Managed Cost/Budget of large projects up to 7 million dollars. Performed earned value functions, pecentage completion, forecasting and was responsible for the project schedule for the team. I have been in the engineering business for a little over 20 years. Worked for Bechtel, worked with Procter & Gamble, Mustang Engineering, Parsons and Shell Oil. I also have experience with SAP as well.
SUMMARY OF EXPERIENCE
Over 20 years experience in industrial and manufacturing Project Management, Procurement, Contracting, and Bids and Proposals. Experienced in domestic and international projects in the following areas: fossil fuel, food, beverage, feminine hygiene, diapers, pulp and paper, natural gas as well as petrochemical and the Oil Industry. A dynamic situational leader, I am able to inspire and motivate team pride, team cohesion, and team effectiveness. I am a great listener and I have excellent communication skills. Decision-making and problem solving are my hallmarks. I am a self-starter and possess the negotiation skills required to operate in both a domestic and international arena and I have utilized these skills on numerous occasions when negotiating price, delivery, discounting, terms and
08/08 ¡V 03/09 Mustang Engineering, Houston, Texas
Project Controls Manager (Contract basis)
Citgo - entailed two different projects.
„X FEED and ULSD (Ultra Low Sulfur Diesel) Modification Project ¡V involved product tankage and handling, refinery flare, cooling water, air, raw water supply, water treatment and other utilities. This project was in excess of a billion dollars, and was considered one of the largest projects Mustang has ever attempted.
„X Improved Crude Desalting Project - approximately 27 million dollars. The object of this particular project was to increase the performance of refinery operations improving crude desalting performance, which would improve energy efficiency, reducing maintenance costs, and equipment reliability. My responsibilities included the management of cost control and oversight of schedules.
Both projects involved forecasting, budgets for all disciplines, value engineering log, project status report, needs lists, progress reporting and maintenance of all trends.
06/07 - 08/08 SNC-Lavalin Engineering and Constructors, Inc. ¡V Houston, Texas
Project Controls Manager
„X NGL Consolidation Project - Conoco-Phillips (COP) - $700 million dollars. The objective of the project was to optimize the processing scheme for all naphtha and lighter components. This process optimization effort significantly reduces utility requirements, reduces process complexity, increases overall gasoline octane, improves C7 solvent product quality and rate, and reduces the benzene in gasoline. Additionally the reduction in steam consumption will improve the reliability of the refinery's steam system.
„X Responsibilities included project cost to include budgets, estimates, PM+ and scheduling activities.
„X Monitored project progress, produced cost reports for capital projects and supported analysis, variance reports associated with work plan strategy including staffing needs.
„X Set up work breakdown structures (WBS) for the project team.
„X Created and developed a structure for Change Orders in an effort to manage and control any additional scope changes that could reflect trends on the project.
„X Conducted internal and client meetings.
03/06 ¡V 05/07 Shell Oil E&P - Houston, Texas
Project Controls Engineer (Contract basis) - covered American geographical region.
„X Supported the Regional Technical Director's project activities by working in EPW's SAP blueprint business system to create, plan and schedule for the project.
„X Provided support for the other associated business processes such as Business Warehouse as part of cost reporting which provided information around material and services, requisitioning and invoice verification.
„X Supported the business in Houston, New Orleans, Dallas, South Texas and Wyoming by creating, maintaining, closing work plans, network activities and elements in SAP.
„X Developed and maintained project cost reports in SAP to provide accurate and timely information management to the business with supporting analysis and commentary.
„X Provided advice on, and ensured compliance with SAP blueprint procedures for project execution processes, standards and tools used for provision of information systems.
„X Set-up project networks, associated work plans and elements in SAP.
„X Monitored project progress, produced reports and supporting analysis for activity leads and the leadership team.
„X Assisted in Defining work breakdown structures (WBS) for services required on the project.
„X Identified inefficiencies and other quality improvement opportunities with the team blueprint project system process, and developed and proposed appropriate solutions.
„X Provided project SAP support to both Human Resources and Finance.
Harold Irving, Jr. ¡V Page 2
07-02 ¡V 02/06 Parsons Construction/International Company - Mehoopany, Pennsylvania
Project Controls Engineer - OnLine Design
„X Provided cost and procurement support for The Procter & Gamble Company in Mehoopany, PA.
„X Provided initial construction planning and statistical cost engineering support for a $350 million dollar project. Responsible for statistical analyses of cost, budgets, and risk management.
„X Cost functions included utilizing SAP (Project Cost Control Tool) for planning, capitalizing equipment, forecasting, asset transferring, purchasing of equipment, cost of goods purchased, maintenance of inventory, and recalculation of spending budgets.
„X Interfaced and negotiated with vendors for cost and delivery of equipment and established cost, procurement planning, collection of cost data in an effort to analyze capital spending and tracked all spending, predictions, and invoices on the project.
„X Provided detailed cost reports for global capital accounting, closeout activities, compliance reports to four different Procter & Gamble project managers.
„X Assigned and developed work breakdown structure (WBS) numbers for tracking and auditing purposes.
„X Provided construction updates, developed a structure for change orders in an effort to manage and control any additional scope changes that could reflect trends on the project.
„X Implemented a plan to provide new statistical cost data for capital equipment to the P&G project managers. Developed a schedule for the delivery of parts, construction and procurement. In addition, purchasing status updates were given on a daily basis.
„X Monitored the entire work process for both engineering and construction for simultaneous projects to assure continuation from inception to completion.
02/02 - 05/02 Jacobs Engineering - Cincinnati, Ohio
Project Controls Engineer
Dalton Latex. Project - $25 million dollars. Dalton Latex is a large chemical plant.
„X Prepared initial planning/scheduling for the installation of two new emulsion polymer/systems reactor trains, miscellaneous equipment, utilities and process structures.
„X Worked initial strategy for definition of scope, identified design, procurement, and delivery plan for the project.
„X Assisted in the development of team alignment by conducting interactive scheduling meetings, coordinated with disciplinary teams and assured the appropriate processes to formulate the project from an inception to completion target date.
06/87 ¡V 08/01 BGP/Belcan Engineering - Cincinnati, Ohio
Senior Project Manager/Construction Site Leader (Contract basis through Proctor & Gamble Co.)
* Managed a $165 million dollar domestic/International project in Germany, England, and Italy. This complex project consisted of a new building, installation and relocation of complex components such as lane diverters, case-packers and modifications for new indexers in both Europe and North America.
* Developed inception and completion plan to include scope definition, procurement, purchasing, schedule, design, construction, and start-up strategy.
* Coordination was difficult, as equipment was being fabricated in Europe and customs presented a challenge due to the marketing window established that was critical to have the product in the stores.
* Duties included daily construction meeting's, status updates from Europe on delivery and installation needs, design changes, number of potential change orders, statistical cost information, critical to success.
* Coordination and constant negotiations with European vendors as it related to pricing, discounts and delivery. Interfaced a great deal with the Project Manager and Vice President, providing continuous updates.
* Worked extremely close with my design team to assure all drawings were released in a timely fashion in an effort to allow the European vendors the ability to fabricate the equipment without any delay on the part of North America.
* The project itself not only came in on time, on schedule, but was also under cost.
EDUCATION
B.S. Business Management: University of Phoenix
Associate Degree: University of Louisville
Architectural Technology Certificate: Olive-Harvey Jr. College
TRAINING
SAP (Cost Control Tool) 5 yrs. from The Procter & Gamble Co. and 1 year with Shell Oil.
Software: Word, Excel, Fastrak (Scheduling Tool)
Microsoft Project
MILITARY
U.S. Air Force
Sgt. Aircraft Mechanic
Honorable Discharge (4 yrs.)
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 8851 to 8900 of 15508)
Go to Search Parameters...
Brief Description
Masters of Environmental Science, Masters of Industrial Hygiene, Diploma in Industrial Safety. 3 years of experienc in EHS field in process industries.
Processes Control lab to bulk,Water analysis,Textile auxiliary testing
as incharge operator at catalyst production unit and process operator at the ammonia plant Experience in units- : kneaders,extruders calciners,heaters,Turbines, Centrifugal compressors, Boilers, Super heaters, Reformers, MEA& HPC Systems
Experienced Mining engineer in large scale openpit Mines with knowledge of SAP and Materials Management and controlled blasting
Eighteen years Electrical experience in the Offshore, Petrochemical, Power Generation, and Natural Gas Processing industries. Project Manager, Hook-Up & Commissioning, Supervisor of E & I Design staff and E & I contractors on projects. Budgeting and Procurement experience.
11+ years of experience in Procurement, Materials, Inspection & Expediting positions
Highly skilled carpenter 17 years experience. Related work includes structural steel erection, connecting and rigging. Poured concrete, scaffold set up and tear down, foreman for residential housing from framing to finish carpentry.
40 years of underground mining experinece in all phases of mine development. I've supervised crews of 20 or more miners and operators, and have experience in the operation of underground haulage equipment, shaft sinking equipment and drilling/blasting equipment such as jumbos and jacklegs
Management of QA (Quality Assurance), Planning, Scheduling & Project Control
Chemical Engineer, Drilling Fluids Engineer, Process Engineer
An accomplished Environmental Consultant with strong planning and operational experience coupled with an excellent academic background. Strong interpersonal, problem solving and client handling skills, keen to develop skills further in a new and challenging role.
2 Years of Experience, Heavy Equipment Certified, CDL CLass A, OSHA 10HR/30HR, COnstruction Management Degree in progress
Irish Australian coal mining operator, excavator upto 400 tonne, haul truck , water cart etc.
Procurement specialist with supply chain experience. I am versatile, bilingual(spanish),proven difference maker and leader.
Cost/Budget Controls Manager
Proficient in Integraph Plant Design System (3D PDS) and its software including Piping Designer, Equipment Modeling, Microstation, AutoCAD, SPR (Smart Plant Review), Batch Manager, Isometric Extraction and knowledge in Microsoft Windows.
I have completed my diploma & degree. I have completed my NDT ASNT Level 2, I have more than 5 years experienced in the field of NDT technician.
DRAUGHTSMAN/QUANTITY SURVEYOR with 5 years exp. 3 years in Burj Dubai Tower with Diploma in Civil Engineering
Troubleshooting Specialist with years of experience in installation, commissioning, regulatory documentation, project management, high-profile customer services, and a proven background in all aspects of electronics and control systems.
Journeyman Ironworker with exsperience in boilermaker, pipefitter work
Instrumentation Graduate with hands on exposure in PLC programming and commisioning of PLC based Systems espescially,GE Fanuc,AllenBradelly,Beckener & Rainer (B&R).Hands on experience in Yokogawa DCS-CS 3000,System Engineering.
Having three years of experience in the field of process engineering, B.E, Chemical
Responsible for actively involvement in the pre-commissioning and commissioning of the worlds largest natural gas plant
Autocad draughtsman 19 years mainly civil/structural experience
As Instrumentation Inspector/supervisor fully involved in construction,precommissioning,commissioning,start-up activities
Bachelors degree in Chemical Engineering with Minerals Engineering, 4 years experience with a global mineral processing company.
Electronics security engineer
I have 13 years of oilfield experience as an operator of numerous gas and oil production facilities. I am an innovative thinker with a demonstrated ability to improve production and decrease down time very adaptable to changing projects and work schedules and have a proven ability .
Energetic, sincere and trustworthy
Master Technician (Mechanical)
Corrosion, Lab, Chemist, Oil & Gas
I have done my Bachelor’s Degree in Mechanical Engineering in Bharath Niketan Engg. College,anna university. The page following below contains my detail profile and responsibilities I can handle efficiently in your esteemed organization.
Application For The Post Of Offshore Medic
I am formerly a Sr. Maintenance Engineer responsible for the Maintenance and Project implementation of several Petro Chemical Plants. My responsibilities included supervising anywhere fro 10 to 200 mechanics at any on time. I was also resposible for budget up to 7million US.
CAWI - AWS (MIAMI); Qualifications NDT - SNT-TC-1A :Level II : RT and PT
I am willing to gain the experiences and applied the knowledges learned at the school. I am interested to do job related in engineering field.
Skills Experience in Oil & Gas Industries & offshore oilfield.
An engineer from evergreen branch (Mechanical Engineering) ready to put the optimum use of my knowledge in any desire discipline.
Prefer well completion, wireline, drilling engineer
Autocad, Pro-e
Seeking a challenging career in leading Petroleum Company as a petroleum engineer, that ýmatches my field of interest in Petroleum Engineering, where my abilities and skills ýcan be developed and knowledge can be applied.
Work as apipe fitter for 6 years.my last work location was in new calidonia,austria for bieng finish contract
An engineering post-graduate with specialization in environmental engineering. Overall work experience of more than 14 years with majority in Petrochemical.Career Objective-To excel in the field of Industrial Environmental Management by virtue of knowledge, team work and self motivation.
In-depth knowledge of related course work and work experience in Civil Engineering Firm. Worked as Design Engineer in private consultancy firm from May’03 to June’04. Working as an Associate Design Officer with Patni Computer Systems since Feb’06 till date.
3 years diploma in electrical engineering. Skills: involved in commissioning & maintenance of electrical equipment in upstream oil & gas /petrochemical industries.
Having Eight Years Experience in the field of Civil Construction of Tank Farms, Roads, Control Buildings, Valve Stations, Pipe Racks, Pipe-way Sleepers, Paving, Sulphur Silos, Furnaces, Boilers, Conveyors, Flare Tower, Heavy Vessel Foundations in Power and Desalination Plant, Chemical Plant, Public
Proficient in Excel and in Word. Proficient in Primavera Project Planning software.
Adaptable, Enthusiastic, seeks work in Aberdeen or UK.
A graduate of University of Port Harcourt, Faculty of Science, Department Of Geology (Bs.c Geology) Rivers State, Nigeria. Working currently as a contract staff with Shell Petroleum Development Company Nigeria Ltd.
B.Eng. Electrical Electronics. CCNA-Abuja,Nigeria. IEEE-USA Member, Networking Telephony/Data, MicroSoftExcel etc, Travelling & Visiting New places
First
Prev
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
[ 178 ]
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com