CONTACT INFORMATION:
View contact information...
INSTRUMENT SUPERVISOR
CAREER OBJECTIVE:
A Challenging and rewarding position which contain a forward moving, Where My Education, Experience, Talent Can be Utilized and Expanded for The benefits of The Organization.
FIELD OF COMPETENCE:
Site Leader, Supervisor DCS (Distributed Control Systems), GE Gas turbine and Compressor, Vibration Monitoring System, Metering, Process Control Systems, Control Valves.
MAIN REFERENCES:
GS ENGINEERING AND CONSTRUCTION CO,SOUTH KOREA
CEGELEC(OIL&GAS )ABU DHABI
ALJABER GRINAKER(A.L.E.C) LTA (ABU DHABI)
CROMPTON GREAVES LTD (MUMBAI)
PERFECT INSTRUMENTATION& ENG PVT.LTD(BANGALORE)
EDUCATION:
Examination Board/University Year of passing % of marks
Diploma in Electronics&Instrumentation Board of technical Education
Tamil Nadu April 2001 80% first class with honours
Higher secondary Board of Higher secondary
Examination, Tamil Nadu April 1998 65%
Secondary school leaving certificate Board of Matriculation
Examination, Tamil Nadu May 1996 65%
ADDITIONAL QUALIFICATION:
* DIPLOMA IN COMPUTER TECHNOLOGY – MS OFFICE, MSWORD, EXCEL
POWER POINT, C++.
* SEA SURVIVAL TRAINING COURSE FOR OFFSHORE- GTSC, ABU DHABI.
* H2S SAFETY TRAINING COURSE-OIEC, IRAN.
Client PARS OIL & GAS COMPANY (POGC)
Project South Pars Gas Development Project Phase 9&10
Area Assaluyeh
Place Iran
Period 8th May 2008to 25th march 2009
Designation Instrument Commissioning supervisor
- Involved In commissioning of Gas Turbine GE MS5002D and Compressor NOUVO PIGNANE centrifugal compressor BCL506N(Italy).
- Ensuring that system setting-up, SAT, Loop check and function test are complete, and any associated system configuration /correction /modification works are properly incorporated as per process/equipment control/project specification requirement.
- Supervising, co-operate, giving guidance and expediting the vendor and the subcontractor on the control of works, procedure, drawing/documentation, test equipment and Material to Ensure meeting Requirement and Schedules.
- Preparing Punch and Clearing punch with the vendor and subcontractor.
- Preparation of Test Procedure for Instrument Calibration and documentation works
- Supervision of Installation and Calibration of Fire & gas Instruments.
- As built of Piping and Instrument drawings and Instrument Loop Drawings.
Client CEGELEC (OIL&GAS) ADMA OPCO-Fire&GasUp.gradation project
Area bunduq offshore
Place Abu Dhabi.
Period 10th Nov 2007 to 29th Feb 2008
Designation Instrument Supervisor.
- Installation & Calibration of Different make Of Fire & Gas Devices such as IR, UV+IR, MIR, UV Flame Detectors, Flammable Gas Detectors, Open Path Gas Detectors, Ultrasonic Gas Detectors, Toxic Gas Detectors, etc...)
- Pre Commissioning and Commissioning of Fire & Gas Detectors, Manual Alarm Point, Beacons and Sounders
- Worked on GE-FANUC AND ALLEN BRADLEY PLC Upgrading work
- Involved and Coordinated with Client for Loop checking, Trouble Shooting and commissioning
- Preparation of Test Procedure for Device Calibration and documentation works
- Supervision of Installation and Calibration of Fire & gas Instruments.
- As built of Field Instrument location Drawings and Instrument Loop Drawings
- Installation and Commissioning of HERNIS (HE 400) CCTV system
Client CEGELEC (OIL &GAS) GASCO – ABICS Project.
Area ASAB
Place Abu Dhabi.
Period 15th June 2006 to 25th June 2007
Designation Instrument Supervisor.
- Worked as an Instrument Supervisor in Gasco Asab Plant.
- Supervise and co ordinate with workers to laid Fibre Optic Cable, Primary and Secondary cables.
- Supervise and co ordinate with vendor to installation the field instrument as per the P&ID.
- Complete installation of instruments and junction boxes.
- Supervise and involved cable glanding, panel and junction box termination.
- Scheduling of shutdown activities and preparation of priority works.
- Work involved on instrument hot transfer and unit shut down.
- Worked on HONEY WELL D.C.S system, experion pks c200, and integrated control system.
- Involved and co ordinate with clients to loop checking, trouble shooting and commissioning the projects.
- Preparation of test procedure for instrument calibration and documentation works.
- Supervising, installation and calibration of field instruments.
- As built of field instrument location drawings and instrument loop drawings.
- Maintenance developing start up support and commissioning activities.
________________________________________
Client CEGELEC- SAKHALIN ENERGY INVESTMENT CO LTD,
Area GPC YARD.
Place Abu Dhabi
Period 1st July 2007 to 15th Sep 2007
Designation Instrument commissioning technician
- Worked as an instrument commissioning technician, Sakhalin ll MTl projects.
- Installation, commissioning, and calibration of different process
& control instruments and fire and gas instruments.
- Complete loop checking and pre commissioning of field Instruments.
- Involved and co ordinate with client to loop checking, trouble
Shooting and pre commissioning the projects.
- Involved in IFAT teams (factory acceptance test)checking of all
I/Os and graphics in DCS system console.
- Well versed in vibration monitoring system (V.M.S) BENTLY NEVADA. Involved in calibration like radial vibration, axial vibration, key phaser, seismic (aero derivatives) using the instrument like TK3, function generator (Jupiter 2000), shaker table.
- involved in fixing the proximitor, probes and extent ion cables.
- involved in commissioning of FAP(fire alarm panels)addressing
- mode addressable system(discovery)
- involved in pre commissioning and commissioning activities of
Process, fire & gas, vibration and closed circuit television (cctv
Bosch) and preparing the commissioning dossiers.
________________________________________
Client CEGELEC – ADCO (CCP PROJECT)
Area RUMAITHA
Place Abu Dhabi
Period 18th Sep 2007 to 5th Nov 2007
Designation Instrument commissioning technician
- calibration of different types of field instrument s
- work involved in well head control panels commissioning Activities.
- Commissioning of fire &gas instrument and deluge system.
- Pre-commissioning and commissioning of different process instruments.
________________________________________
Client AL JABER GRINAKER (A.L.E.C) L.T.A
Area AL RUWAIS-TAKREER OIL REFINERY
Place Abu Dhabi
Period 02nd march 2004 to 20th April 2006
Designation Instrument technician
Erection, commissioning &calibration all process instruments:
- TRANSMITTER: Rosemount, yokogawa, Honeywell
- CONTROL VALVES: Jamesburry,Fisher,Massonaline, yemataki,ABB, metso.
- VIBRATION PROBES: Bentley Nevada with mitrix transmitter.
- FLOW METERS: Mass flowmeter(micro motion ) vortex flow
Meter rosemount,E&H),Annubar(Rosemount,Switzer),Ventury flow meter (Brookes).
- LEVEL TRANSMITTER: Capacitance type (E&H), Ultra sonic (Rosemount), torque tube displacer type(Tokyo kaiso),Radar type (Rosemount), Leveltrol (Rosemount).
- CONVERTERS&TRASDUCERS: l/P(bell,Moore,Rosemount)
P/l (Bells, Rosemount)
- PLC: Allen Bradley (5/40, 5/35)
- DCS: yakogawa (micro XL),Honey well (C200)
________________________________________
Client CROMPTON GREAVES LTD
Area WATER DISALLATION PLANT
Place MUMBAI
Period 15TH may 2002 to 25th nov2003
Designation Instrument technician
- Involved in calibration of all test instrument.
- involved in termination work in control cubicles like D.C.S
(distribution control system), P.L.C programmable logical controls) M.C.C (motor control cubicles)
Reading the plants drawing like I.L.D (instrument layout diagram) P&ID (piping & instrument diagram and hook-up drawing
Iam well versed in calibration of smart instrument like PT, DPT, FT,LT, Pressure switch, Limit switch using HART Communicator (375 series).
Involved in loop checking, installation of instruments, junction box termination and cable trays.
________________________________________
Client PERFECT INSTRUMENTATION &ENGG PVT LTD.
Area HINDUSTAN PETROCHEMICAL LTD
Place MUMBAI
Period 25TH Feb 2001 to 30th April 2002
Designation Instrument technician
- Involved in loop checking, junction box termination, installation of instruments.
-
- Inspected of mounting instruments and correct as per the standard procedures.
- preparation of test procedures for instrument calibration and
Documentation works.
Involved and co ordinate with client to loop checking, trouble shooting and pre commissioning the projects.
Involved in commissioning of fire & gas system, console operation in control room,
Involved in preparation of process control loop dossiers and vendor documents and co ordinate with vendors.
PERSONAL DETAILS:
Nationality: Indian
Qualification in detail: Diploma in Electronics and
Instrumentation.
Total year of experience: 8&1/2years (3&1/2 years in India& 5 years
In abroad)
View contact information... |