CONTACT INFORMATION:
View contact information...
TRAINING, COURSE ATTENDED
Welding Course (GTAW – SMAW) BLK Cilacap 1995
Welding Awareness Training June-2007
MSTS Combined sea survival, fire fighting & first aid Oct-2007
Conducted by PT. J Ray McDermott Indonesia.
WORKING EXPERIENCES:
Daewoo NIG. LTD NIGERIA
(Oct 16th, 2008 until January, 2009)
POSITION: Welder GTAW-SMAW: SS, CS, And Duplex SS
Job Description:
Gymnastics before toolbox safety meeting for Job division from supervisor to every crew
Prepare welding equipment, fit up check before weld of pipe.
Turn on purging gas by the argon infusion for SS and Duplex SS pipes,
Weld pipe with welding procedure, TIG for root & hot pass, filler & capping with SMAW
Keep out my weld product from defect.
PROJECT COMPLETED
GBARAN UBIE OIL & GAS Project. Bayelsa – NIGERIA
PT. McDermott Indonesia. Batam.
(August 18th, 2006 until April 23rd, 2008)
POSITION: Crafts Process Welder: GTAW-SMAW: SS, CS, And Duplex SS.
Duties and Responsibility:
Toolbox safety meeting, prepare welding equipment after accept job order from supervisor /foreman. Check pipe before to weld with the procedure.
Turn on purging gas by the argon for infusion to pipe for welding process, use Sandvik 2209-filler wire for duplex SS pipe, ER 80 S NI-1 for Carbon steel OK 7018-C1 for SMAW
Preheat 40 C minimum temperatures for Carbon steel pipe, with burner or PWHT.
Safety training (MSTS) combined sea survival, fire fighting & first aid.
Weld at offshore field; Shongla-Thailand ARTHIT PLATEFORM, Lived in DB 26, work at LQ Plate form and wellhead
Keep out of my weld product from defect, bring about company ordinance.
PROJECT COMPLETED
PTTEP ARTHIT Project, Central processing PLATEFORM, Batam Fabrication and Thailand Offshore field
PT. Nippon Steel. BATAM
(May 23, 2006 until August 07, 2006
POSITION: Welder GTAW-SMAW: SS, CS. ( 6G GTAW ASME IX )
Duties and Responsibility:
Prepare welding equipment; check than preheat the pipe joint before to weld.
After briefing about safety & quality, weld stainless pipe or carbon steel with welding procedure at fabrication spool shop use LB 7016 & LB 7018 arc electroda for SMAW, TGS 50 wire root of Carbon steel with TIG
316 L TIG filler wire for stainless steel and use argon gas for purging/infusion
PROJECT COMPLETED
TOTAL SISI NUBI project, Central processing PLATEFORM
PT. McDermott Indonesia. BATAM.
(August 18, 2006 until April 24, 2008)
POSITION: Crafts Process Welder: GTAW-SMAW: SS, CS, And Duplex SS.
Duties and Responsibility:
Toolbox safety meeting, prepare welding equipment after accept job order from supervisor /foreman. Check pipe before welding with the welding procedure.
Turn on purging gas by the argon for infusion to pipe for welding process, use Sandvik 2209-filler wire for duplex SS pipe, ER 80 S NI-1 for Carbon steel OK 7018-C1 for SMAW
Preheat 40C Minimum temperatures for Carbon steel only, with burner or PWHT
Keep out of my weld product from defect, bring about company ordinance.
PROJECT COMPLETED
WOODSIDE LNG PHASE V EXPANSION (R-2706) AUSTRALIA.
SU TU VANG PROJECT CENTRAL PROCESSING PLATFORM ( R-2837 ) CUU LONG JOINT OPERATION. VIETNAM
PTTEP ARTHIT Project, Central processing PLATEFORM, Batam Fabrication
PT. TRUBA JURONG ENGINEERING
(February 28, 2005 until Dec 28, 2005)
POSITION: HP 1 GTAW-SMAW: P1 – P95. Boiler Welders
Duties and Responsibility:
After briefing about safety & quality, Prepare welding equipment and preheat to pipe joint before to weld. GTAW-SMAW alloy steel (A-335 P91) use the filler metal TGS-9Cb / CM 9Cb
LB 7018 arc electrode, TGS 50 wire root of carbon steel, weld pipe 2"CS at fabrication spool shop and assemblies panel of boiler.
PROJECT COMPLETED
PLTU Project CILACAP 2 X 300 MW T.3104 KARANG KANDRI CILACAP CENTRAL JAVA.
Cilacap 2 x 300 MW Coal Fire Steam Power Plant Project
PT. Mc Dermott Indonesia. BATAM.
(December 05, 2003 until January 29, 2004)
POSITION: Crafts Process Welder: GTAW-SMAW: SS, CS, And Duplex SS.
Duties and Responsibility:
Toolbox safety meeting, prepare welding equipment after accept job order from supervisor. Check pipe before welding with the procedure. turn on purging gas by the argon for infusion and use Sandvik 2209-filler wire for duplex SS pipe, ER 80 S NI-1 for Carbon steel OK 7018-C1 for SMAW
Preheat 40 C minimum temperatures for Carbon steel only. Keep out of my weld product from defect and bring about company ordinance.
PROJECT COMPLETED
FPSO CONOCO project, JVPC CPP VIETNAM Project..
PT. Profab Indonesia. BATAM.
(July 30, 2002 until January 29, 2003)
POSITION: Welder GTAW-SMAW: CS, INCONEL
PROJECT COMPLETED
Vessel Fabrication of CONOCO Project
HEAVY FABRICATION FOR ONSHORE AND OFFSHORE FACILITIES, BATAM
FORMOSA HEAVY INDUSTRIES TAIWAN. R. O. C
(February 05, 1998 until February 25, 2000)
POSITION: WELDER GTAW – SMAW C/S
PROJECT COMPLETED
Mailiao Power Plant Project..
PT. Truba Jurong. Eng
POSITION: Semi Skill, QC Crew
(March 15, 1996 until February 03, 1997)
PROJECT COMPLETED
Tambak Lorok Power Plant Project. Semarang, Central-Java
Interest/hobby: Reading, sport, music and traveling
Reference: Available on request
View contact information... |