Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #86028 next resume »»
CONTACT INFORMATION:
View contact information...

BORN: 1965

NATIONALITY: INDIAN

QUALIFICATIONS: High school, Punjab School Education Board, Chandigarh in 1980

Trade Certificate in DM Mech. from Industrial Training Institute, Patiala in 1985

Training on MICROSTATION Ver.3.0 by Rolta India Ltd in September 1990

Learned French language & passed 1st. semester examination of French Studies from Alliance Franchise, New Delhi in 1991

Completed Bachelor of Science in Mechanical Engineering from Rochville University, MD, USA in 2008

LANGUAGES: English, Hindi, Punjabi

COMPUTER LITERACY: AutoCAD, MicroStation, PDS, 3DM & MS Office

CAREER SUMMERY: 23 Years plus experience in plant engineering, piping study drawings, equipment layouts, nozzle orientation, general arrangement piping drawings & piping supports.

- Plot Plan
- Equipment Layout
- Preparation & Review of Piping GA drawings
- Nozzle orientation of vessels
- Preparation & checking of piping isometrics
- Bill of Materials
- Piping supports

FIELDS OF EXPERIENCE: Oil & Gas, Power Plant, Petrochemical, Effluent Treatment & Fire Fighting

EXPERIENCE: Working with Worley Parsons, Atyrau, Kazakhstan LLP
As PDS Lead Piping Designer in Plant Design Team on GUP U-800 Revamp Project For TANGIZCHEVOROIL (TCO), Tangiz, Kazakhstan Visited the jobsite for the survey of the Different Areas,

Assignment Duration: August 2008 - Till Date

Worked as Checker / Piping Lead Designer in Plant Design Team on GAS UTILAZATION Revamp Project For TANGIZCHEVOROIL (TCO), Tangiz, Kazakhstan, Visited the jobsite for the survey of the Coalescer Filter Area,

Assignment Duration: April 2008 – August 2008

PREVIOUS WORK HISTORY: Worked with First Egyptian Engineering Co.– Cairo, Egypt
As Checker/Technical Lead Designer in Plant Design Team and assisting to Engineering Group Supervisor on EL-TEBBIN THERMAL POWER STATION, EGYPT.

Assignment Duration: August, 2007- April, 2008

Worked with Crestville Engineering & Technology Co. Ltd. – Lagos, Nigeria as Lead Piping Designer/PDS/PDMS Designer on Oil & Gas jobs for Shell Fuel Oil Depot, Nigeria.

Assignment Duration: April, 2007- June, 2007

Worked with FLUOR DANIEL INDIA PVT. LTD.
Gurgaon as Principal Designer (Piping) /Deputy Lead Supervisor/Area Lead Designer, Responsible for VAM / AA Tankage Area Modeling & checking of others work on Smart Plant Review and PDS (3D Modeling) Assignment/Visit to Fluor Daniel - Greenville (U.S.A.) from 5th February 2007 to 22nd February 2007 for 33% Model Review with client & Greenville office For Sipchem Project, Saudi Arabia

Assignment Duration: June, 2006- March, 2007

BECHTEL INDIA PRIVATE LIMITED, New Delhi on various projects and visited other countries per the detail as mentioned below
Deputy Lead Supervisor / Lead Designer / Senior Designer (Piping)

Assignment Duration: April, 1996 – June, 2006

Worked as Lead Designer/Deputy Lead Supervisor & was responsible for Vendor document Review & Checking Piping Isometrics generated by other designers on 3DM (3D Modeling). For
Elm Road Generating Station, Michigan,USA

Assignment Duration: March, 2006 – June, 2006

Worked as Lead Checker, Checking Equipment parametric/Nozzle Reports and Isometrics on Smart Plant Review and PDS (3D Modeling). For
Sonahess G C R Facilities, Algeria

Assignment Duration: January, 2006- March, 2006

Worked as Area Lead Designer & responsible for Pipe Rack, Day Tank Area, Cooling Tower Area & co-ordination with other leads Piping Design, Equipment Modeling & Pipe Modeling on PDS (3D Modeling). For
Borger Refinery, Borger at Texas, U.S.A.

Assignment Duration: April, 2005- December, 2005

Worked on Piping Study Drawings, Equipment Modeling & Pipe Modeling on
PDS (3D Modeling). Assigned to Bechtel - Houston (U.S.A.) from August 2003 to January 2004 for Revamp Project of Ultra Low Sulfur Diesel Projects, at Motiva Convent Refinery, & Norco Refinery, U.S.A.
& visited the Job site for no of times during the stay in Houston

Assignment Duration: August, 2003- February, 2005

Worked on Equipment Layouts, Piping Studies & M T O,
Assigned to Bechtel-London (U.K.) from April 2003 to May 2003
for Gasco OGD - III / AGD – II Feed Project for ADNOC, Abu Dhabi.

Assignment Duration: April, 2003- May, 2003

Worked on Piping Design, Equipment Modeling, Isometric Ext., for Area C & G Equipment's Parametric Report / Isometric Checking on PDS (3D Modeling). Assigned to Bechtel - Houston (U.S.A.) from July 2002 to October 2002 for Equiva Low Sulfur Gasoline Projects, at Motiva Convent Refinery, & Deer Park Refinery, U.S.A.

Assignment Duration: July, 2002- March, 2003

Worked on Pipe, Equipment Modeling & Designing of of Different System of U/G & A/G piping, Isometric Ext.
on 3DM (3D Modeling). Assigned to Bechtel - Frederick (U.S.A.) since December '2000 to March '2001 for Intergen North America LP's, Power Plants (Cottonwood, Magnolia, Redbud ) U.S.A.

Assignment Duration: December, 2000 – July, 2002

Worked on Pipe, Equipment Modeling & Designing of Different System of U/G & A/G piping, Isometric extraction on 3DM (3D Modeling). for Sabine River Works LP, Cogeneration Plant, Orange, Texas, U.S.A.

Assignment Duration: July, 2000-September, 2000

Worked on Pipe, Equipment Modeling & Designing of Different System of U/G & A/G piping, Isometric Extraction on 3DM (3D Modeling). Assigned to Bechtel - Frederick (U.S.A.) from February '99 to November '99 for Coryton Energy Project, Stanford-Le-Hope, England, U.K.

Assignment Duration: February, 99 – June, 2000

Worked on Checking of Isometric, Making & checking of Sleeper Location & Stringing Drawings of Refinery Tank Farm & O & U Additional Areas in PDS (Plant Design System) Ver. 6.1 for Reliance Petroleum Ltd., Jamnagar Refinery Project. Jamnagar, India

Assignment Duration: January, 98 - November, 98

Worked on Piping Design & Equipment Modeling, for Fire Water Pump House & Fuel Gas Compressor House, Extraction of Isometrics & Bill Of material in 3DM
Ver. 5. for Spalding Energy Project, Spalding, U.K.

Assignment Duration: August, 97 - December, 97

Worked on Modeling / designing of pipe supports, Selection of Supports, Extraction of hanger sketch using HGRSKET software on 3DM (3D Modeling)
for different Systems for Samalayuca-II Combined Cycle Project, Mexico, U.S.A.

Assignment Duration: January, 97 - August, 97

Worked on Pipe, Eqpt., & Hanger Modeling, Interference Report & Iso Ext.on 3DM (3D Modeling) on Different systems for Rocksavage Power Project, Runcorn, U.K.

Assignment Duration: May, 96 - January, 97

ENGINEERS INDIA LTD., New Delhi on deputation thru Dalal Consultants & Engineers Private Limited

Senior Draughtsman (Piping)

Preparation of piping GA drawing on AutoCAD Release-11. Review of Piping GA, Isometrics & Supports drawing.

LPG Plant, Lakwa
LPG-Recovery Unit, Usar
Ethylene Plant, Auraiya

Assignment Duration: July, 93 - April, 96

DEGREMONT INDIA LTD, New Delhi
Senior Draughtsman (Piping)

Preparation of piping GA drawing, Plot Plans, Equipment Layouts, P&ID's, Isometrics, Piping Supports & BOM.

E.T.P. Gola Distillery, Gola Gokarnath
E.T.P. Synthetics & Chemicals, Bareilly
E.T.P. Kedia leathers & liquors,Indore
E.T.P. Khoday Distillery,Banglore

Assignment Duration: January, 89 - July, 93

TECHNOFAB ENGINEERING LTD., New Delhi.

Draughtsman (Piping)

Preparation of Isometrics & Bill of Material of fire fighting system for Super Thermal Power Station, Korba

Assignment Duration: April, 88 - January, 89

CHEMICAL & METALLURGICAL DESIGN CO.
LTD., New Delhi

Draughtsman (Mech.)

Preparation of vessel data sheets, GA & Isometrics drawing.
Indian Calcium Carbide Ltd.,
Madhya Pardesh Calcium Carbide Ltd.,

Assignment Duration: October 85 - April 88

SALARY EXPECTED: Negotiable

View contact information...
«« previous resume next resume »»
Search Results (Resumes 351 to 400 of 15344)Go to Search Parameters...
Brief Description
Purchasing/Contract Administration career includes experience in oil & gas, subsea, petrochemicals and drilling. It also includes large and small projects and many years in chemical/refinery enviroment. My Motto: Whatever it takes to get the job done.
Over 31 years of extensive professional experience in various Highway/Road Construction projects in Bangladesh, Ethiopia, U.A.E., Yemen and Laos. Experienced in Geometric and Structural Design of road pavements. Experienced in Execution, Supervision Consultancy and Design of roads including bridges,
Working with Transocean as a Drilling Manager in Integrated services Project started for 5 Jack up rig for Bombay High field with client -ONGC. Operation commence in Jan 2007.
Drilling Engineer offshore tender rigs jackups onshore land rigs
process engineer
a senior instrument & Controls engineer
Sr Piping Designer Oil & Gas 3D model
Project management
20+ years experience in Surveying
Senior Planner with more than 20 years experience in Oil & Petrocehmical Industries
Qualified professional Project Manager and licensed US chemical engineer, with 32 years oil and gas and refined products production and processing facilities, pipelines, stations and terminals.
Seasoned Sr Construction Project Executive
Piping Engineer/Designer
Key Skills: Exposure to several clients and consultants in the core sector industry including the Cement industry has helped me to hone my negotiation and relationship building skills.
www.jdlapinskas.com
About twenty years' professional experience as a Commissioning and as Front line Operator in LDPE plant in RIL & LLDPE Plant in YANSAB with strong educational background and training.
Presently working as Drilling Manager with Transocean started up the project in India for 5 Jackup rig for ONGC along with Tony Flynn who was than our GM -Integrated services in May 2006. Direct responsibility is managing T12 and JTA ( 300' Jackup)on day to day coordination, planning and execution
AutoCAD drafting, Drawing, Painting (Acrylic, Oil, Water Color), Airbrushing, Faux Finishing, Murals, and Computer Graphics /Illustrations. Software: Adobe Illustrator, Adobe Photoshop, Adobe Streamline, Adobe 3D, Flash, Fractal Painter, Quark Xpress, Microsoft Word, Power Point and various scanning
Production Superintendent
heavylifts engineer
Project Controls Manager with widely diversified experience worked with some of the top five engineering and construction companies on international and domestic projects.
Instrumentation, Control and Safety Systems Design Engineering - Projects
Electrical Engineer Transmission Distribution Of Power Supply, DEsigns, Layouts., Operation & Maintenence of Grid substations upto 400 KV
A Professional Engineer with over 18 years' experiences in Process Control Systems for the design, development & implementation of process control applications, oil storage, movement & blending applications and process training simulations. Extensive knowledge in Honeywell Distributed Control System
7 years shipyard work experienced Senior Project Manager
(Maintenance with Procurement Exposure)
Initial four (4.0) years of Detail Design experience is in the field of Civil and Structural design of various Multi storey Buildings, Bulk drugs (Ranbaxy Module 5), Auto Industry, Chemical industry, Oil & Gas, Captive Power Plants, Machine Foundations, including Sub & Super structures for various i
E-goverance specialist
I have over 18 years of professional experience in the field of transport planning & engineering, economics and financial evaluation. I am a graduate in Civil Engineering and post graduate in Transport Planning. In addition I have diplomas in Financial Management and Transport Economics
Instrumentation and control engineer and instructor Phd neural fuzzy modelling and identification, optimization using genetic algorithms
21 years experience in corrosion engineering, monitoring and applying corrosion mitigation strategies to oil/gas/petrochemical industry. Detailed experience in cathodic protection (CP), pipeline integrity, chemical treatment, corrosion monitoring, coatings and corrosion/mechanical damage assessment.
21 Years Experience of Process Engineering in Refinery/Oil & Gas
A geologist currently working with a major oil companies, specialized in reservoir characterization, formation evaluation, operation geology and geosteering in clastic reservoirs. Develop expertise while working in Australia, Saudi Arabia, North Sea, India and several other international projects.
To be fair to everybody. Shared gain knowledge¡¦s and experienced for the benefits of all and to obtain a position with a progressive company that will utilize my experience, broaden my Knowledge, and offer opportunities for advancement.
Very familiar with accounting works 25 years in actual work experience, Can handle superviory and managerial position. Can handle work with very minimal supervision, and can relate with people at all levels in the organization.
Possess a career that spans for over 25 years within the Oil & Gas, Construction, Operation and Maintenance and Manufacturing Industries, performing contract formation and administration work.
Management System Auditing: Conducted internal audits for quality, safety, environment, HACCP and enzyme safety management systems. Project Management: Planned, executed, monitored and managed till successful completion, various large scale industrials projects, which involved engineering design,
Specialised in the design and structural engineering calculations for high integrity mechanical handling systems up to 25,000 tonnes SWL.
26 Years land and project management experience
Experienced Manager
Oil & Gas Volume Professional
B.E(chemical from dharwad karnataka)
Free! 19 years experience in Production Engineering, Production Operations, workover and service rigs for Artificial Lift equipment, operations supervision and administration.
CHEMICAL ENGINEER HAVING TWENTY FOUR EXPERIENCE IN PETROCHEMICALS MANUFACTURING
Twenty three years experience in the Zambian copper and cobalt concentrators; Copper Hydrometallurgical plants consisting of Solvent Extraction and Electro winning plants. Supervised and operated the Chambishi Metals Plc’s Lime Plants and Copper Tank House Producing copper cathodes and cobalt strip
Profession: Civil Engineer,Jr. Geodetic Engineer, MBA undergraduate
Over 14 years of experience in the industry of Health, Safety & Environment (HSE),
34 years experience in Project management, plant construction, commissioning, maintenance, and inspection, with knowledge of Permit to Work systems, experience at man management and engineering levels, and multi discipline supervision. I communicate well on all levels technically & professionally
I have been working for Shell for about 21 yrs now. I joined Shell as a wellsite peterolem engineer in August 1988. Before then I worked for 4 years in Gas and steam electric generating station rising to the post of senior mechanical engineer. I have a Bachelors degree in Mechanical Engineering
HEALTH, SAFETY & ENVIRONMENT
First   1   2   3   4   5   6   7   [ 8 ]   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com