List (VDRL) as per VDS schedule. HVAC VDRL consists of Schedule, Drawings, Calculations, Performance data, QA/ Certification and Manuals.
10. Arrange and initiate Engineering documents of HVAC vendor such as general arrangement drawings, electrical drawings, HVAC control drawings and other HVAC documents.
11. Everyday interaction with HHI HVAC engineers and manager regarding progress of HVAC work and relate HVAC engineering problem encountered with the HVAC vendor.

D) Company: MEINHARDT Philippines Inc. (MPI- MEP Engineering Consulting)
Project Name: INTEL Semi Conductor- Retrofitting Works
Saint LUKES Hospital (High End)
Duration: March 2004 to February 2005
Appointment: Sr. HVAC Design Engineer

Duties and Responsibilities
1. Prepare heat load calculation using Carrier E20 HAP Analysis Program on every rooms and facilities of the hospital.
2. Prepare Air- conditioning and Ventilation duct layout and duct sizing using VAV system, CAV system and Reheat system.
3. Prepare room data sheet for submittal to Project Managers and Owner for review and approval.
4. Prepare and select size of Air- conditioning and Ventilation equipment such as Fan Coil Units, Air Handling Units, Exhaust Fans, Duct heaters, VAV boxes, Fan Filter Units and HEPA Filters.
5. Prepare table of equipment schedule to be specify on the drawings.
6. Review and approved submittal of Mechanical contractors such as shop drawings and material submittals.
7. Prepare heat load calculation, control layout, equipment selection, duct sizing and layout, equipment layout and pipe sizing and layout of Air conditioning system.
8. Prepare design shop drawings and as- built drawings as per request of INTEL space planning engineers.
9. Participate discussion with other discipline for the solution on major problems encountered on site especially during HVAC equipment installation.
10. Comprehensive survey the site of installations prior designing the HVAC system.
11. Attend weekly coordination meeting with the owner and discuss progress of works in design and installation.
12. Prepare commissioning report and site observation report for implementation of contractors.
13. Performed QA/QC on HVAC design for 100% percent submission to client ARENCO.
14. Check consistency of plan drawing versus the schematic diagram of HVAC system.
15. Check and analyze every equipment capacity of HVAC system if oversize or undersize.
16. Recommend simplicity of design for possible value engineering.

E) Company: JAPAN GAS Corporation (JGC)
Location: JGC Bldg. YOKOHAMA, JAPAN
Project name: DOLPHIN Energy Plant (Upstream&Compression Facility-ON Shore)
Client: DOLPHIN Energy Ltd. Qatar
EPC Contractor: JGC Corporation
Duration: March 2003 to February 2004
Appointment: Sr. Mechanical Engineer (HVAC)

Duties and Responsibilities
1. Review all ITT documents issued by owner related to building HVAC system, such as HVAC Design Philosophy Specification, Building Program, Building Material Specification, Safety Concept on Onshore, HVAC General Specification.
2. Prepare HVAC flow diagram for review, for detail design and for construction of buildings namely: Control Center, Operation bldg, Canteen, Mosque, Main Substation, Substations, Instrument Technical Room, Analyzer Room, Fire fighting Station, Maintenance Workshop, Warehouse and Laboratory.
3. Prepare heat load calculation of all sub- station building and non- technical building using Carrier E20 software for reference of EPC sub- contractor.
4. Prepare HVAC controls such as I/O lists, instrument index, control diagram and sequence of operation.
5. Prepare design calculation and drafting of building pipe tie- in location such as sewer pipe, potable water, fire fighting, rainwater, utility water, nitrogen and utility air.
6. Prepare sizing design of sand trap louvers blast proof dampers to be located on the building.
7. Review thoroughly HVAC detail design drawing and calculation of EPC sub- contractor for comment.
8. Attend and prepare minutes of meeting with owner and EPC sub- contractor.

F) Company: TECHNIQUES AIR CONDITIONING & ENGINEERING P/L SINGAPORE
Location: SINGAPORE
Project name: WYETH AYERST PROJECT 2000 (Pharmaceutical Project)
: SCHERING PLOUGH Project (BIOTECH / TABLETING FACILITIES)
: UMC SEMI CONDUCTOR PLANT
: NEW AGILENT SEMICONDUCTOR @ YISHUN (Phase A, B&C')
Duration: August 2000 to December 2002
Appointment: Project Engineer, HVAC Installation

Duties and Responsibilities

1. Supervise and monitor Air Conditioning and Mechanical Ventilation System (ACMV) installation at clean room and non clean room system performed by different sub- contractors such as air conditioning and ventilation ducting, chilled water piping and related electrical and control system.
2. Prepare shop drawing and revise design for approval of consultant prior fabrication and installation of materials.
3. Prepare and compute static pressure calculation of all A/C and ventilation equipment for approval to M&E consultant.
4. Prepare and arrange the calculation of silencer of all the AHU's and Ventilation Fans for submission.
5. Prepare penetration request with detail drawing to the Main con.
6. Participate in daily inspection activities with JLL personnel such as visual inspection, dimensional verification, line- checking and hydro- testing, blasting/ coating inspection etc.
7. Prepare inspection report and attend the inspection together with the clerk of works and the main con.
8. Supervise the installation of ductworks and chilled water piping of sub- contractors.
9. Monitor everyday manpower of sub- contractors.
10. Procurement of materials such as pipe, vibration isolators, fans, FCU, duct dampers and etc.
11. Coordinate with the main con if any conflict on site on the CSD drawing issued.
12. Attend daily M&E construction meeting initiate by Kajima and M+W.
13. Ensure implementing of comprehensive safety on every worker during installation on site.
14. Monitor and participate testing, balancing of HVAC equipment, electrical and controls prior final commissioning with the client and consultant.
15. Conduct weekly safety toolbox meeting with the sub- contractors.

G) Company: FLUORDANIEL PACIFIC INCORPORATED (FDPI Philippines)
Project Name: DRY LAUNDRY PLANT- P & G PHILIPPINES
Owner: PROCTER & GAMBLE PHILIPPINES
Duration: March 1999 to March 2000
Appointment: Field HVAC Engineer

Duties and Responsibilities
1. Inspect and monitor the daily manpower and mechanical installation of HVAC (Ducting, Piping, Equipment and Electrical requirements) and Process Piping (Vacuum and Dust Collection) according to IFC Drawing, Piping and Instrument Diagram (P&ID) and fabrication drawing.
2. Assist Mechanical Superintendent regarding implementation of correct HVAC drawings, Technical Specification and scope of works of HVAC sub- contractor.
3. Weekly verification and checking the status of HVAC materials availability on site.
4. Ensure all HVAC works installation meet the client's standard and international standards/code.
5. Inform HVAC sub-contractors regarding works schedule and priority schedule to comply on the overall completion of the Project.
6. Maintain proper documentation on Engineering works, Site works and Commercial issues of HVAC System.
7. Prepare proper work monitoring by maintaining a marked- up drawings on completed works.
8. Prepare mechanical design and cost estimate for an additional works requested by client P&G.
9. Prepare field instructions, project work order and rough order magnitude regarding additional works of sub- contractors.
10. Prepare planning schedule for the sub- contractors as per coordination with other discipline.
11. Conduct punch listing works with the sub-contractor and expedite for immediate rectification.
12. Coordinate and check the installation to other trade of discipline by operating the PDS/ DRV model.
13. Review and check every progress billing of HVAC sub- contractors if over claim or under claim.
14. Ensure implementation of safety rules and regulation at the project site.

H) Company: PARSONS INTERNATIONAL LTD. Philippines
Project Name: GIZAN MILITARY CITY in SAUDI ARABIA
Duration: February 1998 to March 1999
Appointment: Mechanical Engineer 2 (HVAC System)

I) Company: TCGI ENGINEERS- Philippines
Project Name: SIAM MARIWASA TOTO SANITARY WARE PLANT
: MOOG CONTROLS EXPANSION PROJECT: RCP RESEARCH CENTER
: AVON COSMETICS PLANT
Duration: June 1995 to February 1998
Appointment: Mechanical Designer 1 (HVAC System)

EDUCATIONAL BACKGROUND

June 1990 to April 1995: MAPUA INSTITUTE of TECHNOLOGY (MIT)
Intramuros, Manila.
Bachelor of Science in Mechanical Engineering (BSME)
October 1995: Registered Mechanical Engineer (RME)
Philippine License no. 0050125

April 1995 to February 2000: TECHNOLOGICAL UNIVERSITY of the PHILIPPINES
Ayala Blvd. Ermita. Manila
Master of Science in Mechanical Engineering (MSME)
Major in Energy Engineering (for Thesis).

SEMINARS ATTENDED

October 2007: Helicopter Underwater Escape Training (HUET) with EBS,
Basic Fire Fighting and Self Rescue, Sea Survival and Offshore Safety Procedure. By SMTC Training Center
November 2007: Permit to Work (PTW) Applicant.
By: SMTC Training Center
November 2007: Basic Hydrogen Sulphide (H2S) Training
By: SMTC Training Center
June to July 2003: HVAC Computer Aided Design (Carrier E20)
By: CADVISION
September 2001: Safety Supervisory Course
By: Ministry of Manpower of Singapore
June 2001: Safety Management Course
By: House of Quality Business and Management Consultants Singapore
April 2001: Air Filter Course
By: Camfil Air Filter (FARR Filter) Singapore
May 2001: Trane Chillers Familiarization Course
By: Trane Singapore
February 2001: ISO 9000 Certification Course
By: House of Quality Business and Management Consultants Singapore
June 1999: Refrigeration & Air- conditioning Preventive Maintenance
By: Philippine Society of Mechanical Engineers.
November 1997: National Construction Productivity Development Project
By: JICA
July 1997: Design, Operations and Maintenance of Air- Conditioning
Philippine Society of Mechanical Engineers.

SKILLS: Proficient in the use of Desktop computer and familiar with
Following software: Microsoft Office, Microsoft Power Point, MS Project, Primavera Expedition, AutoCAD2005 &Carrier E20 (HAP & Block Load).

INT'L CODES & STDS. USED CARRIER Design Handbook; ASHRAE Handbooks;
SMACNA; DW-144; AMCA Standards; ASME Code;
NFPA 90; UPC Code; IMO Std.; SOLAS 2000, SHELL Stds. (DEP and SES); TOTA GS Specifications.
NORSOK H-001 (HVAC), API RP 505 (Hazard Classification of Electrical Equipment at Petroleum Facilities), ISO 15138 (HVAC at Offshore Production Installations).

Personal Strengths
Proactive, Competent, Energetic, Humble, Practical Minded, Enthusiastic, Result Oriented, Fast
Learner, Good Interpersonal Skills, Strong Leadership Skills, Highly Motivated, Excellent Team Player/
Leader, Can Work Independently, Technically Strong and Client Management Skill Oriented.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 801 to 850 of 15497)Go to Search Parameters...
Brief Description
Integrity management engineer with world leading expertise
Corrosion and Metallurgy Engineer, Painting and Coating Inspector, Engineer, QA/QC Inspector, Manager
Human factors, human performance, human error, ergonomics, industrial psychology
This is to express my sincere interest to apply to your company as Mechanical/Piping Field Engineer/Supervisor
I strongly beleve that I am a match for the position of Drilling Completion Engineer with any Oil/Gas organization , and that the beneficial will be mutual.
I have over 18 years in experience in the construction,design and administration of large projects.
Experience Environmental engineer in the oil and gas and fertilizer industries in the field of environmental monitoring, auditing, implementation of Environmental Management System ISO 14001, Waste Management
Metallurgical Engineer with almost 20 years experience in Operations, Projects and Management in Milling facilities. Excellent computer, communication and verbal skills. Very proficient in MS Office Software and OSISoft PI software as well as several Enterprise system software packages.
Rotating Equipment, Package Engineer, Water and Waste Water
I am HSEQ professional and want tp work with any multi-national company as HSEQ Professional.
Diplam in civil engineer
I am a Mining Engineer having worked in coal Industry for twenty eight years both in under ground and open cast mines. I have taken training inAustralia on coal technology at University of New Castle. I am ready to face any challenge and prove myselfGiven a chance.
Solid experience in Contracts Management for 18 yeras 9 months in major upstream Oil & Gas Industry in India.. My academic qualification is BE(Electrical) graduated with Honors, in the year 1989 from Govt. Engineering College, Bilaspur (M.P) India..I had the expertise in MS Words, Excel. SAP.
My working career was started from 1988 after pass out Diploma in Electrical Engineering 3 year’s course. I have total 20 years of experience in various fields. I will do all types of maintenance, troubleshooting & commissioning works.
C&I / DCS/Control System/Engineering/Project Management
Electrical and Instrument Project Execution, Installation, Precomm, commissioning and Estimating
+20 years work experience in fire alarm life safety, special hazards and low voltage industry. Bachelor of science in electrical engineering. NICET certified engineering technologist (Level 3 in fire alarm systems).
21 years experience in Drilling Engineering.
With over 30 years experience in the mining industry, I feel that I can bring new ideas to any project. I am very good with people and have no problem working and directing them. Having lead the Expansion Division in Southern Peru Copper Corp, I am confident in my abilities.
Refinery Analyzer Engineer
I could be a valuable asset to your organization because of my vast background in the Oil and Gas industry. I have worked in almost every corner of the industry, from the bottom to the head man, in the field and in the office. I have attended NAIT (Northern Alberta Institute of Technology
Bachelors degree in science,Diploma in industrial safety,Diploma in petroleum refining engineering and 20 years of experience in chemical plant operation
A Certified Human Resources Professional, with practical and progressive experience in all aspects of human capital management; labour relations and negotiations and safety/loss control management in Central Asia, West & East Africa, Central America, Canada, USA, and the Asia-Pacific region.
Over 25 years of various experience in On shore petrochemicals(India), Off shore/on shore oil and Gas field in Dolphin Energy Qatar (A Total + Oxy joint Venture Company), ZADCO,UAE and Gas processing(Qchem –A Chevron group company) complex in Qatar.
27 Years Experience in the Field of Piping Construction and commissioning for Oil & Gas Industry,
20 years of experience in safety profession both in onshore construction and marine construction.
MBA, PHR
Experienced and motivated specialist in the operation of Petrochemical plants(iso propel benzene plant and phenol plant) and gas plant,with extensive experience on plants in Romania and Libya who has developed organizational and co-ordination skills along with management expertise
Construction management, and design of roads, infrastructure, utilities, pad sites, drainage and storm water management facilities.
20 years experience QA/QC SENIOR WELDING INSPECTOR IN petrolium refinery piping &cross country pipelines .having CSWIP-3.2,API-510,PT,MT,RT&UT ASNT LEVEL-2
Varied experience in the Oil and Gas Industry with 22 years in the administartion and management of Contracts in excess of US $1 billion.
Technically competent electrical engineer with chronicled success of over 27 years predominantly in managing installation, commissioning ,operation and maintenance of electrical equipments, networks in various projects including - power generation, desalination, oil & gas production/ process facili
Landman, Title, Leasing, GIS and CAD Experience,
Staff sergeant officer, I'm the head of security in the french embassy in Tunisia. Speak french, english, spanish, and basic arabic. I'm in training course in second of the two years of university degree in management.
As a team member of your organization I can provide: Manage and control operations over all process stages which meet quality and quantity standars set by the company. Develop, manage and control operating and capital budgets to ensure that all expenditures achieve desired and don’t exceed
Mining Engineer Over 21 years of engineering design, research, planning and supervision experience in mining and energy industry.
Experienced on preparing Engineering Design such as FEED preparation package and Detail Design preparation package including procurement and planning support activities and projects involves are TOTAL FPSO, Off- shore Facilities, On- shore gas plant, semi- conductor plant, pharmaceuticals plant.
Experienced engineer-seeking position in management
Power plant operation and maintenace management, power contract performance administration; Quality Management System Representative ISO 9001:2000, EMS 14001:2004, OSHAS 18001:2007
Mech.engineer/18 yrs exp /petrochemical/refinery/power plants (Maintenance/Projects(Piping/pipe line/equipments)/shutdown maintenance)
Over 18 years of drilling and completion experience.
I am an highly skilled and ethical professional seeking employment as a Lease Analyst or Division Order Analyst in any Oil and Gas industy. I have been in the Land dept. in oil and gas since 2005, I have a bachelor's degree in business and currently taking a course in Land Analyst Institute.
I have more than 18 years experience in engineering .I am confident that with my experience in project Design, Planning, Scheduling, I can make a significant contribution to your projects.
Arun - MBA, PMP, BE, Project Controls, Project Services
Extensive hands-on international and United States oil and gas industry experience focused in the full spectrum of Exploitation geology (Development and Production), from mapping and geocellular modeling through prospect generation, operations and reserves reconciliation. TX Lic. #1455
Project Construction Management Professional have built High rise,Low rise,Industrial ,Infrastructrure and hospitality projects
B.Sc Engg(Electrical)+MBA(Finance), 25 exp as electrical engineer in mechanised open cast mines and Power Sub Station wiht excellent performance.
With a PhD in geology, I have 13 years' of mining industry experience, focusing on exploration / development projects and investment opportunities, primarily in the FSU
Inspection/Welding Engineer
Port Planning, Construction, project Management
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   [ 17 ]   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com