* Eight years of proven experience in execution of maritime jobs like Construction of Rubble mound breakwater (for Naval Base & LNG Project ) Jetty ( Ethylene Terminal, LNG and oil tanking projects), Berths ( for LNG loading ), Cooling Water Intake / Outfall for Power & LNG plants and other marine structural works at different parts of the world includes South Asia, Middle East, South East Asia and Africa
* Two years of experience in execution of buildings and roads.
Professional Experience Details: TOTAL EXPERIENCE: Ten years
Period / Organization / Designation / Project Details
Mar-2009 - August 2009
* PT Mc connel Dowell Indonesia, Merak, Indonesia
* Client: PT Oïl Tanking Merak
* Marine Superintendent ( Night Shift ) / Marine Supervisor ( Day shift )
Project: Construction of 550 mtrs length Jetty for Oil Tanking includes Jetty trestle, 2 Nos loading platforms, 8 Nos mooring dolphins and 4 nos breasting dolphins
Jul-2008 to Dec-2008
* Yemgas (Technip / KBR / JGC Consortium), Yemen LNG project (Main EPCM Contractor)
* Client: Yemen LNG Company
* Piling Marine Supervisor
Project: Construction of 800 mtrs length open sea LNG jetty and jetty head consists of 6 mooring dolphin, 4 berthing dolphin and loading platform
* Installation of jackets, driving insert piles, reverse circulation drilling works, offshore grouting for pile jacket leg connection, under water concreting by tremmie mode and superstructure of jetty by cast in situ concrete.
* Launching and installation of pre cast concrete girders and steel truss.
* Water intake station and water outfall basin: GRP pipe installation / backfilling of trench / antifer blocks placing / supervising and monitoring of the diving activities, hydrographic and topographic survey works.
Apr-2008 to June-2008
* Iberdrola Middle East (EPCM–Contractor)-2000 MW Combined Cycle power plant, Meisaeed, Qatar
* Client / Consultant: Meisaeed Power Co. / PB power
* Marine Civil Supervisor
Project: Construction of Cooling water Intake and outfall for the power plant
* Deep excavation in onshore part and dredging at offshore part 6.8 km channel for installaling GRP pipes for cooling water intake and outfall - bed preparation, under water installing / backfilling with different size rock materials.
Sep-2006 to March 2008
* Chiyoda Technip Joint Venture - QGX Project, Ras Laffan, Qatar (EPCM Contractor)
* Client: Qatar Liquified Gas Company Ltd. II (Qatar Petroleum & Exxon Mobil)
* Civil Supervisor (Jetty and Berth Area)
Project: QGII LNG Onshore and Common Facilities Project – CLP - Off plot
* Construction of LNG loading Berth 4 and Berth 5 (Includes loading platform, Breasting Dolphins and Mooring Dolphins by floating mode method using jack up / floating barges and construction of superstructures / abutments.
* 5.8 kms jetty corridor (includes pipe rack, pipe sleeper, equipment, and steel structure foundations), Local Marine Terminal / Sub-station buildings, Marine flare, culverts & fly overs.
Duties and Responsibilities:
* Supervision, guidance and overview of sub contractors to implement the requirement of the sub contract including the drawings and specifications
* Overall planning of the work and coordination with other discipline work in the same area
* Monitor and advise the sub contractors on the control of his labours, construction equipment and materials to ensure meeting the schedule
* Ensure the sub contractor use approved and updated materials
* Confirm the work complies with Quality, Safety / Health and Environment requirements and work with the subcontractors to take corrective action in case of problems.
* Prepare daily and weekly construction reports
* Co-operate and advise Sub contractors to correct work plans in case of engineering drawing or material availability problems or change of work required.
Sep-2005 to Till Aug-2006
* SAIPEM Sa-Petromar Lda, ENI Group, Soyo, Angola
* Client: Total Exploration & Production, Angola
* Field Engineer (Maritime works) / Civil Supervisor ( Yard Development Works)
Project: Rosa Development Project-Surf: Maritime construction works for shifting Bundle Hybrid Offset Riser of 1300 m (4000 T) to connect the production, gas lift, and water injection flow lines to the Girasol FPSO (Total E & P Angola) from yard to offshore through Laguna.
Channel Preparation / Launching ramp piling & erection / launching of BHOR to Laguna and to offshore
* Channel Preparation: Dredging 5800 mtr long Laguna: work barge operation using clamp shell operation, Grab, toyo pump and crane with 23 mtr dragline.
* Land Mode Excavation for channel preparation: Using Crane with 25 mtr dragline and using 17 mtr long stick excavator for slope preparation & laying of geo textile material and gabion material with crane for the slope protection of channel.
* Driving steel piles by vibrating hammer and delmag-30 percussion hammer upto -30.00 mtr from ground level for launching ramp & erection of launching ramp (220 mtr length)
* Driving of steel piles in the Laguna with work barge operation for mooring of the BHOR (sub-sea structure)
* Rail track: preparation of sub-base, laying of sleepers and installation of railways.
* Launching operation of BHOR (BUNDLE HYBRID OFFSET RISER) from ramp to Laguna and Laguna to offshore.
* Steel Sheet Pile installation for slope protection works.
* Soil-Cement works (soil stabilization) for working platform in yard development activities
Jan-2004 to Sep-2005
* Larsen & Toubro Ecc Division, Hq: Chennai, India
* Engineer (Civil)
Project: Construction of 1.3 km long Ethylene jetty at T.R Pattinam, Bay of Bengal (Pondichery UT) 15 km North of Nagapattinam, India. For Chemplast sanmar Ltd.,
Duration of stay: for 5 months
Project: Coimbatore Bypass (National Highway) Renovation Works. (Independently handled), Coimbatore, Tamil Nadu State, India
Duration of stay: for 3 months
Project: Construction of North / South Causeway and Spur (4000 mtr) (Rubble Mound Breakwater) at Arabian Sea for HAZIRA PORT AND LNG TERMINAL PROJECT
(SHELL GAS BV), Surat, Gujarat State, India
Duration of stay: 12 months
Mar-2001 to Dec-2003
* HOCHTIEF (Germany), Larsen and Toubro Ltd. (India) Seabird Joint Venture Project seabird, Karwar, India.
* Client / Consultant: Indian Navy / Redicon-Nedico ( Royal Haskoning )
* Junior Engineer (Civil)
Project: Rubble Mound Breakwater Construction 5200 mtr long (Arabian Sea offshore) & land reclamation works for Indian Navy's Naval Base (INS KADAMBA)
Rubble Mound Breakwater (Execution and supervision of breakwater works)
* In charge of work barge in offshore looking after all activities related to barge.
* Handling global positioning system and barge tracking system for barge / crane positioning
* Placing of Armour stones (1kg to 20ton), core (0-1000 kg) and filter material from crane barge (Using different capacities riprap grapple, skip & rock grab) mooring barge and split barge for construction of Rubble mound Breakwater
* Accropode sizes 2.5 m3( 6.25 Ton), 4.0 m3( 10 Ton), 6.3 m3( 15.75 Ton), placing from crane barges for breakwater
* Dredging work at seawater intake area: work barge operation using crane with toyo pump, clamp shell, Grab & long stick excavator.
* Co Ordination with Survey Department (Both Hydrographic / Topography)
* Co Ordination with Quality Control Department for Quality clearance and approval from consultants and clients.
* Co ordination with plant and equipment departments for all maintenance & repair of equipment related to barge.
* All safety aspects of barge
* Sound knowledge for marine operation like shifting of anchors, placing of barge in position.
Jetty works ( Execution and Supervision of Jetty for Ethylene Terminal project )
* Jetty is 1.3 Km long consists of Mooring Dolphins, Breasting Dolphins, Pipe trestle and Service platform.
* Bored cast in situ piling works taking up by floating mode, Piling Gantry and Temporary platforms.
* Under water concreting done by tremmie mode, Super structure of jetty by Cast in situ concrete only
* Construction temporary Jetty for load out facilities includes driving of piles, erection of steel beam and pre-cast concrete slabs.
* Responsibilities: Responsible for piling in charge and working as per schedule and as per Job safety analyses, which includes organizing managing all resources and field activates to achieve an efficient and economic completion of the contract with in agreed time and cost wise paying due regards to Safety and meeting quality requirements
Nov-1999 to FEB-2001
* M/s Shapporji Pallonji & Co.Ltd. Bangalore, Karnataka, India.
* Client / Consultants: Sasken Communication Technology / Potential Service Consultants
* Site Supervisor
From excavation works to hand over the building to client. (Architectural Building with 11 floors + 2 basements)
Execution and Supervision of Building / Road Works
* Mechanized execution of rock excavations and earth moving works
* Laying of Pavement Quality Concrete & Dry Lean Concrete for roads.
* Laying of Dense Bituminous Macadam (DBM) and Bituminous Macadam for roads.
* Mechanized mass concreting works, concreting at heights and deep under ground with mobile and static concrete placer booms.
In Office:
* Estimations and productivity calculations for heavy equipments.
* Liaison with subcontractor, clients billing and variation orders
* Scheduling, monitoring of various site activities includes resource loading, statistical data recording, schedule analysis and evaluation of works.
* Documentation work
* Preparing daily, weekly and monthly reports of the site to Project Management (Through Management Information System) and analysis of reports.
* Preparation of work order & billing of Subcontractors
* Planning, Estimation, reconciliation of the quantities for construction works and exposure in costing.
Education Details:
* Diploma in Civil Engineering, M.E.I Polytechnic, Bangalore, Technical Board of Karnataka, India in year 1999.
* Diploma in Construction Management, Annamalai University, Tamil Nadu, India, in year 2002.
* Short Term Course in AutoCAD, International School of Computer Training, New Delhi in year 1999
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 5701 to 5750 of 15512)
Go to Search Parameters...
Brief Description
Heavy diesel mechanic since leaving school 20 years ago
Designer having 10+ years of experience in the Electrical detailed engineering on Power Plant, Oil &Gas (Onshore/Offshore) and Petrochemical projects in both Indian & Global projects.
Geologist and mineralogist (double degree, diploma). 1 year experience in mapping, supervision (rig and camp), underground, grass root exploration and production.
ACS800,ACS550,ACS600,ACS1000(all ABB),DCS500,DCS800(both ABB),Drive Window, Winder Soft, IGSS7.0, PL7PRO, UNITY XL,FieldBus,HART,BrainTCP/IP,DH+,DNP,MODBUS
With regard to CAD capabilities, I have over 2 years experience in the following software: Microstation PDS EERACEWAY (3D Raceway Modeling) PDS DRAW (Drawing Manager), PDS PDS-EQUIP (3D Equipment Modeling), Microstation Java 7.1, Orthogen/PDS, AutoCad
40hr hazwoper, Confined Space Entry, Underground Storage Tanks, Industrail Hygeine, Industrail Safety, Lead Abatement, Lead Superviser
Lease Records Administrator with 14 years related business experience in the oil and gas industry.
Experianced Offshore Rigger,Ab seaman,200t captain with USA work Visa
Sr. Piping Design Engineer
Possessed sound knowledge of reservoir simulation and high proficiency in use of reservoir engineering softwares such as Eclipse, Saphir,Peep,Mbal. Possessed an integrated knowledge of well test design and interpretations.
Marine Civil Construction Supervisor
Experienced instrumentation technician able to handle loop-check, termination, calibration of field instruments and devices
Cathodic Protetion Design,ECDA Survey,Soil Resisitivity
I have 17 years of working experience on road construction and mining both hard rock and alluvial
A result oriented professional with proven abilities in plant Electrical & control system. Preventive & Breakdown Maintenance in the field of Oil & Gas and Petrochemical Industry. Installation, Maintenance & Trouble shooting of Electric drives, HT & LT Switchgears & Protection Relays, Control Panels
MULTI SKILLED PLANT OPRATOR
Comprehensive problem solving abilities, good verbal and written communication skills, Ability to deal with people diplomatically, willingness to learn, Team facilitator.
Bachelor of Science of Electrical Engineer, Drafting Aide Certificate AutoCAD 2009, CAD Operator Certificate AutoCAD 2009, Member of Phi Theta Kappa International Honor Society, Member of National Technical Honor Society, Dean List for 2008-2009
To secure a position that will maximize my talent and expose me to the new challenges, as well as satisfaction in my immediate environment through hard work and professionalism
I am a strong team player with proven experience contributing in cross-functional teams to fulfill corporate goals, who communicates well both verbally and in written form, who shares his ideas and knowledge with others, who develops excellent working relationships to his co-workers and customers.
Experienced in wind data analysis, wind flow modeling and loads calculation using softwares like Wind Pro, WAsP, WAsP Engineering, Wind Farmer and other supporting software¡¦s like AutoCAD, Map Source, Surfer and Global Mapper.
PRIMAVERA PLANNER, PROJECT PLANNING &MONITORING ,RESOURCE (MANPOWER,PLANT,MATERIAL),PREPARED RECOVERY PLAN ETC.
Drilling Engineer
Expertise in working with PFD's and P&ID's, Process Design Calculations and Process Simulators
Two years of experience in Process / Facility Engineering
Project Management, Problem ID/Solving, Report Generation and Data Management.
Stores Executive, SAP working invironment, Diploma in Mechanical Engineering, Graduate Diploma in Materials Management
Knowledgeable in Hazard Identification and Risk Assessment.
HSE
Design Engineer with experience in 3D modelling and Stress Analysis
A highly motivated young engineer with proficient skills in ECLIPSE and Petrel RE, with great mind of problem solving, and with great personality in team work
Mapping of geology and structures, Preparation and assessment of geological repots, Exploration program processes, Ore reserve estimation, Sample selection and preparation for analysis, Quality Control, Liasoning work with DMG & IBM offices.
Myself M.Tech in Naval Architecture seeking a responsible position in offshor eengineering. My area of interest is the structural analysis, fluid structure interaction, hydrodynamics, subsea pipelines analysis..
Metallurgical Accounting, Budgting, Flotation, CIP process,Gravity Concentration, Smelting, Elution, Dump Retreatment, SHE issues management, Mentoring trainees
Mechanical Engineer with hands on pit time, ready to relocate. Employeed as Maintenance Supervisor on a Surface Coal Mine. Dragline/Shovel Experience.
Piping Engineer
MSc. in petroleum geology, University of Tehran
Drilling Technician
IT specialist, professionally qualified in Management and Computers(M.B.A Information Systems, Masters degree in Computers) with 10 years of proven hands-on experience in Computer System Analysis, System Support, System Administration, Networking, Database development and management.
19 yrs of hard rock mining experience (ie: copper, gold) as well as diamond mining. Will adapt to most enviroments and willing to work overseas; will reply to all responses. Sincerley Stu Hogg
A seasoned subsea systems engineer with a detailed understanding of trees, controls and manifolds from front end feasibility and conceptualisation to offshore installation and commissioning.
Procurement, Expediting, Material Control, Supplier Surveillance, Supply Chain Management
Senior Structural Designer/Construction Support Specialist
Construction Engineer
qualified in six modules of different aspects of corrosion,and the confidence gained throughout the years while running my own consultancy
A middle management level professional having an experience of 13 years (6 years of Gulf experience) in the avenue of QA/QC in Industrial Construction
MWD Engineer
Control system designer / instrumentation
Civil / Structural Designer, PDMS, AutoCAD,
Training and trade testing of apprentices
First
Prev
101
102
103
104
105
106
107
108
109
110
111
112
113
114
[ 115 ]
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com