CONTACT INFORMATION:
View contact information...
Education 1981-1987 Odessa Marine Engineering University,
Odessa, Ukraine, Ship Building Department
Qualification Naval Architect
1989, Central Marine Institute for Further Education, Odessa, Ukraine
Management & Repair Technology Certificate
SO Internal Audit Training Course, ABS Certificate
Database Training, Halliburton KBR Certificate.
Working Experience:
2007 June¡V 2009 February Prosafe Production Services Pte Ltd, FDPSO "Azurite ", Singapore,
Naval Architect ¡VEngineer
Responsibilities:
Calculation and Monitoring of weight& COG for the all items (structural, piping, equipment, architectural, electrical, HVAC, instrumentation, temporary construction items )
Creation and update of weight control database)
Comparison analysis of the design & fabrication weight
Preparation data for Watertight Integrity Plan & Down flooding point Calculation.
Preparation data for Load Master Software.
Preparation data for Load Line &Tonnage Certificates
Development specification & data sheet for life saving appliances (life boat & FRC &life rafts)
1998 May- 2007 June, AMEC Services Ltd, Azerbaijan Operations
2005 July ¡V 2007 June Azeri ¡VCirag-Gunashli,
Process Compressor & Water Injection Utility Topside project,
Azerbaijan, Baku, ATA Fabrication shipyard, Weight Control Engineer
Responsibilities:
Calculation and Monitoring of weight& COG for the all items (structural, piping, equipment, architectural, electrical, HVAC, instrumentation, temporary construction items )
Creation and update of weight control database (predicted & erected items weight &COG)
Weekly Weight Monitoring (installed items)
Comparison analysis of the design & fabrication weight.
Monthly Weight Report for project management
Calculation weight &COG of panels for lifting & heavy lifting.
Calculation weight condition of platform: Dry, Lift, Load out, Weighing.
Total weight of Topside is approx 13500TE
2003 June ¡V 2005 June Central Azeri, Compressor & Water Injection Platform Topside project,
Azerbaijan, Baku, ATA Fabrication shipyard, Weight Control Engineer
Responsibilities:
Calculation and Monitoring of weight& COG for the all items (structural, piping, equipment, architectural, electrical, HVAC, instrumentation, temporary construction items )
Creation and update of weight control database (predicted & erected items weight &COG)
Weekly Weight Monitoring (installed items)
Comparison analysis of the design & fabrication weight.
Monthly Weight report for project management
Calculation weight &COG of panels for lifting & heavy lifting.
Calculation weight condition of platform: Dry, Lift, Load out, Weighing.
Total weight of Topside is 14000TE
2003 March ¡V 2003 May Central Azeri, Compressor & Water Injection Platform Topside project,
UK, Wallsend shipyard, Weight Control Engineer
Responsibilities:
Calculation weight& COG for the all items ( structural, piping, equipment, architectural )
Creation and update of weight control database (predicted & erected items weight &COG )
Monthly Weight report for project management
Calculation weight &COG of panels for lifting & transportation.
2002 Aug -2002 Sep, Caspian Drilling Company,
Stability Analysis of semi-submersible drilling rig " DADA GORGUD"
Responsibilities:
Stability Analysis of semi-submersible rig ( approved by ABS Classification Society )
002 Apr ¡V 2002 May, Caspian Drilling Company, preparation the Operation Manual for semi submersible rig DADA GORGUD, section of " Marine Operations "
Responsibilities:
Stability Analysis of semi-submersible rig for transition mode, operation mode, survival mode.
2001 Dec-2002 Mar, Caspian Drilling Company, semi submersible rig "DADA GORGUD" UPGRADE 4 PROJECT
Weight Control Engineer.
Responsibilities:
Calculation weight &COG for variable deck loads, lightship correction, control of draft during Upgrade 4 project.
Control of draft during project.
Weekly Weight Report to project management.
2001Jan- 2001 Jul, AIOC, Engineering Services Contract
Weight Control of engineering & modification of CHIRAG-1 Production Platform.
Responsibilities:
Calculation the weight &COG for all items during modification project ( new equipment, new process systems, relocation structural items )
2000 Aug- 2000 Dec, Caspian Drilling Company, semi submersible rig " DADA GORGUD" UPGRADE 3 PROJECT
Weight Control
Responsibilities:
Calculation weight&COG for variable deck loads, lightship correction, control of draft during Upgrade 3 project. Took part into inclination test of semi submersible rig
Weekly weight report to project management.
1999 Jun- 2000 Apr, AMEC, Water Injection Project, Technical Assistant
Responsibilities:
Work with project technical documentation.
1998 May-1999 Mar, BP, semi submersible rig "SHELF 5" UPGRADE PROJECT, Technical Assistant
Responsibilities:
Work with project technical documentation for classification societies
1987 August- 1997, KASPMORSUDOREMONT Ship repair Yard, Baku, Azerbaijan
1987 Aug-1997 Engineer of Hull Structures Department,
Engineer of Floating & Dry Docks
Engineer of Project Department
Design Engineer of Design Office
Language: English „Ï Russian „Ï
Computer: MS-Office, Hydrostatic & Stability Software, ORACLE Database.
View contact information... |