PROFESSION: INSTRUMENT @ CONTROL ENGINEER
DATE OF BIRTH: 8 SEPT 1957
MARITAL STATUS; MARRIED
NATIONALITY: ROMANIAN
EDUCATIONAL QUALIFICATION: UNIVERSITY GRADUATE: MASTER OF SCIENCE IN INSTRUMENTATION ENGINEERING
1978-1983: TIMISOARA UNIVERSITY: FACULTY OF AUTOMATION AND COMPUTER
1972-1977: VICTORIA INDUSTRIAL HIGH SCHOOL- Instrumentation in chemical plant
PROFESSIONAL EXPERIENCE: 25 YEARS
May 2006 till now: SIEMENS PTD, ABU DHABI ENGINEERING MANAGER SCMS
2003- 2006: BUNDUQ OIL CO. ABU-DHABI PMC INSTR. & CONTROL ENGINEER
2001- 2003 PARSONS E@C, KUWAIT PMC INSTR. CONSTRUCTION ENGINEER
1996- 2001 KUWAIT CONTROLS COMPANY INSTR. MAINT.& CONSTR. ENGINEER
1995- 1996 POG-EP-FOCHI, MALAYSIA INSTR. CONSTRUCTION ENGINEER
1993-1995 NUCLEAR POWER PLANT OF CERNAV. INSTR. COMMISSIONING ENGINEER
1990-1993 RESEARCH CENTRE OF EL. EQUIP. SCIENTIFIC RESEARCHER
1983-1990 CHEMICAL PLANT OF SLOBOZIA INSTRUMENT MAINT. ENGINEER
For detailed experience see attached sheets
PROFESSIONAL AND SUPERVISORY SKILLS:
PMP certified (Project Management Institute-USA)
Honeywell FSC training
Siemens SICAM SAS training
Siemens SICAM PAS training, Win CC training
Siemens DIGSI training
Ability to learn quickly in order to meet new requirement
The knowledge of Microsoft Word and Excel
The knowledge of design, construction and business strategy
DRIVING LICENCE- YES
DATE 12 April 2008 REFERENCE:
2006 TILL NOW: SIEMENS LLC, ABU DHABI, UAE
TAWEELAH B 400KV SUBSTATION:
Install, commissioning and Site Acceptance Test for Substation Control and Monitoring System (SICAM SAS): PROFIBUS FMS (fiber optic cables) protocol between Bay Control Units and Substation Controller and HMI, Winn-CC visualisation and control system for HMI, Sicam Plus for configuration of Substation Controllers.
DUBAI H 400/132 KV SUBSTATION:
Install, commissioning and SAT for SICAM PAS (Power Automation System) (the latest version of SICAM SAS): IEC 61850 ETHERNET protocol between BCU's and Full Server Substation Controllers, PAS-CC visualisation and control system for HMI, Sicam PAS UI for configuration of Full Servers Controllers.
SARJA AL TAY 220/132 KV SUBSTATION:
Install, commissioning and SAT for SICAM PAS V5.0: IEC 61850 ETHERNET protocol between BCU's and Full Server Substation Controllers, PAS-CC visualisation and control system for HMI, Sicam PAS UI for configuration of Full Servers Controllers
ABU DHABI-YAS ISLAND 132/22 KV SUBSTATION:
Parameterisation of Siprotec devices, configuration of Sicam Pas and Pac CC, install, commissioning and SAT for SICAM PAS V6.0: IEC 61850 ETHERNET protocol between BCU's and Full Server Substation Controllers, PAS-CC visualisation and control system for HMI, Sicam PAS UI for configuration of Full Servers Controllers, IEC 101 Protocol between SICAM PAS and Control Center (LDC, DMS)
ABU DHABI-SAADYAT ISLAND 400/132/22 KV SUBSTATION:
Install, commissioning and SAT for SICAM PAS V6.0: IEC 61850 ETHERNET protocol between BCU's and Full Server Substation Controllers, PAS-CC visualisation and control system for HMI, Sicam PAS UI for configuration of Full Servers Controllers, IEC 101 Protocol between SICAM PAS and Control Center (LDC, DMS)
2003-2006: BUNDUQ CO. LTD, ABU-DHABI (JAPPANESS COMPANY)
BUNDUQ PLATFORM COMPLEX (OFF SHORE): ESD REPLACEMENT
Monitor and supervise Tebodin engineering company for replacing existing relay based Platform Control Panels in Living Quarter Platform, Water Injection Platform, Central Collector Platform and Gas Sweetening Platform with TUV approved (SIL3 as per IEC 61508) Programmable Logic Controller based Emergency Shutdown System (Fail Safe Controller Honeywell): review existing data, site visits and data collection, shutdown philosophy, instrument I/O list, Cause and Effect Diagrams, Cable Block Diagrams, Interconnection diagrams, Cable interconnection details (ESD-DCS-IRP), Loop Diagrams, Specifications and Data Sheets for Shutdown Valves ( TK valves), Diesel valves (Neles), ESD system (FSC Honeywell), DCS interface system (MODBUS communication for Yokogawa CS 3000), Level Switches (Magnetrol), Transmitters (Honeywell and Rosemount), Interposing Relay Panels.
Verify and approve Project execution plan, Functional Design Specifications, Communication overview, Bill of material, General arrangement drawings, Power consumption/Heat calculation, Rack layout, Termination details, Weight calculations, I/O wiring schematic drawings, Power distribution, Factory Acceptance Test, Site Acceptance Test, Functional Loop Diagram, Engineering Documents, Reliability Calculation, System Performance Testing Procedure, Loop wiring diagram for ESD FSC Honeywell.
Participate in Den Bosch (Holland) for FAT (Factory Acceptance Test) for Fail Safe Controller System (Honeywell) (two weeks), checking all hardware and logics, SEO, interface with DCS (Yokogawa) and Matricon server. Monitor and supervise Tyco activities for replacing existing Halon Fire protection system with new Inergen based Fire protection system for LQP (control room, battery room, switchgear room, radio room, AHU room) and VESDA early detection system for LQP control and radio room.
Site survey for ESD replacement with engineering and installation companies. Workshop inspection for TK valves (hydraulic and air test for shell and seat, opening and closing time).
Issue bid documents, enquiries and Material Purchase Order for instrument items (transmitters, level switches, shutdown valves, ESD system, Interposing relay panels, pull knob and push button, junction boxes, instrument cables) with proper documentation: data sheet, specification, etc. Issue bid documents for installation contractor.
Bunduq representative for installation work on offshore (more then one hundred days): installed transmitters, junction boxes, cables trays, pulling cables, installed new Honeywell ESD panels, communication cables, installed new YOKOGAWA Field Control station, loop checking and commissioning work (on line changing of existing ESD with new one, after properly isolation of output signals), hand over to operation, as build drawings.
BUNDUQ NEW GAS INJECTION PLATFORM
Joined new Gas Injection Platform team for instrumentation related work and supervise Larsen & Tubro (India) engineering company and Gas Services International (Singapore) for instrumentation activities related to new GIP:
Data sheets, specifications for transmitters (Rosemount), control valves (Hopkinsons), self acting pressure valves (Fisher), shutdown and blowdown valves (ABV), orifice plates (FMC), rupture discs (Fike), fire and gas detectors (Zellweger Analytics), fusible loops (Steelage), wellhead control panel (Petrotech), ESD and Fire & Gas systems (Honeywell), PLC (Allen Bradley) for package units (three associated gas compressors, two acid gas compressors, gas dehydration unit), DCS system (Yokogawa): checking Technical Bid Analysis and Purchase specifications; Data points and I/O lists, Cause & Effect matrix, Logic diagrams and Loop drawings for DCS, ESD, FGS, Junction boxes and cables schedule, Cable block diagrams, serial links between DCS and subsystems (Modbus RTU), etc Participate in Pune (India) for FAT for Fail Safe Controller System (Honeywell), checking all hardware and logics, SOE, interface with DCS (Yokogawa).
Erection and pre commissioning activities in India (two months in Hazira) for new platform (field instruments and junction boxes installation, pulling cables, installing DCS, PLCs, ESD, F&G, continuity checks and loop checking).
Bunduq offshore commissioning activities for new platform (two months): interconnection with existing ones: FSC-FSC communication with existing FSC Honeywell ESD, V-net communication for existing Yokogawa DCS, modification and commissioning of Flare Flame Ignition Panels. Commissioning of new Well Head Control Panel (Vetco Gray actuators), new Bypass drum system, new GDU (Natco), new Instrument and Nitrogen system (Circo), new Acid Gas and Associated Gas Compressors (Ariel, GSI), new ESD and F&G system (Honeywell), new DCS (CS 3000, Yokogawa), new PLC's (Allen Bradley), new Inergen system (Tyco).
2001-2003: PARSONS E@C, KUWAIT
AHMADI-KNPC MANIFOLD: (Smith Metering System: oil field)
Monitor and supervise Hyundai contractor activities for control system installation ( SCADA, Smith Flow Controllers, Smith Supervisory Computer, Allen Bradley PLC, Honeywell DCS), field instruments (Turbine Flow meter, Positive Displacement Flow meter, Honeywell Pressure Transmitter, Rosemount RTD, Rotork MOV and Massoneillan Control Valves), junction boxes and Control Room panels installation and termination, Fibre Optical Cables and modems, continuity test and loop checking through Smith Supervisory Computers (Sea Island, KNPC Manifold and Crude Oil Control Centre) and Honeywell DCS (Crude Oil Control Centre).
NORTH KUWAIT: UPGRADING OF GC-23 CAPACITY (oil field)
Monitor and supervise Petrofac contractor activities for control system:
install DCS Panels @ Computers (two Honeywell system cabinets with two HPM, 4 non IS and 3 IS marshalling cabinets, one LCN panel), install Hima H 51q-HRS ESD Panels, FireTech Heaters Panels and Tyco F@G System Panels, complete hook up of DCS System, ESD and F@G systems.
Calibrate instruments, fabricate and install instrument supports, install field instruments, install instrument tubing, install junctions boxes, install Saab Radar type level transmitters, Masonneilan control valves, Biffi Motor Operated Valves, Deluge system.
Lay underground instrument cables (152 km), install cable trays, install instrument cables (above ground), gland and terminations (18000 nos.).
Shutdown work (instrumentation Tie-ins) ;Pre-commissioning: instrument cable continuity checks, site acceptance tests for DCS, ESD and F@G system, instrument loop checks (2000 nos.)
1996 – 2001 KUWAIT CONTROL COMPANY
2000-2001 GHATERING CENTER NO 15 –UP-GRADING (Oil field)
GHATERING CENTER NO. 25 - NEW ONE
Construction work in GC 15 for instrumentation equipment. (Deputy Site Engineer): Workshop instrument calibration for Yokogawa and Foxboro smart transmitters (pressure, level, flow and temperature), for Delta pressure switches, for Magnetrol level switches and transmitters, for Dectronics flare and gas detectors. Erection field work for instruments: dig cable trenches, pull cables, install cable trays, lay cables, install junction boxes, wiring in marshalling cabinet, Logic manager cabinet for TDC 3000 Honeywell DCS and Fire and Gas cabinet, continuity test. Install cabinet FT 50 Loop checking for field instruments through TDC 3000 DCS with Honeywell and Parsons personnel for G.C. 15 and through ABB Advant Control DCS with ABB and Parsons personnel for G.C. 25.
WAFRA JOINT OPERATION (Oil field)
Supervision of installation work of field instruments for pressure maintenance facilities of MGC Wafra, including tank level and pressure measurement, pump control flow, chemical dosing, etc.
MINA ABDULLA REFINERY (Oil field)
Field Hardware for Advanced Control System Project (Deputy Site Engineer): erection work (conduit cable, instrument supports, junction boxes installations, tubing for instrument, cable trenches, instrument installation). Workshop calibration for ABB smart transmitters.
SHUAIBA REFINERY (Oil field)
Refinery steam System Metering project (Site Engineer): site survey for spare cables, hook-up drawing for cable conduit route and tubing for Honeywell flow transmitters. Erection work: conduit cable, pull cable, install junction boxes, install instruments, field and Honeywell data logging system wires connection.
1999– 2000 NETWORK WATER DEPARTMENT, SHWUAIKH
Assure routine maintenance for pump stations (Mina Abdulla, Mina Al Zour, Doha): pressure loops (Smart and Delta Pi Kent transmitters) with HART Communicator, flow loops (VKA and VKB Kent Veriflex converters), level loops, level switches (Roboflex), motor operated valves (Auma and Rotork), temperature and vibration measurement for pumps (Rosemount). Assure faster solution for trouble shooting. Construction, testing and commissioning activity for field and control room instrumentation and control system at Mutla Low ( smart transmitters, Magmaster flowmeter, Auma and Rotork MOV, Penny and Giles paperless recorders, ABB controllers, Rotork SCADA SYSTEM)
SHUAIBA P. A. I.
Replacement of two chlorination units (Walace- Therman): install local control panels for evaporators, install stand- alone controllers for chlorinators, install level switches and solenoid valves, fix cable tray, pull cables, wiring. Continuity test, loop checking, commissioning, hand-over.
Replacement of SDAAR system for pumping station: identify all field cables, all signals (1500), count the number of necessary modules (AI, DI, controllers and communication modules), full cables details in Excel format for SCADA manufacturer (ACTION CONTROL). Assignate each signal to correspondent channel of SCADA modules
1996 – 1999 DOHA WEST & DOHA EAST POWER STATION
Supervise all maintenance activity for instrument equipment: electronic transmitters, electronic modules ( isolators, summators), recorders, indicators, hand-auto station, control valves (all these instruments supply by Yamatake- Honeywell), ITT Barton flow switches, Airschoff pressure switches, Tokyo-Keisso level and flow switches, Rikadenky temperature monitoring system for pumps, Dkk conductivity analysers, Nakakita and Nels control valves, ABB smart transmitters. Loop checking through TDC 3000 Honeywell DCS for field equipment. Supervise protection tests for pumps.
KCC Main Office work
Office work, as detailed engineering contractors, including enquiries, quotations, tenders for instrumentation activities: to supply, install, calibrate, loop testing and commissioning for field instruments, cables, junction boxes, control room equipment (DCS, SCADA, PLC)
For all these activities prepare all necessary documents (faxes, letters, price calculations, etc.) through daily use of Microsoft Word 97 and Excel 97
RIKKA Swage Water Treatment Plant
In charge for maintenance and trouble shooting activities for Endress-Hauser instruments (pressure, level, temperature, flow and pH), Sigma Sampling System, ABB Variable Frequency Driver equipment, Merlin UPS equipment, Sierra Flow transmitter, Siemens Simatic PLC and Operator panel for Atlas Centrifugal Compressor, Parson XL/ SCADA and Distributed Control System, Great Lakes Dissolved Oxygen Analyser, etc.
SUBYA POWER STATION (300 MW * 8 UNITS)
Routine maintenance of Mitsubishi DIASYS- IDOL DCS system: trouble shouting faults, caring out logic modifications, tuning of loops, calibration and checking of modules related to Automatic Plant Control System, Electro Hydraulic System, Turbine Supervisory Instrumentation System, DAS I/O System and Functional Group Control System. Carry out logic modification for the Allen Bradley PLCs associated with HP/LP bypass system.
1995- 1996 POG- EP- FOCHI, BINTULU LIQ. NATURAL GAS PLANT, MALAYSIA
Supervise, install and pre-commissioning activity for flame and gas detectors, break glasses, orifice plates, transmitters, control valves, cathodic protection. For all these equipment – dig trenches, pull the cables, install cable trays, install junction boxes, wiring connection, commissioning.
Assure operation precautions for intrinsically-safe instruments installed in hazardous areas and for flameproof instruments ( flame proof cable wiring, flame proof metal conduit, flame proof junction boxes). Supervise all activities for design, supply, install and commissioning for closed circuit television (CCTV Henriss- Norway): 8 video cameras in different areas, central unit in control room basement, monitors in control room, fibber optical cables (5 km length, 2 km trenches and trays).
1993-1995 NUCLEAR POWER PLANT, CERNAVODA, ROMANIA
Review the pre-commissioning turn-over package and the design documentation for logic and control and measurement loops (classic side: boiler and turbine). Prepare procedures for checking, verification, testing and calibration of temperature, pressure, level and flow loops. Supervise commissioning personnel and participate directly in performing functional tests for protection system (Marconi) and measurement and control system (Nuovo Pignone).
1990 – 1993 RESEARCHE CENTER FOR ELECTRICAL EQUIPM, BUCHAREST
Research, design and commissioning in the following field: prepare procedure for checking, verification, testing and calibration of system for Cernavoda Nuclear Plant (Fluke oscilloscope, Guideline standard voltage elements, etc.). Perform level 2, 3, and 4 commissioning procedures for ventilation system for nuclear plant. Design and manufacture of devices for measurement and control ( non-stress installation for boiler coils for nuclear plant)
1983- 1990 CHEMICAL PLANT OF SLOBOZIA, ROMANIA
Assured normal function for ammonia and urea tripping plants, by a properly calibration and maintenance of instrument equipment: Kent-Tiegli and Foxboro pneumatic and electronic transmitters and controllers, Delta pressure switches, Kent analysers, Fisher and Masoneillan control valves, Bently Nevada vibration and axial displacement measurement system. Perform loop checking for control system for temperature, pressure, level, flow, etc. Lead and up-date the knowledge of maintenance team, for prompt action in non friendly medium, where steam and gases are present (hydrogen, ammonia, etc). faster solution for troubleshooting events. Maintain necessary documentation, assure spare parts for equipment.