Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #82535 next resume »»
CONTACT INFORMATION:
View contact information...

EDUCATION:

1988 - 1993: Department Geodetic Engineering, Institute Technology Bandung.
1985 – 1988: Senior High School in Bandung
1982 – 1985: Junior High School in Bandung
1976 – 1982: Elementary School in Bandung
June – July 1996: Training Survey and CAD in Brisbane-Australia
April 1996: Training Arc-View GIS Software in Bogor
March 1994: Training GPS Survey and Processing in Bandung

INSTRUMENT SURVEY FAMILIAR:

Total Station: Topcon GTS-210 Series and Sokkia Set 3B
Laser Scanning: Leica HDS 3000, Software: Cyrax
GPS Receiver: Handheld, Trimble 4000 SSE and 4000 SST
DGPS: Trimble 4000 RS/DS
RTK GPS: Trimble 5700
Echo sounder, Current Meter, Side Scan Sonar, Multibeam, Distometer

SOFTWARE FAMILIAR:

GPS Software: MisPlan, Trimvec, Trimnet, Geolab and Geotracing
GIS Software: Map Info 6, Arc-View 3.1
Mining Survey: Surfac, LDD2006
Survey Software: Softdesk 8, Surfer 7,GSI
CAD: AutoCAD 14/2000/2006/2008
Office: MS Word, MS Excel, MS Power Point, MS Project and MS Access.
Fotogrametric: Summit and Socet set Software
Sounding Software: Hydronav ver.6.01

WORK EXPERIENCES:

1. Jan 2008 – Present: Contract with Oil Company. Site Project Duri Oil Field - Riau-Indonesia.

Senior Geodetic Engineer to project surface investigation services for upgrading areas:
1. Flow line along 11.24 km + 1 Gathering Station (GS) in GS Kotabatak
2. Test Station (10 location) in Balam and Bangko GS
3. Flow line along 12.5 km in Menggala GS
4. Flow line along 13.35 km & 8 wells site location in Bekasap GS
5. Flow line along 7.82 km & 6 well site location in Pematang GS
6. Flow line along 6.61 km & 11 well site location in Petani GS
7. Test Station ( 6 location) in Kulin GS
8. Flow line along 13.98 km + Test Tank location in NDD13
9. Canal Construction along 5.82 km in NDD13
10. Surface Topo Survey with RTK GPS for area NDD14 = 1200 Ha.

Duty and Responsibility:
* Reporting all activity to Project Manager
* Ensure the provision of accurate and timely survey control and service to all sections of the project either as stand-alone work, collaboration with contractors and contractor's surveyors and consultants.
* Establish and monitor primary and secondary controls within the target area, this includes levelling of these controls with an automatic level as well as documentation of the control and closure accuracies and adjustments, extension of these controls and placement of temporary controls to ensure timely surveys.
* Compile and update (as required) procedures and methods for all the main surveying tasks – i.e. Traverse survey, Centerline survey,Profiling & Cross Section, drill hole surveys, station establishment, computer calculations and recording of information. This also includes a code of practice for surveying on site.
* Maintain survey computer directories and accurate records of all files
* Coordinate the survey section daily activities with active interaction with the operations and engineering personnel to ensure timely and effective surveying requests are achieved.
* Maintain all training for all personnel within the Survey section and ensure that goals and objectives are set out with realistic achievable deadlines.
* Maintain a pro-active approach to all aspect s of operational safety and encourage teamwork within the department.
* Preperation weekly report, monthly and final report
* Check and supervise all drawing report including: Plan & Profile drawing, Topographic Drawing, Cross Section and P&ID Drawing
* Other duties as assigned

2. June 2004 – December 2007: With The Coal Mining Company. Site Project Bengalon-Sangata, East Kalimantan-Indonesia.
Position: Senior Geodetic Engineer.

Duty and Responsibility:

* Ensure the provision of accurate and timely survey control and service to all sections of the PIK project either as stand-alone work, collaboration with contractors and contractor's surveyors and consultants.
* Establish and monitor primary and secondary controls within the prospecting and mining lease, this includes levelling of these controls with an automatic level as well as documentation of the control and closure accuracies and adjustments, extension of these controls and placement of temporary controls to ensure timely surveys.
* Compile and update (as required) procedures and methods for all the main surveying tasks – i.e. pit, quarry and stockpile pickups, set outs for pit and engineering or construction tasks, drill hole surveys, station establishment, computer calculations and recording of information. This also includes a code of practice for surveying on site.
* Maintain survey computer directories and accurate records of all files that are utilised in volumes calculations for pit volumes and stockpiles.
* Coordinate daily survey pickups and prepare a daily dig plan for use by operations personnel.
* Coordinate and set out all Mine design and geological requirements including preparation of set out plans for all designated personnel to utilise and coordination of set out pegs in accordance with laid down procedures.
* Ensure that pit surveys are carried out on a regular basis to enable accurate bench and total volumes to be calculated at the end of each month. Survey work quantities for payment purposes to contractor if required and for use in Mine reconciliation, blasted stock calculations and process throughout figure comparisons.
* Ensure that stockpile surveys are carried out on a regular basis to enable accurate stockpile volumes to be calculated at the end of each month for reconciliation and Coal stocks calculations.
* Coordinate the survey section daily activities with active interaction with the operations and engineering personnel to ensure timely and effective surveying requests are achieved.
* Ensure that annual Mine Inspectorate plans for the Indonesian Republic Mining Directorate are carried out, signed off and presented within the allotted time frame.
* Monitor wall instability in pits, dumps or dams or other critical infrastructure with accurate reporting on required basis to provide information for failure prediction analysis.
* Interact daily with construction, operations, engineering and geologist sections and with other departments when required.
* Effectively survey, compile and collate a location Mine plan.
* Maintain all training for all personnel within the Survey section and ensure that goals and objectives are set out with realistic achievable deadlines.
* Maintain a pro-active approach to all aspect s of operational safety and encourage teamwork within the department.
* Maintain all Feasibility study areal survey to develop PIK area coal mining
Other duties as assigned

3. August 2000 – April 2004: With The Coal Mining Company. Site Project Murung Raya-Central Kalimantan-Indonesia.
Position: Senior Geodetic Engineer.

Duty and Responsibility:

* Ensure the provision of accurate and timely survey control and service to all sections of the MGM project either as stand-alone work, collaboration with contractors and contractor's surveyors and consultants.
* Establish and monitor primary and secondary controls within the prospecting and mining lease, this includes levelling of these controls with an automatic level as well as documentation of the control and closure accuracies and adjustments, extension of these controls and placement of temporary controls to ensure timely surveys.
* Compile and update (as required) procedures and methods for all the main surveying tasks – i.e. pit, quarry and stockpile pickups, set outs for pit and engineering or construction tasks, drill hole surveys, station establishment, computer calculations and recording of information. This also includes a code of practice for surveying on site.
* Maintain survey computer directories and accurate records of all files that are utilised in volumes calculations for pit volumes and stockpiles.
* Coordinate daily survey pickups and prepare a daily dig plan for use by operations personnel.
* Coordinate and set out all Mine design and geological requirements including preparation of set out plans for all designated personnel to utilise and coordination of set out pegs in accordance with laid down procedures.
* Ensure that pit surveys are carried out on a regular basis to enable accurate bench and total volumes to be calculated at the end of each month. Survey work quantities for payment purposes to contractor if required and for use in Mine reconciliation, blasted stock calculations and process throughout figure comparisons.
* Ensure that stockpile surveys are carried out on a regular basis to enable accurate stockpile volumes to be calculated at the end of each month for reconciliation and Coal stocks calculations.
* Coordinate the survey section daily activities with active interaction with the operations and engineering personnel to ensure timely and effective surveying requests are achieved.
* Ensure that annual Mine Inspectorate plans for the Indonesian Republic Mining Directorate are carried out, signed off and presented within the allotted time frame.
* Monitor wall instability in pits, dumps or dams or other critical infrastructure with accurate reporting on required basis to provide information for failure prediction analysis.
* Interact daily with construction, operations, engineering and geologist sections and with other departments when required.
* Effectively survey, compile and collate a location Mine plan.
* Maintain all training for all personnel within the Survey section and ensure that goals and objectives are set out with realistic achievable deadlines.
* Maintain a pro-active approach to all aspect s of operational safety and encourage teamwork within the department.
* Maintain all Feasibility study areal survey to develop MGM area coal mining
* Develop Geographic Information System (GIS) for regional analysis tools
* Other duties as assigned
.

4. Jan. 1994 – July 2000: With the Engineering & Information Technology Consulting, Bandung Office-Indonesia.
Last Position: Geodetic Engineer

Project Experiences:
* Topographic Survey & Digital Mapping over 1000 Ha, Scale 1: 1000 for Coal Mining Development Project, Batulicin (South Kalimantan), Client: Arutmin Indonesia
* Topographic Survey & Digital Mapping over 600 Ha, Scale 1: 1000 for Gold Mining Development Project, Toli-toli (Central Sulawesi), Client: Rio Tinto Indonesia
* Topographic Survey & Digital Mapping over 800 Ha, Scale 1: 1000 for Coal Mining Development Project, Sesayap (East Kalimantan), Client: PT. Baradinamika Mudasukses
* Topographic Survey & Road Design for Coal Transportation Planning and Development Project, Binuang-Marabahan (South Kalimantan), Client: PT. Baradatra Satrya
* Topographic Survey & Digital Mapping over 1500 ha, scale 1: 1000 at Muara Teweh-Central Kalimantan, Client: PT.Marunda Grahamineral
* Topographic Survey & Digital Mapping over 4000 ha, scale 1: 5000 at North Bengkulu,Bengkulu Province - Sumatra, Client: PT.Niaga Baratama
* Topographic Survey & Digital Mapping over 1000 ha, scale 1: 1000 at North Barito, Central Kalimantan, Client: PT.Suprabari Mineral
* GPS Control Point Survey for National Third Order (400 points), Bandar Lampung and Medan (North Sumatra), Client: Agrarian National Board (BPN)
* Topographic Survey and Mapping 500 kV Transmission Line Route: Klaten to Tasikmalaya ( 320 km ), Client: Electric State Company (PLN)
* Topographic & Bathymetric Survey for Bakaru Hyro Electrc Power Plan (HEPP), Bakaru River – South Sulawesi, Client: Electric State Company (PLN)

Duty and Responsibility:

* Lead a survey team GPS and Topographic Mapping

* Update daily survey readings and mappings

* Update daily calculate field data survey

* Ensure that accurate and up-to-date all data accordance with the Survey and Drafting Directions

* Prepare or cause to be prepared a Schedule survey work, Jobdesk for surveyor and labor

* Maintain daily, weekly and monthly topographic survey targets set by Senior Geodet/Chief Surveyor

* Calculating data and drawing used AutoCAD

* Maintain a pro-active approach to all aspect s of operational safety and encourage teamwork

* Prepare final report & final drawing and then shall be approved by Chief Surveyor

* Other duties as assigned

View contact information...
«« previous resume next resume »»
Search Results (Resumes 3151 to 3200 of 15498)Go to Search Parameters...
Brief Description
PMI and CMAA Certified Project Manager with a BSME avilibile for large scale Mechanical/HVAC Projects as a Senior Project Manager or Owners Rep. Willing to work Agency, Contract, Direct Hire and International Projects.
Field-oriented geologist with 20 years experience, including management. Looking for management position with aggressive junior mining/exploration firm looking to start up operations in North America, esp. within the lower 48 States.
VP Sales used strategic planning to increase annual profit by $13 mm and sales by 17% in a declining market. Proficient in marketing and sales management (direct, business-to-business, consultative, & value added). Negotiated contracts in excess of $1 mm. Record sales in 5 of the past 9 years.
at present working on cyberbase rig totally computerised
heighted , office oriented, global person
Experiences: Oil / Gas Field Facilities, Pipeline and Production Plant Operations, Commissioning and start up
Professional Drilling Consultant
Welding Suprintendent / Supervisor
Underground Supervisor/ Superintendant
Graduate in Bsc Environmental science & MBA, 7 years working experience
PIPING DESIGN ENGINEERING
For the past 15 years I have been employed in petrochemical piping & Power Plant design & drafting utilizing Autocad, Microstation, 3D CADWORX, Plant 4D Programs and Field surveying using Total station and 3D Leica ScanStation 2, using Cyclone and CloudWorx programs to obtain as-builts of existing f
CNC Service Manager and Technician / Building Project Manager
Studying M. Sc I Year (Environmental Science) in Distance Mode B. Sc Diploma in Occupational Safety Health and Environment ,First aid training
Preparing Concrete profiles. „« Preparing P.T. Design Drawing and Shop Drawing as per the Engineers Design (ADAPT or RAM Programs).
Free! An MBA graduate with 6 years of work experience in the oil and service-related industries. Experience in ESP, HPS, VSDs, PLCs, HMIs, and SCADA systems. Additionally, I have experience in project management.
Planning Engineer, Workshop Management, Maintenance and Material control, Safety Officer, AutoCAD, Fleet Management System Software(FMS),IVMS Download, Internet Skill, MS Word, Ms Excel, Corel Draw, Primavera Project Planner (P3), Ms Project, Power Point, Ms Dos, Publisher, Page Maker, Etc
9 years of rich work experience in Project Controls, Planning & Scheduling functions in the field of Oil & Gas, Petrochemical/Chemical Plants.
Having more than Twenty (20) years of experience in the field of Supervision and Inspection of Welding, Piping Fabrication and Installation in the Heavy Industrial construction such as Oil and Gas Plants, Power Generating Plants, Petro-Chemical and other Industrial Insta
cad operator using micro station. detailing and some design in 3D
Fifteen years of rich and cross cultural experience in Instrument Construction Supervision, Instrument Inspection, Commissioning and Troubleshooting Maintenance Work of all types of Instruments.
Radio Operator / AB Seaman
Seeking for a position of Store Keeper where I can leverage my valuable experience of management skills with potential of growth and challenging environment. Confident and have potential to directs the work or other communications.
Willing to do the job as a geologist in Major Corporation and apply all my skills and knowledge for the growth of the corporation
I have over 11 years experience in the industry. I have worked in Ghana, Burkina Faso and Rwanda. I have worked as consultant, project manager, project geologist, senior exploration geologist, for a number of companies in numerous mineralization settings.
B. Sc. with Chemistry along with the 14.5 years of professional and project in petrolium refinery . Precommissioning & commission assistance in, LPG RECOVERY , ACID GAS REMOVAL , FUELGAS/NAPTHA RECOVERY
Free! All round drilling expertise from driller up to management. Managed on- and offshore drilling campaigns world-wide. Shell Round II. Currently head of drilling rig planning, acquisition and divestment for Shell Malaysia. Analytical and problem-solving capabilities. Broad engineering background.
SAP Procurement
Experienced Land/Right of Way Agent
petrololeum
Subsea systems (Controls, Trees and Wellheads). Service and Manufacturing of downhole drilling tools, BHA components, DD equipment & fabrication. Project team, QS, FAT, MC & ITP. Internal/external Audits, Procedural writing and MRB’s. ISO 9001:2008. UT, MP & UT Level 2.
Welding Inspector 3.1, Welding Engineer
self starter, great communication skills, great with microsoft programs, familiar with oilfield environment
13 years of experience in Engineering Projects & Maintenance, design engineering, construction and commissioning of instrumentation in petrochemical and chemical industries involving detailed engineering including, project estimation, preparation of instrument specification, comparison statement ,pr
18 years petrochemical experience, senior engineer
Excellent experience in Microsoft Office Tools , email ,internet as well as capable of learning and handling any software packages.
Postgraduate in Civil Engineering with specialization in Infrastructure, Highways & Bridges, Soil & Materials engineering & Project Management Systems with about 17 years of professional experience in construction supervision, design of Highways & Infrastructure projects
10 Year experience in FEED & Detail engineering of Electrical System in Oil & Gas, onshore Plat-form, Petrochemical Plant, Automobile sector and Pharmaceutical Industries
plc ,cement plant sponge iron ,flexible packaging unit
HSE Executive
Numerical Simulation (Eclipse/Petrel RE), Analytical tools(PROSPER/MBAL), Well testing, reserves estimation, material balance,decline curve analysis, production testing
10 yrs in safety management
Chemical Laboratory Analyst / Chemical Process Technician.
Experienced rig medic
PROJECT ENGINEER / ROTATING ENGINEER / ELECTRICAL ENGINEER
I am a SENIOR GEODETIC ENGINEER with experiences 15 years in Mining, Oil & Gas and Consulting Bisnis. I want to work with the International Company with the position is a Senior Surveyor
Experienced base/precious metal Exploration/Mining Geologist
Quality Engineer
Seven years of Process/Project engineering experience encompassing process design, process safety management and regulatory compliance, Project scope development, Project scheduling, Project execution strategy. Areas of process design specialization include relief system design, equipment design.
Process Technician with 9+ years of experience
First   Prev   51   52   53   54   55   56   57   58   59   60   61   62   63   [ 64 ]   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com