SUMMARY OF QUALIFICATIONS:
------------
Twenty-five years in Oil/ Gas and Power Generation project management and engineering.
Areas include Project Controls (planning, scheduling, cost tracking) and Field Supervision for EPC turnkey projects, plant modifications and outages. Experience is multi-project, union and open shop, foreign and domestic, with budgets to $850MM. Recent projects have been in Offshore Development, Gas Pipeline and Fossil Power. Software includes Primavera P3, P6, Artemis Project View, Pro-Log, FDCost, Milemarker, SAP, Monte Carlo and MS Office.
------------

WORK EXPERIENCE:
------------
Jan 09-Sep 09; Total Oil, Lagos, Nigeria Project Controls Mgr thru Dover Engr of Port Harcourt for Initial Engineering and scope allocation for the EGINA Field FPSO FEED (300,000 man-hours) then PCM for all Sub-sea scope. Developed the estimate and budget for 59,000 man-hours and associated costs to produce 310 Sub-sea FEED deliverables. This included extensive Nigerian content requirements. Generated spreadsheets and the Primavera network to baseline, track and forecast hours, costs, physical progress and earned value. Implemented and managed the processes to produce weekly and monthly reports while interfacing with sister and client engineering efforts.

Oct 07-Jan 09: Chevron, Accra, Ghana (contract) Project Controls Mgr for the West African Gas Pipeline.
$850MM. The project has seven partners with six sites in four countries; 600km offshore, 55km onshore, compressor station and 5 terminals. Subs were T&M and Lump Sum, 6 currencies. Developed, implemented and managed the programs and processes for scheduling, cost control and physical installation measurement. Captured and reported costs, quantities, productivity, earned value and schedule performance data. Assessed variance from forecast and budget. Identified areas of risk, tracked changes and developed recovery efforts to meet targets. P3, P6

Jul 04-Oct 07: Shaw-Stone/Webster, Trenton, N.J.(contract) Project Controls Mgr for the development of estimate, budget, schedule, performance metrics and contracting strategy for a $470MM FGD/ESP air quality project at a three unit PP&L fossil site. Construction started May 06. July 04 to Sept 05 PCM on a $550MM, 500MW Combined Cycle power project in Astoria, N.Y. Directed in-house and subcontractor planning, scheduling and progress reporting. Tracked costs and identified variances and trends. Used P3 Sub-Project restoration for statusing.

Jun 03 – Jul 04: Washington Group Int'l (contract) Scheduling and Controls Lead for Steam Generator and Reactor Head replacement at Oconee Units 1&2 and Prairie Island Nuclear Power Stations. Planned, scheduled, integrated and tracked networks of 3500+ activities each. Managed implementation of project controls systems and processes for major component replacement. Outages averaged 74 days breaker to breaker. P3e, Artemis PV

Apr 02-Jun 03: Reliant Energy, Hunterstown, PA (contract) Project Controls Manager for a $510MM EPC combined cycle power station, 2.6MM man-hours, 800MW. Managed cost, schedule and performance tracking and reporting. Progress, milestones, systems turnover, quantities/rates, change orders, costs, cash flow, invoices, variances, forecasts, impact analysis and recovery efforts were primary areas of responsibility. P3

Mar 01-Apr 02: Duke-Fluor Daniel, Beverly. OH (contract) Controls Team Lead on a 620MW combined cycle EPC power station project, $370MM. Provided cost tracking, planning/scheduling, progress and performance metrics, and change management supervision. Conducted weekly site reviews and coordinated monthly project reports; client and internal. Assessed budget and schedule deviations while directing efforts toward milestone achievement. P3, FD Cost

May 00-Mar 01: General Electric, Joliet, IL (contract) Site Manager, five unit simple cycle GE 7FA's. Site installation budget $78MM. Primary responsibilities were oversight of the prime contractors (civil and balance of scope) while monitoring and coordinating interdepartmental functions, targeting efforts for budget/schedule achievement and providing site support needs. Job scope also included emergent issue resolution, addressing client concerns, invoice review, local staffing and sourcing, as well as home office liaison and reporting.

Mar 99-Apr 00: Consumers Energy, Bay City, MI (contract) Construction Manager, D E Karn fossil station dual fuel low NOx conversions. Work was in-plant on two of four 650mw units with outages required. Included gas supply piping, burner replacement, two aux boiler rebuilds and cooling tower reconfiguration. $46MM.

Aug 98-Mar 99:D C Cook Nuclear Station, Bridgeman, MI (contract) Lead Scheduler in Work Control for a two unit restart program. Produced daily production schedules and lookaheads. Responsible for core offload and core safety train fragnets. Developed level II logic for system work windows and steam generator replacement. P/2

May 98-Aug 98:Texaco, Longbeach, CA (contract) Construction Manager, nightshift, refinery modifications and refit during turnaround. In-plant work, operating facility. 280,000 man hours, $34MM.

Mar 93-Jun 95:Arco Chemical, Freeport, TX (contract) Site Manager for tanker offloading, pumping and storage facilities. $46MM. The project included three berth tanker docking, and three salt dome storage wells with brine reservoirs. Coordinated subcontractors, engineering, QC, project controls, services, facilities etc.

Oct 91-Feb 93:River Bend Station, St. Francisville, LA (contract) Outage Scheduler. Planned, scheduled, loaded and tracked assigned systems, equipment and tests during refueling. Included were ILRT, MOV signatures, DG rework and 14 systems. Revised the network to accommodate emergent work, scope changes and various constraints.

Nov 90-Jun 91:Trojan Nuclear Plant, Rainier, OR (contract). Construction Manager for plant mods during outage. Pre-outage prep including engineering, procedure approval, material procurement and staging, was required for projects in the 1000-25000 man-hour range.

Jan 90-Nov 90:Calvert Cliffs Nuclear Plant, Lusby, MD (contract) Construction Engineer, independent dry fuel storage facility, new construction, $40M. Included cask handling equipment, barge dock alteration, dredging, and transporter access. Security considerations were extensive.

Dec 88-Jan 90:FP&L Port Everglades, Ft Lauderdale, FL (contract) Outage Coordinator. Scope of responsibility included pre-outage prep, overhaul execution and restart for both contract and in-house efforts, 2 units. Coordination of craft with engineering, materials, specialty services, QA/QC, safety and cost were core requirements.

June 87-Dec 88:General Electric, Bayonne, NJ (contract) Construction Manager, four unit turnkey co-generation power project. Coordinated contractors, vendors, and specialty services with deliveries, commissioning and other constraints. Resolved interferences, conflicts and priority issues.

July 85-Mar 87:Virginia Power, Chester, VA (contract) Outage Coordinator. Assignment consisted of pre-outage preparation through shutdown and startup. Typical concerns: Need/priority evaluation, in-house vs. contract analysis, scope control, procurement, contract admin, craft allocation, work around resolution and cost/schedule impact.

July 82-May 85:Westinghouse Gas Turbine Division, Concordville, PA Construction Manager at two sites in Saudi Arabia and one in Mexico. Issues included area, discipline and system oversight, force allocation, materials, turnovers, local procurement, commissioning to operations transition and owner's engineer relations. Configurations were both simple and combined cycle. Saudi, Ha'il $380M, Saudi, Quaseem $170M, Tula, Mexico $18M.

Nov 80-Apr 82:Westinghouse Nuclear, Angra, Brazil Start-up Support Mgr. Coordinated the materials, equipment and craft for start-up on an 850MW nuclear plant from hot functional thru commercial op.

Apr 78-May 80:Aramco,Dhahran, Saudi Arabia Construction Manager for the Abu Ali water injection and desalting project. Interfaced production and engineering with the construction effort. Directed sub-contractors and force account work. Implemented change orders, approved draws, assured timely procurement and delivery.

EDUCATION & CERTIFICATION:
------------
B.S. Civil Engr.
Los Angeles Univ. April 1978
Courses inn Piping Design, I&C,
P.E. Prep (Mech), Radiology and various programs and systems.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 10551 to 10600 of 15477)Go to Search Parameters...
Brief Description
Experience in Reservoir and Drilling Engineering. Some teaching and creative background. Technical and commercial skills.
Senior Grade Control Coordinator--Specialist in Managing Remote Field Exploration, Resource Development and Grade Control for Mining Operations
Over 20 years of Electronic, Electrical and Mechanical experience. 10 years of Field Service in both domestic and international travel.
I am lead piping engineer ,supervised 6 engineer ,6 autocad drafter and 7 PDMS staff.I am familiar with all international stds related to oil&gas ,petroleum and power plant.
17 years of legal work experience as DA, Chief Judge, Legal Advisor and part time professor
RT Level II, MPI, LPT, PMI, MFL, UTT
Safety Officer
I am likely to be something of a perfectionist and will sacrifice pleasure ells where in order to accomplice my work to a set standard, I am determined and have high standards set my work. Combined with my positive no-nonsense style of work I always get positive results from my work. I can work unsu
HSE Manager in major energy, power generation, oil and gas sectors covering technical and commercial requirements. With professional experience in directing and mananing health, safety and the environment protection & sustainability development aspects as per OSHA framwork and guidelines. Strong abi
Work Over and completion for onshore rig
Pre sales consultant, product consultant, business analyst
Good understanding of Accounting Principle,Excellent problem solving skill and leadership qualities,Good knowledge of Accounting Package , Microsoft Word and Excel.
Data Collections for a map company collect photography and research on oil & gas leases, titles, assignment, memorandum, amendment, judgments, and taxes. Find term, file and instrument dates, gross acres, lessor, lessee, entry mineral rights for run sheet and plats. Reach complete abstract. Meet Dea
NCCO/NAHETS Certified operator. Northern California College of Construction Grad
Document Controllre with 3 years work experience in Qatar
Drilling Safety Manager/ Operational Safety Trainer Land Based Drilling
Electrical Engineering
18 Years including 10 years in oil & Gas - Construction experienced Safety Specialist , having Mechanical engineering Degree from Bangalore University and Diploma in Industrial Safety From RLI Chennai, India & OSHA 30 Hours Trained - Key skills : Construction Safety Mangement, Auditing, Trainer
Acting in a operation and maintenance of several equipments, such as: Internal Combustion Engines ( Caterpilar , MAN MWM, Mitsubishi, Wartsila type W200, SACM type 240-D), Fresh Water Generators (Water Maker - MECO), Lubricant and Heavy Fuel Oil Purifiers (Alfa-Laval), Main Air Compressors, Pumps...
Educational Qualifications: Master of Engineering in Mechanical Engineering specializing in Welding Engineering from Indian Institute of Technology, Roorkee, Uttar Pradesh, India in April 1996 with 74.40%, American Welding Society (AWS) Certified Welding Inspector (CWI) -AWS-CWI Certificate
I have degree in Business Administration with Customer Service, Administration and IT Skills. I worked in gas distribution and transmission compnay for more than 10 years. Presently I am working as Admin Manager s in Phones4u UK. I started as Store Admin in August 2005 but got promoted afterwards.
3 yrs diploma in mechanical engineering with 1st class from bset, bhubaneswer (india) in April-2002 professional qualification: -• cswip 3.1 (twi) certification for welding inspector, cert. no- 36291 •surface preparations & paint application techniques (certification from jotun paint school)
Mining Geologist
Senior Primavera 6.2 Planner / Scheduler or Management Skills
Experience as Piping Designer, in performing Pipe Modeling, Piping Arrangement Drawings, Checking & Extraction of Isometrics from 3D Model. ƒá Hands on Experience in Piping Software¡¦s ¡V Bentley¡¦s PlantSpace Design series, Microstation, PDMS & TRIBON M3. Knowledge of Piping Stress Analysis.
Refinery Tankfarm Pre-commissioning and commissioning Experience
Electrical & instrumentation engineer (automation & control specialist)
MBA-FINANCE AND MECHANICAL ENGINEER WITH 2 YEARS EXP IN CHEMICAL INDUSTRY AND 1 YEAR IN BANKING INDUSTRY
I have done degree in mechanical engineering. I am having AWS-CWI certification. And I am also having approval of Saudi Aramco as a Welding Inspector. I have also done ASNT level-II in UT, MT, RT, and PT. I am having more than 5 years and 8 months experience in oil and gas field.
Materials Coordinator on oil/gas, and construction industry. 12yrs experience onshore and offshore.
Expert on drilling problems such as stuck, circulation losses;easy going and team work. can work any where;
Trade Qualified Boilermaker with over 15 years experience
Highly skilled graduate Project Manager/Civil Engineer and Project Controls Lead with more than 25 years related domestic and international experience in project and construction management.
Diploma in elect. engg., working in offshore as rig electrician for 5 years
I am graduate of petroleum and natural gas engineering department from Middle East Technical University. I have worked for an independent natural gas exploration and production company for 2 years. I am interested in well testing, stimulation, reservoir engineering studies in an int. co.
Piping Supervisor
Result oriented Geotechnical/ Engineering Geologist with 2-3 years onshore experience in ground engineering with keen interest to develope further expertise in the field. Strong analytical and personal ability to problem solving solutions with Civil Engineering Geology knowledge of Construction
APICS (CPIM) certified, Graduate diploma in Production Engineering
Mechanical engineer wih marine background, stuffed in maintenance, fabrication, commissioning of projects. have good experience in oil / gas industry.
I have 15 years experience in the electrical field, with journeyman and interprovincial qualifications, also a Class A ticket. I have training in iIndustrial, commercial and residential electrical installations, also, telephone and data networks, with Nordex certification.
Helped Company to avoid unnecessary stock products and maintained good products. Developed services and customer focus as a strong competitive advantage. Motivated staff and successfully instilled a strong client-first orientation in sales and service team. Manage operations, and buying activitie
6 years experienced electrical engineer in low voltage and high voltage
Network Engineer Specialist
High energy Petroleum Engineer with a masters degree and experience in nodal analysis, production optimization, artificial lift design, pressure transient analysis, reservoir simulation, production forecasting, risk analysis, proven leadership and team building skills.
Petrochemical Process Operator dealing with Polypropylene and Polyethylene production. More than ten years experiences with processing, treating materials, handling of product, pre-commissioning, commissioning activity and start-up the new plant.
Planning, Monitoring and Scheduling of fabrication and erection of Steel Structure, Pressure Vessels, Tanks and Piping works by using Primavera Project Planner P3 Version 3.0 and 2.0b with 5+ years of experience.
Geophysics graduate with ~3years experience with wire line/TLC logging seeking for a full time position as a geophysicist.
Presently,I am working as an Administrative assistance in Atlantic Methanol production company. I have also work in Mobil oil equatorial Guinea as a Secretary warehouse. I have been subjected to many training in management.
Seeking for Entry Level Job in Environmental Engineering
EXPERIENCED MARINE SUPERINTENDENT - MASTER MARINER, FPSO / TANKERS / SHIPYARD / OFFICE BASED
First   Prev   201   202   203   204   205   206   207   208   209   210   211   [ 212 ]   213   214   215   216   217   218   219   220   221   222   223   224   225   226   227   228   229   230   231   232   233   234   235   236   237   238   239   240   241   242   243   244   245   246   247   248   249   250   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com