Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #86603
next resume »»
CONTACT INFORMATION:
View contact information...
Education:
College
Technical / Vocational Bachelor of Science
Silliman University-Dumaguete City, Philippines
Industrial Instrumentation Course
Meralco Foundation Institute, Pasig City, Philippines
Designation: Sr. Instrumentation Technician / Loop Check Technician
Date of Birth: 12th June 1960
Nationality: Filipino
Marital Status: Married
Language Skills:
(Written/Spoken) English & Filipino
Employment History
Period
Apr 2003 - To Present
Oct.1999 to Jul 2002
Mar 1994 to Aug 1997
Mar 1988 to Mar 1990
Company
Presidium Controls & Industrial Technologies Corporation
Cebu, Philippines.
3F Dispo Bldg. AC Cortes Avenue, Mandaue City, Philippines
Tel: +63-32-3180152/ 3440467
Yokogawa Technical Services Incorporated (Project Based Employee)
Libis, Quezon City, Philippines
Philippine National Oil Company
Porac. Pampanga, Philippines
National Police Commission
Buendia Avenue, Makati City, Philippines
Work Experience
Period: April 2008 up to Present
Project: Carmen Copper Corporation (Atlas Mining ) Field Instrumentation and Distributed Control System (DCS) Upgrade
Customer: Yokogawa Philippines Incorporated / CCC-ACMDC
Role: Senior Instrument Technician / Lead Instrument Calibration Technician
Project Highlights:
This project upgraded old panel mounted single loop controllers to state-of-the-art Yokogawa CS3000 Distributed Control Systems for the whole ore processing complex including Primary Crusher, Secondary & Tertiary Crushers, Screening Plants, Conveying Systems, Ore Storage Bins, Grinding & Re-Grind Process area, Ball Mill Plants, Pyrite Separation Plant, Cleaners and Plant Utilities. The Yokogawa DCS interfaces with various PLCs and subsystems including Allen-Bradley, Schneider Electric, Yaskawa, Omron, ABB, Siemens etc. Project duration from installation to commissioning lasted more than 16 months.
Responsibility:
* Site survey for cable tray routing, instrument location & impulse tubing routes and layout
* Installation and layout of cable trays, raceways, conduits, instrument stanchion and supports
* Layout and installation/fixing/dressing of multi-core and single pair cables
* Installation of instrument junction boxes and auxiliary terminal boxes
* Installation of field instruments based on instrument installation and hookup details
* Calibration and re-ranging of smart transmitters/field instruments by Hart or BRAIN Terminals to reflect instrument datasheet values and ranges
* Wiring and termination of field instruments from smart transmitters & sensors (pressure, flow, level, temperature, analyzers),solenoid valves and actuators, control valves, MCC relays, frequency drives, signal transducer etc.
* Bench calibration of temperature, pressure gauges and indicators
* Termination and fixing of multi-core cables in junction boxes
* Loop-checking and continuity testing of instruments based on prepared loop drawing packages and schedule
* Signal testing and simulation from field instruments to the DCS in the auxiliary or main control rooms
* Assists commissioning engineers during loop commissioning and testing of systems and subsystem equipments
* Inspection of buyout construction materials prior to site delivery
* Preparation of site work reports and work progress.
* Work with project engineers for as built drawings.
Period: 04th January to May 2008
Project: Batch Process Automation Project
Customer: Kerry Foods and Ingredients, Cebu, Philippines
Role: Senior Instrument Technician / Lead Instrument Calibration Technician
Project Highlights:
Turnkey project expanding an existing food ingredient plant facility which constructed new batch process tanks complete with PLC, instrumentation and automation equipment and control system using
Yokogawa PLC and HMI Touch Screen as Operator Interface
Responsibility:
* Installation and layout of cable trays, raceways, conduits, instrument stanchion and supports
* Installation of field instruments and gauges/indicators.
* Wiring and termination of Yokogawa Pressure Transmitters, Electromagnetic Flowmeters, Burkert Batch Flowmeters, FESTO Pneumatic Valves and Actuators, Temperature Sensors and Controllers, Local Motor Control Panels MCC relays, Danfoss frequency drives
* Loop-checking and continuity testing of instruments from field to Yokogawa Programmable Logic Controllers (PLC) and Hakko Human Machine Interface (HMI) Touch Screens
* Bench calibration of instruments and re-ranging of smart transmitters by Hart 275 Communicator and BRAIN BT200 Communicator
Period: 12th April to 12th December 2007
Project: Refinery Instrumentation and DCS Controls System Project
Customer: Arctura Oleo-Chemical Corporation
Role: Instrument Technician
Project Highlights:
Turnkey instrumentation project on a new fatty acid & oleo-chemical plant utilizing smart transmitters and state-of-the-art Distributed Control System from Yokogawa, Installation of various field instruments from Yokogawa, Fisher-Rosemount, ABB, Foxboro, Endress-Hauser, Honeywell, etc. Implementation ofnew instrumentation and control system for Reverse Osmosis Water Treatment Plant using smart transmitters and Telemecanique PLC.
Responsibility:
* Installation and layout of cable trays and conduits
* Fabrication and layout of instrument stanchion and supports
* Installation of instrument junction boxes and auxiliary terminal boxes
* Layout and installation/fixing/dressing of multi-core and single pair cables
* Installation of field instruments (pressure, temperature, level flow) based on instrument installation and hookup details
* Calibration and re-ranging of smart transmitters/field instruments
* Wiring and termination of field instruments from smart transmitters & sensors
* Loop-check of instruments prior to commissioning.
* Trouble-shoot problematic loops during commissioning start-up from field to DCS control room
Period: 09 January to 04 April 2007
Project: Glass Plant Batch Pan Mixer Automation Project
Customer: San Miguel Corporation, Mandaue Glass Plant
Role: Instrumentation/Automation Technician
Responsibility:
* Site survey for instrumentation and electrical work
* Lay-out and installation of cable trays and conduit
* Cable pulling and continuity test of cables and wires
* Installation of level sensors, proximity limit switches, pneumatic actuators and solenoid valves
* Loop checking and pre-commissioning test
* Wiring and termination of field devices up to the junction box and PLC control system panel
* Testing, commissioning and hand-over of project documents, software media, manuals to client.
Period: 10 October to December 2007
Project: Field Instrumentation Rehabilitation & DCS Upgrade
Customer: Orica Nitrates Philippines Inc.
Role: Instrumentation Technician
Project Highlights:
Replacement of old and outdated instruments and upgrade of DCS hardware and software from Yokogawa CS1000 to CS3000 in an ammonium nitrate chemical plant
Responsibility:
* Installation and layout of cable trays and conduits
* Fabrication and layout of instrument stanchion and supports
* Installation of instrument junction boxes and auxiliary terminal boxes
* Layout and installation/fixing/dressing of multi-core and single pair cables
* Installation of field instruments (pressure, temperature, level flow) based on instrument installation and hookup details
* Calibration and re-ranging of smart transmitters/field instruments
* Wiring and termination of field instruments from smart transmitters & sensors
* Loop-check of instruments prior to commissioning.
* Trouble-shoot problematic loops during commissioning start-up from field to DCS control room
Period: 10 February to December 2006
Project: Meat Processing Plant PLC Controls System Project
Customer: Matutum Meat Processing Plant, General Santos City
Role:
10 October to December 2007
Responsibility:
* Site survey for instrumentation and electrical work
* Lay-out and installation of cable trays and conduit
* Cable pulling and continuity test of cables and wires
* Installation of level sensors, proximity limit switches, pneumatic actuators and solenoid valves
* Loop checking and pre-commissioning test
* Wiring and termination of field devices up to the junction box and PLC control system panel
* Testing, commissioning and hand-over of project documents, software media, manuals to client.
Period: 10 May to December 2005
Project: DCWD Talomo Sump Control System & SCADA Project
Customer: Davao City Water District, Davao City, Philippines
Role:
Instrument Installation Technician
Project Highlight:
Upgrading of conventional panel mounted controllers and recorders using Yokogawa Stardom Hybrid SCADA Controllers and HMI, new
Yokogawa Smart transmitters for Sump Level and Flow Metering
System with SCADA/PC HMI, interfacing with Telemecanique
/Schneider Electric Variable Frequency Drives and Softstarters and other parameters monitoring and trending.
Responsibility:
* Installation and layout of cable trays and conduits for instruments and power
* Fabrication and layout of instrument stanchion and supports
* Installation of instrument junction boxes and Foundation Fielbus Junction boxes
* Layout and installation/fixing/dressing of multi-core and single pair cables
* Installation of Yokogawa field instruments (pressure,level,flow) based on instrument installation and hookup details
* Calibration and re-ranging of smart transmitters/field instruments
* Wiring and termination of field instruments from smart transmitters & sensors including loop-checking prior to commissioning.
Period: 01 October 1998-
Project: Dyno-Nobel Ammonium Nitrate Plant Instrumentation & Control Systems
Customer: Dyno Nobel Philippines, Inc., Bacong, Negros Oriental
Role:
Instrument Installation Technician
Project Highlight:
Total instrumentation rehabilitation by upgrading of pneumatic instrumentation to smart transmitters and conventional panel mounted controllers and recorders to Yokogawa CS1000 Distributed
Control System and integration of Siemens Simatic – S7
Programmable Logic Controllers used for safety and shutdown
System. ABB-Taylor instruments and controllers were replaced with
Yokogawa instruments and DCS.
Responsibility:
* Assisted site survey for preparation of instrumentation work
* Lay-out of armored multi-core cable on trays
* Installation of junction boxes and cable pulling and termination of multicore and single pair cables
* Installation of Yokogawa smart transmitters and pneumatic valve positioners/actuators including impulse piping layout
* Loop checking and pre-commissioning test from field to DCS control room including field calibration of selected loops
* Assisted in the hot-cutover of loops from pneumatic to DCS control
* Installation and layout of DCS control panel in the rack/marshalling panel room and installation of DCS consoles in the Central Control Room (CCR)
Period: Apr.'97 to Jan.'98
Project: National Power Corporation-Geothermal Power Plant Control Systems Upgrade
Customer: National Power Corporation-Palinpinon Geothermal Plant Complex
Valencia, Negros Oriental, Philippines
Role: Instrumentation Technician
Project Highlights:
A new Yokogawa CS1000 DCS control system was installed to replace an obsolete Fuji Data Acquisition System. Tie-in of the DCS signals to the existing marshalling panel was done on-line loop-by-loop via hot-cutover. The same type of control system was installed in four (4) identical modular plants namely Nasuji, Sogongon 1, Sogongon-2, Okoy Geothermal wells monitoring system.
Responsibility:
* Cable pulling, fixing and termination of cables from existing marshalling panel to the new DCS marshalling cabinet.
* Layout of DCS system cables from rackroom to DCS control room
* Installation of instrument junction boxes and auxiliary terminal boxes
* Calibration and re-ranging of new Yokogawa smart transmitters/field instruments added to the project scope
* Loop-check of instruments prior to commissioning.
* Trouble-shoot problematic loops during commissioning start-up from field to DCS control room
Period: Jun.'95 to Apr.'97
Project: URSUMCO- Control Systems & Instrumentation Modernization
Customer: Universal Robina Corp-Manjuyod, Negros Oriental, Philippines
Role: Instrumentation Technician
Project Highlights:
Modernization of the automation system an entire raw sugar factory was achieved by installation of Yokogawa CS1000 DCS and new field instruments for process areas like boilers, vacuum pans and evaporators and cane handling mill. This is the pioneering automation project involving a sugar mill which used the Distributed Control System (DCS) as a control system platform and became the bench-mark for succeeding projects in the sugar industry of the Philippines..
Responsibility:
* Monitoring and preparation of work progress report.
* Installation and layout of cable trays and conduits
* Fabrication and layout of instrument stanchion and supports
* Installation of instrument junction boxes and auxiliary terminal boxes
* Layout and installation/fixing/dressing of multi-core and single pair cables
* Installation of Yokogawa DP transmitters, temperature transmitters, flow meters, frequency drives etc, based on hookup details
* Calibration and re-ranging of smart transmitters/field instruments
* Wiring and termination of field instruments from smart transmitters & sensors in junction boxes and marshalling cabinet
* Loop-check of instruments prior to commissioning.
* Assisting during start-up and commissioning,
Period: Septtember 1994 to August 1997
Project: National Police Commission
Customer: Philippine National Police
Role: Assistant Support Personnel
Worked as logistic support personnel for the Office of the Vice Chairman -NAPOLCOM
Responsibility:
* Support personnel in the office of the vice chairman
* Assists the daily office activities and government functions
* Functions as logistics personnel
Period: March.1988 to March 1990
Project: PNOC Geothermal Exploration Project
Customer: Philippine National Oil Company-Pampanga
Role: Logistics Support Personnel
Worked as logistic support personnel in a geothermal exploration project
Responsibility:
* Monitoring and preparation of shipping request
* Submit regular shipping and transportation reports
* Assist in departmental activities of logistics personnel
Trainings and Seminars:
Name of Course and Duration:
03-08 JUL 2008 Yokogawa Distributed Control System (DCS) Centum CS3000
Hardware and System Familiarization, Cebu City, Philippines
15-16 OCT 2007 Programming PLC Using Siemens Logo, Quezon City,
Philippines
20-21 SEP 2007 Schneider Electric Global Detection & Sensor Application,
Mandue City, Philippines
09-10 AUG 2007 Variable Frequency Drives and Starters, Schneider Electric Phils.
Mandue City, Philippines
21-23 APR 2007 Yaskawa Variable Frequency Drives, New Tech Park, Singapore.
23 JAN -22 FEB 2007 Microsoft Office Applications Training, Berkeley Computer Institute
Cebu City, Philippines.
05-22 DEC 2005 Instrumentation and Process Control, Meralco Foundation Institute
Pasig City, Philippines
14 NOV-02 DEC2007 Calibration For Process Instrumentation, Meralco Foundation
Institute, Pasig City, Philippines
28 OCT-16 DEC2007 Industrial Electrician Course, Meralco Foundation Institute
Pasig City, Philippines
28 OCT-16 DEC2007 Advanced Industrial Motor Controll, Meralco Foundation Institute
Pasig City, Philippines
22-23 FEB 2003 Understanding Distributed Control Systems, Yokogawa Phils. Inc.
Quezon City, Philippines
19-20 DEC 1999 ISO 9000 Quality Systems, Dyno-Nobel Philippines Inc.
Dumagute City, Philippines
15-16 NOV 1999 Swagelok Fittings and Tubings Seminar Systems, Dyno-Nobel
Philippines Inc., Dumagute City, Philippines
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 5701 to 5750 of 15508)
Go to Search Parameters...
Brief Description
Geologist and mineralogist (double degree, diploma). 1 year experience in mapping, supervision (rig and camp), underground, grass root exploration and production.
ACS800,ACS550,ACS600,ACS1000(all ABB),DCS500,DCS800(both ABB),Drive Window, Winder Soft, IGSS7.0, PL7PRO, UNITY XL,FieldBus,HART,BrainTCP/IP,DH+,DNP,MODBUS
With regard to CAD capabilities, I have over 2 years experience in the following software: Microstation PDS EERACEWAY (3D Raceway Modeling) PDS DRAW (Drawing Manager), PDS PDS-EQUIP (3D Equipment Modeling), Microstation Java 7.1, Orthogen/PDS, AutoCad
40hr hazwoper, Confined Space Entry, Underground Storage Tanks, Industrail Hygeine, Industrail Safety, Lead Abatement, Lead Superviser
Lease Records Administrator with 14 years related business experience in the oil and gas industry.
Experianced Offshore Rigger,Ab seaman,200t captain with USA work Visa
Sr. Piping Design Engineer
Possessed sound knowledge of reservoir simulation and high proficiency in use of reservoir engineering softwares such as Eclipse, Saphir,Peep,Mbal. Possessed an integrated knowledge of well test design and interpretations.
Marine Civil Construction Supervisor
Experienced instrumentation technician able to handle loop-check, termination, calibration of field instruments and devices
Cathodic Protetion Design,ECDA Survey,Soil Resisitivity
I have 17 years of working experience on road construction and mining both hard rock and alluvial
A result oriented professional with proven abilities in plant Electrical & control system. Preventive & Breakdown Maintenance in the field of Oil & Gas and Petrochemical Industry. Installation, Maintenance & Trouble shooting of Electric drives, HT & LT Switchgears & Protection Relays, Control Panels
MULTI SKILLED PLANT OPRATOR
Comprehensive problem solving abilities, good verbal and written communication skills, Ability to deal with people diplomatically, willingness to learn, Team facilitator.
Bachelor of Science of Electrical Engineer, Drafting Aide Certificate AutoCAD 2009, CAD Operator Certificate AutoCAD 2009, Member of Phi Theta Kappa International Honor Society, Member of National Technical Honor Society, Dean List for 2008-2009
To secure a position that will maximize my talent and expose me to the new challenges, as well as satisfaction in my immediate environment through hard work and professionalism
I am a strong team player with proven experience contributing in cross-functional teams to fulfill corporate goals, who communicates well both verbally and in written form, who shares his ideas and knowledge with others, who develops excellent working relationships to his co-workers and customers.
Experienced in wind data analysis, wind flow modeling and loads calculation using softwares like Wind Pro, WAsP, WAsP Engineering, Wind Farmer and other supporting software¡¦s like AutoCAD, Map Source, Surfer and Global Mapper.
PRIMAVERA PLANNER, PROJECT PLANNING &MONITORING ,RESOURCE (MANPOWER,PLANT,MATERIAL),PREPARED RECOVERY PLAN ETC.
Drilling Engineer
Expertise in working with PFD's and P&ID's, Process Design Calculations and Process Simulators
Two years of experience in Process / Facility Engineering
Project Management, Problem ID/Solving, Report Generation and Data Management.
Stores Executive, SAP working invironment, Diploma in Mechanical Engineering, Graduate Diploma in Materials Management
Knowledgeable in Hazard Identification and Risk Assessment.
HSE
Design Engineer with experience in 3D modelling and Stress Analysis
A highly motivated young engineer with proficient skills in ECLIPSE and Petrel RE, with great mind of problem solving, and with great personality in team work
Mapping of geology and structures, Preparation and assessment of geological repots, Exploration program processes, Ore reserve estimation, Sample selection and preparation for analysis, Quality Control, Liasoning work with DMG & IBM offices.
Myself M.Tech in Naval Architecture seeking a responsible position in offshor eengineering. My area of interest is the structural analysis, fluid structure interaction, hydrodynamics, subsea pipelines analysis..
Metallurgical Accounting, Budgting, Flotation, CIP process,Gravity Concentration, Smelting, Elution, Dump Retreatment, SHE issues management, Mentoring trainees
Mechanical Engineer with hands on pit time, ready to relocate. Employeed as Maintenance Supervisor on a Surface Coal Mine. Dragline/Shovel Experience.
Piping Engineer
MSc. in petroleum geology, University of Tehran
Drilling Technician
IT specialist, professionally qualified in Management and Computers(M.B.A Information Systems, Masters degree in Computers) with 10 years of proven hands-on experience in Computer System Analysis, System Support, System Administration, Networking, Database development and management.
19 yrs of hard rock mining experience (ie: copper, gold) as well as diamond mining. Will adapt to most enviroments and willing to work overseas; will reply to all responses. Sincerley Stu Hogg
A seasoned subsea systems engineer with a detailed understanding of trees, controls and manifolds from front end feasibility and conceptualisation to offshore installation and commissioning.
Procurement, Expediting, Material Control, Supplier Surveillance, Supply Chain Management
Senior Structural Designer/Construction Support Specialist
Construction Engineer
qualified in six modules of different aspects of corrosion,and the confidence gained throughout the years while running my own consultancy
A middle management level professional having an experience of 13 years (6 years of Gulf experience) in the avenue of QA/QC in Industrial Construction
MWD Engineer
Control system designer / instrumentation
Civil / Structural Designer, PDMS, AutoCAD,
Training and trade testing of apprentices
I'm A Civil Engineer graduate with 14 years experience in the Gulf country seeking for new job.
Fire/Safety Advisor, 32 1/2 years petroleum experience
First
Prev
101
102
103
104
105
106
107
108
109
110
111
112
113
114
[ 115 ]
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com