SUMMARY OF QUALIFICATIONS:

* Registered Mechanical Engineer by the Professional Regulation Commission (PRC) of the Philippines.
* B.S. Mechanical Engineering Degree
* Knowledge and can interpret Piping & Instrument Diagram (P&ID), Piping Arrangement Drawing (PAD), Isometric Drawing & Structural and Tank Drawing.
* 7 Months experience in Geothermal Power Plant Construction in Piping & Structural
* 1 Year experience as Planning/ Scheduling Engineer in fabrication of Piping, Structural and Tanks.
* 1 Year & 3 Months experience in Piping in Oil and Gas Construction Site
* Proficient in Project Planner MS Project
* Proficient in MS Excel
* Knowledge in Primavera and SAP
* Computer Literate (MS Word, MS Power Point, MS Publisher)
* Knowledge in AutoCAD Layout and Detailing (2D & 3D)
* Knowledge in Piping Inspection & take-off weight of material.
* Knowledge of Industry Piping Codes.
* Knowledge in piping engineering including pipe wall thickness calculations, branch connection reinforcement check and equipment nozzle load calculations.
* Knowledge in assessing pipe routings with regards to stress and supports.
* Capable to handle a minimum of 3 to 4 groups of Piping Foreman
* Knowledge of piping, pre-fabrication carbon steel and stainless steel, piping erection, familiar with codes, good knowledge of drawing study.
* Ability to give solution and suggestion to any critical situation in piping constructions.
* Ability to making layout of pipeline prior to erection to minimize of delayed work schedule.
* Be able to work independently under pressure and can easily adjust in new working environment.
* Can foresee and handle major problems & suggest solutions to lead engineer.

OBJECTIVE:

To be a part of a highly organized oriented group wherein I can upgrade my knowledge and capabilities in my chosen career and responsibility to an impressive and competitive project discipline execution. An able to implement the cost saving as well as the early accomplishment the assign project in awareness in every project budget and identify additional work task billable to client and become competent asset in any company that values quality and hard work requirements and somehow I can allow to share that knowledge to enhance and impart to the next generation of specialist in the field of engineering industry.

WORK EXPERIENCE:

OVERSEAS EMPLOYMENT:
CONSTRUCTION PROJECT INVOLVES:

PROJECT NAME: NAUYYIM GAS AND OIL SEPARATION PLANT
COMPANY NAME: SAUDI GAS COMPANY (ARAMCO)
CONTRACTOR NAME: J & P LTD.
Address: Alhuta Rhiyad KSA
Period: April 2009 to May 2009
Position: Site Piping Engineer
Department: Construction Site (Pre-Commissioning)
Hired Status: Rental

DUTIES AND RESPONSIBILITIES:

* Preparation of the test package, schedules the walk-down, compliance with the NCRs and the RFIs.
* Developing the turnover packages/procedures. Preparation of the test package, schedules the walk-down, compliance with the NCRs and the RFIs.
* Checking of installed materials on pipeline, types of Valves, their directions, Tag numbers, Commodity Code, rating and size based on the giving standards and specification as per P & ID drawing.
* Coordinated with operations and maintenance with respect to scheduling, construction coordination, commissioning plans, and start up procedures, walk down and receiving plans, turnover packages.
* Checking all the pipe line (Compressor & Chemical Injection Area) for any discrepancies for immediate action for rectification.
* Assisting the authorized group for preparation of materials and test limits prior for start-up test.
* Preparation & review system identification for turnover, Scoping of the P&IDs as per the system.
* Site survey for modification and rectification according to actual installation of Pipe Line if any as built situation.
* Conduct daily progress monitoring, prepare reports and forecast activities as required and keeps informed the higher supervisor informed on progress of overall assigned activities.
* Identify construction critical items that have cause of impacting the delayed work schedule.
* Submit inspection punch list clearing in order to close some categories that will affect the holding over dossier prior to start-up any Pipe Line.

PROJECT NAME: SAUDI KAYAN PETROCHEMICAL COMLEX
COMPANY NAME: SAUDI BASIC INDUSTRIAL COMAPANY (SABIC-SAUDI KAYAN)
CONTRACTOR NAME: FLUOR SAUDI LTD.
SUB-CONTRACTOR: MOHAMMAD AL-MOJIL GROUP (MMG)

Address: Jubail Industrial City KSA
Period: September 2008 to February 2009
Position: Site Piping Engineer
Department: Construction Site (Boiler Area)
Hired Status: Rental

DUTIES AND RESPONSIBILITIES:

* Assists Supervisor and Superintendents in the preparation of construction methods, schedules, manning progress chart, materials and equipment requirements.
* Supervised the assigned project area and ensuring that deliverables are complete as per schedule. Takes corrective action where necessary to control engineering work and over all progress on the project.
* Strong leadership/communication and interpersonal skills, resolving complex technical issues that flow across discipline interfaces of the assigned project area, Plan to adjust unanticipated changes in scope, materials, equipment delivery and cost, as defined by the approved scope
* Preparations of materials based on the giving standards and specification and inspection of fabricated spool pipes as per Isometric drawing.
* Prepare inspection request prior to accept construction Piping/ Welding works, Pressure testing and releasing of installed Pipe Lines in order to prepare certification of the completed items.
* Supervised and coordinates overall planning, control and appraisal of the project, plan to adjust unanticipated changes in scope, materials, equipment delivery and cost, as defined by the approved scope
* Responsible for material identification, class and specification for the pipe line prior for fabrication and erection.
* Inspection of types of Valves, their directions, Tag numbers, Commodity Code, rating and size.
* Identify and monitor changes or deviations in construction drawings and specifications being issued by client from time to time at the project.
* Site survey for modification and rectification according to actual installation of Pipe Line.
* Ensure the newest revisions of current design to use to complete the work and that design changes are approved prior to implementation.
* Preparations of materials based on the giving standards and specification and inspection of fabricated spool pipes as per Isometric drawing.
* Review the Isometric design to be used and identify potential changes which will improve the constructability of the work.
* Identify construction critical items that have cause of impacting the delayed work schedule.

PROJECT NAME: RABIGH OLEFIN PLANTS PROJECT (ROPP)
COMPANY NAME: RABIGH REFINING & PETROCHEMICAL COMPANY (PETRO RABIGH)
CONTRACTOR NAME: JAPAN GAS COMPANY (JGC ARABIA)

Address: Rabigh City KSA
Period: May 2008 to August 2008
Position: Piping Supervisor
Department: Construction Site
Hired Status: Rental

PROJECT NAME: SHARQ - LINDE POLYETHYLENE PLANT EXPANSION
COMPANY NAME: LINARCO ( LINDE ARABIAN COMPANY )
CONTRACTOR NAME: MOHAMMAD AL-MOJIL GROUP (MMG)

Address: Jubail Industrial City KSA
Period: January 2007 to May 2008
Position: Piping Supervisor
Department: Construction Site
Hired Status: Rental

DUTIES AND RESPONSIBILITIES:

* Assign to a field construction organization in a supervisory capacity.
* Responsible for supervising and directing operation with assigned area.
* Giving instruction to foreman according to the construction requirements.
* Responsible for material identification, class and specification for the pipe line prior for fabrication and erection.
* Checking & distribute drawings to foreman prior for erection and installation of Pipe Line.
* Distribute of test package for clearing the priority punch provide by the contractor prior for test.
* Preparations of materials based on the giving standards and specification and inspection of fabricated spool pipes as per Isometric drawing.
* Prepare inspection request prior to accept construction Piping/ Welding works, Pressure testing and releasing of installed Pipe Lines in order to prepare certification of the completed items.
* Prepare test package and test limit base on giving P & ID by a client prior for Hydro testing.
* Inspection of types of Valves, their directions, Tag numbers, Commodity Code, rating and size.
* Identify and monitor changes or deviations in construction drawings and specifications being issued by client from time to time at the project.
* Site monitoring and line checking for modification and rectification according to actual installation of Pipe Line.
* Ensure the newest revisions of current design to use to complete the work and that design changes are approved prior to implementation.
* Review the Isometric design to be used and identify potential changes which will improve the constructability of the work.
* Responsible for the reconciliation of materials quantities with the client.
* Responsible of Pipe Line checking prior for approval production accomplishment.
* Conduct daily progress monitoring, prepare reports and forecast activities as required and keeps informed the higher supervisor on progress of overall assigned activities.
* Site survey for modification and rectification according to actual installation of Pipe Line if any as built situation.
* Established a working relationship and communication to assigned field engineers.
* Preparations of materials based on the giving standards and specification and inspection of fabricated spool pipes as per Isometric drawing.
* Submit inspection punch list clearing in order to close some categories that will affect the holding over dossier prior to start any Pipe Line testing.
* Review the Isometric design to be used and identify potential changes which will improve the constructability of the work.
* Identify construction critical items that have cause of impacting the delayed work schedule.
* Implements and enforces policies, safety procedures and related work rules as established by field construction management.
* Ensures safety standard and requirements being implemented in equipment and tools are in safe condition and operated safely.
* Conduct a daily safety awareness to avoid cause of accident and injury.

LOCAL EMPLOYMENT:

COMPANY NAME: TAIHEI ALLTECH CONSTRUCTION (PHIL.), INC. (TACOPHIL)
Address: Barrio Dita Santa Rosa Laguna
Period: January 2007 to December 2007
Position: Planning/ Scheduling Engineer
Department: Planning/ Scheduling

DUTIES AND RESPONSIBILITIES:

* Project planning, scheduling, costing, monitoring and contract management of refinery and petrochemical projects.
* Preparation of schedules with respect to the master time schedule, updating and progress monitoring using Primavera and MS Project Planner.
* Generation of reports using S- Curves and other reporting and monitoring formats.
* Analyzing critical activities with negative float and initiate action for covering up the delays.
* Experience of project management activities, preparation of recovery plans, settling contractual issues and closing of turnkey contracts for projects.
* Experience of developing systems and procedures for the department including progress-monitoring procedure.
* Prepared project progress measuring system.
* Attending progress review meetings with client and sub-contractors.
* Prepared project cost estimation for the contract and monitoring actual utilization of resources.
* Responsible for the construction and commissioning detailed planning & progress monitoring.
* Prepared the detail activity and resource planning for the revamping.
* Preparation of all periodic reports, forecasts and presentations.
* Material procurement and cost estimation and analysis.
* Preparation of detail activity schedule and progress monitoring for the Mechanical construction of process plant area.
* Preparation of work procedure and execution sequence for all critical activities.
* Coordinate with site personnel during the execution of the work.
* Material, manpower & equipment planning for daily work activities.
* Preparation of detail activity and resource planning and progress monitoring of the work using Primavera.
* Make a project work schedule for fabrication (Piping, structural & Tanks).
* Make a load chart for projected load output per month.
* Make a control sheet as a daily progress monitoring base on the drawing released from engineering
* Checking & distribute drawings to shop prior to fabrication.
* Updating progress status in weekly & monthly schedule.
* Making monthly progress report send to client and for monthly billing.
* Conduct daily progress monitoring, prepare reports and forecast activities as required and keeps informed the higher supervisor informed on progress of overall assigned activities.

PROJECT NAME: 40 MW NORTHERN NEGROS GEOTHERMAL POWER PLANT
COMPANY NAME: PHILIPPINE NATIONAL OIL COMPANY (PNOC-PHIL)
CONTRACTOR NAME: TAIHEI ALLTECH CONSTRUCTION (PHIL.), INC. (TACOPHIL)
Address: Northern Negros Bacolod City
Period: June 2006 to December 2007
Position: Site Piping Supervisor
Department: Construction Site

DUTIES AND RESPONSIBILITIES:

* Inspection in trials of installation of turbine prior to tightening.
* Inspection of alignment in Turbine-Generator foundation prior to installation
* Inspection of turbine in installation to the babbit bearing.
* Inspection of alignment in Condenser foundation prior to erection.
* Inspection of installation of hot well pump and its accessories.
* Monitoring of tank erection (NaOH, H2O, & RAW WATER)
* Conduct inspection of piping fit-up before full welding.
* Checking the orientation of valve and support.
* Conduct Hydro Testing of piping.
* Conduct of punch listing in piping, structural & tanks.

EDUCATION & CERTIFICATION:

COLLEGE:
Cebu Institute of Technology
Bachelor of Science in Mechanical Engineer
N. Bacalso Avenue Cebu City
2000-2005
SECONDARY:
Santa Monica Institute
Poblacion II Mabini, Bohol
1995-1999
ELEMENTARY:
Mabini Central Elementary School
Poblacion Mabini, Bohol
1989-1995

ADDITIONAL INFORMATION:
Age: 26 Years Old
Birth Date: February 1, 1982
Birth Place: Poblacion 2 Mabini, Bohol
Civil Status: Single
Sex: Male
Citizenship: Filipino
Height: 5'4"
Weight: 155lbs

View contact information...
«« previous resume next resume »»
Search Results (Resumes 6651 to 6700 of 15508)Go to Search Parameters...
Brief Description
BE MECHANICAL ENGINEERING,ME THERMAL ENGINEERING.
9 years Experience in Oil and Gas offshore production process platforms as Production operator, Plant Operator. Worked in IRAN Petropars Gas development Project phase 6,7&8 as Field Operator through the employer DAELIM Ind. Co. South Korea, Well experience in Commissioning and Plant start-up also.
i am a qualified mine surveyor and a civil engineer currently with Anglo platinum.
I am electrical engineer and doing job in CCIC qatargas project since 2 years.i am looking for the new job in oil and gas industry
Recycle Hydrogen System,Recycle Gas Scrubbing,H2S Handling ,Amine Treating,Reactor Effluent Water Wash,Vapor/ Liquid Separation,Hydrogen Purification,Stripper,Off Gas Absorber ,NHT,PLATFORMING,CCR
To work in a motivating and demanding position, which will help me to grow in the field of knowledge, improvise skills and add value to the system and grow along with the organization.
proficient in AUTOCAD, MS Project, MS Office package, SAP & primevera.
Highly motivated mining engineer graduate, with internship experience at Kompania Weglowa, largest coal producer in Europe. Interested in working as open pit and underground mining engineer, developing technical knowledge skills in adult and pursuing a career in mining industry.
Preparation of Data book files to conform to clients procedures and guidelines, Organize information from internal sources including client, suppliers and in kind resources, Generating and maintaining the project master punch list.
Offshore Drilling Maintenance Engineer
Good work ethic, current job title is foreman. Can read prints, run/route tray, terminate, build panels, troubleshoot, some experience bending tubing etc. Knowledgeable in power, automation, & pneumatics along with a good understanding of both drilling and production operations.
3 years Diploma (mechanical engineer) &12 years work exp- oil & gas area for mechanical supervisor.
PIPING ENGINEER
Perform canister gas content analysis and residual gas experiment on selected core sample, data acquisition and data entry to determine lost gas value.
Well service specialist
A full time position to appreciate and explore a challenging environment in the field of Environment and Safety that offers Professional growth & advancement opportunity while being resourceful, innovative and flexible
Process Engineering
Have all Oilfeild tickets
Seasonal Professional with nearly 9.3 years of experience in Construction, Erection & Project Management and Team Management with well known organizations. Demonstrative abilities in identifying potential, deconstructing complex situations and further conceiving and implementing streamlined solutio
Document Controller
Experienced gained in drilling engineering, heavy work-over operations, HPHT wells, deep water operations, well completion and testing, tendering, cost/contractor control, qa/qc, project management and conflict resolution. Holds a diploma in Mechanical engineering and final y B.TECH in petroleum
Fresher- engineer in maintenance and exploitation of oil and gas deposits.
Programming of Emerson DCS (Ovation),
MBA-Finance and done summer training in standard charted bank
Sales and marketing professional with a proven track record of achievement in leading and managing a seasoned, high performing, global sales team.
Multi-disciple project engineer covering, electrical, instrument, mechanical, piping work etc. Gas Turbine & High Voltage Power installation work. DCS work. Contract Management / Planning / Cost/ Commissioning, Training, Maintenance,. Vendor Inspection. Contract estimation work, QA/QC/QS.
Results oriented electronics technician. Background includes twelve years of experience in troubleshooting, assembling, installation, testing, upgrading, configuration, support, and maintenance of Audio, Video, Communication devices, Cellular phones, computer hardware and software.
A capable, enthusiastic civil engineer with 12 years experience on site construction specialize in horizontal and vertical construction, tunneling, viaduct, high speed railways, High rise buildings
Diploma of Associate Engineer in Civil Technology
All type of Light & Heavy Lifting & Transportaion job
diamond driller
Im a Mechanical engineering graduate. i have completed my undergraduation (B.E.) in india under Anna university and did my masters (MSc in Mechanical engineering) in UK at Staffordshire university. After that i came to india and joined as production manager in Sri venkateswara textiles.
Relatively young well test engineer/testing supervisor with 10 years hands-on experience in well testing. ex-service hands with direct knowledge of how things worked and troubleshooting. Good interpersonal skill and work hard.
Mining engineer with 4+ years experience.
Biomedical Engineer having skills to sortout the problems of electronics & mechanical. also able to work in the pressure.
I am a chinese,39 years old.I graduated from DALIAN MARITIME UNIVERSITY.I have 5 years experience on Oil Tanker as Junior Deck Officer and 10years on FPSO as DPO & Cargo Operator.I hold Chief Officer Certificate.
I have a proven ability to organize and lead members of a team, ability to bring fresh perspectives to a business and technical team, excellent verbal and written communication skills. I catch on quick. I am a multi tasker, and great under pressure. I believe in team work and will work as a team pla
Piping engineer
Total 4.2 years relevant work experience in the field of Piping Stress Analysis. • Diploma in Piping Engineering from Suvidya Institute of Technology. • B.E. in Production Engineering with First Class. • Diploma in Production Engineering with First Class.
I am a site manager currently financing myself through a BSc in construction management with the Reading University, having already completed various construction related college courses. I have been working in the U.A.E for the past 2.5 years managing a large workforce on mix use developments.
I have BSC in electrical engineering and now I am working in ethiopian electric power corporetion since june 16 - 2005 under protection and communication enginering
PROFILE: Filipino CPA and MBA with 15 years of experience in the fields of audit, finance and accounting
Experienced Landman/ROW Agent
Design, detailing, offer evaluation, TQs preparation, vendor drawing approval of the various static equipments like Pressure Vessels, Heat Exchangers, Columns, Reactors.
I finished in diploma in Architecture, master diploma in architecture cadd
Challenging and rewarding position in growth-oriented organization which offers diverse job responsibilities in vehicle maintenance and will fully utilize both my technical and managerial abilities.
Detail Engineering: P& ID review and Basic selection of Instruments from process description, Control Philosophy in co-ordination with Process Department, Engineering of distributed control system, Specifications for field instruments, Panel Instruments and control system.
Excellent negotiation skill,strong analytical skill,excellent client orientation skill.B.sc degree in banking and finance
I have over 12 years of experience in sales in the oil and gas industry. I have multiple certifications as you will notice in my resume.
4 years experience in Quantity Surveying, also exposed in construction management works.
First   Prev   101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124   125   126   127   128   129   130   131   132   133   [ 134 ]   135   136   137   138   139   140   141   142   143   144   145   146   147   148   149   150   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com