WORK EXPERIENCE

1. October 2008 – January 2009. Gleeds Management and Construction Consultancy Tunbridge Wells Kent UK.

Position: Quantity Surveyor

* I assisted in managing costs on a wide variety of new building projects and structures, such as residential developments, schools, offices and factories.
* Responsible for undertaking costs analysis for repairs and maintenance of projects
* Actively involved in carrying out feasibility studies, risk and value management, cost control, tenders and contract documentation.
* Identified, analysed, and developed responses to commercial risks
* In charge of writing progress reports, evaluation of completed works, arranging for payments while ensuring that health and Safety regulations are met at all times.

2. June 2008 – September 2008 GLEEDS (PFI/PPP sector Gleeds Management Services Limited) London UK

Position: Project Manager

* I functioned as a Project Manager within GLEEDS PFI department over a four month period during which I worked with a team of three Project Managers on the 'Building School for the Future' scheme for Kent County Council in Maidstone (KCC),
* I was responsible for managing area data sheets of the drawings, room data sheets, ICT part and LCT
* I liaised with sub-contractors on behalf of KCC to ensure accurate drawings, schedules, tools, as well as Health and Safety issues are properly designed and carefully followed.

3. January 2006 – July 2008 Gleeds Management and Construction Consultancy Tunbridge Wells Kent UK.

Position: Quantity Surveyor

* Assisted in establishing client's requirements while undertaking feasibility studies of projects
* Prepared early stage budgets and detailed cost plans while performing risk and value management
* Advised my employer on various procurement strategies and ensured proper communication is achieved with the procurement department when requesting quotes
* Prepared tender and contracts documents including bill of quantities. I also ensured cost control processes where in place before, during, and after all projects
* Tasked with preparing cost plans for tender
* Actively involved in the establishment of financial control systems
* Excellent working within allocated budgets and still achieving expected results.
* Proficient in providing advice on contractual claims and variations
* Developed skills in problem analysis and report writing
* I have been involved in tendering and valuation of local contracts on different projects
* I have carried out extensive work on major projects in new buildings and fit outs in London and South East England. These ranged from £2million - £18million.
* I was tasked with the pre-qualification of suppliers, the creation of bidder's lists and the preparation of contractual terms and conditions in the preparation of tender documents.

4. Oct. 2000 – Aug. 2005 Lexibus Engineering Group, Rivers State, Nigeria.

Position: Project Manager

* Actively involved in Residential and Commercial land development projects.
* I designed the schematics for a Storm water project which involved dividing the storm water shed areas, calculation of maximum and minimum flow rate, determination of the storm drain pipe sizes and slopes, surface water drainage slopes as well as determining locations of the storm drainage inlets.
* Street design: determined elevations of centreline curb & gutter and back of walkway; designed gutter slopes to ensure storm water flow. Sewer and waterline design: determined locations, slopes and connections; decided fire hydrant and manhole locations. Street lights location and design.
* I worked with a team of Contract Administrators in the preparation of Contract Documents for an upcoming major phosphate production project in Port Harcourt.
* I was tasked with the preparation of an Environmental Impact Report (EIR), construction of water pipeline, pumping station, treatment plant, and various ancillary buildings and facilities Improvement and plan checking for various Public Agencies.

5. Jan. 2000 – Aug. 2005 Lexibus Petroleum Services Limited, Port Harcourt, Rivers State, Nigeria.

Position: Offshore Project Surveyor

* Responsible for Barge move survey support services for (OCIP project), ExxonMobil (Nig.) Unlimited.
* Survey support for Pipe Trenching project (BTIP) for Shell Petr. Dev. Company (SPDC) East, Nig
* Involved in creating survey support for underwater Pipeline inspection Services for ExxonMobil
* In charge of site survey operations for Chevron Texaco (Nig) Ltd.
* Involved in survey support for soil sampling operation for ExxonMobill Producing Unlimited.
* Provide Pipelying survey operational support for Chevron Texaco (Nig) Ltd.
* Responsible for all 8" Pipe Field Maintenance Services FMS for ExxonMobill Producing Unlimited.
* Supervised the construction of Phase II Gas Turbine (SCPP) at SPDC Industrial Area.
Setting out of drainage pattern
Cable route setting out operation
Levelling operations within the facility
Turbine engines and panels Installation task
Setting out of foundations and retaining walls
* Managed Computations and Map making using MicroStation software (CADD)
* Lead process piping and plant layout designer / 3D cad modeler/piping checker/Drafting QA/QC
* SHELL FORCADOS YOKRI INTEGRATED PROJECT (Onshore and Offshore interphase). Nigeria
* SHELL UTAPATE FIELD DEVELOPMENT PROJECT. (Subsea pipeline study/drawings) Nigeria
* SHELL KOLO CREEK RUMUEKPE PIPELINE 20" x 33 Km. (River and roads crossings) Nigeria
* Preparation of PDFs, P&IDs (PEFS/UEFS)
* Preparation of 3D plant and piping model to issue plot plans and equipment layouts
* Piping General Arrangements. Including piping and equipment sections and piping details.
* Piping isometrics and BOMs annotations and generation. Piping spooling for fabrication.
Piping design for turbine and compressors including structural steel supports.
* Provide 3D models, sketches and drawings to assist the skids manufacturers with fabrication.
* Lead trainer for 20+ local Nigerian drafters and 6 local Nigerian piping designers with 3D Rebis software.
* Lead designer for the preparation of Technical Tenders. Inspection of the Plant, Piping, Structural, Equipment of facilities and projects such as:
EIU SHE Revamp project.
ExxonMobil (5 offshore platforms) Nigeria
Bonny flow station project.
Shell SPDC (30,000 bbl/day flow station) Nigeria
Cawthorne Channel Project.
Shell SPDC (5 flow stations and utilities) Nigeria
Idu Field Gas Recovery and Plant Revamping.
NAOC Agip (flow station, pipeline and utilities) Nigeria
* Involved in Pipeline Routing 12" MP Between Bagi To Ibewa Alinmen for Elf (Nig) Ltd
* Responsible for As-Built Survey of 30MW Gas Turbine Facilities.
* Detail of Ibewa Production Centre for Elf (Nig) Ltd
* Supervised the pipeline Route 12" HP from Bagi to Obite Alignment (Part 1& 2)
* PI/FP Survey of SPDC SCPP (Gas Turbine 3) Site (SPDC)
* Plan and Profile of Pipeline for NAF Base Refuelling Facilities for Aero Contractor (Nig) Ltd.
* Involved in the Construction/Burial of 2" PVC Water-Pipeline for SPDC.

6. Dec. 1998 – Jan. 2000 Niger Delta River Basin Development Authority (NDBDA) Rivers State, Nigeria.

Position: Project Planner
* I was in a team of professionals in the delivery of a feasibility study in the regeneration of Port Harcourt town. This included the design, drafting and processing of full set of plans for two 36-inch diameter potable waterline projects.
* I was responsible for the preparation of Engineer's Cost Estimate, Technical Specification, Bid Documents and Storm Water Pollution Prevention Plan (SWPPP).
* Reviewed civil plans outlined for the project execution.
* Applied all the instructions and specifications stipulated for the project execution in order to take advantage of available resources allocated.
* Reported on a weekly basis, civil works progress and on site tests on a monthly basis to be addressed in the staff meetings.
* Coordinated the civil works scheduled for each week.
* Verify incoming supplies allocated to the project ensuring the quality standards.
* Civil work output analysis.
* Evaluated the personnel under my supervision.
* Monitored civil works accomplished on a regular basis according to closing dates for each work site of the project.
* Coordinated maintenance activities and routines related to equipment used.
* Recorded all information as detailed as possible related to asphalt mixture controls and pre-mixed concrete placements.
* Verified the compliance of quality standards and procedures for activity releases with respect to each of the work sites of the project.
* Carried out the daily schedule related to concrete demand to accomplish weekly project targets.
* Supervised the administrative personnel appointed to the project.
* Civil project reporting with respect to civil scheduling, materials allocated, supplier's performance and work progress ensuring the compliance of quality standards.

7. April. 1997 – Dec. 1998 Eko International Bank (Building and Engineering Department) Lagos, Nigeria.

Position: Building Engineer

* Managed, directed and administered the international sales effort for a large national plumbing and waterworks supply company which included sales and invoicing, purchasing, inventory management and administration, letters of credit negotiation.
* I opened new markets and negotiated exclusive agreements with sub contractors and suppliers. I was solely responsible for managing the site activities to fulfil the project target with ensuring that all installations are according to standards and specifications.
* I was involved in monitoring and supervising of onsite works including labour force and subcontractors.
* Ensured accurate drawings and quantities of material are on hand and carefully followed to maintain standards and achieve target. I was also responsible for the daily preparation and update of site progress reports.
* I openly communicated with other departments for any variations or modifications of works which led to other additional responsibilities as a QS Engineer.
* I designed and processed full sets of plans of 60% and 90% submittals for a Traffic Calming Project. I effectively managed the role of a Construction Manager for a Street Improvement Project and got involved in preparing Engineer's Cost Estimates, Technical Specifications and Bid Documents.

8. Nov. 1996 – April. 1997 H F P Nig Ltd Civil and Building Engineering Contractors Lagos, Nigeria.

Position: Trainee Quantity Surveyor

* I was directly responsible for all aspects of supply and delivery on site, a case in point was the supply of 200KM of Medium voltage transmission line, this included electric poles, cables, hardware and accessories.
* I was solely responsible for supply and delivery logistics, this role involved the coordination of suppliers, plant inspections, ship chartering, loading and off loading responsibility, the hiring of cranes, trucks and barges for the movement of equipment to various locations. I ensured all equipments and tools required were delivered on time and within budget, which positively affected the overall project completion timescale.

SCHOOLS ATTENDED

1. 2005-2006 MSc Project Management for Construction, University Of Brighton, Brighton UK. Accredited by the Chartered Institute of Building (CIOB) & Royal Institute of Charted Surveyors (RICS). Emphasis on human resources management, construction law, contract procedures, construction technology, procurement method, cost and financial analysis, benchmarking in construction Introduction to project management techniques in construction, including organizational structures for project delivery, construction contracts and documents, cost estimating and bidding planning and scheduling, cash flow analysis, project tracking and control, introduction to construction processes: excavation and site works, foundation layout, concrete form design, concrete, steel, timber, and masonry construction; project planning, scheduling, and control; construction safety.

2. 1999-2004 BEng (Hons) Civil Engineering, Federal University of Technology Minna, Niger State. Accredited by the Nigeria Institute of Engineers.

3. 1995-1997 OND Building and Quantity Surveying, Federal Polytechnic Ado-Ekiti, Ekiti State. Accredited by the Nigeria Institute of Building (NIOB) & Nigeria Institute of Quantity Surveying (NIQS).

PROFESSIONAL MEMBERSHIPS
* Charted Institute of Building (CIOB) United Kingdom.
* Association of Project Management (APM) United Kingdom.
* Royal Institute of Charted Surveyors (RICS) United Kingdom.
* Institution of Civil Engineers (ICE) United Kingdom.

SPECIALISMS SKILLS
Benchmarking, Cost Management, Life Cycle Costing, Project Management, Risk Management, Value Engineering

COMPUTER SKILLS
Auto CAD, Arch CAD, Pertmaster, Primavera, Prince2, SAP, MS Office and MS Projects

HOBBIES
Tennis, Foot Ball, Swimming, Travelling & Listening to Music.

REFERENCES
Will be provided on request

View contact information...
«« previous resume next resume »»
Search Results (Resumes 8351 to 8400 of 15310)Go to Search Parameters...
Brief Description
Exploration Geologist with eighteen months experience. Experienced with core and chip logging and sampling, DD + RC rig supervsion, Drillhole planning, orebody interp and wireframing, project appraisal and generation
I am qualified as a drilling fluids engineer. I have been employed with Baroid Trinidad Services Ltd a member of the Halliburton family.
SAP, LOGISTICS COORDINATOR, EXCEL, WORD, IMPORT/EXPORT, CUSTOMS, LC, PO
B.E Metallurgy & Materials Engineering . I am motivated with good interpersonal skills and communication skills. I try to give my best at what ever I do. I can be a good team member as well as a good team leader as per the requirement.
B.Eng Mechanical Engineering SKILLS: Numerical skills Information Technology skills Logical and Analytical skills.
I am computer literate, possess good interpersonal and communication skills, available for team work and always have the zeal to achieve whatever goals set
Decisive, result-oriented professional offering 7 years of experience in Mechanical, Electrical & Civil Industry.
COMPUTER SKILLS
Working experience of 1-year 2-months in Electrical Industry . In which, having experiance of 6-months as Electrical Design Engineer in an EPC company handling the projects of substation designing belongs to the chemical,metal &fertilizer process industries.BE/Bsc Electrical engineer. 4-year degree
Certified NAHETS graduate. Completed level I & II and am certified to operate the following: skid steer, backhoe, wheel loader, all-terrain forklift, excavator, bulldozer, motor grader, water truck, and off-road rigid and articulating dump trucks. I hold a current Class B NV CDL and medical card.
I am a Diploma electrical engineer and diploma software engineer. I have also completed courses of PLC/SCADA and CAD/CAM . I have been working as a testing engineer of a Distribution and power transformer since last 7 years.
Drill Equipments/Systems. Crane Electrical Systems Plant Process Equipments. Effluent plant. Generators Control Systems. Transforming Systems. Jacking Systems. Winching Systems. Air Condition and Refrigeration Systems. Intercommunication Equipment. Power Generators. Health & Safety at Work Act. Comp
Lease Anaylst
API, CSW, CWB QA/QC inspector willing to travel
DIPLOMA + B.E IN ELECTRICAL ENGINEERING + GULF EXPERIENCE Seek a position in Electrical Applications that provides the opportunity to make a strong contribution to organization goals through continued development of professional skills.
Operating rubber tire backhoes-trackhoes-and dozers as well many years.
Alex is a Licensed Civil Engineer by the Philippine Regulation Commission. He graduated Bachelor of Science in Civil Engineering as Cum Laude (Academic Honors) at Central Luzon State University. He is knowledgeable in AutoCAD and STAAD and also on all Microsoft Office Applications.
i am,Graduate in electrical & electronics engg.,having 1year gulf experience as planner/auantity surveyor in various saudi aramco and saudi electicity co. projects
Mechanical Engineer, Autocad, Pro/Engineer, Six Sigma, Planner, Supervisor, Microsoft Office, FE / EIT Exam, Primavera, Thermal-Fluids, Dynamics, Energy, Mechanical, Electrical, Materials
To put my best possible efforts by applying my professional qualification and expertise in order to enhance the image of the organization in which I am working
Good team player, ability to work with minimal supervision and to contribute optimally to the achievement of the organization's goals
REsume for Petrophysics or Geoscience Tech
Survey Engineer 10 Years Experience in Land Surevy
Commissioning of Electrical, Electronic control, Instrument and Safety System
Registered Professional Engineer with more than six years of work experience in the areas of Field Engineering, and Construction Management.
Foreman on Oil Jobs
I have been employed by Drilling & Workover organization in Saudi Aramco as a contractor of a service company from July, 1997. As a Materials Coordinator/Expeditor and Project Coordinator include my responsibilities assisting material Advisors at Material Acquisition and Forecasting Unit; coordinat
Develops schemes and prepares engineering plans for the Fiber In The Loop Networks (FITL) of various key business clients using SDH transmission solutions.
Educational Details: Diploma in Civil Engineering-1999 (Part time)
Safety Engineer
Pre-commissioning Engineer
Graduate engineer with specialization in metallurgical engineering and professional experience as welding engineer in the fabrication field for the past 10+ years. CEng MIOMMM MWeldI, ASQ-CQE, API 510 pressure vessel inpsector, CSWIP Senior Inspector
Mining Geologist
application for the post of safety engineer/ safety officer having an experience of 6 years and 7 months of which 2years and 7 months in kuwait approved as a safety officer from koc kuwait and approved as a safety supervisor from knpc kuwait
I am post graduated from I.I.T roorkee and have 3 yr experience in oil and gas consultancy(offshore) after post graduation. I have sound knowledge of SACS, STAAD softwares
experience in electrician and maintenance and mechanic
Lead Quality Engineer / Inspection Engineer / Welding Engineer
I am a Chemistry graduate having fifteen years experience from petorchemical and ammonia plants. At present I am working as a shift chemist in Saudi International Petrochemical Company. Previously I was worked in Madras Fertilizers Ltd as Senior Lab Analyst. Kindly consider my resume.
I'm an ambitious self-motivated professional,I'm well motivated, I've got a strong desire to succeed, and I'm always ready and willing to learn new information and skills.
Manager - Service Assurance and Process Designer
Surface Mine Electrician working with all aspects of electrical systems on surface facilities.
Lead Electrical Outage/Project Planner, Senior Electrical Planner, Mechanical Supervisor, Safety & Environmental Manager, OSHA Certified Instructor
I have capitalised a good experience over the past eight years supporting the operation of a major onshore oilfield in Algeria
Overall In-Charge for all Catering Operations at the Installation, Cost & Waste Control, Menu Planning, General Housekeeping for in and out of Accommodation and living Quarters, Providing Laundry Services, Practice of Safe & Environment Garbage Disposal, Mobilizations of crew and job rotation, etc.
Objective: positions utilizing my extensive knowledge and expertise in the field.
I have 34 years experience in my trade. I completed Ordinance Maintenance Course, Advanced Maintenance Course, Advanced Diesel Course, then went on to teach Advanced Diesel Courses while I was in the military.
Logistics 10+ years experience including: Commercial (Mining) project logistics; Humanitarian aid ; and, Military. Transportation & Distribution management; Warehousing; Purchasing. Fluent in both English and French; and computer literate.
Experienced with water/wastewater treatment technologies, Experience in designing reterofitting structures for highway bridges, Good knowledge of urban storm water hydrology and GIS software.
Expierenced in analytical techniques in hydrology/hydrogeology. Expert in modeling of ground/surface water using a variety of software. Skilled at managing moderate teams through planning, execution and report writing. Excellent written and verbal communication skills.
Looking to surround myself with quality people in a professional environment that strives for excellence in every task. To be a contributing member of a quality team. I want a position that allows me to grow as a person as well as an employee.
First   Prev   151   152   153   154   155   156   157   158   159   160   161   162   163   164   165   166   167   [ 168 ]   169   170   171   172   173   174   175   176   177   178   179   180   181   182   183   184   185   186   187   188   189   190   191   192   193   194   195   196   197   198   199   200   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com