Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #82644 next resume »»
CONTACT INFORMATION:
View contact information...

DATE OF BIRTH: 4TH MAY, 1980

NATIONALITY: NIGERIAN

STATE OF ORIGIN: EBONYI STATE

CURRENT POSITION: PLANNING ENGINEER/SCHEDULER
OBJECTIVE: To work in a challenging position in a reputable organization, that offers good experience and opportunity to think, develop and evaluate my own ideas towards excellence.

PROFILE
EDUCATION QUALIFICATION
2007 –Date Post Graduate Diploma (PGD) in Project Management from Federal University of Technology, Owerri, Imo State

2004 Higher National Diploma (HND) in Mechanical
Engineering from Akanu Federal Polytechnic Unwana, Afikpo North, Ebonyi State.

1995 West Africa School Certificate from Comprehensive Secondary School, Unwana

ADDITIONAL SKILL AND TRAINING
2009 First Aid/CPR Training
2007 Primavera Project Planner (P3), P4 & P6
2007 HSE COMPETENCE DEV. TRAINING PROGRAMME; HSE Competence (Level 2 & 3)
2004 Certificate in AutoCAD (P & ID) Designs, Microsoft Office Packages; Microsoft Project, MS-Word, MS-Excel, etc,

PROFESSIONAL MEMBERSHIP
Nigerian Society of Engineers (NSE) Graduate Member

STRENGTH
* A good team player and Ability to work under pressure
* Ambitious and hardworking,
* Self driven and driven by positive challenges

WORK EXPERIENCE

IGPES INTERNATIONAL, Port Harcourt.
As Planning Engineer/ Scheduler Jan 2009 – Date
Project Involved: Gbaran Ubie Integrated Oil & Gas Project (EPF)
Responsibilities:
- Providing Schedule from summary to detailed level to optimize expenditure of time, resource utilization and cost.
- Regular project reports and Preparing of schedules.
- Preparing and Updating the weekly Progress Calculation Report.
- Identifying the critical path that has to be managed in order to meet the schedule objectives.
- Providing of progress update information to Senior Management and SPDC (Client).
- Working together with the SPDC Planning Team in updating progress.
- Assisting Management in developing corrective action, etc.
- Monitor and regularly review of the overall Project plan to identify pinch points, potential delays and delays that need to be managed.
- Assisting with the production of regular look ahead, this shall highlight the critical activities in the coming periods.
- Establishing, monitoring and maintaining overall project plan, including critical path and resolution of incompatibilities
- Monitoring the sub-contractors, consultants, and sub-constructors performance against their programmes, deliverables, drawing indices, milestones, and budgets as set out in the contracts
- Ensuring respect of the project schedule, cost and quality targets, and undertake swift corrective actions when required
- Create, develop, and implement policies, procedures and systems for planning and project control
- Creating, developing and maintaining project planning documents using sound techniques and well proven tools (Primavera and MS-Project)
- Performing regular audits to review and assess sub-contractors, consultants, and sub-constructors activities progress, and evaluate all progress reports produced by them
- Producing regular and accurate status reports to the Company's management on the project progress, critical path, risk and resourcing as required and Undertaking periodic updates of progress schedules
- Price Estimation, MTO and Preparation of Tenders (Technical and Commercial), etc.

ALCON NIG. LIMITED, CONTRACTING.
As Planning Engineer in Contract/Planning Dept. July 2007 – Jan. 2009
Project Involved: Okoloma NAG Plant & Pipe Line (Integrated Project)
Responsibilities:
- Providing Schedule from summary to detailed level to optimize expenditure of time, resource utilization and cost.
- Regular project reports and Preparing of schedules.
- Preparing and Updating the weekly Progress Calculation Report.
- Undertaking periodic updates of progress schedules
- Identifying the critical path that has to be managed in order to meet the schedule objectives.
- Providing of progress update information to Senior Management and SPDC (Client).
- Working together with the SPDC Planning Team in updating progress.
- Assisting Management in developing corrective action, etc.
- Monitor and regularly review of the overall Project plan to identify pinch points, potential delays and delays that need to be managed.
- To assist with the production of regular look ahead, this shall highlight the critical activities in the coming periods.
- Assist with the collation of the monthly progress figures and production of monthly progress reports to ensure that they remain on schedule and highlight any potential issues.
- Price Estimation, MTO and Preparation of Tenders (Technical and Commercial)
- Involved in Planning & Scheduling of Akwa Ibom International Air Port.

LEOCO AND COMPANY LTD, PORT HARCOURT
As Planning Engineer Aug. 2006 - July 2007
Project Involved: 6" SCH 100 API 5L X 65 GIJ LINE Constr. & Laying From Izombe to Ossu 3
Responsibilities:
- Preparing and Updating the weekly Progress Calculation Report
- Undertaking periodic updates of progress schedules
- Identifying the critical path that has to be managed in order to meet the schedule objectives.
- Providing of progress update information to Senior Management and ADDAX PETROLEUM LTD (Client)
- Working together with the ADDAX PETROLEUM LTD (Client) Planning Team in updating progress.
- Assisting Management in developing corrective action, etc.
- Monitor and regularly review of the overall Project plan to identify pinch points, potential delays and delays that need to be managed.
- To assist with the production of regular look ahead, this shall highlight the critical activities in the coming periods.

TENTA CO. LIMITED (OIL & GAS SERVICES)
As Assistant Planning Engineer Feb. 2006 – Aug. 2006
Project Involved: Laying of 2" Agbada 1 Gas lift Line Well 1, 3 & 4 (SPDC)
Responsibilities:
- Assisting in the development of an initial plan, which will allow the project to proceed with the activities required to setup and establish the project.
- Assisting with the development of the Project mobilization plan that allows the early identification of the initial staffing and resource requirements
- Assisting in the development of the Project level schedule.
- Monitoring and regular reviewing of the overall Project plan to identify pinch points, potential delays and delays that need to be managed, etc.

CUBEE ASSOCIATES LTD, PORT HARCOURT (Property and Development Company)
As Project Manager/Site Supervisor Sept. 2005- Feb. 2006
Responsibilities:
- Determining resources required, interviewing candidates, vetting vendors, and assigning tasks.
- Setting up meetings, running meetings, writing and distributing meeting minutes.
- Creating a plan, executing a plan, and adjusting the plan as necessary.
- Status reports and presenting to top management.
- Supervision of worker in the site and Organizing Safety meeting and awareness
- AutoCAD designs (Structural Drawing) of Building Plan and Elevations.
- Assurance and Control of Quality Fabrication and Installation process of all door and window frames, etc.

Ido/Osi Local Govt. Secretariat, Ekiti State
NYSC: Works Department (Mechanical Technician) 2004 – 2005
- Metal Turning with Lathe machine
- Engine and Plant maintenance and Grinding of Valves
- Servicing of injector pumps and valves

Winam Emporium Ltd, Aba. 2000 – 2001
Trainee (One Year industrial Training)
- Repairs of industrial Air Compressor.
- Servicing of Hydraulic Tank of Polyurethane (PU) machine.
- Servicing of ISO and Poly Tank of PU machine.
- Servicing and maintaining of injection moulding and PU machines.

Winam Emporium Ltd, Aba. Nov. 1999-March 2000
Trainee (Four Months Industrial Training)
- Operating of Polyureathe (PU) and Injection Moulding (PVC) machines.
- Maintaining of PVC and Adhesive machines.
- Servicing of Industrial Air Compressor.

EXTRA CURRICULUM ACTIVITIES:
Swimming, Traveling, Reading, Writing and Football

REFEREES:
Will be provided

View contact information...
«« previous resume next resume »»
Search Results (Resumes 6201 to 6250 of 15497)Go to Search Parameters...
Brief Description
NDT level II, piping fabrication and errection, welding inspection etc.
9 years experience in production operator (oil and gas field) at present i am working in sudan
Analytical chemistry lab-skills for testing materials in quantitative and qualitative purpose with conventional or instrumentation techniques (UV-VIS, Atomic Absorbance and Infra Red Spectrophotometry, High Performance Liquid Chromatography, Gas Chromatography, Flamephotometry.
20 years of HR experience in recruitment, remuneration, pay structure development, performance management, job evaluation, benefits, organizational design, employee relations, database management, leadership, management, facilitation, coordination
I have over 36 years in the Oil & Gas Industry. International experience on land & offshore. Experience in remote location logistics. Have worked in desert, mountains, & jungle. Have drilled HTHP wells with oil base mud. Experience drilling horizontal & underbalanced. Spanish Speaking.
Bachelor in Engineering - Metallurgical Engineering.
Preparation of Techno-Commercial Proposal for various LSTK Projects like, Refineries, Petro-Chemical Companies, Steel Plants, Power Plants, Oil Bulk Plants, Gas Plants, Substations, Cable Laying, Plant Utilities and Various Industrial Projects.
Diploma in Chemical Engineering
BE in Mechanical Engr
Design Engineer-Static Equipments with 4 years Experience
Ensuring good quality control of mud system by analysis of drilling Mud additives
Have 10 years in cementing, tools and drill stem testing
Developing logic’s with RSLogix 5, 500, 5000 For AB Controllers, Simatic Manager for Siemens and Unity Pro for Schneider.
MIET Polytechnic, Trichy, India Diploma in Mechanical Engineering, St.Joseph's Higher Secondary School, Trichy. Engineering Group
FEED, DFR, RFP, Detailed Engineering
GULF EXPERIENCE
Mechanical Engineer with 4 years experience
Instruemnt engineer( PLC ,DCS ,ESD,field instruments )
My name is Adenowo Tosin Akeem, i hold a Bachelor of Science (B.Sc) degree in Earth Sciences(geology). Am interested in your reputable firm which i believe would need my experience. The following is a brief on my experience;
I got experienced as Mine Engiineer, Cost Control and Mine Planning
CA State Certified General Electrician(Journeyman) with some Instrumentation training in Process Controls
A highly motivated and experienced Construction and Structural Supervisor , with experience in oil and gas industry. An awareness and commitment to HSE implementation. Valuable team member, able to work on oBrief Description:* (Plwn initiative, with excellent man management and communication skills.
Experienced in Planning & Scheduling, Good knowlege of Primavera and MS-Project Software Operations, etc. HND in Mechanical Engineering
4 years working as storekeeper in Gulf countries. I am now currently employed in Butec- Qatar as storekeeper. I handled 5 sites in the project. I usually maintain and monitor of stocks, making receiving and purchase request in the system and issuing materials.
I have done post graduation in Geophysics with 1st class/A Grade. i have a year of seismic servicing industry experience working as an Assistant Geophysicist in one of the leading geophysical companies in Pakistan furthermore i have done 4 weeks internship in Prospect Generation Department of OGDCL
API 570/653 With excellent database skills
Drilling Fluids Engineer, Power Plant Engineer
Welder needs work
I am having more than 3 years experience in the field of construction ,troubleshooting and commissioning in istrumentation field.
Maintain unit and running reair
A hard worker who can create mechnical design. Knowledgeable 3D design such as Autodesk Inventor and Solidworks and can give from the scartch design. Have designed various of automated machine such as test handles, coveyors, laser handlers, jigs and fixtures.
F.S.C+Diploma in Refrageration And Air Conditioning 3years+autocad course
Mechanical engineer, autocad, offpipe, microsoft
Specialized in Corrosion & Materials Technology, Failure analysis, Quality control and Project Management
Electronics Engineer with 7.75 years of exp. in installation, testing, commissioning and troubleshooting of Satellite communication equipments and Vessel Traffic Management Systems which includes Radar Systems, AIS, VHF Systems, Hyd/ Met. Stations, etc
As A Production Optr Carried Out: DCS [Yokogawa 1000 & CS300, Emerson] Oil Production & Processing, Gas Processing (De-Hydration, Sweetning etc), H.P & Waste Gas Compressors, Wellhead Operations [Well Testing, HY Panel Operations, SCSSSV Function Test, Well Activation] Completion, Workover, W/L
Flow Assurance Engineer
Surface Mining Operator and Foreman
I am Graduated in M.Eng in Petroleum Reservoir Engineering from University of Calgary - Canada in 2006. I have more than two years of experiences in Research Institute of Petroleum Industry (RIPI), National Iranian Oil Company in reservoir simulation projects.
OBJECTIVE: Seeking full time employment with some reputed company in order to be able to play a major role in its activities and enhance my skills alike.
4 1/2 years oil & gas engineering experience (of which 3 years upstream) in conceptual, front end and detailed design.• Bachelor of Mechanical engineering, 2000-2004, from Visvesvaraya Technological University Karnataka, India with First Class.• Post Graduate Diploma in Petrochemical & Refining,
Registered Professional Engineer Experienced in Project Management and Construction
i am certificate hlder majoring in land surveying seeking for vacancies. Experience in building construction and infrastructure work for 11 years. Very famliar with all kind of surveying instrument Total Station. I have knowledge in AutoCAD Land Development Desktop.
Environmenatl Skills: Water reuse planning, ArcGIS, Energy, Wastewater Treatment, Remediation, BioWin, Modeling, Stormwater, Groundwater modeling
Procees Engineer With 5 Year of Exprience
Senior underground narrow vein gold geologist with experience in exploration, resource definition and geophysics.
Diploma Instrumentation, B. Tech Electronics(Appeared) , Skill in Automation Technologhy. Experties in Simens System, step7 , PCS7
5 years cad customisation autolisp, visual lisp, vb.net, structural design software development, connection design
Handle all Process oil and gas
I am seeking a Well Site Geologist/Mudlogging position with a quality, client service oriented company. I have worked in Environmental Consulting and Mudlogging/Well Site Geology. My oilfield experience is in Utah, primarily in the Uintah Basin, and also in Colorado, New Mexico, Wyoming, and Texas.
First   Prev   101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124   [ 125 ]   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140   141   142   143   144   145   146   147   148   149   150   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com