Over nineteen years of experience in construction projects. Almost all my work has been done independently. During my career span, I participated in various aspects of work, related to Planning, Cost/Material Controlling, Estimating, Accounting, Engineering etc. I have thorough knowledge in EVMS, Windows based applications, especially in Primavera, MS Project, Suretrack and MS Access. Holding certificates in Computer PC Essentials User ID (1290260) and MS Excel 2000 (1621259) from Brain Bench. (WWW.brainbench.com), Membership in Project Management Institute ID 582724.
ENI Oil Company Limited Jan 2007 – Mar 2009
Libya
Sr. Planning Engineer
Head Office, Tripoli
Sr. Planning Engineer: Prepare Baseline schedules, review contract time determination schedules, review baseline construction schedules, analyze monthly updates of construction schedules, analyze modifications to construction schedules, prepare project schedule status reports, perform time impact analysis and prepare recommendations to analyze schedules, coordinate schedule impacts between adjacent projects, monitor and document construction progress Collection, compilation and preparation of data from different Onshore and Offshore projects to create a summarized Weekly/Monthly Report showing Comparison Schedules, Prepare S-Curves and EVMS (Earned Value Management System).
Ensure the document submitted by the contractor is complied with the Tender Requirements for new projects, Conduct feasibility studies for the completed projects and generate reports for the mistake happened and the correction measures taken. Compare the schedules, technical requirements and reports for new projects and produce a Bid Comparison Sheet. Prepare 4 year Budget Proposal, Technical Meeting Reports, Accruals/Comparison Budget with Actual, Prepare Tender Committee report, Prepare slides for presentations (New Projects, Yearly Performance, Future Trends, and Productivity etc).
ECC International Dec 2004 – Nov 2006
Iraq
Project Scheduler for Northern Iraq
Kirkuk
Projects: 4040.003-K1 Training Facility Phase I (Kirkuk),4040.016 - K1 Training Facility Phase I (Kirkuk), 5171.004 - DBE Academy Phase I & II (Sulaymaniah), 4040.026 - Suse Prison (Sulaymaniah),4040.029 - Suse Prison (Sulaymaniah), 4040.024 - Police Station Renevotation, 4044.032 - Iraqi Army 2nd & 4th Division Facilities, 4040.034 - Northern Police Stations, 4040.036 - 4th Division K-1, Phase III.
Schedule Controller: Prepare schedule for new projects in Northern Iraq and implementing it. Responsible for preparing Daily / Weekly / Monthly reports, take physical progress and update the P3 schedule, based on the progress prepare invoice sheet for the client and subcontractor, monitor productivity, EVMS, CPA, EVA, slippage of activities and reporting to the Project Manager. Prepare proposal schedules for the upcoming projects.
JGC Corporation Feb 2004 – Nov 2004
Yokohama, Japan
Dolphin Project (Upstream & Compression Facilities) Aug 2004 – Nov 2004
Ras laffan (State of Qatar)
Schedule Controller: Compile sub-contractor's data and prepare Daily, Weekly and Monthly reports (Progress, Manpower and Equipment). Take the physical progress and compare with the sub-contractor's reports. Update progress in P3 (Level III & Level IV). Prepare 3 Month, 3 Weeks Look-Ahead Schedules and monitor the productivity. Take progress photos and prepare the reports in PDF format (Acrobat).
Western Libya Gas Project – Wafa Desert, Libya Feb 2004 – Jul 2004
AGIP - Italy
Schedule Controller: Daily, Weekly & Monthly Reports.(System Wise Monitoring, Updating Schedules-All Levels including 3 Week Look Ahead, Preparing Productivity Reports, Assist in the provision of planning and scheduling service to the project in accordance with Contract Execution Procedures.
Chiyoda-Foster Wheeler Jun 2003 – Dec 2003
Sur, Sultanate of Oman
Oman LNG Plant - Sur Jun 2003 – Dec 2003
Planning Engineer: Assist Chiyoda-Yokohama Project Control Team for finalizing Level III schedule for the submission to the client. At site, combined the Sub-Contractor's schedule to prepare Level IV working schedule. Responsible for preparing Daily/Weekly/Monthly reports. Monitoring productivity, slippage of activities and reporting to the Controls Manager.
Al Habtoor Engineering Enterprises Co (L.L.C) Jan 1999 – May 2003
Dubai, U.A.E
Construction of ADNOC Group New H.Q – Abu Dhabi Feb 2002 – May 2003
Schedule Controller: Doing Labour Costing, preparing weekly and monthly reports. Apart from the planning works, I developed a user friendly multi-user software to control and monitor the documental transmittals using MS Access. With this software it's very easy to get information about the MAR, Method Statement, RFI and all other correspondence with the sub-contractor as well as with the clients.
Shangri-La Hotel Development Project - Dubai Sep 2001 – Feb 2002
Planning Engineer: Doing Labour Costing for this project. Analyzing the effect of Labour Cost with the forecast and actual and reporting it to the project director weekly along with different histograms of manpower, steel and concrete. Updating a database prepared myself using MS Access to control the delivery of Concrete, Reinforcement and Precast. Using this report to compare the original invoice submitting from the sub-contractor for the preparation of Monthly Invoice.
Planning Department Jun 2000 – Sep 2001
(Carpentry & Joinery / Steel Fabrication Division)
Planning Engineer: Worked alone as Planning Engineer for preparing detailed production and installation programs for Carpentry & Steel Division. Monitoring progress of Shop Drawing Approvals, Mockup & Materials, Production, Delivery of Materials to site, Manpower Allocation, Installation & Cost Controlling using Primavera.
Marina Mall – Abu Dhabi Aug 2000 - Feb 2001
Resi. Complex for Sheikh Sultan Bin Zayed Al Nahyan Aug 2002 - Feb 2001
Wadi Al Hatta Filling Station Nov 2002 - Jan 2001
Dubai Cruise Terminal Oct 2000 - Dec 2000
Awir Filling Station Oct 2000 - Nov 2000
Dubai Internet City Phase I Sep 2000 - Oct 2000
Ajman Retail City Centre Jul 2000 - Aug 2000
Planning Department (Head Office) Jan 2000 – Jun 2000
Planning Engineer: Worked for various projects preparing Detailed Construction Programs in Primavera.
Dubai International Airport Project Jan 1999 – Dec 1999
Planning Engineer: One of the planners of the Project Control Team. Activities included are planning and scheduling through Primavera, taking physical progress and analyzing with sub-contractors progress reports, preparing weekly & monthly progress reports along with graphs for submitting to client. In the Concourse Building, I controlled the entire vaulted ceiling & hotel room progress for Project Control. After the completion, I was transferred to the Head Office.
Foster Wheeler International Corporation Dec 1995 – Dec 1998
EQUATE – Ethylene Glycol Project
Shuaiba, Kuwait
Planning Engineer: One of the key planners of the Project Control Team and responsible for Planning and Scheduling for the Ethylene Glycol Plant construction project being executed for EQUATE at Al Shuaiba, Kuwait. Activities included are planning and scheduling through Primavera, Construction Progress Analysis and reporting through detailed study of quantities and man-hours spent, Piping Material Control, Interface with sub-contractors, Group Discussions and Weekly Meetings for Project Planning, Prepare programs in MS Access (eg. Hydro testing, Welding Progress, Material Requirements/Arrival Dates), prepare all kinds of graphs and schedules for bidding purpose, prepare presentation/slides for the new project using PowerPoint, receive/send data's through AS400 to Italy and Kuwait, participate and analyze feasibility studies, prepare all kinds of conferencing through internet, administrating the flow of data's, troubleshooting hardware & software problems, evaluating & implementing software packages.
Dywidag Saudi Arabia Ltd. Apr 1991 – Sep 1995
Saudi Cement Company (HCP) Nov 1993 - Sep 1995
National Methanol Company (MTBE) May 1992 - Oct 1993
Air Separation Plant (NIGC) Apr 1991 - Apr 1992
Scheduler/EDP Administrator: Scheduling & Monitoring the progress of different sites, assist the Estimator for preparing the Tender Documents, preparing invoice for the client and internal progress in Primavera, submit the progress report to Commercial Manager, administrating the flow of data's, troubleshooting hardware and software problems, evaluating & implementing software packages.
Education
B.Tech – Civil 1991
University of Kerala, India
Master of Computer Applications 1988 – 1990