Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #83636
next resume »»
CONTACT INFORMATION:
View contact information...
P.E.
Sr. Process Engineer
10-year track record of innovation and success in chemical engineering
Highly skilled, results-driven senior chemical/process engineer with a highly successful background in the design and development of highly sophisticated engineering processes. Extensive experience working as a Process Design/ Process Simulation Engineer. Excellent project management talents, with a proven talent for creating and monitoring progress of project schedules for major engineering projects. Able to build, lead and mentor teams of high-performing engineers. Outstanding client relationship and management talents.
Process Simulation & Development / Project Planning & Execution / Project Management / System Start-up, Commissioning, Integration & Troubleshooting
Professional Experience
Sr. Process Engineer, Polyplant Project Inc. (PPP), Burbank, California (2008 – Present)
Principal engineer responsible for process simulation, mechanical process design & development, and project management activities for clients in China, and S. Korea.
Key Achievements:
Performed Project management and coordination with internationally located clients and service providers for engineering project planning such as scope-clarification, kick-off meeting, front end/ detailed engineering proposals including project costing & scheduling, and execution of plant start-up, commissioning, integration and troubleshooting services
Managed multi-disciplinary meetings to negotiate contracts and services for front end engineering design. Project management work included evaluating contracts, cash flows, project reporting, initiation, organization, schedule development, budget development and control, and project closeout.
Wrote proposals, quality management, and schedule management plans for Greenfield petrochemical plants located in China
Performed steady-state, rate-based, and dynamic modeling in ChemCAD and Aspen to prepare heat and mass balances of various unit operations and to size and design multi-component distillation towers, turbo-expansion systems, absorption columns, hydrogen recovery units, strippers, flares, knock-out drums, heat-exchangers, vessels, ASME coded tanks, fluidized bed reactors, line sizing, waste discharge estimation.
Developed Process Flow Diagrams (PFDs), and Piping & Instrumentation diagram (P&IDs).
Evaluated various control loops and instrumentation options for automation of the processes.
Performed pressure vessel, relief valve design, and vessel depressuring using codes such as ASME Section VIII, API 520/521, API 526, API 2000, and OSHA 1910.
Performed preliminary engineering estimates for production of solar grade and electronic grade polysilicon.
Applied knowledge of various other codes and industry standards such as API's, PIP, OSHA, ASME, BS, AS, CS, NFPA 30.
Team Lead/Project Manager, Parsons Corporation, Pasadena, California (2006 – 2008)
Directed operations of Process Design and Mechanical Process Group. Provided supervision and mentoring to a team of ten engineers. Created process flow and piping/instrumentation diagrams. Developed project schedules and allocated resources. Developed and estimate budgets, and tracked Earned Value reporting. Interfaced with clients in gathering requirements and conducting technical assessments.
Key Achievements:
Spearheaded process development, implementation and debottlenecking using steady-state, dynamic and batch simulation software such as Aspen Plus, HYSIS, ChemCAD and Aspen Batch-plus.
Perform dynamic simulation to evaluate various control strategies.
Developed Process Flow Diagrams (PFDs), Piping & Instrumentation diagram (P&IDs), and estimated line sizing and pressure drop calculations.
Designed and developed unit operations such as vacuum distillation towers, absorbers, strippers, pumps, high pressure vessels and storage tanks.
Performed regression analysis for binary interaction parameters for various thermodynamic methods such as NRTL and UNIFAC.
Conducted Failure Mode & Effects Analysis (FMEA), Hazard Operation Analysis (HazOP) and system detailed description (SDD).
Equipment selection and design such as bag house, pulse jet filters, heat exchangers, cooling towers, compressors, and knock-out drums. etc.
Managed operations of Thermox fired heaters for vapor relief discharge at petroleum tank farm facility.
Reviewed basic order agreements and contracts, negotiated costs with service providers, interacted with client
Wrote project preliminary and detailed engineering proposals
Performed cost estimate and resource requirements for process engineering group
Managed process design group for front end and detailed engineering
Sr. Project Engineer, ECM, Costa Mesa, California (2003 – 2006)
Oversaw a team of multidisciplinary engineers. Trained, mentored and monitored performance of team members. Created automation and control functions for extraction systems. Performed analyses to determine process control and instrumentation requirements. Conducted hydraulic calculations and evaluated motor performance curves to finalize systems design.
Key Achievements:
Performed steady-state simulations in Aspen to improve yield, throughput and quality of systems pertaining to petroleum tank farm facilities
Designed and installed temperature-swing adsorption(TSA) units.
Developed Process Flow Diagrams (PFDs), Piping & Instrumentation diagram (P&IDs), As-builts, and estimated line sizing and pressure drop calculations.
Steered automation of systems through the installation of a variety of instrumentation and utilization of Programmable Logic Controllers (PLCs)
Steered design and development of several new processes that led to a significant increase in productivity.
Orchestrated setup of OPC servers & clients, to retrieve real-time system data.
Staff Engineer, ARCADIS, Fullerton, California (2001 – 2003)
Coordinated the design and development of a wide array of complex products. Performed pipe sizing calculations, mass and energy balance, and operated/maintained extraction systems for vapor relief systems. Created detailed technical documentation. Prepared and delivered reports on project progress for management.
Key Achievements:
Played key role in a significant increase of success rate for guaranteed implementation programs.
Performed line size calculations, hydraulic calculations, and mass flow calculations for biochemical processes.
Developed standard operating and start-up procedures for temperature-swing(TSA) and pressure-wing adsorption(PSA) units.
Prepared basis-of-design documents for preliminary and front end engineering.
Conducted design of demister tanks and knock-out tanks for gas liquid separation.
Research Engineer/Associate (1998 – 2001)
Performed chemical process optimizations and auditing for various industries; conducted experiments to develop new biochemical processes;
Key Achievements:
Evaluated treatment of wastewater from Textile and Brewery Industry, and treatment of mixed industrial and municipal wastewater treatment plants.
Conducted Environmental Auditing of Industrial Wastewater in conjunction with the regional water quality control board.
Conducted Performance evaluation of effluent treatment plants, sampled and analyzed wastewater samples, and interacted with client to evaluate industrial waste generation.
Education and Credentials
Master of Science (2001)
University of Iowa, Iowa City, Iowa
Bachelor of Engineering, Chemical Engineering (1998)
Dr. Babasaheb Ambedkar Technological University, Maharashtra, India
Professional Engineering License, Chemical Engineering
State of California (CH 6208)
TRAINING
40-Hour OSHA Hazardous Waste Training (29 CFR 1910.120)
Certificate in Safety, Health, and Risk Program (SHARP) Management
PUBLICATIONS
Gandhi S., Oh B-y, J.L. Schnoor, P.J.J. Alvarez (2001). Iron-enhanced bioremediation of TCE, Cr(VI), sulfate and nitrate mixtures in flow-through columns. Water Research, 36(8) (2002) pp. 1973-1982.
P.J.J. Alvarez, Scherer. M., G.F. Parkin, Gandhi S., Gregory K (2001) Iron-Enhanced Bioremediation of Aquifers contaminated with Chlorinated Solvents, Hexavalent Chromium, and Nitrate. Proc. HSRC Project No 98-1. Kansas City, May 22-2001.
PROFESSIONAL AFFILIATIONS
National Society of Professional Engineers (NSPE)
American Institute of Chemical Engineers (AICHE)
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1901 to 1950 of 15498)
Go to Search Parameters...
Brief Description
Chemical Engineer, P.E. Petrochemical Design Background Experience
ISO Compliance, 6 Sigma, Asset Mgmt, Vendor Mgmt, Catering, Transport, HK, Costing & Budgeting, HR, Employee welfare, FBT, Guest house mgmt, PF, ESIC, Medical, Fire drill, Security, Solving Employee feedbacks, Auditing, Billing.
I am a proficient project Manager in GIS with ESRI and ERDAS technologies
 11.0 years exp. normal Operations in a petrochemical & Gas plants mainly in operation of centrifugal compressors (cooper, kobelco & Elliott),reciprocating compressors ( IR ,SULZUR & Burckhardt ) ,all type of pumps (mainl
13 years in quantity surveying
18+ years automotive mechanics,11+years powder metal industry blending heatreat operations etc.
Rotating equipment / mechanical maintenance technician / Commissioning technician
Experienced, results oriented, safety minded manager
Oil & gas consultant with 29 years of experience and supervision on land, platform, jack-up and semi-submersible rigs. Proactive leader with strong communication skills, both verbal and written. Effective problem solver and decision-maker.
I have been working as an exploration geologist for 20+ years, field work to project management, Porphyry, Magmatic and Gold deposits in Canada
Structural Designer
To Secure a position with an established organization, to utilize my knowledge and experience in the field of Heavy Duty Equipment.
diploma in mech.eng, NVQ-level -3
Experience Drilling Supervisor, Land & Offshore
Dependable, motivated and organized hard worker who learns new procedures quickly, and meet schedules
I have a comprehensive understanding of a wide and varied range of vehicles, including HGV, PSV, Heavy Plant and Drilling Machinery. I am keen to use these multiple skills in a post which will prove challenging. In addition to my mechanical capabilities, I also have a good working knowledge of hydra
Career Maintenance Manager Mining
Rig Manager / Mechanical Engineer
Twenty five years in the Oil and Gas industry all of which was in the discipline of Project Services and Controls, providing leadership in Estimating, Cost Control, Planning, Scheduling, Contract Administration services. In-depth exposure in Heavy Oil, Natural Gas, Petro-Chemical, Compressor Package
Senior construction manager
Electrical estimator in industrial and commercial construction. Proficient in WinEst and Excel.
Diamond Drill Operator, surface drilling with the use of various types of machinery
Oil & Gas Landman
23 Years hands on construction/on site experience.MDP Project Management, Employed by EPCM company for 14 years prior to retrenchment, then focussed my attention on positions abroad.
Results-driven project and program management professional with first-rate skills in directing full cycles for complex, multi-site programs and initiatives. Proven ability to deliver substantial revenue, productivity, and quality improvements through well-managed, on-time projects.Particulary strong
28 years experience in ug/ hard rock and coal. Hard Rock: Alimak, Drift (rubber and rail), all types of stoping methods, and equipment operator of 1,1/4yd to 9yd loaders all brands, over shot rail muckers from 12b to 25 , jumbo drills single and double boom. Coal: Fletcher bolter and long wall
30 plus years experience with heavy equipment both as an operator and supervisor.
Procurement & Contracts Expertise
Marine engineer with all training necessary and green card
National Diploma in Chemistry and 28 Years experience in Laboratory work and management.
8 years of experience as MBBS doctor with additional skills in administration, project management, liasoning, coordination, HR management, quality monitoring, emergency health care, Trainings, Lecturing, critical reviewing and remote place health services.
20 years signalling experience with IRSE licenses and Signal Maintainer certificate. SPONSORSHIP PREFERED.
Environmental Management include the preparation of complete EIA report for various industries in relevant to sustainable use of resources / quality health safety environmental management / various water treatment components. Qualification - M.Sc. in Enviornmental Science.
PETROLEUM GEOLOGIST with experience in exploration, development, acquisitions, divestitures, and operations. Experienced in clastic, carbonate and salt environments. Available to travel for either permanent or contract work.
Suitable to work in process/operation area as technician (field & panel op) supintendent, etc.
My field experience is 20 years in monitoring, planning and executing exploration programme for following minerals,1.coal, 2. iron-manganese, 3. tungstan, 4. diamond,5. lithium-rubidium-cesium, 6 copper. Leasing and liasoning work with govt. and private cos. Project manager-05 years exp.
Seismic field processing on Promax for 10 years and actually short experience on CGG software
Over 23 years experience in engineering and project management in Oil & Gas, refining, and petrochemical environment. Extensive knowledge in particular aspects of project engineering, mechanical and maintenance engineering. Key engineering competences include procurement of major capital equipment.
O&G prospect/areal HC content assessment by a hand-picked series of near-surface, geochem-related, composited anomalies very indicative of commercial deposits.
MEP Professional Engineer with advanced Management Knowledge For High Rise Building
Over twenty-five years of work experience in the Oil, Gas and Petro - Chemical Industry,
I have 20 years of experienced in the field of Quality Control, Material Engineering and Construction Supervision in Heavy Construction such as: PetroChemical industries, Pipelines, Infrastructure, Highrise Building, Commercial Mall, Sewage Treatment Plant, Pumping Station, Milk Processing Plant etc
Extensive experience in project mgmt, tool,fixture, & machine design
Over 24 years global experience in reservoir development and management of oil and gas condensate fields.
Snr Project Engineer with Lead Process Engr / Manager and multidiscipline experience over 20 years in major international oil / gas & petrochem projects with leading Engineering and Operators in Europe ,US, Africa (Nigeria) and Mid East.
Petroleum Engineer with over 30 years of experince in oil and gas fields operation and maintnanace, including design and construction of surface facilites(Pipeline)
QA/QC ENGINEER
An experience individual with excellent knowledge of Sales/Marketing, Freight handling, Imports/ Exports Management with the objective of achieving organizational goals and making it a strong profit center seeks an opportunity in managerial capacity
I offer a broad range of upstream petroleum business skills and leadership experience covering exploration/development planning and LNG project execution, subsurface and production facilities planning, economic analysis, strategic planning, commercial/legal negotiations and corporate communications.
Five tears of experience in the field of industrial environmental monitoring specially related to petroleum and petrochemical complexes.I have sound knowledge of US EPA regulation. I can also design air air polltion control systems.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
[ 39 ]
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com