Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #84000 next resume »»
CONTACT INFORMATION:
View contact information...

Principal Geological Engineer
Years of Experience
17 ( approx 2 years in Australia with PB, 15 in India, Bhutan, Nepal with others)
Residence Language
Australia; India English, Bengali, Hindi

Education
Master of Science (Applied Geology), Indian Institute of Technology, India;
Bachelor of Science, University of Burdwan, west Bengal, India
Professional Affiliations
International Association of Engineering Geology and Environment: Member; International Society of Rock Mechanics: Member; Indian Society of Geological Sciences: Member; Australian Geomechanical Society: Member
International society of Rock Mechanics: Member
Key Qualifications
Mr. Mukherjee has more than 17 years experience in underground construction and related designs in Australia, Sweden, India, Bhutan, and Nepal. He has long valuable contribution in tunnels in large hydro projects, water transport tunnels in irrigation, and subway/metro tunnels relating to large rock caverns like powerhouse caverns, large storage caverns for fuels, deep subway stations and bus terminus, large span tunnels in difficult ground and cross over structures. He has lead teams in the planning and execution of geological–geotechnical and geological investigation campaigns using advanced geological and geophysical techniques including state-of-the-art 2-D and 3-D geological ground modelling software. He has produced technical reports on ground investigation and interpretation. His other areas of expertise include construction supervision, active design during construction / design optimisation, geotechnical instrumentation (planning, execution, monitoring, data production, interpretation), and project management (design coordination, planning, and delivery).
Apart from his core technical competence, Mr. Mukherjee has complementary exposure in contracts management, tendering, and business development experience.
Career Objective
To achieve a leading technical presence in geotechnics in the Australian and Regional Market place fulfilling the key senior role within the geotechnical group with long term commitment, and providing leadership and technical advice to the team members including other teams when required. Instilling best practice through the work process, skill development, innovation and technical excellence, leading by example and to act as a mentor to function staff to ensure that they benefit from working with an engineer of recognized standing in the industry

Aspire to be trained directly in depth for the new technical & management packages / modules (company's In-House / globally practised: software, approach plan, best management practises).

Overseeing the delivery of projects to meet or exceed time, quality and budgetary targets in line with Clients' expectations. Marketing the Company's services through meetings with Clients, bid and proposal preparation and general promotional activities. Seek opportunities and encourage work packaging internationally. Fulfil other internal company roles as mutually agreed from time to time.
Project Experience
Road/Traffic Tunnels
* Airport Link Project, Brisbane, Thiess – John Holland Joint Venture.2008-2009. Principal Engineering Geologist, detail design submission for 5.8billion AUD combined toll road and busway project.
Project is part of Brisbane's key TransApex strategic development plan and includes 3.5 km of dual three-lane and two-lane road tunnels with complex ramp cross overs (totaling more than 12 km of TBM driven and road header driven tunnel). Airport Link toll road, a PPP project, will provide a primary orbital function for traffic to bypass Brisbane's central business district via North–South Bypass Tunnel and Inner City Bypass. It will also deliver a secondary radial traffic function between south central and northern suburbs, Brisbane Airport and Australia TradeCoast precinct. Where it connects with existing surface road infrastructure at its three major interchanges it includes multiple large span shallow ramps, bridge, and cut-and-cover structures, and large ventilation buildings. Northern Busway design and construction includes approximately 1 km of shallow large span busway tunnel provisioned for two new bus stations and stops on a 3 km long two-lane, two-way bus-only facility.
Major role played in APL project (PBA JV: a joint venture between PB & Arup) consisted of:
* Planning and execution of comprehensive ground investigation campaign including extensive ground geological mapping, drilling, RAAX and acoustic probing, in-situ and laboratory testing of rock and soil, pile testing, assisting in hydro-geological charactierisation
* Quality screening, data collation and building up of the ground investigation of database; presentation of database using GIS, gINT,
* interrogation and interpretation geological database; characterization of ground and its behavior to the tunnel & other structures; modeling of the global project geology base upon 2-D and 3-D analysis (using CADD, VULCAN, Google sketchUp)
* development of rock mass classification system and interrelating it to the rock material parameters for seamless interfacing with tunnel design system and numerical modeling
* assisting in developing the project construction supervision manuals and quality procedure for ground inspection, characterization and tunnel mapping
* supervising, training and mentoring of the junior team members
* Pir Panjal Railway Tunnel, Srinagar, Jammu and Kashmir, India, Northern Railways.2004-2006. Coordinator and Project Geologist. Responsible for detail design and construction supervision for 11-km-long railway tunnel design in Himalayan geology (deep shear zone, karstic topography, high overburden over 2,000 m) using NATM concept, tendering, and evaluating of contractors. Works included geological mapping, geotechnical and rock mass assessment, technical parameters for tunnel design and support system.
* Delhi Metro Subway Corridor MC1a, New Delhi, India, Client: Delhi Metro Railway Corporation.2002 – 2004. As Manager - Rock Support and Geology. Responsible for detail designing and construction execution of 4.5-km-long stretch of underground metro corridor including four underground metro stations using top-down and cut-and-cover method and active design optimisation during construction. Carried out detail geotechnical and geological investigation, factual and interpretive geotechnical report preparation, geotechnical inputs for designing of cut-and-cover rock slopes, pile foundation characterisation, and soil stabilisation. Complete campaign for geotechnical instrumentation for the project from design to implementation, including data acquisition and processing.
* Delhi Rapid Transit Underground Metro Corridor, New Delhi, India. 2001. Responsible for contractors' bid design, geotechnical site characterization, risk assessment and construction methodology.
* Rohtang Hillroad Highway Road Tunnel, Manali, Himachal Pradesh, India. 2007. External Expert to contractor's bid design and tender input. Carried out risk assessment for 8.8-km-long road tunnel at high altitude Himalayan snow-bound area with extremely high overburden over 2,000 m. input for tunnel construction, and evaluation of TBM/mined tunneling option.

Large Span Rock Cavern
* Unlined Rock Storage Cavern Storage of Crude Oil, Visakhapatnam, India.2006 -2008.
Client: Engineers India Ltd., Ministry of petroleum & Natural Gas, Govt. of India. Assignment included tender design, detail design verification and construction supervision. Worked as Principal Geologist & Assistant Project Director being responsible for geotechnical aspects, technical coordination and invoicing / payments. The project used advanced 3rd generation design concept of hydrological confinement of hydrocarbons with modified cavern floor avoiding sludge formations in an unlined rock storage cavern 50m below the groundwater table, average 75m below ground.
Project involves 2.33-million-metric-tonne capacity underground unlined crude oil storage cavern with 1.8-million-cubic-metre underground rock excavation for five caverns of cross section of 600 m², 3 caverns 840m long and 2 of 320m. Other components: 2x95m deep 75 m² main shafts, 3x 80m deep inlet shafts, 1750m access tunnel, 1350m long water curtain tunnels; 80 m long water curtain bore holes. The project is situated in Archean gneissic craton in eastern coast of India adjoining creek and shear zone. Job also involved contractors' bid evaluation and recommendation. The project is presently under construction and scheduled for completion in 2010.
* Detailed Feasibility Study For Unlined Rock Storage Cavern Storage Of Crude Oil, Multiple locations in India (Mangalore, Mumbai, Vizag) for storage volume of 0.5 million metric ton to 2.5 million metric ton.2000 -2001.
Client: Engineers India Ltd., Ministry of petroleum & Natural Gas, Govt. of India. As Lead Geologist, carried out detailed feasibility study of strategic storage of crude oil at sites being responsible for geotechnical investigation campaign, geological mapping and geo-hydrological characterisation, drilling and geophysical studies, preparation of Geotechnical Baseline Reports, compilation of final Detailed Feasibility Report.

Hydropower Tunnels & Caverns
* 1,500-MW Nathpa Jhakri Power Project, Rampur/Simla, Himachal Pradesh, India, Nathpa Jhakri Power Corporation.1993 – 1998. Senior Engineering Geologist. Carried out rock mass classification for tunnel. Involved in stabilisation of slopes and foundations, and support recommendation using NATM concept. Responsible for geotechnical instrumentation, installation, monitoring and studies in tunnels and shafts during excavation, on-site validation of tunnel support design based on observed rock mass conditions during tunnel excavation.
* Tala Hydro-electric Project, Chukha, Thimpu, Bhutan, Tala Hydro Power Authority.1998 -2000. Senior engineering geologist for 1,020-MW project consisting of 7-km-long head race tunnel with access adit. Responsible for technical documentation of geological details encountered during excavation, providing back up for portal development, and optimising cycle time for construction. Monitored and interpreted geotechnical instrumentation for safety. Responsible for contract management.
* 60-MW Hanol-Tuini Hydropower Project, Dehradun, Uttaranchal, India, SunPower India Ltd. 2007. Engineering Geology Expert. Carried out geotechnical assessment of project components (barrage, tunnel alignment, in-ground powerhouse, construction adits), construction material and excavation methodology, preparation of detailed project report.
* 340-MW Teesta Hydro-power Project, Sikkim, India, National Hydro Power Corporation.2001. Project Tender Geologist. Carried out site geotechnical assessment, risk assessment, study of rock class distribution, suitability assessment for power house, water diversion structure, adit and portal location.
* 80-MW Middle Marsyangdi Hydro-power Scheme Stage II, Kathmandu, Nepal, Nepal Electricity Authority.2001. Project geologist for contractor's bid submission. Carried site geotechnical assessment, risk assessment, study of rock class distribution, suitability assessment for power house, water diversion structure, adit and portal location.
* 240-MW Alaknanda Hydro-power Project, Badrinath, Joshimath, Uttaranchal, India, Malana Power.2007. Engineering Geology Expert. Assessed dam foundation, constructability, construction material.
* 750 x 2-MW Nyamjung Chhu (Stage I and II) Valley Hydro-power Development, Tawang, India, Bhilwara Malana Power Company.2007. Engineering Geology Expert. Responsible for study of virgin valley for development of cascade type hydropower projects. Assessed project components and optimisation of power production. Assessed geotechnical risks, and alignment of head race tunnel, dam foundation.
* Rapid Valley Assessment for Hydro-power Project Development, Spiti Valley, India, Bhilwara. Malana Power Company.2006 – 2007. Engineering Geology Expert. Assessed river valley for hydropower generation. Carried out rapid feasibility study of underground structures and foundation for various components of project, and construction material.

Contract Management
* Delhi Metro Subway Corridor MC1a, New Delhi, India, Delhi Metro Railway Corporation.2004. Contract Manager. Assessed subcontractor billing and claims, subcontract agreement finalisation, and settlement of dispute.
Bid/Proposal Management and Business Development
* Detail Feasibility Study for Road Tunnel Network, Various Locations, India, Himachal Pradesh Road and Infrastructural Development Corporation (HPRIDC).2005. Bid Manager. HPRIDC invited request for proposal for detail feasibility study assignment for decongestion of Simla, the capital city, by road tunnels underneath existing buildings etc.
* 320-MW Tapovan Vishnuprayag Hydropower Project, Uttaranchal, India, National Thermal Power Corporation.2006. Responsible for design, construction review and supervision of TBM tunnelling.
* 300-MW Devasari Hydropower Project, Dehra Dun, Uttaranchal, India, National Thermal Power Corporation.2007. Responsible for technical and financial proposal for detail project report preparation, detail design and construction supervision.
* Strategic Storage of Crude Oil in Rock Cavern, Mangalore, Karnataka, India, Indian Strategic Petroleum Reserve Ltd and Engineers India Ltd.2008. Responsible for bid for tender design and construction supervision for 3.25 million metric tonnes capacity strategic storage.
Technical expertise
* Engineering geological and geotechnical studies for prefeasibility, detailed feasibility studies and detailed design phases using geophysical techniques (seismic studies, optical televiewing of bores, RAAX, acoustic sounding), core drilling, geological mapping and modeling, geo-hydrological testing & characterization (pump out tests, packer testing);
* Comprehensive geological database management and 3-D geological modeling; utilization of outputs from software like gINT, VULCAN, WELLCADD, SketchUP; AUTOCADD
* Monitoring, presentation, interpretation of geotechnical instrumentation;
* Generating technical reports for various stages of studies from prefeasibility, detailed feasibility studies to detailed design phases;
* Project scheduling, tasking, budgeting, deliverable management and leading the large team of geotechnical /geological engineers;
* Interfacing, coordinating with interdisciplinary aspects of design delivery, construction management, E&M, environment impact management;
* Project reconnaissance study and reporting, proposal preparation, tendering and coordination;
* Client liaison, budgeting, invoicing

Publications
* Mukherjee, B, Kunar, S & Hassan A 2001, 'Geotechnical characterization of site for underground unlined cavern for crude oil storage', paper presented to New Frontiers in Tunnelling Conference, Kathmandu.
* Mukherjee, B & Hakansson, U 2004, 'Rock blasting in urban environment: New Delhi metro project', paper presented to Bergmekaniks Dagen (seminar in rock mechanics), Stockholm.
* Mukherjee, B & Samanta. G, 'Development of geological ground model for an urban tunnel project and its sequential optimization from conceptual to detail design stage: an useful tool for geotechnical risk identification and design inputs' (World Tunneling Congress Montreal' 2010; to be published)
Trainings
* Queensland Blue card holder for Construction safety, Queensland, Australia
* Safety tanning in confined space and rescue, Queensland, Australia
* Safety in Tunnels and underground construction, National Safety Council, India
Professional History

2008 – present Principal Engineer-Geology: Parsons Brinckerhoff Australia Pty Ltd
2006 – 2008 Asst. Project Director / Principal Geologist: Sweco International AB, Sweden/India
2004 – 2006 Country Manager: Geoconsult ZT GmbH, Austria/India
2004 – 2006 External expert in Engineering Geology: RSW, Canada & Indo -Canadian Consultancy Services Ltd, India
1999 – 2004 Senior Engineering Geologist: Skanska International Civil Engineering AB, Sweden/India
1998 – 1999 Senior Project Geologist: Larsen and Toubro Ltd, -Engineering and Construction Group, India
1994 – 1998 Asst. Manager-Geology: Impregilo s.P.a and HCC Joint Venture, India
1992 – 1994 Research Officer: Indian School of Mines, India

Summery of assignments and projects worked:

Service type code:
C: Construction / with Contractor
CDT: Contractor's Design Team
DC: Design Consultant

Assignment type code:
FS: Feasibility Study
DFS: Detailed Feasibility Study
DD: Detailed Design
CS: Construction Supervision
TE: Tender Engineering

Project Name, Project type Location & Project Details Service Type & agency Assignment type
1. Airport Link, Northern bus way & Airport Round About
DD Brisbane DC
Parsons Brinckerhoff –Arup JV (deputed from PB) DD,
CS Investigation, Geological assessment & Interpretive reprts, rock characterization, 3-D geological modeling and support design as part of detail design submission

2. Strategic Storage of crude oil in unlined rock cavern Visakhapatnam, India DC SWECO International AB. DFS, TE Detailed feasibility report, Tender engineering & FEED.
3. Delhi Metro rapid transit system New Delhi, India
CDT Kumagai-Skanska-HCC JV (deputed from Skanska International) DD Detailed design of rock support; geotechnical instrumentation, active design optimisation
4. Detailed feasibility for Strategic Storage of crude oil in unlined rock cavern Three sites in India: Mumbai, Mangalore, Visakhapatnam DC Skanska Teknik AB, Stockholm DFS Detailed feasibility report (basic design, cavern lining & stability, cost calculation, system studies)
5. Rohtang Road Tunnel Himalayan belt; Himachal Pradesh, 8.8 km long high altitude hill road tunnel C External expert to Larsen & Toubro Ltd. TE Risk assessment for construction and validation of construction method
6. Tala hydroproject Bhutan, 1020 MW runoff the river HEP C Larsen & Toubro Ltd, CS Rock classification, tunnel support, tunnel mapping, geotechnical instrumentation
7. Pir Panjal railway tunnel Kashmir, 11Km long railway tunnel;
DC Geoconsult, Austria Tendering, geotechnical investigation, detailed design and construction supervision
8. Nathpa Jhakri Hydroproject Himachal Pradesh, India
1500 MW runoff the river with 30km tunnel, underground powerhouse, 60m high dam
C
Impregilo sPa & Hindustan Construction JV CS Rock classification, tunnel support, tunnel mapping, geotechnical instrumentation
9. Rapid hydropower potential study: Spiti valley Upper Himalaya, India DC ICCS-RSW JV FS Rapid feasibility study of hydropower projects along valley
10. Various hydropower projects Himalayan belt, India DC Skanska, ICCS-RSW JV, Geoconsult FS, TE Tendering, feasibility study, estimation, construction method

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2751 to 2800 of 15341)Go to Search Parameters...
Brief Description
I am a career driven individual with desire and ambition to succeed, grow and develop with a dynamic and professional company like yours, one that can afford good prospects coupled with challenge for professional achievement and satisfaction.
More than 16 years in the field of Secretarial job, 4 years in the field of Accounting and Credit & Collection & 2 years in Office Clerical jobs. Expert in computer program applications like MS Word, Excel, Access, Outlook, PowerPoint, Mind Manager, CRM. Also, PC assembly and trouble shooting.
Sr. Designer with Autocad,Microstation, PDMS,AutoPlant, SmartPlant
DCS Operator with more than 15 years Experience
Mining 20 years South Florida dig wet or dry prossess every type of material. Experence with Hoe,Loaders,Buldozers,Pumps, Screeners,Stackers, Crushers, Machanic, People, Customers, Bidding, Truck Broker 20 years to move material, IMSHA,Permits, South Florida Water Management .
14 years in Details engineering, Control system, Construction, Operation and Maintenance works of Electrical and Instrumentation in EPC projects Oil & Gas, Hydrocarbon, Petrochemical, Refineries
16 years Experienced Warehouse/ Logistics/ Supply Chain Management, Proficient in Inventory Control and Procurement, seeks suitable job.
Sr. Java developer
Have B.Sc. degree (2:1 upper division) in Geology, and 11.5 years (1998 – 2009) working experience with Shell E&P (Netherlands and Nigeria) as senior Geologist and subsurface team leader. Very skilled in static modelling using Petrel, HCIIP volumetric computations, Field development planning
Senior Piping Designer/Field Coordinator/PDMS and PDS Designer
I have worked over in iraq working 12 hours a day seven days a week straight for tree months at a time in all types of conditions.....worked as a V S C Manager for 2 1/2 years over in Iraq
My skills are logistics, inventories, supply chain, drilling materials,
Constructions, Erections, Installation, Maintenance, Inspection of Static& Rotating Equipment Piping Acessories and Structural steel and Computerized Maintenance Planning’s System ,Familirize with API , ASME and ASTM standard . Understand to read P&ID, Hyd/Pneum Circuit, Isometric Drawings.
Safe, Reliable, Cost effective Supervision with 23 years experience
Senior Geotechnical / Civil Engoneer
Heavy equipment - mining
HEAVY EQUIPMENT OPERATOR with over 24 years experience in handling and operating different types of Heavy Equipment such as CAT Excavator 330, Crawler Crane 65 Toner, Mobile Crane, Tower Crane, Bulldozer at any type, Front Loader, Dump Truck and Light Vehicles
Experienced Oil & Gas Driller
Trouble shooting, repair and maintenance of moblie mining equipment
General Analysis of Petrochemical, raw materials, process, products, customer complaint. Expert in several Lab instruments as AAS, ICPS, ICS, DSC, HPLC, GC, etc.
Driller/Toolpusher looking for over seas position,has cyber, Top drive & directional experience, 7 years drilling , 15 years derricks, 6 years work over , 1 year geothermal experience. 27 total years experience.
36 years of expierance in the open pit mining field . 1.5 years of supervision of a 25 pluss cew. expierance in opperating all heavy equipment pertaining to open pit mining.
Hands-on Operational Management of Exploration & Development activities using Best Practices and BPI management skills.
Field Superintendent / Projects Start-up Leader with 30 years experience in onshore and offshore oil and gas production operations. Experience gained in working for major Oil Companies covering surface production operations, planning and training aspects
31 Yrs. Of Experience i Rotating Equipment Maitenance /Conditio Monitoring
I have high energy level and eager to learn new skills ,I am very organized person and in my entire job I have organized my activity and other people activity.I can take responsibilities ,I am a customer focused and I have always met my deadlines.
Solid experience in Project Management and Project Control of Oil and Gas Projects.
■ Quality-driven professional with over 25 years of experience■ Verifiable track record for successful completion of projects in EUROPA ,SOUTH- AFRICA.RUSSIA and QATAR. ■ Business oriented; able to understand and execute broad corporate policy. ■ Implementatio
PRINCIPAL ENGINEERING GEOLOGIST-GR LEADER
To offer quality management services related to mining and quarrying covering the aspects of mine planning and engineering, development and operations, including among others activities such as formulation of short and long term plans and implementation; drilling and blasting design and optimization
Senior Reservoir Engineer with 20 years experience in Reservoir Simulation and reservoir management. Very good experience in Well Test Analysis, reserve estimates, material balance and enhanced oil recovery schemes.
Graduate Diploma in Petroleum Engineering
I have been working for the past 22 years in project controls / planning, construction and maintenance disciplines in Oil & Gas, LNG, Fertilisers, Petrochemicals, Power and Refinery. I have a good knowledge of International Standards & working practices. Thorough knowledge of Primavera (P3).
Bachelor of Engineering Batch 1978 From Punjab Engineering College – Chandigarh – India.
i` ve got 10 years of work experience within which I` ve collected data base on around 1 000 000 samples, that were sorted and put in spreadsheets.
Good communication,Self motivated,Analytical and Team player. B. Engr. Elect/electronic
Quality Assurance/Control * Inspection & Project Engineering * Welding * NDT * Coating * Fabrication * Construction * Offshore and Onshore Gas / Oil / Gas Plants*Jackets / Topsides / Well sites / Pipelines / Piping / Structural / Pressure Vessels / Tanks /
Telecom Engineer transmission speciality more than 16 years experience
Efficient planning for execution of project
Strong management professional who enjoys growing business and improving performance.
18 years experience: design of suppression and alarm systems, manage design, review P&ID for HPR chemical plants, CFD modeling, nuclear industry FHA, performanced-based: (fire exposure, fire endurance, smoke control) designs, firefighting experience 5 years
Advanced engineering education with a MS degree in Mineral Economics. Emphasis in Financial Risk Management, Advanced Mineral Asset Valuation using MonteCarlo Simulation and Option Pricing Theory, Investment and Portfolio Management, Bilingual Spanish-English
A highly motivated multi-lingual manager seeking a challenging position overseas. I am computer literate with experience using Microsoft Office applications. I have excellent oral and written communication skills. I have worked for a company and clients with strong safety-cultures.
Position Objective: Senior Managerial position in electrical or electro-mechanical industrial firm. The aim is to bring the facility’s productivity, profitability and quality up to a highly recognized standards utilizing personnel, technology & procedures.
Qualified and experienced professional in hydrology system modeling and engineering project management. Seeking to attain a challenging position that provides responsibility and management in a research or engineering environment where I can be actively involved in solving environmental issues.
Lean Manufacturing, Manufacturing/Business Process Improvement, Value Stream Mapping, Factory Layout Design/Cellular Manufacturing, Process Mapping & Analysis, Performance Measurement, MRPII/ERP, Operations Management, Project Management, Cost/Benefits Justification.
Ph.D. materials engineer with 23 years of R&D experience in: a) Program management; b) Measurement of material properties Test method development and fixture design; c) Polymers, composites and their processing; d) Laboratory supervision and management of technical personnel.
13+ Years of Experience in Overhead Power Transmission Line Projects/Construction
A Professional Mechanical Engineer with nearly 13 years of experience in project as well as maintenance field in Power and Petrochemical industries, to seek a performance oriented and challenging career in the Industry.
Senior Geotechnical engineer with 7 Years of experience and having Masters Degree in Geotechnical engineering
First   Prev   51   52   53   54   55   [ 56 ]   57   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com