CONTACT INFORMATION:
View contact information...

P.Eng, PMP, LEED AP

Project Controller (Planner / Scheduler & Cost Control Specialist)

Objective: To obtain a position that will leverage advanced project management skills, quality assurance, cost control, program development and training experience to the benefit of my employer.

Technical skills and proficiency
* Expert knowledge and 10+ years hands-on experience in Primavera 6-2, P3-1
* Extended experience in implementation of project control procedures and systems in large-Scale projects, using Prolog, Prism, Edge Builder
* Experienced in scope definition, work breakdown structure (WBS), and cost breakdown structure.
* Extended experience in planning and evaluation of schedules using critical path method (CPM). Managing resource-loaded schedules, and activities floats.
* 10+ years of experience in estimating, cost activity coding, earned Value reports, and cost control of multidisciplinary medium and large scale projects
* Experienced in entire project life cycle with excellent knowledge of engineering, procurement, construction and commissioning.
* Diversified experience in different sectors, such as in mining sector, wastewater treatment infrastructure, pharmaceutical, and energy projects.
* Highly proficient with Microsoft Project
* Highly proficient with Microsoft office soft wares such as: Excel, Power point, and Visio.

PROFESSIONAL EXPERIENCE

September 2009 – October 2009
Metro California _Los Anglos
Position: project Controller

Projects and Role
* Prepare detailed project controller procedure for new proposal for BRT( Bus rapid transit)
Mar 2005 – August 2009
Stantec Consultants, Toronto
Position: Senior Planner / Scheduler

Projects with Stantec:
* Hydro One: Bruce to Milton – $700M -Ontario
* Vale INCO: Totten Mine, Sudbury- $500M –Sudbury -Ontario
* Xtrata: Calciner Project, Sudbury – $26M
* City of Windsor: Lou Romano Treatment Plant – $150M
* Wyeth: CE project – Brandon – Manitoba – $49M
* City of Toronto & Earth Tech: Ash Bridges Bay Water Treatment Plant -$7M

Summary:
* Established and setup schedule control activities & provided detailed schedule analysis
* Use WBS in schedule to Communicate with SAP system in Bruce X Milton project
* Monitored and updated the project schedule – monitored progress and generated progress reports at all levels of summary.
* Export and import Data between SAP and Primavera
* Performed cost estimating, cost budgeting/cost baseline, resource planning, cash flow & data analysis and control activities and/or schedule development, maintenance. Monitoring activities & ensure work is completed as scheduled & meets established milestones
* Based on definition and scope of project, developed work breakdown structure to determine internal and external deliverables, responsibilities and milestones to successfully implement the project
* Supported project organizational and administrative activities when be delegated.
* Updated forecasts (EV/SPI/CPI/EAC/ETC) & identified cost trends for management attention.
* Worked with other organizations / subcontractors to coordinate work sequences with the project schedule, cost management plan & total project plan.
* Analyzed schedule progress and performance and identified developing problem areas.
* Coordinated schedule variances, identified schedule impacts, forecast change process and provided recommendations for performance improvement and/or corrective action to project management.
* Contact with project and technical staff, to review of estimates, schedules and cost variance analyses.
* Interfaced with all levels of project management, project controls staff and corporate counterparts for schedule control issues & interfaced with client staff to provide schedule deliverables.
* Interfaced with organization and client management for specific scheduling presentations

March 2005 – August 2006 (part-time, evenings)
Hi-Tech Institute, Toronto
Position: Course Instructor for M/S Project and Primavera

Summary:
Worked as Part time Instructor for Primavera p3-1 and instructor for M/S Project

March 2003 – December 2004
Gulf Consult in joint venture with Worley Parsons
Position: Project Planner & Cost Controller

Summary:
* Responsible for applying Cost Control and Scheduling by using Primavera Software & M/S Project for different types of projects in Kuwait, including hospitals (GMS Hospital, KOC Hospital); 42 floor commercial building (Al-Babtian Tower), etc…
* Review contract drawing before commencing the project.
* Arrange meetings with subcontractors and project mangers to determine the resources for the project.
* Defined activities for the project and determine activities' code and activities identification
* Assigned resources and manpower for each activity
* Divide the project into zones and determine responsibility for each subcontractor & Engineer
* Performed monthly project updates, estimated shortages/delays and increased resources where necessary.
* Cost loading for each activity and performed monthly cash flow

August 2001 – February 2003
KUCM (Kuwait United Construction Management)
Position: Project Planner & Construction Manager

Projects with KUCM:
Commercial Building in Kuwait airport ($45M Cdn)

Summary:

* Preparation of main Schedule for the execution of stages (Primavera)
* Monitor / oversee site progress and updating main program
* Follow up contract signature with subcontractor
* Follow up variances and claims
* Preparing monthly reports and cash flow charts
* Conducting Site meetings with the project staff
* Conducting Site meetings with the project subcontractors
* Estimating / preparation of new tenders

August 2000 – August 2001
Elhani Construction Company (GMS showroom for Cars)
Position: Construction / Planning Engineer

Summary:

* Preparing time detailed schedule for the main project
* Preparing weekly work production schedules for site staff
* Tracking and reviewing correspondences related to schedule and time control.
* Preparing comparison reports to show any variance of target schedule and taking required action to rectify
* Preparing monthly reports
* Preparing cash flow charts
* Preparing monthly payment

August 1997 – March 2000:
Associated Engineering Partnership & Bennie Partnership Overseas Limited (England, Kuwait)
Position: Construction Manager

Summary:
Construction for two lift stations and renovation for sewer in Kuwait City
My project responsibilities included:

Project Construction for New Sanitary system in Kuwait City Area, Kuwait
Cost of Project $72 M
* Coordinate with City for Investigation of existing utilities
* Supervision Construction of 5 Km Micro station for sanitary pipe. ranging fro 2000 mm to 500 mm
* Supervision the construction for open cut & prepare shop draw. total length for open cut (45 KM)
* Prepare profile and section for open cut area
* Coordinate equipment list for different crews
* Make preliminary survey for existing utilities
* Liaison with different city department for approvals
Construction for Library Building at Shuwaikh Campus - Kuwait
* Supervising concrete work at site (piles foundation, cast-in-situ columns rib slab, waffle slab), dome 25m diameters.
* Supervising finishing works in site which including plaster work, block works, painting work, GRG ceiling, gypsum board partitions, glazed partitions, ceramic floors and marble work, space frame, aluminum curtain wall, mosaic tiles for dome
* Following external work, which include paving, interlock tiles, curbstones, storm and sanitary water supply.
* Review of structure drawing

August 1994 – March 1997:
Associated Engineering Partnership & Bennie Partnership Overseas Limited (England, Kuwait)
Position: Construction Manager

Construction for New Sanitary system in Sulaibikhat Kuwait,
Cost of Project $60 M
* Prepare Shop drawing for Micro Tunnel system (!2 KM ) for different diameters
* Coordinate between Excavation work for shafts and Existing utilities
* Prepare value engineering workshops for Selection for options of excavations
* Coordination for Utilities approval with city and Traffic department
* Prepare Project execution plan and project implementation plan
* Surveying work for Micro station machine and shafts for different diameter
* Prepare shop drawing for location of dewatering system and coordinate between location of dewatering points and utilities location
* Final restoration work for roads Curbs, asphalt pavement and Interlock

September 1991 – August 1994
Various employers, in Kuwait
Project Engineer

Summary:
* Construction and supervision of different civil buildings
* Road works, pipe laying, interlock, curbstone, landscape
* Construction of Tourism village
* Industrial civil engineering works, Construction of sanitary pump station

EDUCATION and ACADEMIC QUALIFICATIONS

LEED Canada Accredited Professional (LEEDAP) Canada Green Building Council – 2009
PEng. Professional Engineer of Ontario – 2006
PMP Certificate Project Management Institute PMI - 2005
B.Sc. Degree in Civil, Engineering, Zagazig University, Egypt, 1989
(EAE) Egyptian Association Engineers (Civil) Egypt - 1989
Kuwaiti Engineers Society, Kuwait - 1992
References: available upon request

View contact information...
«« previous resume next resume »»
Search Results (Resumes 5301 to 5350 of 15512)Go to Search Parameters...
Brief Description
SAP BW/BI Techno-Functional COnsultant
Mechanical Engineer - Static Equipment (Design & Detailed Engineering of Pressure Vessels, Columns, Column Internals, Heat Exchangers & Storage Tanks based on various Design Codes & Standards.)
Piping designer /supervisor , PDS designer
Instrument and Control Engineer
More than 11.10 (8.10 years in Saudi Arabia, 5 months in Qatar, 1.7 years in Abu Dhabi UAE & 1 year in India) years of extensive experience in Quality Assurance and Quality Control in Oil, Gas & Petrochemical Projects, Acetic Acid Project, Ammonia Urea Expansion Project and Power Plants involving En
Infor, Datastream, Maximo
DIPLOMA IN CIVIL ENGINEERING, CURRENT POSITION- LEAD STRUCTURAL CAD TECHNICIAN AND COORDINATER, SKILLS- AUTOCAD, REVIT STRUCTURE, MS OFFICE,CADS RC.
Executive Management level experience and expertise
B Tech Degree in Mechanical engineering with 6+ years experience as a Production Planning and Material engineer in manufacturing of Oilfield equipments, Pressure Boilers, Process plants.
Searching for a challenging job in the field of PetroChemical engineering. Expert in MS Office and other computer operations.
6 years of experience in oil reservoir management. Development & monitoring low quality multilayered reservoirs. Preparing development plan, production forecast & the budget. DST, hydraulic fracture & acidizing operations supervision. Water flooding designing, operations & surveillance.
Mining engineer
POST GRADUATE - MTECH MECHANICAL (FROM NIT NAGPUR-INDIA),STORAGE TANK
Fork Lift Operator and Material Handler
I have the skills to work in “a smoke-free environment” which suits me much, ability to work independently, recognize and prioritize tasks. I have an experience of translation from English into Azeri and Russian and vice versa, both oral and written.
Electrican and Instrumentation Design and Site Construction. LV Distribution, MCC, UPS, Lightings, Field Instrumentation, SCADA, Shutdown Systems, Fire and Gas Systems, Gas Station Facility Design, Pipeline Facility, Cathodic Proteection
Hull structural engineer for 6 years, tribon and autocad user
Construction, equipment management and team building within a safe working environment are areas where I excell. Startup, operations, maintenance management in developing countries
I have 20 years experience across the petrochemical industry, including Petrochemical refining, offshore gas compression, FPSO experience, and fixed platform oil/gas separation and export. Supervisory/Control Room/Commissioning. In many countries, Singapore, Dubai, Qatar, Brazil, U.K.
Project Contollers
Engineering Degree, Industrial equipment sales to EPC contractors, Power, Oil/ Gas, Utilities, Tenders and RFQ , techno-commercial negotiation, Team Management, Strategic alliances
Expert for OSP Survey, Planning, Design, Implementation and coordination
Travel process outsourcing
Experienced in Oil and gas projects.
Time served Electrical Engineer with 16th Edition qualification.
Over 15 years international experience in ectromechanical, power transmission OHL and Cable Engineer
Danish marine geologist. Experienced in acquisition and interpretation of seismic data - scientific production of 6 papers on the topic. Seismic facies and texture interpretation. Experianced in Landmark interpretation tools. Fluvial, deltaric and coastal environment interpretation.
Experience in open pit mining i.e. Quarry development and operations
8+years experience as a Geologist in gold and diamond exploration
Contracts and procurement, contract administration, expediting, negotiation,
14 years experience in piping, pipeline and mechanical engineering within the oil and gas and petrochemical industries. Experience of all project phases including Estimation, Front – End Engineering, Detailed Design, Construction and Commissioning.
B.E.Mining, 12 yrs experience, Working in leading cement company in India, ACC Ltd, Holcim group company, getting trained to work in SAP, Head of the mining operations of the captive limestone mines, First class mine manager's certificate of competency Mines Safety dept (DGMS) Govt. of India
B.Sc. of Petroleum Engineering from Suez Canal university with general grade “Good“ in may 1992 Refining Eng. Branch.
An experienced, ambitious, enthusiastic Operations/Program Manager (PM) who is self motivated, dedicated and organised. Works well as part of a team and individually, showing excellent inter-personal skills, has a proven track record of marketing, sales delivery and excellence and shows flexibility
Drilling Engineer: Challenge-driven and decisive professional offering nearly 16 years of experience as Drilling Engineer / Production & Operations Engineer on land, jackup, and off-shore platform drilling rigs. US & International.
PETROLEUM ENGINEER HAVING 16 YEARS OF VERSATILE EXPERIENCE IN PRODUCTION OPERATIONS.
Have 16 Years Experience in the field of Personnel & Administration in various construction Sites in India.
I have varied Experience of Project management & Execution of RCC framed structured high-rise Petrochemical building, Power plant Buildings, Heavy Rotating & static Equipment foundations, erection of related equipments, refinery civil & steel structural works etc.
To work for a company in the environmental field that allows professional and personal growth.
A position utilizing strengths in leadership and technical operations to accomplish Company objectives. Willing to travel and/or relocate.
Total 18 years of design and project management experience in offshore and onshore construction field. Working in M/S Oil & Natural Gas Corporation Limited of India (ONGC) since July, 1985. Documentation and project implementation under ISO 1994 / 2000 for past 4 years.
Ph.D. (Remote Sensing), specialization in digital terrain modeling (DTM). 10 years experience in application of DTM in environmental protection, soil science and structural geology.
Goal: I am looking for an international job opportunity on Cost Management in Mineral Process Plant
Exploration Geologist with over 15 years experience and a strong desire to become part of a successful team in the mineral exploration or mining fields. Experience in all aspects of field work, and acquiring a solid knowledge base of minesite geological duties.
I, K.Karvannan a Post Graduate in Applied Geology and Post Graduate in Business Administartion (MBA) having more than a decade experience in oil & gas industry looking for a career in upstream oil industry particularly in the field of Geology anywhere in the world. The detailed resume as follows.
15 Years Environmental Management (Program/Project/Personnel)experience. The past 5 years have been dedicated to the development, integration & deployment of enterprise-wide compliance management systems for two Major Oil companies and a large Healthcare/Educational Institution.
I have More than 16 years experience with pioneer engineering companies. My major experience is as “Document Data Controller/ Incharge Design Department, refineries and process industries. I am ready to join on short notice.
Executive, Senior Manager, Vice President. P eng mining and MBA. Over 13 years of experience. Restructured operations, started new mines, raised $32M, listed new company and supervised up to 100 employees. Bilingual English and French. Open to relocation and to extensive traveling.
Utility Process Engineer
I wish to be a member of a dynamic company that has long-term goals and continuing challenges in meeting those goals. Would like to be a part of a company that has a true philosophy of co-operative effort where difficult goals and challenges are accomplished by team effort.
First   Prev   101   102   103   104   105   106   [ 107 ]   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140   141   142   143   144   145   146   147   148   149   150   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com