Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #82946 next resume »»
CONTACT INFORMATION:
View contact information...

I am a drilling fluid engineer with 31 years of experience with all types of water base and oil base fluids. When I graduated from college in 1978 with a degree in Chemistry, I immediately went to work for Magcobar as a drilling fluid engineer. My assignments were all based in the Gulf of Mexico (Louisiana). After leaving Magcobar, I worked for two different drilling fluid consultant companies. My assignments while working for them were for Exxon in the Gulf of Mexico. Exxon was so satisfied with my work I was offered the opportunity to start my own consultant company. I incorporated Southern Drilling Fluids Consultants, Inc. For 13 years my responsibilities were to aid in drawing up mud programs for each project either my self or one of my consultants was on, and make sure they were implemented. I had to supervise 20 drilling fluid consultants on Exxon and Texaco jobs. I was personally the engineer on several of Exxon's most difficult drill wells and two of the biggest projects ever under taken in the Gulf of Mexico (The Lena Tower and The Zinc-Alabaster Project). I went to work for Mud Check, Inc. as a drilling fluid consultant. My assignments were still with Exxon and then ExxonMobil. These assignments were still in the Gulf in both deep water and shelf work. I did get to do some work on land in South Texas on the King Ranch also. I was offered an opportunity with Baker Hughes Drilling Fluids to become a Senior Fluid Service Representative. I agreed to work for them and my work assignments were mostly ExxonMobil wells. I did do a couple of other major deepwater projects for a couple of other operators. These projects were projects where the operator was having severe lost returns before getting Baker Hughes Fluids. Upon Baker getting the contract for the next wells from the operator, I was sent as the senior fluid engineer to these Baker Hughes jobs and we ran Rheologic Constant Rheology Fluid. Losses on these wells were kept to a minimum and the wells were drilled under the time line and under budget.

On two other high profile deep water projects I was the on site project fluids manager in charge of the 4 man fluid team on board. All of our wells were under projected time line and under budget.

I am currently working on deep high pressure, high temperature wells in south and central Texas.

I am including in my resume some of the wells I have taken part in as a mud engineer. They cover a wide range of areas and depths drilled and problems encountered. To keep my resume as short as possible I have only listed a few of each type of well drilled. If you need any more information please feel free to contact me.

Mud types run

Water base: Lignosulfonate, Claytrol, PHPA, Penetrex, High and low lime base mud, KCL, KCL-KOH, Ligno-Pac*, saturated salt (NaCl),Pyro-Drill, Amoco Selectafloc, XCD-Drispac polymer, Deep Drill, Bara Drill N, Perflow, high pH muds with H2S scavengers added, Lignosulfonat mud with 50 pounds per barrel of calcium carbonate. (* I developed this system for ExxonMobil.)
Oil Base Fluids: Invermul, Carbo-Drill, and several generic diesel base systems.

Synthetic Base Fluids: Accalade, Baker Hughes Synteq, Baker Synteq with 50 pounds per barrel of Calcium Carbonate, Rheologic Constant Rheology Fluid, and ExxonMobil's Escaid 110 mineral oil mud.

Completion Fluids: brine, calcium chloride, calcium bromide, and zinc bromide. Mixed all types of spacers and lost circulation pills, including cross link polymers.

Operators worked for

Include Exxon, ExxonMobil, Amoco, Texaco, Superior Oil, LLOG, Mariner, Forrest Oil and Gas, Coastal Energy, Dan A. Hughes.

Experience

HPHT:
Drilled 6 wells with ExxonMobil in Mobile Bay, Al. with bottom hole temperatures in excess of 450 degrees. Well depths exceeded 20,000 feet. These wells were drilled with a water base extended polymer mud.

Drilled 4 wells on the King Ranch, South Texas, where both high pressures and high temperatures were encountered. Mud weights in excess of 18 pounds per gallon were necessary to control the wells. Bottom hole temperatures exceeded 470 degrees. Well depths ranged from 19,000 – 22,500 feet measured depth.

Drilled 6 wells Hidalgo County, Texas. Wells drilled were under balanced, with constant gas using a rotating head. Wells drilled successfully to depths of 19,000 – 20,250 feet measured depth. Technique of drilling with lighter fluid and weighting up fluid for trips, then cutting fluids back when back on bottom for drilling was used successfully.

Drilled 4 wells in High Island Blocks, Gulf of Mexico, (an area known for high gas pressures). Several kicks were taken in the process of drilling these wells. Mud weights were 16.8 to 18.3 at Total depth on these wells. Depths of wells were 17,000 – 18,500 measured depth.

Drilled several deep exploratory wells in Mississippi Canyon
Blocks, Gulf of Mexico. A lot of unexpected gas and pressure were encountered on these wells. These wells were in 4,000 - 7,800 feet of water depths. Total depths of the wells ranged from 20,000 - 23,000 measured depth.

ERD

Drilled extended reach several wells at Mississippi Canyon 311 with angles as high as 84 degrees. Measured depth on these wells averaged 19,000 feet. True vertical depth was as shallow as 9,978. Most wells averaged 6,000 feet of throw.

Drilled on South Timbalier Block 164, Gulf of Mexico, from a platform. 19 Wells were directionally drilled at high angles. Several of these wells were "S" shaped wells to avoid the other wells already drilled on the platform. Well angles averaged 63 degrees. Several of the wells exceeded 78 degrees of angle at TD. TD's averaged 17,000 feet.. Lignosulfonate mud with Soltex was used to successfully drill this platform.

Drilled 52 directional wells from the Lena Tower, Mississippi Canyon, the Gulf of Mexico. Water depth was 1,106 feet. Wells were high angle with several "S" shaped holes on this facility. Highest angle was 83 degrees with a throw of 5,700 feet. The angles on wells drilled was high due to having to drill between and around other wells already drilled. Ligno-Pac mud was used to drill all 52 wells. This is a mud system I developed for ExxonMobil.

Drilled 6 wells on Green Canyon 18, Gulf of Mexico. This was an existing platform in 1,200 feet of water. The platform was built on a knoll. Water depths around the rig exceeded 7,000 feet. The drilling was extending out from the platform under the 7,000 feet ocean floor. Very long sections of directional building were necessary to drill from the platform in 1,200 feet to beneath the ocean floor in 7,000 feet of water. Angles of these wells often exceeded 70 degrees. Depths ranged from 28,000 - 34900 feet MD. New Parks Deep Drill fluid was used on these wells.

Horizontal Drilling

Member of ExxonMobil's horizontal drilling team. Successfully drilled 22 horizontal wells. These wells were drilled in both West Delta and South Timbalier Blocks, Gulf of Mexico. Lateral sections were 1,000 - 3,000 feet in length.
Total depths of wells ranged from 15,000 – 19,900 feet. Drill in fluids were used on these wells.

H2S Experience

Drilled 6 wells in Mobile Bay for Exxon. This area is known to have some of the highest concentrations of H2s in the world. Under went extensive training before this project started in proper proceedures and techniques to safely drill these wells. Passed FIT test received certification in the use of a Scott air pack. A mud with H2S scavengers was used to drill these wells. Monitored sulfates with a Garret Gas Train.

Drilled several land based wells in Alabama where a high pH mud was used to control H2S at the surface. H2S scavengers were eventually added before TD was reached.

Deepwater Experience

Drilled 6 exploratory wells in Mississippi Canyon Blocks. Water depths ranged from 4,000- 7,800 feet. Well depths were 24,500-29,700 MD.

Drilled 5 wells in Alamos Canyon. Water depths were 7,400-9,163 feet. Total depth of wells was 18,800 - 28,600 MD.

Drilled 3 wells in Ewing Banks Blocks. Water depths were 4,200 - 6,940 feet. Total depths were 19000 - 21640 MD.

Drilled 4 wells in Green Canyon. Water depths were 7,800 – 9,980 feet. Total depths of wells was 29,000 – 34,008 MD.

Drilled 3 wells in Garden Banks. Water Depths were 6,900 – 9,200 feet. Total depth of the wells were 20,900 to 26,378 MD.

Problems encountered while drilling wells

Lost circulation
Have mixed and pumped nut plug, mica, sized fiber, Steel Seal, calcium carbonate, Pronto Plug, Kwik Seal, Chek-Loss, Gunk squeezes, Barite Plugs, and High fluid loss squeezes. While using many different combinations of these products we were able to stop lost returns in many wells that had total loss returns. Both spotting of pills and squeeze techniques were used on these wells.

Used Exxon's fracture sealing procedures. This was using sized Barite in a high fluid loss pill. The sized barite would fill the fractures and keep the fractures open and filled. Several pills of the sized barite would normally have to be squeezed before the fracture would be sealed. Exxon eventually found out that medium walnut hulls worked better than the sized barite for this procedure.

Ran both water and oil based fluids with 50 pounds per barrel of sized calcium carbonate to control seepage. While drilling with these fluids, sweeps with LCM in them were used to aid in sealing seepage and avoiding total lost return.

Dealt with total lost returns in horizontal sections. Products used included Cruseal (crawfish shells), sized calcium carbonate including large flakes, and Perfflow. Pills mixed and used were limited to products that could be acidized and dissolved so there was no permanent damage to the production zone.

Stuck Pipe: Actually I have had just a few experiences with stuck pipe. I have always felt that running the best and most cost effective mud leads to little or no stuck pipe. In the few instances we had stuck pipe I mixed and spotted either Black Magic, Coastal Spot, or Pipe Lax (depending on what type of fluid was being used). We had some success when the pills could be spotted quickly after becoming stuck.

Hole Cleaning: I am experienced in mixing all kinds of sweeps to aid in hole cleaning. These include thin thick combination sweeps, weighted sweeps, high fiber sweeps, walnut hulls sweeps, Deep Sweep sweeps (this is large ground barite which is removed at the shale shakers). Attended K&M School on Extended Reach Wells and Proper Hole Cleaning Techniques.

Areas worked

Both deep water and shelf drilling in the Gulf of Mexico (both Louisiana and Texas offshore), Louisiana land, south Texas land, central Texas land and Alabama land.

Education
1978 Nicholls State University, Thibodaux, LA
BS Pre-Med/Chemistry

1974 Edward Douglas White Catholic High School, Thibodaux, LA

Certifications and Classes

Randy Smith Blow-Out Prevention Training, (Exp. 2010)
Exxon Fire Fighting School
Extended Reach Training by K and M
H2S Certified, Certification Current
Water Survival Training
Brine Fluids Certified
Attended Exxon Water Base I and II Classes
Attended Exxon Synthetic Drilling Fluid I and II Classes

References
Will be provided

View contact information...
«« previous resume next resume »»
Search Results (Resumes 451 to 500 of 15478)Go to Search Parameters...
Brief Description
Over 24 years of various offshore vessels, ship yards, offshore rigs/ gas platforms, drill ships and engine factories as Oilier, Junior Engineer, Maintenance Superintendent, Technical Staff, Mechanic, Marine Engineer, Rig Mechanic, Maintenance Engineer, Hydraulic Mechanic, Rig and gas Platform Chie
More than 30 years experience in civil structural design, consulting and supervision in upstream, downstream, and pipeline of oil and gas fields
Oil finder/working manager with 27 years experience in US/international exploration and production geology, geophysics and research.
Control System Engineer
CCC Certified, MBA, Cost Controller / Project Controller expert in Advanced Excel, MS Access
Accomplished professional with over 19 years of experience in all phases of the oil and gas drilling industry as a Roughneck, Motorhand, Derrick Hand, Assistant Driller, Driller and Relief Rig Manager. Demonstrated proven track record of recent operational success as Directional Driller, Trainer, Te
Utilizing my professional skills can be achieve good plant reliability and availability , improvement in plant efficiency by out of box thinking & brain storming , failure analysis by RCA method , adhering companies safety and HR rules and regulations , team building ,Hazop, P&ID review , commission
commsioning for L N G Process Plants
Very experience cementing engineer/specialist
Seek the excellent opportunity to improve the company profit by implementing best systematic procedures in maintenance and to lead a team of engineers to minimize the instrument operating, maintenance cost, maintain 0% breakdown, safe working and implement Automation wherever possible.
Project engineer with strong analytical & organizational skills. Major capital projects include large-scale LNG plants, offshore floating production, refining, chemical & Gas processing industry
Senior Applications Software Engineer with broad experience in design, development and implementation of highly technical applications. In-depth experience with multiple MMI intensive applications such as EMS SCADA, geological and geophysical workstations.
Welding Inspector
Geophysicist/QHSE Advisor
Driller with 9 years experienc on land rigs and 24 yrs. total exp. in drilling field
I have very good skills for work in team, a like part of the team and with the capacity of leadership to be leader of the team. I apply a proper self direction naturally, I work by means of a good communication between colleagues and the bosses, good organization, intensive diligence, strong initiat
Qualified and Experienced Business Development Manager & Coordinator.
Accomplished Business Analyst and Consultant with over 30 years of responsible experience in areas of accounting, finance, materials management, and procurement. Seeking a responsible and challenging position where I can continually add value and contribute to the growth of a progressive organizati
I am a graduate mechanical plus first class boiler engineer and have 20 years experience of process and pwer generation industries.Iam in search of some engineering job in managerial position keeping in view my qualification and experience.
Project Controls, Project Controls Manager, Scheduling
Maintenance Planner / Scheduler
Eighteen years of professional experience in the fields of logistics, port discharging operations, plant equipment maintenance, warehouse management and contract administration. Three years managerial experience in manufacturing operations.
Mud Engineer/Drilling Fluid Consultant 31 years of experience
Well versed in boiler construction, piping fabrication and installation, machinery installatio
PLC control systems, coordinated lines, Design, Start up, Maintain.
Experienced drilling, completions, workover, manager and engineer. Have experience in hard rock, mid-continent, gulf coast, offshore shallow/intermediate/deep waters. Have both domestic and intrenational experience.
Engineering Manager - nine years of experiance. Responsible for all engineering related fuctions; budgets, skills training, maintenance, forward planning, internal projects and during last three years actively involved as the ovners engineering team representative during project design, procurement
I am an exploration geologist - manager with about 30 years experience in a variety of commodities but concentrating on copper and gold. I have worked in Saudi Arabia, Australia, PNG, Philippines, Indonesia, China, Laos, and Mongolia.My experience in recent years has been in Exploration Management
QHSE and general vessel superintendent.
Passed Secondary Techical Examination, ITI Electronics, Diploma in Mechanical Engg, Advanced Training in Instrumentation and possess 22 years on hand experience in Instrumentation and Control System. Also possess UAE driving licence and have good knowledge in PLC, DCS, Turbine control system etc..
Eight years of experience in Mining Exploration, management of all aspects of exploration drilling campaigns, surface geology mapping, geophysics, geochemistry, and hydrogeology.
Over 20 years of Civil/Structural Engineering: Computer Aided Design & Analysis and Project Management
Extensive contruction management experience in the field of onshore cross country oil and gas pipeline projects.
Dynamic and accomplished Operations and Technical Development Leader with 20+ years of demonstrated achievements in devising effective operational improvements.
Over 20 years of overall experience in geology, geophysics and operations with an emphasis on Seismic interpretation and reservoir modeling. Areas of strength are mainly in operation geology, seismic interpretation, Prospect generation & maturation, opportunity evaluation, reservoir modeling.
24 + yrs oilfield experience, 5 yrs field supervisor managing 9 rigs daily with as many as 30 at one time.
B.S. Geology, Lead Oil Co. Owner, Lead MWD/LWD,Liaison Directional Driller and have experience in all disciplines of Directional Drilling.
Management of Training & Development (technical, vocational and competence assurance). BSc (Open University)
electrical engineer/high voltage/switchgear/substation/plc
Seeking a Senior Project Engineering assignment where I can utilise my wide range of experiences over 27 years in Oil & Gas and Petrochemical Facilities, Process Systems and Pipelines.
About twenty (20) years of diverse working experience in various fields, out of which Ten years in the Oil & Gas sector of Middle East. Worked for Projects for Agip KCO, ADCO, Dolphin, Aramco, Sceco Etc.
well testing marketing manager
Heavy Civil Manager
I am a post-graduate in Chemistry and Marketing, with Twenty-four years experience in Quality Assurance Laboratory (Refinery complex) of Bharat Petroleum Corporation Limited, with five promotions. Last sixteen years worked as Management Staff at various capacities in laboratory.
Engineering
Projects and R&D in Water and Waste water Treatment - Industrial and Residential, Environmental Pollution Control, Corporate Social Responsibility, Additionality, Sustainability and Accountability in Natural Resorces Management
Well conversant & experienced in handling of Offshore drilling project for Oil & gas exploration
Geological investigations, feasibility and acquisition study, surface and underground exploration, exploratory drilling end mine geology (open pit and underground), grade control
Experienced finance manager worked in Banking, Oil and Gas, Constructions and Oil Field Services Sectors
Having 16 years of experience in Petro Chemicals & Refineries, Gas Plants, Combined Gas/Steam Power Plants Construction well versed with ASME, API, AWS & Codes related to Unfired Pressure Vessels, Heat Exchangers, Plant Piping, Storage Vessels, Storage Tanks, SRU Piping, HPCL Plant T&I Works
First   1   2   3   4   5   6   7   8   9   [ 10 ]   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com