Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #87500
next resume »»
CONTACT INFORMATION:
View contact information...
Objective:
Seek the excellent opportunity to improve the company profit by implementing best systematic procedures in maintenance and to lead a team of engineers and technician to minimize the instrument operating, maintenance cost, maintain 0% breakdown, implement the safe working philosophy, improve the energy conservation and implement automation wherever possible.
Summary of Skills:
13 years of experience in Maintenance, Design, installation, testing and commissioning of Distributed Control System (DCS), PLC and SCADA. I possess very good knowledge and skills in DCS, PLC, SCADA and Field Instruments.
Have extensive experience on the various project implementation & maintenance activities, including:
Maintenance of DCS and Field Instruments in modern automated Sugar and Co-Generation Power Plant.
Troubleshooting DCS / Instrument related issues
Energy conservation Audit
Performance Improvement Audit
Plant Losses Analysis and improvement
Preparation & Review of P&ID for automation
Preparation & Review of Logic Diagram
Preparation & Review of Cause end Effect Diagram
Preparation & Review of Flow Chart and write up for Sequence Program
Preparation & Review the List of Instruments and I/O list
Preparation & Review the specification for list of Instruments and issues the BID to various vendors
Preparation and Review the cable specification
Preparation and Review the control room layout
Preparation and Review the cable tray root
Coordinating with commercial Department and attending meeting with vendors for buying the good Instruments.
Participating in FAT and SAT for final implementation of DCS
Design & Engineering of DCS, PLC, SCADA and Field Instruments which involves the preparation of system drawings based on the customer specification, needs & field conditions.
Developing System configurations and programs from functional specifications / user requirement.
Design architecture for Distributed Control System (DCS).
BOM Freeze for DCS hardware & software involved.
BOM Freeze for Instrument Asset Management & Alarm Management for Foxboro DCS.
DCS programming in Foxboro DCS (Version 6.x, 7.x & 8.x), DCS Programming in Honeywell DCS (TPS3000), Programming Honeywell PLCs using Ladder logic & Programming in SCADA (Intellution Fix).
Upgrading the Foxboro DCS system.
Conducting Factory Acceptance Test/Site Acceptance Test.
Integration tests of Software & Hardware to prove the specification to the customer in the final acceptance of the System.
Manage and supervise a team of engineers to design/ implement DCS, PLC and SCADA.
Selection of field instruments and engineering works for various process plants like Power Plant and Sugar Plant.
Installation and commissioning of instrument panels and field instruments.
Conducting Function Test
Professional Qualification
Bachelor of Engineering (B.E) in Instrumentation and Control
First Class and First attempt in all subjects
Training
DCS Engineering Training for Honeywell DCS (TPS3000) conducted at Honeywell, Pune, India.
DCS Engineering Training for Honeywell Plantscape conducted by Honeywell, Pune, India
DCS Engineering Training for Foxboro DCS conducted at Invensys India.
Turbine Governing control system for BHEL steam turbine conducted by BHEL at Hyderabad
Alarm Management Training conducted by Invensys India at Singapore
Loop Management Training conducted by Invensys India at Singapore
Technical Skills
Operating Systems Windows NT, XP, MS-DOS, Unix
Languages C, Functional Block Diagram and Ladder Logic
Programming.
Networking TCP/IP, Switch/Router Configuration.
Hardware Honeywell Logic Manager and DCS [Invensys & Honeywell]
Tools/Packages TPS3000, Plantscape & Foxboro DCS (version 6.x, 7.x, 8.x), Foxboro's Avantis Asset Management System
Professional Experience:
Company Chiyoda Technip Joint Venture, Ras Laffan City, Qatar
Period June 2009 to Sep 2009
Position Instrument System Engineer
Project RasGas Company Limited – Train7, Ras Laffan City, Qatar.
Period June 2009 to Sep 2009
Location Dammam
Description:
Conducting Function Test for Train 7 Instrument Team. Leading a team of engineers to complete the function test for successful completion and commissioning of the Train-7 Ras Gas LNG Plant.
Company Invensys Saudi Arabia, Al Khobar, Saudi Arabia
Period July 2008 to March 2009
Position Lead Engineer
Project Dammam TMC project, Saudi Electric Company, Dammam & Jubail.
Period Sep 2008 to March 2009
Location Dammam
Description:
Leading a team of engineers to design and implement the Foxboro I/A series Version 8.3 DCS system to upgrade the Gas Turbine in Berri & Dammam Power plant.
Project Royal Commission, Jubail & Yanbu
Period Sep 2008 to March 2009
Location Jubail
Description:
Leading a team of engineers to design/ implement the Foxboro I/A series Version 8.3 DCS system to implement the fuel feedstock pipeline monitoring project.
Company Yokogawa Services Limited, Al-Jubail, Saudi Arabia.
Period Apr 2008 to May 2009
Position Operation Team Leader
Project Yokogawa Services Limited, Al-Jubail, Saudi Arabia.
Period Apr 2008 to May 2008
Location Al-Jubail
Description:
Lead the team engineers for proper support to Yokogawa customers.
Company Invensys India Private Ltd, Velachery, Chennai
Period Dec 2003 to Jan 2008
Position Asst. Manager
Project Reliance project, Jam Nagar, India
Period Feb 2007 to May 2007
Location Mumbai
Description:
Leading a team of engineers to design/ implement the Asset Management System for Reliance Project.
Responsibilities:
Design & Engineering of Instrument Asset and Alarm Management Systems.
Developing System configurations from functional specifications/ Project Application Systems.
Design architecture for Instrument Asset Management and Alarm management system
Preparation of Test System Application Programs
System Integration Tests.
Conducting the Factory acceptance test and Site acceptance system.
User CESC
Period May 2006 to Jan 2007
Location Kolkatta.
Role Asst. Manager
Description:
Primarily involved in the following customer support activities for India's southern region Foxboro DCS customer. Troubleshoot the various DCS problems in the customer sites.
Involved in the maintenance of Foxboro DCS (version 4.3), made & implemented the systematic maintenance procedure in CESC, Kolkatta. It the power plant and contains 80 nos of CP30FT & 18nos of AW51A stations
User EID Parry, Pudukkottai, India
Period Dec 2003 to Apr 2006
Location Pudukkottai.
Role Senior Service Engineer
Description:
Primarily involved in the maintenance activities and maintenance of DCS (Foxboro DCS V6.2.1) and various Field Instruments in this particular site. Troubleshoot the various design problems in the customer site and also monitoring the performance and improvement of automation
Design, Installation and commissioning of expansion activities in this site
This plant contains 2500 I/O, 100 control loops, 100 transmitters
Achievements in Invensys:
* Successful maintenance and best customer satisfaction in the site activities
* Successfully implemented the expansion activities
* Increased the Profit Margin by best preventive maintenance practices
Company Bannari Amman sugars (Co-generation Power Plant) Period Feb 2000 - Nov 2003.
Position Senior Engineer
Description:
Worked as Senior Engineer and head of the instrument department in co-generation power plant, which involves operation and maintenance of Honeywell Logic Manager, TPS3000X DCS and Field instruments.
Responsibilities:
Programming, Trouble Shooting and Maintenance of Honeywell LM620 series logic manager PLC.
Configuration and Control language modification of HPM, Graphics generation, maintenance and Trouble shooting of Honeywell TPS3000X Release.
Troubleshooting and Maintenance of Bentley Nevada Vibration Monitor System and Woodward governor 505E.
Calibration, Maintenance and troubleshooting of various process type Smart Transmitters/ Control Valves (Yogagowa, Rosemount, Fuji, IL, ARCA and MIL).
Achievements in Bannari:
* Implementation & Commissioning of combustion control system for boiler
* Maintained the Power Generation Plant with 100% uptime for a period of 3 years
* Won the prize for energy audit and reducing the internal plant power consumption.
* Successful automation of Sugar Plant
Company Dharani Sugars & Chemicals ltd.
Period Aug-96 to Jan-00
Position Asst. Engineer.
Description:
Erection and commissioning of SCADA system, Allen Bradly PLC system, Trison Governing system & field instruments for Power Generation
Plants.
Responsibilities:
Commissioning of 15MW power plant instrument including SCADA, PLC, Governor & Field instruments.
Calibration, Erection and commissioning of Smart Transmitters.
Calibration, Erection and commissioning of Control valves.
Erection and commissioning of speed sensors and vibration sensors for Turbo generator.
Loop checks coordination and support.
Erection and commissioning support for the 15MW Turbo generator and auxiliary equipments
Material management.
Commissioning support for 15MW power plant.
Achievements in Dharani:
Designed combustion control loop for boiler and implemented successfully.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 451 to 500 of 15498)
Go to Search Parameters...
Brief Description
Drill & Blast specialist with a licence to manufacture explosives; worked in numerous countries doing oil & gas exploration; extensive experience in all aspects of open cut mining particularly in the areas of drill & blast
Senior production engineer / technologist, + 30 yrs experience, BSc, M. Eng Pet Eng
Independent Petroleum Consultant
Mine Manager, Chief Operating Officer, HSE Manager, Mining Engineer
Senior Process Engineer (Indian) with about 24 years experience available for Senior assignments in Oman / UAE with reputed oil & gas companies
Multi tasking experienced Geologist(MSC.)/ P.Engineer(PhD), looking for positions in geology/ reservoir engineering (even on entry level). I am fluent in many languages, willing to relocate Worldwide, available immediately. Presently living in Canada.
Sorption, desorption, refining, distillation, demineralization, extracting (demulsification with surface-active agents), absorption, rectification, water purification (ion-exchange, ultrafiltration, reverse osmosis and so on). Responsibilities: „Ï water pre-treatment system of plant u
scolecodontologist-oil exploration-palynology-geology
Project Manager/Controller/Scheduler
Deepwater drilling and completion superintendent and supervisor
Consulting Engineer / Civil, Structural, Architectural /
Over 24 years of various offshore vessels, ship yards, offshore rigs/ gas platforms, drill ships and engine factories as Oilier, Junior Engineer, Maintenance Superintendent, Technical Staff, Mechanic, Marine Engineer, Rig Mechanic, Maintenance Engineer, Hydraulic Mechanic, Rig and gas Platform Chie
More than 30 years experience in civil structural design, consulting and supervision in upstream, downstream, and pipeline of oil and gas fields
Oil finder/working manager with 27 years experience in US/international exploration and production geology, geophysics and research.
Control System Engineer
CCC Certified, MBA, Cost Controller / Project Controller expert in Advanced Excel, MS Access
Accomplished professional with over 19 years of experience in all phases of the oil and gas drilling industry as a Roughneck, Motorhand, Derrick Hand, Assistant Driller, Driller and Relief Rig Manager. Demonstrated proven track record of recent operational success as Directional Driller, Trainer, Te
Utilizing my professional skills can be achieve good plant reliability and availability , improvement in plant efficiency by out of box thinking & brain storming , failure analysis by RCA method , adhering companies safety and HR rules and regulations , team building ,Hazop, P&ID review , commission
commsioning for L N G Process Plants
Very experience cementing engineer/specialist
Seek the excellent opportunity to improve the company profit by implementing best systematic procedures in maintenance and to lead a team of engineers to minimize the instrument operating, maintenance cost, maintain 0% breakdown, safe working and implement Automation wherever possible.
Project engineer with strong analytical & organizational skills. Major capital projects include large-scale LNG plants, offshore floating production, refining, chemical & Gas processing industry
Senior Applications Software Engineer with broad experience in design, development and implementation of highly technical applications. In-depth experience with multiple MMI intensive applications such as EMS SCADA, geological and geophysical workstations.
Welding Inspector
Geophysicist/QHSE Advisor
Driller with 9 years experienc on land rigs and 24 yrs. total exp. in drilling field
I have very good skills for work in team, a like part of the team and with the capacity of leadership to be leader of the team. I apply a proper self direction naturally, I work by means of a good communication between colleagues and the bosses, good organization, intensive diligence, strong initiat
Qualified and Experienced Business Development Manager & Coordinator.
Accomplished Business Analyst and Consultant with over 30 years of responsible experience in areas of accounting, finance, materials management, and procurement. Seeking a responsible and challenging position where I can continually add value and contribute to the growth of a progressive organizati
I am a graduate mechanical plus first class boiler engineer and have 20 years experience of process and pwer generation industries.Iam in search of some engineering job in managerial position keeping in view my qualification and experience.
Project Controls, Project Controls Manager, Scheduling
Maintenance Planner / Scheduler
Eighteen years of professional experience in the fields of logistics, port discharging operations, plant equipment maintenance, warehouse management and contract administration. Three years managerial experience in manufacturing operations.
Mud Engineer/Drilling Fluid Consultant 31 years of experience
Well versed in boiler construction, piping fabrication and installation, machinery installatio
PLC control systems, coordinated lines, Design, Start up, Maintain.
Experienced drilling, completions, workover, manager and engineer. Have experience in hard rock, mid-continent, gulf coast, offshore shallow/intermediate/deep waters. Have both domestic and intrenational experience.
Engineering Manager - nine years of experiance. Responsible for all engineering related fuctions; budgets, skills training, maintenance, forward planning, internal projects and during last three years actively involved as the ovners engineering team representative during project design, procurement
I am an exploration geologist - manager with about 30 years experience in a variety of commodities but concentrating on copper and gold. I have worked in Saudi Arabia, Australia, PNG, Philippines, Indonesia, China, Laos, and Mongolia.My experience in recent years has been in Exploration Management
QHSE and general vessel superintendent.
Passed Secondary Techical Examination, ITI Electronics, Diploma in Mechanical Engg, Advanced Training in Instrumentation and possess 22 years on hand experience in Instrumentation and Control System. Also possess UAE driving licence and have good knowledge in PLC, DCS, Turbine control system etc..
Eight years of experience in Mining Exploration, management of all aspects of exploration drilling campaigns, surface geology mapping, geophysics, geochemistry, and hydrogeology.
Over 20 years of Civil/Structural Engineering: Computer Aided Design & Analysis and Project Management
Extensive contruction management experience in the field of onshore cross country oil and gas pipeline projects.
Dynamic and accomplished Operations and Technical Development Leader with 20+ years of demonstrated achievements in devising effective operational improvements.
Over 20 years of overall experience in geology, geophysics and operations with an emphasis on Seismic interpretation and reservoir modeling. Areas of strength are mainly in operation geology, seismic interpretation, Prospect generation & maturation, opportunity evaluation, reservoir modeling.
24 + yrs oilfield experience, 5 yrs field supervisor managing 9 rigs daily with as many as 30 at one time.
B.S. Geology, Lead Oil Co. Owner, Lead MWD/LWD,Liaison Directional Driller and have experience in all disciplines of Directional Drilling.
Management of Training & Development (technical, vocational and competence assurance). BSc (Open University)
electrical engineer/high voltage/switchgear/substation/plc
First
1
2
3
4
5
6
7
8
9
[ 10 ]
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com